Attachment 03 - Spec 01 31 00.01 Project Management and Coordination.docx

DOCX document 28 KB Posted

Attached to
Z1DA--442-21-700 | EHRM Infrastructure Upgrades | Cheyenne, WY |
Solicitation number
36C77626R0007
Issued by

About this file

This is a Project Management and Coordination specification section that establishes administrative requirements for coordinating construction operations on a federal infrastructure upgrade project located in Cheyenne, Wyoming, involving multiple buildings at a Department of Veterans Affairs facility.

The specification mandates that the prime contractor provide, administer, and utilize a web-based project management software package (with Procore, Oracle Primavera Submittal Exchange, or equivalent systems as acceptable options) to host and manage all project communications and documentation through final completion. The software must include minimum features encompassing project data compilation with contractor and subcontractor information; customizable access control and digital rights management; document workflow planning; creation and real-time tracking of RFIs, submittals, change orders, and project communications; PDF markup capabilities with security locks; payment application and contract modification processing; meeting minute distribution; drawing and specification management with revision control; construction progress photography management; and mobile device compatibility. The contractor must provide user licenses for the Owner and Architect's consultants, deliver eight hours of software training for all users, and furnish a locked digital archive in a format readable by common desktop applications upon project completion to prevent further modifications.

View the file

Other files

File Type Posted
36C77626R0007 0008.pdf PDF
Attachment 06 - DBA Wage Determination WY20260041 Updated 06182026.pdf PDF
Attachment 15 - Tech Questions Tracker - Cheyenne V3 18May26.docx DOCX document
Attachment 14 - 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS.docx DOCX document
Attachment 16 - RFI Response Files.zip ZIP file
36C77626R0007 0007.pdf PDF
36C77626R0007 0006.pdf PDF
36C77626R0007 0005.pdf PDF
Amendment 14 - 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS.docx DOCX document
36C77626R0007 0004.pdf PDF
Attachment 13 - 442-21-700 Contractor Construction Yard.pdf PDF
36C77626R0007 0003.pdf PDF
Attachment 11 - Cheyenne VA - Asbestos Report.pdf PDF
Attachment 12 - Appendix 13 - Geotech Boring Report.pdf PDF
Attachment 10 - Cheyenne Tech Questions Tracker - Partial Answers.pdf PDF
36C77626R0007 0002.pdf PDF
36C77626R0007 0001.pdf PDF
Attachment 09 - 442-21-700 Cheyenne PreBid Sign In Sheets.pdf PDF
Attachment 08 - Site Visit Instructions.pdf PDF
Attachment 04 -Infrastructure Standard for Telecommunication Spaces.pdf PDF
Attachment 01 - 442-21-700 EHRM Infrastructure Specifications.pdf PDF
Attachment 07 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 02 - 442-21-700 EHRM Infrastructure Drawings.pdf PDF
Attachment 05 -OEHRM Site Infrastructure and End User Device EUD Requirements.pdf PDF
Attachment 06 - DBA Wage Determination WY.pdf PDF
S02 - 36C77626R0007.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 31 00.01

PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative provision for coordinating construction operations on Project, including, but not limited to, the following:

1. Web-based Project management software package.

B. Each contractor shall participate in coordination requirements. Certain areas of responsibility are assigned to a specific contractor.

1.3 DEFINITIONS

A. BIM: Building Information Modeling.

B. RFI: Request for Information. Request from Owner, Architect, or Contractor seeking information required by or clarifications of the Contract Documents.

1.4 DIGITAL PROJECT MANAGEMENT PROCEDURES

A. Web-Based Project Management Software Package: Provide, administer, and use web-based Project management software package for purposes of hosting and managing Project communication and documentation until Final Completion.

1. Basis of Specification: Procore, Oracle Primavera Submittal Exchange or other equivalent web-based project management software.

2. Web-based Project management software includes, at a minimum, the following features:

a. Compilation of Project data, including Contractor, subcontractors, Architect, Architect's consultants, Owner, and other entities involved in Project. Include names of individuals and contact information.

b. Access control for each entity for each workflow process, to determine entity's digital rights to create, modify, view, and print documents.

c. Document workflow planning, allowing customization of workflow between project entities.

d. Creation, logging, tracking, and notification for Project communications required in other Specification Sections, including, but not limited to, RFIs, submittals, Minor Changes in the Work, Construction Change Directives, and Change Orders.

e. Track status of each Project communication in real time, and log time and date when responses are provided.

Project Number Project Name Project Location

PROJECT MANAGEMENT AND COORDINATION

05-01-24

01 31 00.01 - 1

f. Procedures for handling PDFs or similar file formats, allowing markups by each entity. Provide security features to lock markups against changes once submitted.

g. Processing and tracking of payment applications.

h. Processing and tracking of contract modifications.

i. Creating and distributing meeting minutes.

j. Document management for Drawings, Specifications, and coordination drawings, including revision control.

k. Management of construction progress photographs.

l. Mobile device compatibility, including smartphones and tablets.

3. Provide Project management software user licenses for use of Owner, Architect, and Architect's consultants. Provide eight hours of software training for web-based Project software users.

4. At completion of Project, provide digital archive in format that is readable by common desktop software applications in format acceptable to Architect. Provide data in locked format to prevent further changes.

PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)

- - - END - - -

File details come from the government source that posted it. Updated .