Bid Schedule-HVAC-REOS
| Request for Proposal (RFP) - Attachment-03 - FA805120R4001 - 20 Apr 2020 |
| Pricing Worksheet - Heating & Air Conditioning Recommissioning & Optimization Services |
| Offerors shall insert their FFP unit price into cells highlighted in yellow below to determine Total Evaluated Price (TEP) |
| Section B - Supplies or Services and Prices/Cost |
Additional Information/Notes Government Obligation to Order -- Ceiling: $9,700,000.00 Allowed Per Order -- Minimum: $50,000.00 Maximum: $1,000,000.00
| CLIN# | Decscription of Contract Line Item Number (CLIN) | Facility Quantity | Unit of Issue | Unit Price | Total Extended Price | |
| 0001 FFP | The Contractor shall provide HVAC Recommissioning & Optimization Services (REOS) IAW PWS for Small (S) Facilities (size range of facility is 1-50,000 SF). All management, labor, tools, General and Administration costs (G&A), profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, and profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. Period of Performance (PoP): 1 July 2020 to 30 June 2021. | 3.00 | EA | $ - 0 | $ - 0 | |
| 0002 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Medium (M) Facilities (size range of facility is 50,001 -100,000 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2021. | 6.00 | EA | $ - 0 | $ - 0 | |
| 0003 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Large (L) Facilities (size range of facility is 100,001 -200,000 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2021. | 3.00 | EA | $ - 0 | $ - 0 | |
| 0004 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Extra Large (XL) Facilities (size range of facility is greater than 200,001 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2021. | 1.00 | EA | $ - 0 | $ - 0 | |
| 0005 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Small (S) Force Support Facilities (size range of facility is 1-100,000 SF) (defined as a facility with a high number of Variable Air Volume (VAV) components). This includes facilities such as dormitories, lodging, child development centers (CDC), etc. with a VAV system component in most rooms. All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2021. | 3.00 | EA | $ - 0 | $ - 0 | |
| 0006 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Large (L) Force Support Facilities (size range of facility is 100,001 to 250,000 SF) (defined as a facility with a high number of Variable Air Volume (VAV) components). This includes facilities such as dormitories, lodging, child development centers (CDC), etc. with a VAV system component in most rooms. All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2021. | 1.00 | EA | $ - 0 | $ - 0 | |
| 0007 FFP | Materials, Other-Direct-Costs (ODCs). This CLIN shall be used exclusively for purchase of materials to accomplish minor in-scope repairs IAW paragraph 2.3 of the PWS. The unit price in this Proposal Price Sheet CLIN is for evaluation purposes. Exact quantity shall be identified at task order level. Excess quantities shall be deobligated by the Government if not used upon completion of task order. NOTE: This CLIN shall be utilized for minor in-scope repairs parts cost only. PoP: 1 July 2020 to 30 June 2021. | 12.00 | EA | $ 10,000.00 | $ 120,000.00 | |
| 0008 FFP | Travel. This CLIN shall be used for travel trip expenses IAW Section 10.0 of the PWS. Each travel trip will be paid in accordance with the FFP unit price amount. Costs to cover travel trips in excess of the unit price amount will be determined by the Contracting Officer in accordance with equitable adjustment procedures. Travel costs may not exceed the max rates in the JTR. The unit price in this Proposal Price Sheet is for evaluation purposes. Exact quantity shall be identified at task order level. Excess quantities shall be deobligated by the Government if not used upon completion of task order. PoP: 1 July 2020 to 30 June 2021. | 25.00 | EA | $ 2,500.00 | $ 62,500.00 | |
| 0009 FFP | Main CLIN for Data. The Contractor shall provide data IAW the Contract Data Requirements List (CDRL) DD Form 1423, designated as Exhibit A and attached to Section J thereof. NOTE: This CLIN is Not Separately Priced (NSP). The price(s) associated with this CLIN are to be included in the FFP of each HVAC-REOS facility CLIN. PoP: 1 July 2020 to 30 June 2021. | |||||
| FFP | Total Price Year-1 | $ 182,500.00 | ||||
| CLIN# | Decscription of Contract Line Item Number (CLIN) | Facility Quantity | Unit of Issue | Unit Price | Total Extended Price | |
| 1001 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Small (S) Facilities (size range of facility is 1-50,000 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2021 to 30 June 2022. | 4.00 | EA | $ - 0 | $ - 0 | |
| 1002 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Medium (M) Facilities (size range of facility is 50,001 -100,000 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2021 to 30 June 2022. | 6.00 | EA | $ - 0 | $ - 0 | |
| 1003 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Large (L) Facilities (size range of facility is 100,001 -200,000 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2021 to 30 June 2022. | 3.00 | EA | $ - 0 | $ - 0 | |
| 1004 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Extra Large (XL) Facilities (size range of facility is greater than 200,001 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2021 to 30 June 2022. | 1.00 | EA | $ - 0 | $ - 0 | |
| 1005 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Small (S) Force Support Facilities (size range of facility is 1-100,000 SF) (defined as a facility with a high number of Variable Air Volume (VAV) components). This includes facilities such as dormitories, lodging, child development centers (CDC), etc. with a VAV system component in most rooms. All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2022. | 1.00 | EA | $ - 0 | $ - 0 | |
| 1006 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Large (L) Force Support Facilities (size range of facility is 100,001 to 250,000 SF) (defined as a facility with a high number of Variable Air Volume (VAV) components). This includes facilities such as dormitories, lodging, child development centers (CDC), etc. with a VAV system component in most rooms. All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2022. | 2.00 | EA | $ - 0 | $ - 0 | |
| 1007 FFP | Materials, ODCs. This CLIN shall be used exclusively for purchase of materials to accomplish minor in-scope repairs IAW paragraph 2.3 of the PWS. The unit price in this Proposal Price Sheet CLIN is for evaluation purposes. Exact quantity shall be identified at task order level. Excess quantities shall be deobligated by the Government if not used upon completion of task order. NOTE: This CLIN shall be utilized for minor in-scope repairs parts cost only. PoP: 1 July 2021 to 30 June 2022. | 16.00 | EA | $ 10,000.00 | $ 160,000.00 | |
| 1008 FFP | Travel. This CLIN shall be used for travel trip expenses IAW Section 10.0 of the PWS. Each travel trip will be paid in accordance with the FFP unit price amount. Costs to cover travel trips in excess of the unit price amount will be determined by the Contracting Officer in accordance with equitable adjustment procedures. Travel costs may not exceed the max rates in the JTR. The unit price in this Proposal Price Sheet is for evaluation purposes. Exact quantity shall be identified at task order level. Excess quantities shall be deobligated by the Government if not used upon completion of task order. PoP: 1 July 2021 to 30 June 2022. | 30.00 | EA | $ 2,500.00 | $ 75,000.00 | |
| 1009 FFP | Main CLIN for Data. The Contractor shall provide data IAW the CDRL, DD Form 1423, designated as Exhibit A and attached to Section J thereof. NOTE: This CLIN is NSP. The price(s) associated with this CLIN are to be included in the FFP of each HVAC-REOS facility CLIN. PoP: 1 July 2021 to 30 June 2022. | |||||
| FFP | Total Price Year-2 | $ 235,000.00 | ||||
| CLIN# | Decscription of Contract Line Item Number (CLIN) | Facility Quantity | Unit of Issue | Unit Price | Total Extended Price | |
| 2001 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Small (S) Facilities (size range of facility is 1-50,000 SF). All management, labor,tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2022 to 30 June 2023. | 7.00 | EA | $ - 0 | $ - 0 | |
| 2002 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Medium (M) Facilities (size range of facility is 50,001 -100,000 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2022 to 30 June 2023. | 7.00 | EA | $ - 0 | $ - 0 | |
| 2003 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Large (L) Facilities (size range of facility is 100,001 -200,000 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2022 to 30 June 2023. | 3.00 | EA | $ - 0 | $ - 0 | |
| 2004 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Extra Large (XL) Facilities (size range of facility is greater than 200,001 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2022 to 30 June 2023. | 1.00 | EA | $ - 0 | $ - 0 | |
| 2005 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Small (S) Force Support Facilities (size range of facility is 1-100,000 SF) (defined as a facility with a high number of Variable Air Volume (VAV) components). This includes facilities such as dormitories, lodging, child development centers (CDC), etc. with a VAV system component in most rooms. All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2023. | 1.00 | EA | $ - 0 | $ - 0 | |
| 2006 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Large (L) Force Support Facilities (size range of facility is 100,001 to 250,000 SF) (defined as a facility with a high number of Variable Air Volume (VAV) components). This includes facilities such as dormitories, lodging, child development centers (CDC), etc. with a VAV system component in most rooms. All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2023. | 2.00 | EA | $ - 0 | $ - 0 | |
| 2007 FFP | Materials, ODCs. This CLIN shall be used exclusively for purchase of materials to accomplish minor in-scope repairs IAW paragraph 2.3 of the PWS. The unit price in this Proposal Price Sheet CLIN is for evaluation purposes. Exact quantity shall be identified at task order level. Excess quantities shall be deobligated by the Government if not used upon completion of task order. NOTE: This CLIN shall be utilized for minor in-scope repairs parts cost only. PoP: 1 July 2022 to 30 June 2023. | 20.00 | EA | $ 10,000.00 | $ 200,000.00 | |
| 2008 FFP | Travel. This CLIN shall be used for travel trip expenses IAW Section 10.0 of the PWS. Each travel trip will be paid in accordance with the FFP unit price amount. Costs to cover travel trips in excess of the unit price amount will be determined by the Contracting Officer in accordance with equitable adjustment procedures. Travel costs may not exceed the max rates in the JTR. The unit price in this Proposal Price Sheet is for evaluation purposes. Exact quantity shall be identified at task order level. Excess quantities shall be deobligated by the Government if not used upon completion of task order. PoP: 1 July 2022 to 30 June 2023. | 35.00 | EA | $ 2,500.00 | $ 87,500.00 | |
| 2009 FFP | Main CLIN for Data. The Contractor shall provide data IAW the CDRL DD Form 1423, designated as Exhibit A and attached to Section J thereof. NOTE: This CLIN is NSP. The price(s) associated with this CLIN are to be included in the FFP of each HVAC-REOS CLIN. PoP: 1 July 2022 to 30 June 2023. | |||||
| FFP | Total Price Year-3 | $ 287,500.00 | ||||
| CLIN# | Decscription of Contract Line Item Number (CLIN) | Facility Quantity | Unit of Issue | Unit Price | Total Extended Price | |
| 3001 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Small (S) Facilities (size range of facility is 1-50,000 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2023 to 30 June 2024. | 7.00 | EA | $ - 0 | $ - 0 | |
| 3002 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Medium (M) Facilities (size range of facility is 50,001 -100,000 SF). All management, labor,tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2023 to 30 June 2024. | 6.00 | EA | $ - 0 | $ - 0 | |
| 3003 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Large (L) Facilities (size range of facility is 100,001 -200,000 SF). All management, labor,tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2023 to 30 June 2024. | 3.00 | EA | $ - 0 | $ - 0 | |
| 3004 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Extra Large (XL) Facilities (size range of facility is greater than 200,001 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2023 to 30 June 2024. | 2.00 | EA | $ - 0 | $ - 0 | |
| 3005 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Small (S) Force Support Facilities (size range of facility is 1-100,000 SF) (defined as a facility with a high number of Variable Air Volume (VAV) components). This includes facilities such as dormitories, lodging, child development centers (CDC), etc. with a VAV system component in most rooms. All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2024. | 1.00 | EA | $ - 0 | $ - 0 | |
| 3006 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Large (L) Force Support Facilities (size range of facility is 100,001 to 250,000 SF) (defined as a facility with a high number of Variable Air Volume (VAV) components). This includes facilities such as dormitories, lodging, child development centers (CDC), etc. with a VAV system component in most rooms. All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2024. | 3.00 | EA | $ - 0 | $ - 0 | |
| 3007 FFP | Materials, ODCs. This CLIN shall be used exclusively for purchase of materials to accomplish minor in-scope repairs IAW paragraph 2.3 of the PWS. The unit price in this Proposal Price Sheet CLIN is for evaluation purposes. Exact quantity shall be identified at task order level. Excess quantities shall be deobligated by the Government if not used upon completion of task order. NOTE: This CLIN shall be utilized for minor in-scope repairs parts cost only. PoP: 1 July 2023 to 30 June 2024. | 22.00 | EA | $ 10,000.00 | $ 220,000.00 | |
| 3008 FFP | Travel. This CLIN shall be used for travel trip expenses IAW Section 10.0 of the PWS. Each travel trip will be paid in accordance with the FFP unit price amount. Costs to cover travel trips in excess of the unit price amount will be determined by the Contracting Officer in accordance with equitable adjustment procedures. Travel costs may not exceed the max rates in the JTR. The unit price in this Proposal Price Sheet is for evaluation purposes. Exact quantity shall be identified at task order level. Excess quantities shall be deobligated by the Government if not used upon completion of task order. PoP: 1 July 2023 to 30 June 2024. | 35.00 | EA | $ 2,500.00 | $ 87,500.00 | |
| 3009 FFP | Main CLIN for Data. The Contractor shall provide data IAW the CDRL DD Form 1423, designated as Exhibit A and attached to Section J thereof. NOTE: This CLIN is NSP. The price(s) associated with this CLIN are to be included in the FFP of each HVAC-REOS CLIN. PoP: 1 July 2023 to 30 June 2024. | |||||
| FFP | Total Price Year-4 | $ 307,500.00 | ||||
| CLIN# | Decscription of Contract Line Item Number (CLIN) | Facility Quantity | Unit of Issue | Unit Price | Total Extended Price | |
| 4001 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Small (S) Facilities (size range of facility is 1-50,000 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2024 to 30 June 2025. | 7.00 | EA | $ - 0 | $ - 0 | |
| 4002 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Medium (M) Facilities (size range of facility is 50,001 -100,000 SF). All management, labor,tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2024 to 30 June 2025. | 8.00 | EA | $ - 0 | $ - 0 | |
| 4003 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Large (L) Facilities (size range of facility is 100,001 -200,000 SF). All management, labor,tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2024 to 30 June 2025. | 3.00 | EA | $ - 0 | $ - 0 | |
| 4004 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Extra Large (XL) Facilities (size range of facility is greater than 200,001 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2024 to 30 June 2025. | 1.00 | EA | $ - 0 | $ - 0 | |
| 4005 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Small (S) Force Support Facilities (size range of facility is 1-100,000 SF) (defined as a facility with a high number of Variable Air Volume (VAV) components). This includes facilities such as dormitories, lodging, child development centers (CDC), etc. with a VAV system component in most rooms. All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2025. | 1.00 | EA | $ - 0 | $ - 0 | |
| 4006 FFP | The Contractor shall provide HVAC-REOS IAW PWS for Large (L) Force Support Facilities (size range of facility is 100,001 to 250,000 SF) (defined as a facility with a high number of Variable Air Volume (VAV) components). This includes facilities such as dormitories, lodging, child development centers (CDC), etc. with a VAV system component in most rooms. All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: 1 July 2020 to 30 June 2025. | 3.00 | EA | $ - 0 | $ - 0 | |
| 4007 FFP | Materials, ODCs. This CLIN shall be used exclusively for purchase of materials to accomplish minor in-scope repairs IAW paragraph 2.3 of the PWS. The unit price in this Proposal Price Sheet CLIN is for evaluation purposes. Exact quantity shall be identified at task order level. Excess quantities shall be deobligated by the Government if not used upon completion of task order. NOTE: This CLIN shall be utilized for minor in-scope repairs parts cost only. PoP: 1 July 2024 to 30 June 2025. | 24.00 | EA | $ 10,000.00 | $ 240,000.00 | |
| 4008 FFP | Travel. This CLIN shall be used for travel trip expenses IAW Section 10.0 of the PWS. Each travel trip will be paid in accordance with the FFP unit price amount. Costs to cover travel trips in excess of the unit price amount will be determined by the Contracting Officer in accordance with equitable adjustment procedures. Travel costs may not exceed the max rates in the JTR. The unit price in this Proposal Price Sheet is for evaluation purposes. Exact quantity shall be identified at task order level. Excess quantities shall be deobligated by the Government if not used upon completion of task order. PoP: 1 July 2024 to 30 June 2025. | 40.00 | EA | $ 2,500.00 | $ 100,000.00 | |
| 4009 FFP | Main CLIN for Data. The Contractor shall provide data IAW the CDRL DD Form 1423, designated as Exhibit A and attached to Section J thereof. NOTE: This CLIN is NSP. The price(s) associated with this CLIN are to be included in the FFP of each HVAC-REOS CLIN. PoP: 1 July 2024 to 30 June 2025. | |||||
| FFP | Total Price Year-5 | $ 340,000.00 | ||||
| CLIN# | Decscription of Contract Line Item Number (CLIN) | Facility Quantity | Unit of Issue | Unit Price | Total Extended Price | 3 |
| FFP | The Contractor shall provide HVAC-REOS IAW PWS for Small (S) Facilities (size range of facility is 1-50,000 SF). All management, labor,tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: Six (6) Month Extension IAW FAR 52.217-8, Option to Extend Services (Not longer than 30 December 2025). | 1.00 | EA | $ - 0 | $ - 0 | |
| FFP | The Contractor shall provide HVAC-REOS IAW PWS for Medium (M) Facilities (size range of facility is 50,001 -100,000 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: Six (6) Month Extension IAW FAR 52.217-8, Option to Extend Services (Not longer than 30 December 2025). | 1.00 | EA | $ - 0 | $ - 0 | |
| FFP | The Contractor shall provide HVAC-REOS IAW PWS for Large (L) Facilities (size range of facility is 100,001 -200,000 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: Six (6) Month Extension IAW FAR 52.217-8, Option to Extend Services (Not longer than 30 December 2025). | 1.00 | EA | $ - 0 | $ - 0 | |
| FFP | The Contractor shall provide HVAC-REOS IAW PWS for Extra Large (XL) Facilities (size range of facility is greater than 200,001 SF). All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: Six (6) Month Extension IAW FAR 52.217-8, Option to Extend Services (Not longer than 30 December 2025). | 1.00 | EA | $ - 0 | $ - 0 | |
| FFP | The Contractor shall provide HVAC-REOS IAW PWS for Small (S) Force Support Facilities (size range of facility is 1-100,000 SF) (defined as a facility with a high number of Variable Air Volume (VAV) components). This includes facilities such as dormitories, lodging, child development centers (CDC), etc. with a VAV system component in most rooms. All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: Six (6) Month Extension IAW FAR 52.217-8, Option to Extend Services (Not longer than 30 December 2025). | 1.00 | EA | $ - 0 | $ - 0 | |
| FFP | The Contractor shall provide HVAC-REOS IAW PWS for Large (L) Force Support Facilities (size range of facility is 100,001 to 250,000 SF) (defined as a facility with a high number of Variable Air Volume (VAV) components). This includes facilities such as dormitories, lodging, child development centers (CDC), etc. with a VAV system component in most rooms. All management, labor, tools, G&A costs, profit and fees shall be included in this FFP CLIN. This FFP CLIN also includes all labor, tools, G&A, profit and fees for minor in-scope repairs IAW paragraph 2.3 of this PWS. PoP: Six (6) Month Extension IAW FAR 52.217-8, Option to Extend Services (Not longer than 30 December 2025). | 1.00 | EA | $ - 0 | $ - 0 | |
| FFP | Materials, ODCs. This CLIN shall be used exclusively for purchase of materials to accomplish minor in-scope repairs IAW paragraph 2.3 of the PWS. The unit price in this Proposal Price Sheet CLIN is for evaluation purposes. Exact quantity shall be identified at task order level. Excess quantities shall be deobligated by the Government if not used upon completion of task order. NOTE: This CLIN shall be utilized for minor in-scope repairs parts cost only. PoP: Six (6) Month Extension IAW FAR 52.217-8, Option to Extend Services (Not longer than 30 December 2025). | 1.00 | EA | $ 10,000.00 | $ 10,000.00 | |
| FFP | Travel. This CLIN shall be used for travel trip expenses IAW Section 10.0 of the PWS. Each travel trip will be paid in accordance with the FFP unit price amount. Costs to cover travel trips in excess of the unit price amount will be determined by the Contracting Officer in accordance with equitable adjustment procedures. Travel costs may not exceed the max rates in the JTR. The unit price in this Proposal Price Sheet is for evaluation purposes. Exact quantity shall be identified at task order level. Excess quantities shall be deobligated by the Government if not used upon completion of task order. PoP: Six (6) Month Extension IAW FAR 52.217-8, Option to Extend Services (Not longer than 30 December 2025). | 1.00 | EA | $ 1,000.00 | $ 1,000.00 | |
| FFP | Main CLIN for Data. The Contractor shall provide data IAW the CDRL DD Form 1423, designated as Exhibit A and attached to Section J thereof. NOTE: This CLIN is NSP. The price(s) associated with this CLIN are to be included in the FFP of each HVAC-REOS CLIN. PoP: Six (6) Month Extension IAW FAR 52.217-8, Option to Extend Services (Not longer than 30 December 2025). | |||||
| FFP | Total Price Extension | $ 11,000.00 |
| NOTE: Total evaluated price (TEP) is the total of all Small, Medium, Large, Extra Large, Small Force Support Facilities, and Small & Large Force Support Facilities. HVAC-REOS CLINs highlighted in yellow on this Proposal CLIN Price Schedule. These unit prices shall be incorporated into main ID/IQ contract and shall be used for all task orders. Period of Performance for all task orders shall be 180 calendar days. | Total Evaluated Price (TEP) | $ 1,363,500.00 |
| Offeror Signature/Date________________________________________________________________________________________ |