Attachment 03 - DRAWINGS VOL 3.pdf
PDF 18 MB Posted
- Attached to
- Z1DA--564-21-700 | Construct EHRM Infrastructure Upgrades | Fayetteville, AR Federal contract opportunity
- Solicitation number
- 36C77625R0039
About this file
This document is a comprehensive set of mechanical drawings (Volume 3) for the EHRM Infrastructure Upgrades project at the Veterans Affairs facility in Fayetteville, Arkansas. The drawings, dated 12/13/2024, cover mechanical systems for multiple buildings, focusing on demolition, renovation, and new installation of HVAC, refrigerant, and fire protection systems across 19 different buildings. Key elements include installing new ductless split cooling units, VRF/VRV systems, CRAC units, energy recovery ventilators, and modifying existing telecommunications rooms' mechanical infrastructure. The project involves precise technical modifications to mechanical systems, with detailed floor plans, routing diagrams, equipment schedules, and control system specifications for buildings ranging from medical to non-medical facilities.
The drawings provide extensive technical documentation, including demolition plans, new equipment placement, refrigerant line routing, control diagrams, and mechanical system details. Specific technical requirements include installing new cooling units with sensors, modifying sprinkler systems, routing refrigerant lines, providing condensate drainage, and integrating new systems with existing building infrastructure. The mechanical design covers multiple buildings with varying purposes, ensuring comprehensive infrastructure upgrades that meet VA standards and improve the facility's mechanical systems' efficiency and reliability.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C77625R0039 0003.pdf | ||
| 36C77625R0039 0003 Attachment A - Addendums.zip | ZIP file | |
| 36C77625R0039 0003 Attachment C - RFI Response.pdf | ||
| 36C77625R0039 0003 ATTACHMENT B - REVISED WAGE DETERMINATION.pdf | ||
| 36C77625R0039 0002.pdf | ||
| 36C77625R0039 0002 - Attachment A - Spec 01 31 00.01 Project Management and Coordination.pdf | ||
| 36C77625R0039 0001 Attachment 1 - SITE VISIT Sign In Rosters.zip | ZIP file | |
| 36C77625R0039 0001.pdf | ||
| Attachment 02 - Specifications.zip | ZIP file | |
| Attachment 03 - DRAWINGS VOL 1.pdf | ||
| Attachment 03 - DRAWINGS VOL 5.pdf | ||
| Attachment 03 - DRAWINGS VOL 2.pdf | ||
| Attachment 03 - DRAWINGS VOL 4.pdf | ||
| 36C77625R0039.pdf | ||
| Attachment 01 - Wage Determination_Washington County_Arkansas.pdf | ||
| Attachment 04 - Limitations on Subcontracting - Construction.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECTURAL
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
DESIGN TEAM
FIRE PROTECTION
SPEES DESIGN BUILD
STRUCTURAL
WSP USA SOLUTIONS, INC.
ELECTRICAL
SPEES DESIGN BUILD
PLUMBING
SPEES DESIGN BUILD
MECHANICAL
SPEES DESIGN BUILD
33301 NINTH AVENUE SOUTH, SUITE 300
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
CIVIL
WSP USA SOLUTIONS, INC.
33301 NINTH AVENUE SOUTH, SUITE 300
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
COMMUNICATIONS
WSP USA SOLUTIONS, INC.
33301 NINTH AVENUE SOUTH, SUITE 300
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
PROJECT INFORMATION
STATE:
COUNTY:
JURISTICTION:
OWNER:
CODE ANALYSIS
PROJECT DESCRIPTION
THE PROPOSED DESIGN SHALL IMPROVE,
RECONFIGURE, EXPAND AND RENOVATE
EXISTING SPACES FOR NEW
TELECOMMUNICATION ROOMS.
APPLICABLE BUILDING
BUILDING 01, 02, 03, 04, 05, 06, 07, 08,
09, 10, 21, 29, 31, 33, 34, 37, 42, 44, 46, 49, 50 (DATA CENTER)
ICRA CLASS REQUIREMENTS
REQUIREMENTS DEPENDENT ON
EACH INDIVIDUAL ROOM LOCATION.
ARKANSAS
WASHINGTON
FAYETTEVILLE
GOV, VETERANS AFFAIRS
GENERAL NOTES
1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &
SPECIFICATIONS.
2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.
BRING TO THE AWARENESS OF, AND VERIFY WITH VA COR PRIOR TO PROCEEDING.
3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE
TO VISIT THE SITE.
4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT
IMMEDIATELY TO THE ATTENTION OF THE COR.
5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.
6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK
THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.
7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE
WITH THE CONTRACT DOCUMENTS.
FAYETTEVILLE, ARKANSAS
BUILDINGS WITHIN THE SCOPE OF THIS PROJECT
08 1021
50' SETBACK FROM ROADS
/ PERIMETER FENCE
DATA CENTER
TRANSFORMER
MECHANICAL YARD A&B
75'x75' LAYDOWN AREA
VEHICLE BARRIER GATE -
SEE DET 2/A-606
BUILDING TYPE
BUILDING 01 - MEDICAL
BUILDING 02 - MEDICAL
BUILDING 03 - NON- MEDICAL
BUILDING 04 - NON- MEDICAL
BUILDING 05 - NON- MEDICAL
BUILDING 07 - NON- MEDICAL
BUILDING 08 - NON- MEDICAL
BUILDING 09 - NON- MEDICAL
BUILDING 10 - NON- MEDICAL
BUILDING 21 - MEDICAL
BUILDING 29 - NON- MEDICAL
BUILDING 31 - MEDICAL
BUILDING 33 - NON- MEDICAL
BUILDING 34 - NON- MEDICAL
BUILDING 37 - NON- MEDICAL
BUILDING 42 - NON- MEDICAL
BUILDING 44 - MEDICAL
BUILDING 50 - NON-MEDICAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPRINKLERED G-001
COVER
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
08/15/2024 MA CA
100% CONSTRUCTION
DOCUMENTS
EHRM INFRASTRUCTURE UPGRADES - VOL. 3
FAYETTEVILLE, ARKANSAS
PROJECT #: 564-21-700
NTS
ENLARGED LOCATION MAP
TRUE
NORTH
TRUE
NORTH
1" = 200'-0"
SITE PLAN
Revisions: Date: 1 OF 62
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPRINKLERED G-002
DRAWING INDEX
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
08/15/2024 MA CA
100% CONSTRUCTION
DOCUMENTS
Revisions: Date:
SHEET # SHEET NAME
1 OF 62 G-001 COVER PAGE
2 OF 62 G-002 SHEET INDEX
3 OF 62 M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATION
4 OF 62 01-M-400 BUILDING 01 - LEVEL 00 - DEMO FLOOR PLANS & RCPS
5 OF 62 01-M-401 BUILDING 01 - LEVEL 00 - DEMO FLOOR PLANS & RCPS
6 OF 62 01-M-402 BUILDING 01 - LEVEL 00 - FLOOR PLANS & RCPS
7 OF 62 01-M-403 BUILDING 01 - LEVEL 00 - FLOOR PLAN
8 OF 62 01-M-404 BUILDING 01 - LEVEL 00 - REFRIGERANT ROUTING PLAN
9 OF 62 01-M-405 BUILDING 01 - LEVEL 01 - DEMO, FLOOR PLANS & RCPS
10 OF 62 01-M-406 BUILDING 01 - LEVEL 02 - DEMO, FLOOR PLANS & RCPS
11 OF 62 01-M-407 BUILDING 01 - LEVEL 02 - ROOF PLAN
12 OF 62 01-M-408 BUILDING 01 - LEVEL 03 - DEMO, FLOOR PLANS & RCPS
13 OF 62 01-M-409 BUILDING 01 - LEVEL 04 - DEMO, FLOOR PLANS & RCPS
14 OF 62 02-M-401 BUILDING 02 - LEVEL 01 - DEMO, FLOOR PLANS & RCPS
15 OF 62 02-M-402 BUILDING 02 - LEVEL 02 - DEMO, FLOOR PLANS & RCPS
16 OF 62 02-M-403 BUILDING 02 - LEVEL 03 - DEMO, FLOOR PLANS & RCPS
17 OF 62 03-M-401 BUILDING 03 - LEVEL 01 - FLOOR PLAN
18 OF 62 03-M-402 BUILDING 03 - LEVEL 02 - DEMO, FLOOR PLANS & RCPS
19 OF 62 03-M-403 BUILDING 03 - LEVEL 03 - DEMO, FLOOR PLANS & RCPS
20 OF 62 04-M-401 BUILDING 04 - LEVEL 01 - DEMO, FLOOR PLANS & RCPS
21 OF 62 04-M-402 BUILDING 04 - LEVEL 02 - DEMO, FLOOR PLANS & RCPS
22 OF 62 04-M-403 BUILDING 04 - LEVEL 03 - DEMO, FLOOR PLANS & RCPS
23 OF 62 05-M-401 BUILDING 05 - LEVEL 00 - DEMO FLOOR PLANS AND RCPS
24 OF 62 07-M-401 BUILDING 07 - LEVEL 00 - FLOOR PLAN
25 OF 62 08-M-401 BUILDING 08 - LEVEL 01 - DEMO, FLOOR PLANS & RCPS
26 OF 62 09-M-401 BUILDING 09 - LEVEL 00 - FLOOR PLANS
27 OF 62 09-M-402 BUILDING 09 - LEVEL 01 - DEMO, FLOOR PLANS & RCPS
28 OF 62 21-M-401 BUILDING 21 - LEVEL 00 - DEMO, FLOOR PLANS & RCPS
29 OF 62 21-M-402 BUILDING 21 - LEVEL 01 - DEMO, FLOOR PLANS & RCPS
30 OF 62 21-M-403 BUILDING 21 - LEVEL 01 - DEMO, FLOOR PLANS & RCPS
31 OF 62 21-M-404 BUILDING 21 - LEVEL 02 - DEMO, FLOOR PLANS & RCPS
32 OF 62 21-M-405 BUILDING 21 - LEVEL 02 - DEMO, FLOOR PLANS & RCPS
33 OF 62 21-M-406 BUILDING 21 - LEVEL 03 - DEMO, FLOOR PLANS & RCPS
34 OF 62 21-M-407 BUILDING 21 - LEVEL 02 - ROOF PLAN
35 OF 62 21-M-408 BUILDING 21 - LEVEL 03 - ROOF PLAN
36 OF 62 21-M-409 BUILDING 21 - LEVEL 04 - ROOF PLAN
37 OF 62 29-M-401 BUILDING 29 - LEVEL 01 - FLOOR PLAN & RCP
38 OF 62 31-M-401 BUILDING 31 - LEVEL 01 - DEMO, FLOOR PLANS & RCPS
39 OF 62 33-M-401 BUILDING 33 - LEVEL 01 - DEMO, FLOOR PLAN & RCPS
40 OF 62 42-M-401 BUILDING 42 - LEVEL 01 - DEMO, FLOOR PLANS & RCPS
41 OF 62 44-M-401 BUILDING 44 - LEVEL 01 - DEMO, FLOOR PLANS & RCPS
42 OF 62 44-M-402 BUILDING 44 - LEVEL 02 - DEMO, FLOOR PLANS & RCPS
43 OF 62 44-M-403 BUILDING 44 - LEVEL 03 - ROOF PLAN
44 OF 62 50FP101 DATA CENTER - FIRE PROTECTION PLAN
45 OF 62 50-P-101 DATA CENTER - PLUMBING FOUNDATION PLAN
46 OF 62 50-P-102 DATA CENTER - PLUMBING PIPING PLAN
47 OF 62 50-P-103 DATA CENTER - PLUMBING ROOF PLAN
48 OF 62 50-M-101 DATA CENTER - HVAC DUCTWORK FLOOR PLAN
49 OF 62 50-M-102 DATA CENTER - HVAC PIPING PLAN
50 OF 62 50-M-103 DATA CENTER - MECHANICAL ROOF PLAN
51 OF 62 50-M-301 DATA CENTER - SECTION VIEW
52 OF 62 50-M-801 DATA CENTER - PRESSURE MAP PLAN
53 OF 62 M-501 MECHANICAL DETAILS I
54 OF 62 M-502 MECHANICAL DETAILS II
55 OF 62 M-503 MECHANICAL DETAILS III
56 OF 62 M-601 MECHANICAL SCHEDULES I
57 OF 62 M-602 MECHANICAL SCHEDULES II
58 OF 62 M-701 MECHANICAL CONTROLS I
59 OF 62 M-702 MECHANICAL CONTROLS II
60 OF 62 M-703 MECHANICAL CONTROLS III
61 OF 62 M-704 MECHANICAL CONTROLS IV
62 OF 62 M-705 MECHANICAL CONTROLS V
PAGE #
DRAWING INDEX - VOLUME 3
GENERAL
MECHANICAL
DRAWING SYMBOLS
ROOM NUMBER (ALPHA-NUMERIC)
ITEM (AC UNIT SHOWN)
SCHEDULED EQUIPMENT NUMBER
BUILDING NO. WHERE EQUIPMENT IS
LOCATED
DRAIN LINED
GENERAL PIPING SYMBOLS
DIRECTION OF PIPE PITCH (DOWN)
PIPE UP
PIPE DOWN
PENDENT SPRINKLER
FIRE SPRINKLER SYMBOLS
CONTROLS SYMBOLS
ROOM THERMOSTAT / TRANSMITTER -
WALL MOUNT
ROOM HUMIDISTAT (MOISTURE) /
TRANSMITTER - WALL MOUNT
01-AC-#-####
MOISTURE SENSOR - FLOOR MOUNTED
UPRIGHT SPRINKLER WITH GUARD
LEGEND
EXTENT OF DEMOLITION
POINT OF CONNECTION
TEMPERATURE SENSOR (TEMPTRAK)TT
T
H
M
R REFRIGERANT SENSOR - WALL MOUNTED
REFRIGERANT LIQUID AND SUCTION LINERL/RS
HVAC SYMBOLS
TEE PIPE DOWN
DOMESTIC COLD WATER
SUPPLY DIFFUSER
RETURN
REGISTER OR GRILLE
EXHAUST
REGISTER OR GRILLE
ARCHITECT / ENGINEER
AIR CONDITIONING
BACK FLOW PREVENTER
BRITISH THERMAL UNIT
BRITISH THERMAL UNIT PER HOUR
BALL VALVE
CUBIC FEET PER MINUTE
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CLEANOUT TO GRADE
CONDENSING UNIT
COLD WATER
DRAIN LINE
DIRECT DIGITAL CONTROLS
FROM ABOVE
FROM BELOW
FLOOR CLEANOUT
FIRE DEPARTMENT CONNECTION
FLEXIBLE
FAHRENHEIT
FAN COIL UNIT COOLING ONLY
FIRE PROTECTION
GOOSE NECK ROOF COWL
HIGH LEVEL
ISOLATION VALVE
LOW LEVEL
RETURN DIFFUSER
RETURN GRILLE
REFRIGERANT LIQUID LINE
REFRIGERANT SUCTION
REFRIGERANT LIQUID AND SUCTION LINE
SUPPLY DIFFUSER
SANITARY SEWER
TRANSFER FAN
TO ABOVE
TO BELOW
VOLUME DAMPER
VARIABLE REFRIGERANT FLOW
VARIABLE REFRIGERANT VOLUME
WALL CLEANOUT
A/E
AC
BFP
BTU
BTUH
BV
CFM
CHR
CHS
COTG
CU
CW
D
DDC
F/A F/B
FCO
FDC
FLEX
F
FCUC
FP
GNRC
H/L
IV
L/L
RD
RG
RL
RS
RL/RS
SD
SS
TF
T/A T/B
VD
VRF
VRV
WCO
ABBREVIATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
M-001
MECHANICAL GENERAL NOTES,
SYMBOLS AND ABBREVIATION
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
12/13/2024
Revisions: Date:
HVAC DESIGN CONDITION
WEATHER STATION: FAYETTEVILLE DRAKE FIELD
DESIGN CONDITIONS FOR COOLING:
OUTDOOR DRY BULB TEMPERATURE: 95.1 °F
OUTDOOR WET BULB TEMPERATURE: 74.9 °F
INDOOR DRY BULB TEMPERATURE: 75 °F
INDOOR RELATIVE HUMIDITY: 50%
GENERAL NOTES
DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
A) PROTECTING, COVERING AND SEALING EXISTING EQUIPMENT AND
SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.
B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING
DURING DEMOLITION.
C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.
D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
E) IMMEDIATELY REPAIRING DAMAGED PROPERTY TO ITS CONDITION BEFORE BEING
DAMAGED.
F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS
AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.
5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER
PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END
OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST
FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
8. INSTALL GRAVITY DRAIN PIPING WITH A MINIMUM OF 1/8" PER LINEAR FOOT (1%)
SLOPE.
1. ALL TELECOM ROOMS WITH EXISTING QUICK RESPONSE SPRINKLERS SHALL HAVE
THE QUICK RESPONSE SPRINKLER HEAD REPLACED WITH STANDARD
RESPONSE FUSIBLE LINK SPRINKLER HEADS.
2. ROOMS THAT DO NOT HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE
BRANCH PIPING MODIFIED TO TURN THE SPRINKLER HEAD UPRIGHT. PROVIDE
SPRINKLER PROTECTION CAGE.
3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS
NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.
4. TELECOM ROOMS ARE CONSIDERED ORDINARY HAZARD GROUP 1 FOR SPRINKLER
HEAD DENSITY. ANY OTHER HAZARD CLASSIFICATION AND SPRINKLER DENSITY ARE
TO BE IN ACCORDANCE WITH NFPA 13 AND VA POLICY.
5. MODIFY EXISTING SPRINKLER SYSTEM WITHIN THE LIMITS OF CONSTRUCTION TO
COMPLY WITH NFPA 13. PROVIDE TEMPORARY UPRIGHT SPRINKLER HEADS TO
PROTECT SPACES WHERE CEILINGS ARE REMOVED FOR CONSTRUCTION UNTIL THE
NEW CEILING IS INSTALLED AND NEW DROPS TO NEW PENDENT SPRINKLER ARE
INSTALLED. TEMPORARY SPRINKLERS ARE NOT REQUIRED IF NEW OR EXISTING
CEILING IS IN PLACE AT THE END OF THE WORK SHIFT.
6. DATA CENTER SPRINKLERS ARE TO BE CAGED STANDARD RESPONSE FUSIBLE LINK
TYPE.
7. HAZARD CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN ACCORDANCE
WITH NFPA 13 AND VA POLICY.
8. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE TELECOMMUNICATION RACKS
WHERE FEASIBLE BUT STILL IN ACCORDANCE WITH NFPA 13.
FIRE PROTECTION GENERAL NOTES
12/13/202412/13/2024 3 OF 62
SHOWN AREA
PROJECT
NORTH
3.5
3.7 4.3 4.5
N
N.4
P
M.5
M.1
MORGUE
ELEC
E5
SERVICE
VESTIBULE
C22
CHASE PIPE
E04
ALARM
E3
UNIFORM
REFR.
25A
CLOTHING
22C
ANTE
SHOWER
25B
CORRIDOR
C14
CORRIDOR
C21
3.5
3.7 4.3 4.5
N
N.4
P
M.5
M.1
MORGUE
ELEC
E5
SERVICE
VESTIBULE
C22
CHASE PIPE
E04
ALARM
E3
UNIFORM
REFR.
25A
CLOTHING
22C
ANTE
SHOWER
25B
CORRIDOR
C14
CORRIDOR
C21
E5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 01-M-400
BUILDING 01 - LEVEL 00 - DEMO
FLOOR PLANS & RCPS 01
MGH/JW AP
100% CONSTRUCTION
DOCUMENTS
12/13/2024
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
1/4" = 1'-0"
RM E5 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM E5 - FLOOR PLAN
DEMOLISH EXISTING FIRE PROTECTION PIPING.
FURNISH NEW FIRE PROTECTION PIPING OF SAME SIZE TO ALLOW NEW ELECTRICAL
PANEL TO BE INSTALLED.
EXISTING FIRE PROTECTIN PIPING TO REMAIN.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
12/13/202412/13/2024 4 OF 62
NORTH
3.7 4.3 4.5 6
T
U
1 1 1 1
T
1 1
3.7 4.3 4.5 6
T
U
TELEPHONE
EQUIPMENT
T10
BATTERIES
T10A
CORRIDOR
C010
TELEPHONE
EQUIPMENT
T10
BATTERIES
T10A
CORRIDOR
C010
CORRIDOR
C13
T10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 01-M-401
BUILDING 01 - LEVEL 00 - DEMO
FLOOR PLANS & RCPS 01
MGH/JW AP/CY
100% CONSTRUCTION
DOCUMENTS
12/13/2024
KEY PLAN
DEMO SIDEWALL SUPPLY GRILLE.
DEMO EXISTING DUCTWORK.
DEMO EXISTING QUICK RESPONSE SPRINKLER.
DEMO EXISTING FLOOR MOUNTED VERTICAL FAN COIL UNIT AND ASSOSCIATED
CONDENSING UNIT. DEMO ASSOCIATED REFRIGERANT PIPING AND CONDENSATE
LINES.
DEMO EXISTING THERMOSTAT.
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
Revisions: Date:
1/4" = 1'-0"
RM T10/T10A - DEMO FLOOR PLAN
1/4" = 1'-0"
RM T10/T10A - DEMO RCP
PROJECT
NORTH
PROJECT
NORTH
12/13/202412/13/2024 5 OF 62
3.7 4.3 4.5 6 7
S
T
U
M HT
CORRIDOR
C010
CORRIDOR
C13
BATTERIES
T10A
TR / TELEPHONE
EQUIPMENT
T10
01-EH-02-T10A 9
M
01-CRAC-02-T10 3
01-CRAC-01-T10 3
R L
/R S
R L
/R S
1/2"Ø, 5/8"Ø5
51/2"Ø, 5/8"Ø
3/4"Ø 6
8 10
T
D
3.7 4.3 4.5 6 7
T
U
CORRIDOR
C010
CORRIDOR
C13
BATTERIES
T10A
TR / TELEPHONE
EQUIPMENT
T10
WOMEN
HAC
T10L
MEN
2 7
T10
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 01-M-402
BUILDING 01 - LEVEL 00 - FLOOR
PLANS & RCPS 01
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
12/13/2024
KEY PLAN
1/4" = 1'-0"
RM T10/T10A - FLOOR PLAN
1/4" = 1'-0"
RM T10/T10A - RCP
THIS SHEET ONLY INCLUDES NEW CONSTRUCTION AND DOES NOT INCLUDE
EXISTING PIPING WITHIN THE SPACE. FOR EXISTING PIPING AND DRIP PAN
ADDITIONS, SEE SHEET 01-M-403.
MODIFY EXISTING SPRINKLER PIPING TO ACCOMMODATE SPRINKLERS IN UPRIGHT
POSITION. INSTALL NEW STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION.
INSTALL NEW CRAC COOLING UNIT. SEE EQUIPMENT SCHEDULES ON SHEET
M-601. SEE DETAIL ON SHEET M-702.
MOISTURE SENSOR TO BE INSTALLED FOR WATER MITIGATION TRENCHING.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER REQUIREMENTS (INDOOR
UNIT TO OUTDOOR UNIT). PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11. PIPE SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
INSTALL BELOW CABLE TRAY WITH MINIMUM OBSTRUCTION.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
INSTALL NEW UNIT HEATER, SEE EQUIPMENT SCHEDULES ON SHEET M-602.
CONDENSATE LINE TO BE CONNECTED TO THE EXISTING MOP SINK SANITARY
LINE. SEE "INDIRECT DRAIN MOP SINK DRAIN DETAIL" ON SHEET M-503.
FOR CONTINUATION SEE SHEET 01-M-404.
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
KEYNOTES #
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
12/13/202412/13/2024 6 OF 62
3.7 4.3 4.5 6
T
U
CORRIDOR
C010
CORRIDOR
C13
TR / TELEPHONE
EQUIPMENT
T10
HWR
HWS
CHWS
CHWR
H W
R
H W
S
C H
W R
C H
W S
H W
S H
W R
SHOWN AREA
PROJECT
NORTHT10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 01-M-403
BUILDING 01 - LEVEL 00 - FLOOR
PLAN 01
MGH/JW AP/CY
100% CONSTRUCTION
DOCUMENTS
12/13/2024
1/4" = 1'-0"
RM T10 - EXISTING PIPING - FLOOR PLAN
EXISTING PIPING.
PROVIDE DRIP PAN(S) FOR ALL OVERHEAD PIPING IN ROOM T10. ALL DRIP PAN(S)
SHALL BE PROVIDED WITH A MOISTURE SENSOR TIED INTO THE EXISTING BMS.
THIS SHEET IS INCLUDED TO ALLOW CLARITY ON OTHER SHEETS AND ONLY
INCLUDES EXISTING PIPING AND INCORPORATES NEED FOR NEW DRIP PAN(S).
FOR NEW CONSTRUCTION, SEE SHEET 01-M-402.
PROJECT
NORTH
Revisions: Date:
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
KEYNOTES #
12/13/202412/13/2024 7 OF 62
4.5 86 7
N.4
P
Q
S
R
T
CORRIDOR
C13
1/2"Ø, 5/8"Ø
MECHANICAL /
ELECTRICAL
MB 10
CORRIDOR
C21
CORRIDOR
C20
EMS
ENG
28 STAIRS
S03
MECH & LAUNDRY
MB04 CORRIDOR
C15
T10I
1/2"Ø, 5/8"Ø
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 01-M-404
BUILDING 01 - LEVEL 00 -
REFRIGERANT ROUTING PLAN 01
MGH/JW AP
100% CONSTRUCTION
DOCUMENTS
12/13/2024
Revisions: Date:
KEY PLAN
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE.
PIPE UP TO ROOF. SEE SHEET LEVEL 02 ROOF FOR CONTINUATION.
FOR CONTINUATION SEE SHEET 01-M-402.
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
KEYNOTES #
1/4" = 1'-0"
LEVEL 00 - REFRIGERANT ROUTING PLAN
PROJECT
NORTH
12/13/202412/13/2024 8 OF 62
S
R
S
R
S
R
M
T H
VACANT
EXTEMP
COMPOUNDING
1-1216 VAULT
1-1215
CORRIDOR
C111
STAIR
S-103
01-VRV-01-167A
01-VRV-02-167A
D D
R L /R
S
R
TR
167A
3/8"Ø, 5/8"Ø
3/8"Ø, 5/8"Ø
3/4"Ø
11 13
D
S
R
VACANT
EXTEMP
COMPOUNDING
1-1216
STAIR
S-103
CORRIDOR
C111
TR
167A
12 EXPOSED
14 17
SHOWN AREA
PROJECT
NORTH
VACANT
EXTEMP
COMPOUNDING
1-1216
CORRIDOR
C111
STAIR
S-103
VACANT
EXTEMP
COMPOUNDING
1-1216
MENS
STAIR
S-103
CORRIDOR
C111
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 01-M-405
BUILDING 01 - LEVEL 01 - DEMO,
FLOOR PLANS & RCPS 01
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
12/13/2024
KEY PLAN
1/4" = 1'-0"
RM 167 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 167 - DEMO RCP
1/4" = 1'-0"
RM 167A - FLOOR PLAN
1/4" = 1'-0"
RM 167A - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
REMOVE AND RETAIN EXISTING CEILING SUPPLY DIFFUSER FOR REINSTALLATION.
DEMO BRANCH DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT MAIN.
DEMO EXISTING QUICK RESPONSE SPRINKLER.
EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE. ALL NEW SPRINKLER
PIPING SHALL MATCH EXISTING PIPE SIZES. INSTALL NEW STANDARD RESPONSE
SPRINKLER IN UPRIGHT POSITION.
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING UNIT. SEE EQUIPMENT
SCHEDULE ON SHEET M-602.SEE DETAIL ON SHEET M-501.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE THAN 1 FT. ABOVE
FINISHED FLOOR.
INSTALL NEW DUCTWORK TO RETAINED DIFFUSER. TAP TO EXISTING DUCTWORK.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER REQUIREMENTS (INDOOR
UNIT TO OUTDOOR UNIT). PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11. PIPE SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
CONDENSATE LINE TO BE CONNECTED TO THE EXISTING SINK SANITARY LINE.
SEE "INDIRECT SINK DRAIN DETAIL" ON SHEET M-501.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE THRU FLOOR DETAIL" ON
SHEET M-501.
CONTRACTOR TO BALANCE REINSTALLED SUPPLY DIFFUSER TO AIRFLOW
DETERMINED BY PRE-TAB. SEE KEYNOTE 16.
T/A, FOR CONTINUATION SEE SHEET 01-M-406.
EXISTING QUICK RESPONSE SPRINKLER TO REMAIN.
EXISTING MAIN DUCTWORK TO REMAIN.
CONTRACTOR TO PRE TAB EXISTING SUPPLY DIFFUSER TO DETERMINE CURRENT
AIRFLOW RATE. PROVIDE MEASURED AIRFLOW RATE TO VA COR AND A/E.
INSTALL EXISTING SUPPLY DIFFUSER RETAINED DURING DEMOLITION. SEE
KEYNOTE 1. MATCH EXISTING RETURN DUCTWORK SIZING FOR NEW SUPPLY
DIFFUSER.
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
Revisions: Date:
12/13/2024 9 OF 62
NORTH
S
R
S
R
24 26
86 7
Q
S
R
TH
R
M
CLEAN UTILITY
TR
248A
1 BED
CORRIDOR
C208
01-VRV-04-248A
01-VRV-03-248A
D
RESTROOM
247A
D
SOILED
R L /R
S
3/8"Ø, 5/8"Ø
13 1311
16 17
3/8"Ø, 5/8"Ø21
3/8"Ø, 5/8"Ø
3/4"Ø
R L /R
S
R L /R
S
R L /R
S
3/8"Ø, 5/8"Ø
S
R
TR
248A
CLEAN UTILITY
2481 BED
CORRIDOR
C208
EXPOSED
CLEAN
UTILITY
C208
CLEAN
UTILITY
C208
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 01-M-406
BUILDING 01 - LEVEL 02 - DEMO,
FLOOR PLANS & RCPS 01
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
12/13/2024
DEMOLISH EXISTING FLOOR MOUNTED AC UNIT, REFRIGERANT PIPE SERVING
FLOOR UNIT, CONDENSATE PIPE SERVING UNIT, AND ASSOCIATED CONDENSING
UNIT.
CONTRACTOR TO PRE TAB EXISTING SUPPLY DIFFUSER TO DETERMINE CURRENT
AIRFLOW RATE. PROVIDE MEASURED AIRFLOW RATE TO VA COR AND A/E.
CONTRACTOR TO PRE TAB EXISTING RETURN GRILLE TO DETERMINE CURRENT
AIRFLOW RATE. PROVIDE MEASURED AIRFLOW RATE TO VA COR AND A/E.
DEMO EXISTING QUICK RESPONSE SPRINKLER.
EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE. ALL NEW SPRINKLER
PIPING SHALL MATCH EXISTING PIPE SIZES. INSTALL NEW STANDARD RESPONSE
SPRINKLER IN UPRIGHT POSITION. PLACE SPRINKLER HEAD BELOW LEVEL OF DRIP
PAN TO ENSURE COVERAGE.
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING UNIT. SEE EQUIPMENT
SCHEDULE ON SHEET M-602.SEE DETAIL ON SHEET M-501.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE THAN 1 FT. ABOVE
FINISHED FLOOR.
INSTALL EXISTING SUPPLY DIFFUSER REATINED DURING DEMOLITION. SEE
KEYNOTE 26. MATCH EXISTING RETURN DUCTWORK SIZING FOR NEW SUPPLY
DIFFUSER.
INSTALL EXISTING CEILING RETURN GRILLE REATINED DURING DEMOLITION. SEE
KEYNOTE 24. MATCH EXISTING RETURN DUCTWORK SIZING FOR NEW RETURN
GRILLE.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER REQUIREMENTS (INDOOR
UNIT TO OUTDOOR UNIT). PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11. PIPE SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
CONDENSATE LINE TO BE CONNECTED TO THE EXISTING SINK SANITARY LINE.
SEE "INDIRECT SINK DRAIN DETAIL" ON SHEET M-501.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE THRU FLOOR DETAIL" ON
SHEET M-501.
ROUTE REFRIGERANT DOWN TO 1'-0" ABOVE FINISH FLOOR LEVEL BEFORE
PENETRATING WALL.
CONTRACTOR TO PROVIDE 20 GAGE METAL SHEET SHROUDING/CLADDING TO
COVER REFRIGERANT PIPING. USE LOW PROFILE UNISTRUT FOR REFRIGERANT
PIPING. PAINT SHROUD TO MATCH ADJACENT WALL AND COORDINATE COLOR WITH
COR.
T/B, FOR CONTINUATION SEE SHEET 01-M-405.
T/A, FOR CONTINUATION SEE SHEET 01-M-408.
EXISTING PENDENT SPRINKLER TO REMAIN.
CONTRACTOR TO BALANCE REINSTALLED SUPPLY DIFFUSER TO AIRFLOW
DETERMINED BY PRE-TAB. SEE KEYNOTE 2.
SEE "PIPE ROOF MOUNTING DETAIL" ON SHEET M-501.
EXISTING HYDRONIC SUPPLY TO REMAIN.
PROVIDE DRIP PAN WITH MOISTURE SENSOR FOR EXISTING OVERHEAD PIPING.
REMOVE AND RETAIN EXISTING CEILING RETURN GRILLE FOR REINSTALLATION.
DEMO BRANCH DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT MAIN.
CONTRACTOR TO BALANCE REINSTALLED RETURN GRILLE TO AIRFLOW
DETERMINED BY PRE-TAB. SEE KEYNOTE 3.
REMOVE AND RETAIN EXISTING CEILING SUPPLY DIFFUSER FOR REINSTALLATION.
DEMO BRANCH DUCTWORK BACK TO MAIN. CAP AND SEAL DUCTWORK AT MAIN.
FOR CONTINUATION, SEE SHEET 01-M-407.
1/4" = 1'-0"
RM 248 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 248 - DEMO RCP
1/4" = 1'-0"
RM 248A - FLOOR PLAN
1/4" = 1'-0"
RM 248A - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
Revisions: Date:
12/13/2024 10 OF 62
4.5 86 7
N
N.4
P
Q
R
4.5 86 7
N
N.4
P
Q
R20
4.5 86 7
N
N.4
P
Q
R
1/2"Ø, 5/8"Ø3
2 4
01-COND-02-T10 01-COND-01-T101 1
01-CU-02-248A 01-CU-01-167A01-CU-03-3655 5 5
RL/RSR
L /R
S
R L /R
S
3/8"Ø, 5/8"Ø
3/8"Ø, 5/8"Ø
3/8"Ø, 5/8"Ø
MECHANICAL
ROOF PLAN
SHOWN AREA
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES NON SPRINKLERED 01-M-407
BUILDING 01 - LEVEL 02 - ROOF
PLAN 01
MGH/JW AP
100% CONSTRUCTION
DOCUMENTS
12/13/2024
Revisions: Date:
1/4" = 1'-0"
LEVEL 02 - ROOF PLAN
PROJECT
NORTH
KEY PLAN
GENERAL NOTES
1. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
KEYNOTES #
INSTALL AND ATTACH ROOFTOP CONDENSING UNIT. SEE "CONDENSING UNIT ROOF
MOUNT SUPPORT DETAIL" ON SHEET M-502.
SEE "LINESET FLASHING DETAIL" ON SHEET M-501.
SEE "PIPE ROOF MOUNTING DETAIL" ON SHEET M-501.
T/B, FOR CONTINUATION SEE SHEET 21-M-404.
SEE "CONDENSING UNIT ROOF MOUNT SUPPORT DETAIL" ON SHEET M-502.
SEE "PIPE ROOF MOUNTING DETAIL" ON SHEET M-501.
FOR CONTINUATION, SEE SHEET 01-M-406.
12/13/2024 11 OF 62
WAP
PROJECT
NORTH
S
R
S
R
S
R
T
TH
R
M
TR
ATTIC
ACCESS
OFFICE/ANNEST
CORRIDOR
C 311
STAFF
TOILET
RESTROOM
01-VRV-05-365
D
D
D
3/8"Ø, 5/8"Ø
3/4"Ø
HVAC UNIT NOT
IN CONTRACT
R L
/R S
S
R
TR
OFFICE/ANNEST
ATTIC
ACCESS
CORRIDOR
C 311
EXPOSED
OFFICE/I.C.
OFFICE/ANNEST
ATTIC
ACCESS
CORRIDOR
C311
OFFICE/I.C.
OFFICE/ANNEST
ATTIC
ACCESS
CORRIDOR
C311
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 01-M-408
BUILDING 01 - LEVEL 03 - DEMO,
FLOOR PLANS & RCPS 01
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
12/13/2024
1/4" = 1'-0"
RM 365 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 365 - DEMO RCP
1/4" = 1'-0"
RM 365 - FLOOR PLAN
1/4" = 1'-0"
RM 365 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
REMOVE EXISTING FLOOR MOUNTED AC UNIT. DEMOLISH REFRIGERANT PIPE
SERVING UNIT, CONDENSATE PIPE SERVING UNIT, AND ASSOCIATED CONDENSING
UNIT.
DEMO CEILING RETURN GRILLE. DEMO BRANCH DUCTWORK BACK TO MAIN. CAP
AND SEAL DUCTWORK AT MAIN.
DEMO CEILING SUPPLY DIFFUSER. DEMO BRANCH DUCTWORK BACK TO MAIN. CAP
AND SEAL DUCTWORK AT MAIN.
DEMO EXISTING QUICK RESPONSE SPRINKLER.
EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE. ALL NEW SPRINKLER
PIPING SHALL MATCH EXISTING PIPE SIZES. INSTALL NEW STANDARD RESPONSE
SPRINKLER IN UPRIGHT POSITION.
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING UNIT. SEE EQUIPMENT
SCHEDULE ON SHEET M-602.SEE DETAIL ON SHEET M-501.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE THAN 1 FT. ABOVE
FINISHED FLOOR.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER REQUIREMENTS (INDOOR
UNIT TO OUTDOOR UNIT). PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11. PIPE SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
CONDENSATE LINE TO BE CONNECTED TO THE EXISTING SINK SANITARY LINE.
SEE "INDIRECT SINK DRAIN DETAIL" ON SHEET M-501.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE THRU FLOOR DETAIL" ON
SHEET M-501.
CONTRACTOR TO PROVIDE 20 GAGE METAL SHEET SHROUDING/CLADDING TO
COVER REFRIGERANT PIPING. USE LOW PROFILE UNISTRUT FOR REFRIGERANT
PIPING. PAINT SHROUD TO MATCH ADJACENT WALL AND COORDINATE COLOR WITH
COR.
T/B, FOR CONTINUATION SEE SHEET 01-M-406.
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
Revisions: Date:
12/13/2024 12 OF 62
WAP
PROJECT
NORTH
0.8 0.9
Q
S
R
T
S-30
0.8 0.9
Q
S
R
T
0.8 0.9
Q
S
T
PHARMACY
STAIRS
TR
T10BB
MR
H
T
CORRIDOR
C406D
RL/RS
R L /R
S D
3/8"Ø, 5/8"Ø
3/4Ø
01-VRV-06-420
01-CU-04-420
1 2
S-30
HVAC UNIT NOT
IN CONTRACT
0.8 0.9
Q
S
R
T
TR
STAIRS
T10BB
ATTIC
CORRIDOR
C406
PHARMACY
PHARMACY
STAIRS
CORRIDOR
C 406 PHARMACY
CORRIDOR
C 406
ATTIC
PHARMACY
STAIRS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 01-M-409
BUILDING 01 - LEVEL 04 - DEMO,
FLOOR PLANS & RCPS 01
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
12/13/2024
Revisions: Date:
KEY PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
1/4" = 1'-0"
RM 420 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 420 - DEMO RCP
1/4" = 1'-0"
RM 420 - FLOOR PLAN
1/4" = 1'-0"
RM 420 - RCP
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING UNIT. SEE EQUIPMENT
SCHEDULES ON SHEET M-602. SEE DETAIL ON SHEET M-501.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE THAN 1 FT. ABOVE
FINISHED FLOOR.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER REQUIREMENTS (INDOOR
UNIT TO OUTDOOR UNIT). PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11. PIPE SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
PROVIDE ROOF OPENING AND PIPE SLEEVE. SEE "LINESET FLASHING DETAIL" ON
SHEET M-501.
CONDENSATE TO BE DISCHARGED TO THE NEAREST ROOF DRAIN. TERMINATE
CONDENSATE PIPING WITH A DOWNTURNED ELBOW 12" ABOVE FINISHED GRADE.
SEE "CONDENSING UNIT ROOF MOUNT SUPPORT DETAIL" ON SHEET M-502.
INSTALL NEW STANDARD RESPONSE SPRINKLER IN AN UPRIGHT POSITION. INSTALL
NEW BRANCH LINE, TIE-IN TO NEAREST EXISTING MAIN. PLACE SPRINKLER HEAD
BELOW LEVEL OF DRIP PAN TO ENSURE COVERAGE.
EXISTING MEDIUM PRESSURE STEAM TO REMAIN.
EXISTING SUPPLY DUCT TO REMAIN.
PROVIDE DRIP PAN WITH MOISTURE SENSOR FOR EXISTING OVERHEAD PIPING.
PROVIDE DRAIN LINE TO MECHANICAL ROOM.
DEMO EXISTING QUICK RESPONSE SPRINKLER.
DEMO CEILING SUPPLY GRILLE. DEMO BRANCH DUCTWORK BACK TO MAIN. CAP AND
SEAL DUCTWORK AT MAIN.
12/13/2024 13 OF 62
O P Q R S T
O P Q R S T
O P Q R S T
TR
1148-02
HAC
1142-02
CORRIDOR
C1002-02
ELEC.
1108-02
DRESS
1144-02
TLT
1145-02
02-VRV-01-1148-02T
H
R
D
RL/RS
D
3/8"Ø, 5/8"Ø8
3/4"Ø9
M
HVAC UNIT NOT
IN CONTRACT
D
O P Q R S T
TR
1148-02
CORRIDOR
C1002-02
ELEC.
1108-02
HAC
1142-02
DRESS
1144-02EXPOSED
1148, 1149 ,1147 & 1142
SHOWN AREA
PROJECT
NORTH
HAC
1142-02
DRESS
1144-02
INPATIENT
HOLDING
1143-02
DATA
1149-02
HAC
1147-02
GENERAL
STORAGE
1148-02
HAC
1142-02
INPATIENT
HOLDING
1143-02
CORRIDOR
DATA
1149-02
HAC
1147-02
ELEC.
1108-02
DRESS
1144-02
GENERAL
STORAGE
1148-02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 02-M-401
BUILDING 02 - LEVEL 01 - DEMO,
FLOOR PLANS & RCPS 02
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
12/13/2024
1/4" = 1'-0"
RM 1148, 1149 ,1147 & 1142 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 1148, 1149, 1147 & 1142 - DEMO RCP
1/4" = 1'-0"
RM 1148 - FLOOR PLAN
1/4" = 1'-0"
RM 1148 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
DEMO MOP SINK, INCLUDING SANITARY, VENT AND WATER SUPPLIES. CAP
SANITARY AND VENT PIPING IN CONCEALED SPACE. DEMO HOT AND COLD WATER
SUPPLIES BACK TO MAIN, CAP WITHIN TWO PIPE DIAMETERS.
RELOCATE EXISTING CEILING SUPPLY DIFFUSER. ADJUST DUCT LENGTH
ACCORDINGLY TO THE NEW LOCATION OF THE SUPPLY DIFFUSER.
RELOCATE EXISTING CEILING RETURN GRILLE. DEMO BRANCH DUCTWORK BACK TO
MAIN. CAP AND SEAL DUCTWORK AT MAIN.
DEMO EXISTING QUICK RESPONSE SPRINKLER.
EXISTING QUICK RESPONSE SPRINKLER TO REMAIN.
DEMO EXISTING QUICK RESPONSE SPRINKLER. DEMO SPRINKLER BRANCH PIPE
BACK TO MAIN. CAP BRANCH LINE AT MAIN.
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING UNIT. SEE EQUIPMENT
SCHEDULE ON SHEET M-602.SEE DETAIL ON SHEET M-501.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER REQUIREMENTS (INDOOR
UNIT TO OUTDOOR UNIT). PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11. PIPE SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE THRU FLOOR DETAIL" ON
SHEET M-501.
CONDENSATE LINE TO BE CONNECTED TO THE EXISTING SINK SANITARY LINE.
SEE "INDIRECT SINK DRAIN DETAIL" ON SHEET M-501.
F/A, FOR CONTINUATION SEE SHEET 02-M-402.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE THAN 1 FT. ABOVE
FINISHED FLOOR.
EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE. INSTALL NEW
STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION. PLACE SPRINKLER HEAD
BELOW LEVEL OF DRIP PAN TO ENSURE COVERAGE. SEE KEYNOTE # 4.
EXISTING PIPE TO REMAIN.
PROVIDE DRIP PAN WITH MOISTURE SENSOR FOR EXISTING OVERHEAD PIPING
PROVIDE DRAIN LINE. PROVIDE DRAIN LINE WITH CONNECTION INTO VRV
CONDENSATE PIPING. SEE RCP IN VIEW 4 ON THIS SHEET FOR DRIP PAN LOCATION.
RELOCATED EXISTING CEILING SUPPLY DIFFUSER. SEE KEYNOTE # 2.
RELOCATED EXISTING CEILING RETURN GRILLE. SEE KEYNOTE # 3. INSTALL NEW
DUCTWORK. TAP TO EXISTING RETURN DUCTWORK.
PROJECT
NORTH
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
Revisions: Date:
12/13/2024 14 OF 62
O P Q
O P Q
TR
2124-02
OFFICE
2118-02
O P R
COOKING
2123-02
FRIDGE
CAFETERIA
2112-02
PREPARATION
2126-02
RL/RS
02-VRV-02-2124-02
M
T H
R
D
9 10 11
3/4"Ø 7
02-CU-02-2124 02-CU-01-114814 14
3/8"Ø, 5/8"Ø
3/8"Ø, 5/8"Ø
R L /R
S R
L /R
S
R L /R
S R
L /R
S
HVAC UNIT NOT
IN CONTRACT
TR
2124-02
OFFICE
2118-02
COOKING
2123-02
CAFETERIA
2112-02
DINING ROOM
2114-02
O P Q
FRIDGE
EXPOSED
SHOWN AREA
PROJECT
NORTH
FRIDGE
ELEC
2124-02
OFFICE
2118-02
COOKING
2123-02
CAFETERIA
2112-02
DINING ROOM
2114-02
ELEC
2124-02
FRIDGE
COOKING
2123-02
OFFICE
2118-02
DINING ROOM
2114-02
CAFETERIA
2112-02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 02-M-402
BUILDING 02 - LEVEL 02 - DEMO,
FLOOR PLANS & RCPS 02
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
12/13/2024
1/4" = 1'-0"
RM 2124-02 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 2124-02 - DEMO RCP
1/4" = 1'-0"
RM 2124-02 - FLOOR PLAN
1/4" = 1'-0"
RM 2124-02 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
REMOVE PORTABLE DUCTLESS COOLING AC UNIT. TURN OVER TO COR.
DEMO CEILING SUPPLY DIFFUSER. DEMO BRANCH DUCTWORK BACK TO MAIN. CAP
AND SEAL DUCTWORK AT MAIN.
DEMO EXISTING QUICK RESPONSE SPRINKLER.
EXTEND NEW SPRINKLER LINE OFF EXISTING BRANCH LINE. ALL NEW SPRINKLER
PIPING SHALL MATCH EXISTING PIPE SIZES. INSTALL NEW STANDARD RESPONSE
SPRINKLER IN UPRIGHT POSITION.
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING UNIT. SEE EQUIPMENT
SCHEDULE ON SHEET M-602.SEE DETAIL ON SHEET M-501.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER REQUIREMENTS (INDOOR
UNIT TO OUTDOOR UNIT). PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11. PIPE SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
PROVIDE FLOOR OPENING AND PIPE SLEEVE. SEE "PIPE THRU FLOOR DETAIL" ON
SHEET M-501.
CONTRACTOR TO PROVIDE 20 GAGE METAL SHEET SHROUDING/CLADDING TO
COVER REFRIGERANT AND CONDENSATE PIPING. USE LOW PROFILE UNISTRUT FOR
REFRIGERANT PIPING. PAINT SHROUD TO MATCH ADJACENT WALL AND
COORDINATE COLOR WITH COR.
T/B, FOR CONTINUATION SEE SHEET 02-M-401.
ROUTE REFRIGERANT AND CONDENSATE LINE DOWN TO 1'-0" ABOVE FINISHED
FLOOR BEFORE PENETRATING WALL.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE THAN 1 FT. ABOVE
FINISHED FLOOR.
SEE "CONDENSING UNIT ROOF MOUNT SUPPORT DETAIL" ON SHEET M-502.
SEE "PIPE ROOF MOUNTING DETAIL" ON SHEET M-501.
ROUTE PIPING TIGHT TO THE WALL.
PROJECT
NORTH
KEY PLAN
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
Revisions: Date:
12/13/2024 15 OF 62
WAP
WAP
SHOWN AREA
PROJECT
NORTH
A B C D E F G IH
A B C D E F
14 14
REFRIGERATED
STORAGE
3201-02
CONFERENCE
ROOM
3202-02
CORRIDOR
C3001-02
A B C D E F G IH
TR
3202A-02
REFRIGERATED
STORAGE
3201-02
CONFERENCE
ROOM
3202-02
CORRIDOR
C3001-02
STAFF TOILET
3208-02
STAFF TOILET
3209-02
BULK STORAGE
3206-02
OFFICE
PATHOLOGIST
3207-02
OFFICE
PATHOLOGIST
3205-02
CORRIDOR
C3003-02
02-VRV-03-3202A-02 1
7 8
02-CU-03-3202-02A9
R M
RL/RS
HAC
3101-02
LAB
INFORMATION
MANAGER
3203-02
GENERAL
STORAGE
3102-02
H T
3/8"Ø, 5/8"Ø
3/4"Ø
D R
L /R
S D
R L /R
S R
L /R
S
RL/RS RL/RSRL/RS
3/8"Ø, 5/8"Ø3
CW
HW
HVAC UNIT NOT
IN CONTRACT
A B C D E
TR
3202A-02
REFRIGERATED
STORAGE
3201-02
CONFERENCE
ROOM
3202-02
CORRIDOR
C3001-02
12 13
14 14
LAB
INFORMATION
MANAGER
3203-02
24 26
CONFERENCE
ROOM
3202-02
REFRIGERATED
STORAGE
3201-02
CORRIDOR
C3001-02
CORRIDOR
C3003-02
3202-02A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES FULLY SPRINKLERED 02-M-403
BUILDING 02 - LEVEL 03 - DEMO,
FLOOR PLANS & RCPS 02
MGH/JW CY/EA/JJ/MA
100% CONSTRUCTION
DOCUMENTS
12/13/2024
KEY PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
1. ALL PIPING IS SHOWN OFFSET AND DIAGRAMMATIC FOR CLARITY. CONTRACTOR
SHALL RACK PIPING AS CLOSE AS POSSIBLE TO INSIDE WALL OF TELECOM ROOM.
2. NEW WORK SHOWN DARK, EXISTING WORK SHOWN LIGHT.
3. A SINGLE LINE IS USED TO INDICATE ALL REFRIGERANT PIPING ROUTED BETWEEN
THE INDOOR AND OUTDOOR UNITS(S). THIS SINGLE LINE REPRESENTS ALL PIPING
REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
4. ROUTE ALL CONDENSATE AND REFRIGERANT PIPING CONCEALED IN WALLS, CHASES
OR CEILING SPACES.
DEMOLITION GENERAL NOTES
1. WORK TO BE DEMOLISHED SHOWN DARK AND DASHED, EXISTING WORK TO REMAIN
SHOWN LIGHT.
KEYNOTES #
Revisions: Date:
1/4" = 1'-0"1
RM 3202-02A - DEMO FLOOR PLAN
1/4" = 1'-0"2
RM 3202-02A - DEMO RCP
1/4" = 1'-0"3
RM 3202-02A - FLOOR PLAN
1/4" = 1'-0"4
RM 3202-02A - RCP
INSTALL NEW VRF/VRV INDOOR WALL MOUNTED COOLING UNIT. SEE EQUIPMENT
SCHEDULES ON SHEET M-602. SEE DETAIL ON SHEET M-501.
INSTALL REFRIGERANT SENSOR AT A HEIGHT OF NOT MORE THAN 1 FT. ABOVE
FINISHED FLOOR.
INSTALL NEW REFRIGERANT LINES PER MANUFACTURER REQUIREMENTS (INDOOR
UNIT TO OUTDOOR UNIT). PROVIDE PIPE INSULATION FOR ALL REFRIGERANT LINES
PER SPECIFICATION SECTION 23 07 11. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11. PIPE SIZES SHOWN ON PLANS ARE ONLY APPLICABLE TO BASIS
OF DESIGN MANUFACTURER.
INSTALL NEW CONDENSATE LINE. PROVIDE PIPE SUPPORT PER SPECIFICATION
SECTION 23 05 11.
PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL DETAIL" ON
SHEET M-501.
CONDENSATE LINE TO BE CONNECTED TO THE EXISTING MOP SINK SANITARY
LINE. SEE "INDIRECT DRAIN MOP SINK DRAIN DETAIL" ON SHEET M-503.
CONTRACTOR TO…