Attachment 03 - DRAWINGS VOL 2.pdf

PDF 29 MB Posted

Attached to
Z1DA--564-21-700 | Construct EHRM Infrastructure Upgrades | Fayetteville, AR Federal contract opportunity
Solicitation number
36C77625R0039
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a comprehensive set of architectural drawings and details for the EHRM Infrastructure Upgrades project at the Fayetteville Veterans Affairs (VA) Medical Center in Arkansas. The project involves infrastructure improvements across multiple buildings, with a primary focus on upgrading telecommunications rooms (TR) in Buildings 01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 21, 29, 31, 33, 34, 37, 42, 44, and a new Data Center (Building 50).

The drawings include detailed floor plans, reflected ceiling plans, demolition plans, and room finish schedules for each building. Key elements of the project include installing new fire-rated plywood walls, anti-static flooring, rubber base, and telecommunications infrastructure in existing rooms. The project follows strict Infection Control Risk Assessment (ICRA) guidelines, with specific requirements for construction in medical facilities. The Data Center (Building 50) involves a new construction with specific architectural and structural specifications, including wall types, roofing details, and mechanical yard configurations. The project is set for completion by 12/13/2024, with phased implementation across different buildings and areas to minimize disruption to VA operations.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECTURAL

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

DESIGN TEAM

FIRE PROTECTION

SPEES DESIGN BUILD

STRUCTURAL

WSP USA SOLUTIONS, INC.

ELECTRICAL

SPEES DESIGN BUILD

PLUMBING

SPEES DESIGN BUILD

MECHANICAL

SPEES DESIGN BUILD

33301 NINTH AVENUE SOUTH, SUITE 300

FEDERAL WAY, WA 98003-2600

PHONE: (206) 431-2300

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

PHONE: (206) 590-2118

CIVIL

WSP USA SOLUTIONS, INC.

33301 NINTH AVENUE SOUTH, SUITE 300

FEDERAL WAY, WA 98003-2600

PHONE: (206) 431-2300

COMMUNICATIONS

WSP USA SOLUTIONS, INC.

33301 NINTH AVENUE SOUTH, SUITE 300

FEDERAL WAY, WA 98003-2600

PHONE: (206) 431-2300

PROJECT INFORMATION

STATE:

COUNTY:

JURISTICTION:

OWNER:

CODE ANALYSIS

PROJECT DESCRIPTION

THE PROPOSED DESIGN SHALL IMPROVE,

RECONFIGURE, EXPAND AND RENOVATE

EXISTING SPACES FOR NEW

TELECOMMUNICATION ROOMS.

APPLICABLE BUILDING

BUILDING 01, 02, 03, 04, 05, 06, 07, 08,

09, 10, 21, 29, 31, 33, 34, 37, 42, 44, 46, 49, 50 (DATA CENTER)

ICRA CLASS REQUIREMENTS

REQUIREMENTS DEPENDENT ON

EACH INDIVIDUAL ROOM LOCATION.

ARKANSAS

WASHINGTON

FAYETTEVILLE

GOV, VETERANS AFFAIRS

GENERAL NOTES

1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &

SPECIFICATIONS.

2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.

BRING TO THE AWARENESS OF, AND VERIFY WITH VA COR PRIOR TO PROCEEDING.

3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE

TO VISIT THE SITE.

4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT

IMMEDIATELY TO THE ATTENTION OF THE COR.

5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.

6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK

THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.

7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE

WITH THE CONTRACT DOCUMENTS.

FAYETTEVILLE, ARKANSAS

BUILDINGS WITHIN THE SCOPE OF THIS PROJECT

08 1021

50' SETBACK FROM ROADS

/ PERIMETER FENCE

DATA CENTER

TRANSFORMER

MECHANICAL YARD A&B

75'x75' LAYDOWN AREA

VEHICLE BARRIER GATE -

SEE DET 2/A-606

BUILDING TYPE

BUILDING 01 - MEDICAL

BUILDING 02 - MEDICAL

BUILDING 03 - NON- MEDICAL

BUILDING 04 - NON- MEDICAL

BUILDING 05 - NON- MEDICAL

BUILDING 07 - NON- MEDICAL

BUILDING 08 - NON- MEDICAL

BUILDING 09 - NON- MEDICAL

BUILDING 10 - NON- MEDICAL

BUILDING 21 - MEDICAL

BUILDING 29 - NON- MEDICAL

BUILDING 31 - MEDICAL

BUILDING 33 - NON- MEDICAL

BUILDING 34 - NON- MEDICAL

BUILDING 37 - NON- MEDICAL

BUILDING 42 - NON- MEDICAL

BUILDING 44 - MEDICAL

BUILDING 50 - NON-MEDICAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPRINKLERED G-001

COVER

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 203

KENT, WA 98032

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES - FAYETTEVILLE

FAYETTEVILLE, ARKANSAS

564-21-700

08/15/2024 MA CA

100% CONSTRUCTION

DOCUMENTS

EHRM INFRASTRUCTURE UPGRADES - VOL. 2

FAYETTEVILLE, ARKANSAS

PROJECT #: 564-21-700

NTS

ENLARGED LOCATION MAP

TRUE

NORTH

TRUE

NORTH

1" = 200'-0"

SITE PLAN

Revisions: Date: 1 OF 140

AB

ABA

AC(T)

ACM

ACW

ADA

ADJ

A/E

AF

AFF

AGG

ALT

ALUM

APPROX

ARCH

ASPH

A/V

BARR

BATH

BB

BLDG

BLK

BLKG

BLW

BM

BMTU

BO

BOC

BOS

BRC

BRKT

BRNG

BTM

BTWN

CAB

CC

CD

CJ

CLG

CLR

CMU

CO

COL

COMP

CONC

CONN

CONST

CONT

COORD

COR

CORR

CS

CT

CTR

CV

AND

ANGLE

AT

CENTERLINE

DEGREES

NUMBER

ANCHOR BOLT

ARCHITECTURAL BARRIERS ACT

ACOUSTICAL CEILING (TILE)

ASBESTOS CONTAINING MATERIAL

ACOUSTICAL WALL

AMERICANS W/ DISABILITIES ACT

ADJACENT

ARCHITECT/ENGINEER

ACCESS FLOOR

ABOVE FINISH FLOOR

AGGREGATE

ALTERNATE

ALUMINUM

APPROXIMATELY

ARCHITECT(URAL)

ASPHALT

AUDIO / VIDEO

BARRIER

BATHROOM

BACKER BOARD

BUILDING

BLOCK

BLOCKING

BELOW

BEAM

BONE MARROW TRANSPLANT UNIT

BOTTOM OF

BOTTOM OF CURB

BOTTOM OF SLAB

BRACE, BRACING

BRACKET

BEARING

BOTTOM

BETWEEN

CABINET

CONTRACTOR FURN, CONTRACTOR INST

CONSTRUCTION/CONTRACT DOCUMENTS

CONTROL JOINT

CEILING

CLEAR(ANCE)

CONCRETE MASONRY UNIT

CONTRACTING OFFICER

COLUMN

COMPOSITION

CONCRETE

CONNECTION

CONSTRUCTION

CONTINUOUS

COORDINATE

CONTRACTING OFFICER REPRESENTATIVE

CORRIDOR

CONCRETE SEALER

CERAMIC TILE

CENTER

CONTRACTOR FURNISHED, VA INSTALLED

HDR

HDWE

HM

HORZ

HPDL

HR

HT

HVAC

ICRA

ID

ILSM

INCL

INST

INSUL

INT

JT

KV

LAM

LAV

LCM

LT

MAT

MAX

MDF

MECH

MEP

MFR

MIN

MISC

MOD

MTL

N N/A

NEG

NO.

NOM

NTS

O.C.

OPNG

OPP

OPT

OVHD

P

PCONC

PCRA

PL

PLAM

PLY(WD)

PNL

PR

PRFB

PS

PT

PTN(S)

PVMT

QTY

HEADER

HARDWARE

HOLLOW METAL

HORIZONTAL

HIGH PRESSURE DECORATIVE LAM

HOUR

HEIGHT

HEATING, VENTILATION & AIR CONDITIONING

INFECTIOUS CONTROL RISK ASSESSMENT

INSIDE DIAMETER OR DIM

INTERIM LIFE SAFETY MEASURES

INCLUDE(D,ING)

INSTALL

INSULATION

INTERIOR

JOINT

KILOVOLT

LAMINATE(D)

LAVATORY

LEAD CONTAINING MATERIAL(S)

LIGHT

MATERIAL(S)

MAXIMUM

MEDIUM-DENSITY FIBREBOARD

MECHANIC(AL)

MECHANICAL, ELECTRICAL, PLUMBING

MANUFACTURE(R)

MINIMUM

MISCELLANEOUS

MODIFIED

METAL

NORTH

NOT APPLICABLE

NEGATIVE

NUMBER

NOMINAL

NOT TO SCALE

ON CENTER(S)

OPENING

OPPOSITE

OPTION(AL)

OVERHEAD

PAINT

PRECAST CONCRETE

PRE-CONSTRUCTION RISK ASSESSMENT

PLATE

PLASTIC LAMINATE

PLYWOOD

PANEL

PAIR

PREFABRICATED

PLASTIC

PRESSURE TREATED

PARTITION(S)

PAVEMENT

QUANTITY

RAD

RCP

REF

REINF

REP

REQ(s,(')D)

RESIL

REV

RF

RM

RMV

RO

S

SCHED

SD

SECT

SF

SFRM

SHG

SHT(G)

SIM

SM

SOW

SPEC

SQ

SS

ST

STDG

STL

STOR

STRUCT

SUSP

SV

SYS

TEMP

T&G

THK

THRESH

TOC

TOS

TPH

TRANS

TS

TYP

UON

VA

VAR

VB

VC

VERT

VIF

VV

W W/

WD

WDW

WGHT

W/O

WP

WR

RADIUS

REFLECTED CEILING PLAN

REFERENCE

REINFORCE(D,ING)

REPRESENTATIVE

REQUIRE(D,S,MENT(S))

RESILIENT

REVERSE

RADIO FREQUENCY / ROOF

ROOM

REMOVE

ROUGH OPENING

SOUTH

SCHEDULE

SCHEMATIC DESIGN

SECTION

SQUARE FEET

SPRAY APPLIED FIRE-RESISTIVE MATERIAL

SHINGLES

SHEET (SHEATHING)

SIMILAR

SEAM

SCOPE OF WORK

SPECIFICATION

SQUARE

STAINLESS STEEL

STAIN

STANDING

STEEL

STORAGE

STRUCTURAL

SUSPENDED

SHEET VINYL

SYSTEM

TEMPORARY

TONGUE AND GROOVE

THICK(NESS)

THRESHOLD

TABLE OF CONTENTS

TOP OF SLAB

TOILET PAPER HOLDER

TRANSITION

TUBE STEEL

TYPICAL

UNLESS OTHERWISE NOTED

VETERANS AFFAIRS

VARIES

VAPOR BARRIER

VA FURNISHED, CONTRACTOR INSTALLED

VERTICAL

VERIFY IN FIELD

VA FURNISHED, VA INSTALLED

WEST

WITH

WOOD

WINDOW

WEIGHT

WITHOUT

WATERPROOF(ING)

WATER RESISTANT

DBL

DC

DD

DEMO

DEPT

DG

DIA

DIM

DWN

DR

DTL

DWG

E

EA

EJ

ELEC

ELEV

ENG

EOC

EOP

EPDM

EQ

EQUIP

ES

ETS

EX(IST)

EXP

EXT

FA

FD

FE(C)

FF

FFB

FFL

FIN

FLASH

FLR

FLRSNT

FNDN

FOC

FOF

FOS

FP

FR

FRM

FT

FTG

FUR

FURN

GA

GALV

GE

G(W)B

GC

GL

GLB

GMU

GOV(T)

GYP

DOUBLE

DIRECT CURRENT

DESIGN DEVELOPMENT

DEMOLISH(ION)

DEPARTMENT

DESIGN GUIDE

DIAMETER

DIMENSION

DOWN

DOOR

DETAIL

DRAWING(S)

EAST

EACH

EXPANSION JOINT

ELECTRIC(AL)

ELEVATION OR ELEVATOR

ENGINEER(ING)

EDGE OF CURB

EDGE OF PAVEMENT

ETHYLENE PROPYLENE DIENE TERPOLYMER

EQUAL

EQUIPMENT

EACH SIDE

EXPOSED TO STRUCTURE

EXISTING

EXPANSION

EXTERIOR

FIRE ALARM

FLOOR DRAIN

FIRE EXTINGUISHER (CABINET)

FACTORY FINISH

FINISH FLOOR BREAK

FINISH FLOOR LINE

FINISH(ED)

FLASHING

FLOOR(ING)

FLORESCENT

FOUNDATION

FACE OF CONCRETE

FACE OF FINISH

FACE OF STUDS

FIRE PROOF

FIRE RATED

FRAME

FOOT, FEET

FOOTING

FURRING

FURNISHED

GAGE, GAUGE

GALVANIZED

GENERAL ELECTRIC

GYPSUM (WALL) BOARD

GENERAL CONTRACTOR

GRID LINE

GLUE LAMINATED BEAM

GLASS MASONRY UNIT

GOVERNMENT

GYPSUM BOARD

A101

1 TYP

101.1

A-101

SIM

EXTERIOR ELEVATION

INTERIOR ELEVATION

BUILDING SECTION FLAG

WALL SECTION FLAG

CALLOUT FLAG

VERTICAL GRID LINE

HORIZONTAL GRID LINE

TRUE NORTH ARROW

PROJECT NORTH ARROW

(TRUE NORTH DASHED)

ELEVATION MARKER

KEY NOTE

ROOM TAG (SF OPTIONAL)

CEILING HEIGHT TAG

ROOM NAME

150 SF

A

A-101

SIM

01A

TRUE

NORTH

W1

A-101

PROJECT

NORTH

WALL TAG

FLOOR TAG

ROOF TAG

DOOR TAG

WINDOW TAG

SPECIALTY EQUIPMENT TAG

SIGNAGE TAG

SIGNAGE KEY NOTE

(AW SHEETS ONLY)

SIGNAGE MATERIAL TAG

(AW SHEETS ONLY)

EXISTING TO REMAIN

NEW CONSTRUCTION

TO DEMOLISH

HIDDEN ABOVE OR BELOW

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

SMOKE ZONE

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE RATED WALL

SMOKE & 1 HR FIRE RATED WALL

FIRE EXTINGUISHER CABINET

AREA OF WORK / AREA SHOWN

CONSTRUCTION ZONE, ( - - )

PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

PATH OF TRAVEL

EMERGENCY EGRESS PATHWAY

SEISMIC JOINT

BATT INSULATION

RIGID INSULATION

GYPSUM BOARD, TYPE X

ACOUSTICAL CEILING TILE, 2' x 2'

CONCRETE

STEEL

PLYWOOD, FIRE RATED

EARTH

SUPPLY GRILLE PER MECHANICAL

(SIZE & PROPORTIONS MAY VARY)

RETURN GRILLE PER MECHANICAL

(SIZE & PROPORTIONS MAY VARY)

LIGHTING PER ELECTRICAL

(SIZE & PROPORTIONS MAY VARY)

A-101

A01

D88

A5175SOAP DISH

IN-04.02-01

AFF

ACT 2x2

9' - 0"

FEC

F-1

R-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

A-001

ARCHITECTURAL SYMBOLS &

ABBREVIATIONSSPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES - FAYETTEVILLE

FAYETTEVILLE, ARKANSAS

564-21-700

12/13/2024 MA RB

100% CONSTRUCTION

DOCUMENTS

SYMBOLS ABBREVIATIONS

GENERAL NOTES

APPLICABLE PUBLICATIONS

1. ALL WORK DONE BY THE CONTRACTOR OR SUB-CONTRACTORS SHALL BE PERFORMED WITH

A HIGH LEVEL OF WORKMANSHIP.

2. MAINTAIN A SAFE, CLEAN CONSTRUCTION ZONE AT ALL TIMES.

3. DO NOT SCALE DRAWINGS.

4. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A +/- SYMBOL. ONLY NORMAL

INDUSTRY STANDARD TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM DIMENSIONS

INDICATED.

5. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE FULL SPACE INDICATED WITHOUT

ENCROACHMENTS.

6. FURNISH ALL MATERIALS & PRODUCTS TO COMPLY WITH THE CONTRACT DOCUMENTS.

7. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH FLOOR ELEVATION, UON.

8. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE BLOCKING IN WALL BEHIND, THIS

INCLUDES BACKING FOR WALL MOUNTED DOOR STOPS. ENSURE THAT ALL REQUIRED

BACKING IS INSTALLED IN WALLS PRIOR TO INSTALLING DRYWALL.

9. IN TOILET ROOMS PROVIDE STAINLESS STEEL FILLER BEHIND ANY MIRRORS AND OTHER

WALL MOUNTED ACCESSORIES WHEN ITEM IS INSTALLED PARTIALLY OVER CERAMIC TILE.

10. MOVE AND STORE ALL FURNITURE, FIXTURES, AND EQUIPMENT (FFE) AS NEEDED. FFE WILL

BE COVERED WITH PLASTIC BEFORE BEING MOVED. FFE WILL BE MOVED BACK TO THE SAME

LOCATION IT WAS ORIGINALLY LOCATED WHEN CONTRACTORS WORK IS COMPLETE. IF

EQUIPMENT NEEDS TO BE MOVED OUTSIDE THE ROOM IT IS THE CONTRACTOR'S

RESPONSIBILITY TO COVER ALL COSTS ASSOCIATED WITH MOVING, STORING, AND

REINSTALLING FFE. MOVING, REMOVING ANY RETURN OF FURTNITURE WILL BE THE

RESPONSIBILITY OF THE VA.

11. WHEN THE CONTRACTOR MOVES FFE, THE CONTRACTOR IS RESPONSIBLE FOR UNPLUGGING

ALL EQUIPMENT FROM WALLS APPROPRIATELY. DURING REINSTALLATION OF FFE, IT IS THE

CONTRACTOR'S RESPONSIBILITY TO RECONNECT POWER PLUGS. THE VA WILL RECONNECT

ALL DATA TO THE NEW CAT 6A DATA PORTS.

APPLICABLE PUBLICATIONS ARCHITECTURAL NOTES

AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITIONS

OF CODE ENFOREMENT PROCEDURES ( DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS,

FEES, ETC). THE VA SHALL FUNCTION AS THE AUTHORITY HAVING JURISTICTION (AHJ).

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD

APPLICATION GUIDE AND OTHER GUIDEANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL).

INTERNATIONAL BUILDING CODE (IBC) 2018.

INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2018.

NATIONAL FIRE PROTECTION AGENCY (NFPA) 101 LIFE SAFETY CODE. NFPA 101 TAKES

PRECEDENCE OVER IBC.

NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900.

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8.

NATIONAL ELECTRICAL CODE (NEC).

INTERNATIONAL PLUMBING CODE (IPC).

SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAL SOCIETY OF MECHANICAL

ENGINEERS (ASME) A 17.1.

ASME BOILER AND PRESSURE VESSEL CODE.

ASME CODE FOR PRESSURE PIPING.

ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS), INCLUDING VA SUPPLEMENT

BARRIER FREE DESIGN GUIDE (PG-18-3).

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUE

AND COMMENTARY (ACI 318).

MANUAL OF STEEL CONSTRCUTION , LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR

STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC).

ENERGY POLICY ACT OF 2005 (EPACT).

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL

AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RESE RESIDENTIAL

BUILDINGS, 10 CFR PARTS 433,434 AND 435.

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU).

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY AND

TRANSPORTATON MANAGEMENT.

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL

REQUIREMENTS SECTION 01 01 0 OF THE VA MASTER CONSTRUCTION SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE STANDARD 62.1 - 2004.

SAFETY STANDARD FOR REFRIDERATION SYSTEMS - ASHRAE STANDARD 15 - 2007.

VAMC APPROVED HARDWARE LOCKING STANDARDS.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI).

AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM).

FEDERAL COMMUNICATIONS COMMISSION (FCC), ALL REGULATIONS, PROCEDURES AND

STANDARDS FOR TWO-WAY RADIO EQUIPMENT, SYSTEMS AND OPERATION.

ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA).

INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE).

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO), STANDARDS FOR PROTOCOLS AND

INTERFACES THAT INCLUDE OPEN SYSTEM INTERCONNECTIONS (OSI).

JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JACHO),

ENVIRONMENT OF CARE GUIDELINES AND STANDARDS.

FACILITIES GUIDELINES INSTITUTE (FGI): 2010 , OR MOST CURRENT ISSUE, GUIDELINES FOR THE

DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES.

THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND NATIONAL SOCIETY OF PROFESSIONAL

ENGINEERS(NSPE) RECENT ADDITIONS TO THEIR PROFESSIONAL CODES OF ETHICS ENCOURAGING

“ENVIRONMENTALLY RESPONSIBLE DESIGN”.

12. TYPICAL WORK SEQUENCE FOR TR/TE ROOMS SHALL BE THE INSTALLATION OF ICRA

BARRIERS, FOLLOWED BY THE REMOVAL OR DEMOLITION OF CEILING/TILES IF ANY, AND

SPRINKLER WORKS AS PER MECHANICAL, BEFORE PROCEEDING WITH OTHER

CONSTRUCTION ACTIVITIES

13. REINSTALL CEILING TILES AT THE END OF EVERY WORK SHIFT.

14. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE

WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRE STOPPING

COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE

PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

15. CONTRACTOR TO REPLACE EXISTING FIRE EXTINGUISHER WITHIN 75' WITH A CLEAN AGENT

FIRE EXTINGUISHER IN ACCORDANCE TO THE FIRE PROTECTION MANUAL AT ALL TELECOM

ROOMS. REPLACEMENT FIRE EXTINGUISHERS ARE TO MATCH OR EXCEED THE EXISTING

EXTINGUISHER IN ABC RATING AND SIZE.

PHASING NOTES

1. CONSTRUCTION WORKS SHOULD START ON BUILDINGS WITH THE LEAST OPERATIONAL

IMPACT. PREFERABLY, ADMINISTRATION BUILDINGS FIRST, FOLLOWED BY MEDICAL

BUILDINGS.

2. THE VA REQUIRES ATLEAST A 3-WEEK NOTIFICATION PRIOR TO START OF CONSTRUCTION

WORKS.

3. WORK IN ACTIVE MEDICAL SPACES (OR, LAB, ETC) MAY BE REQUIRED TO BE DONE AFTER

REGULAR OFFICE HOURS AND/OR ON THE WEEKENDS .

4. ALLOWABLE CONCURRENT CONSTRUCTION SHALL BE A MAXIMUM OF 6 ROOMS AT A TIME.

ALL HOSPITAL FUNCTIONS SHALL BE MAINTAINED AT ALL TIMES.

5. TELECOM ROOMS NEED TO BE COMPLETED PRIOR TO NEW DATA DROP INSTALLATION.

Revisions: Date:

EXISTING SUSPENDED CEILING

TO REMAIN ON CORRIDOR

SIDE

UNDERSIDE OF STRUCTURE ABOVE

EXISTING

WALL TO

REMAIN OR

NEW WALL

2" HM DOOR FRAME, TYPICAL

LENGTH SHALL VARY LENGTH SHALL VARY

REPAINT FULL HEIGHT FROM SUSPENDED CEILING

TO FINISH FLOOR WHERE DOOR/FRAME ARE TO BE

INSTALLED

EXISTING

WALL TO

REMAIN OR

NEW WALL

UNDERSIDE OF

STRUCTURE ABOVE

LENGTH OF WALL SHALL VARY, TYPICAL

DEMO EXIST SUSPENDED

CEILING AS INDICATED

ON RCP, TYPICAL

EXPOSED WALL

FINISH SHALL BE

PAINTED WHITE

(P-01), TYPICAL

RUBBER BASE, TYPICAL

DEMOLISH EXISTING

SUSPENDED CEILING AS

INDICATED ON DEMO

RCP,TYPICAL

EXPOSED WALL FINISH SHALL BE PAINTED WHITE (P-01), TYPICAL

INSTALL 4'X8'X3/4" AC GRADE FIRE RETARDANT

PLYWOOD WITH A-SIDE OUT APPLIED OVER WALL

FOR MOUNTING OF TELECOMMUNICATIONS

EQUIPMENT, 6" AFF TO 8'-6" AFF.

ON METAL STUD WALL

- SELF DRILLING HEX HEAD 1/4" DIA.

SHEET METAL SCREWS (SCREWS TO

BE CENTER ON STUD) W/ FLAT WASHER.

ON WOOD STUD WALL

- 3/8"⌀ LAG SCREWS WITH 2" EMBED INTO

EXISTING STUDS WITH FLAT WASHER.

ON CMU WALL

- HILTI KWIK HUS-EZ SCREW ANCHORS 3/8"⌀

WITH 3" MIN. EMBEDMENT IN TO EXISTING

CONCRETE (MINIMUM F'c = 3000 psi)

OR

- 5/16"⌀ BOLTS WITH SPRING NUTS OR EQUAL

LOCK WASHER.

RUBBER BASE, TYPICAL

PAINT EXISTING WALL TO

NEAREST BREAK, TYPICAL

INSTALL NEW DOOR OR

INFILL WALL AS INDICATED ON

PLANS

CONTRACTOR TO LEAVE FIRE RATING STAMP UNPAINTED,

COVER STAMP BEFORE PAINTING. REMOVE COVER AFTER PAINT.

FIRE RATED PLYWOOD PAINTED WHITE (P-03)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AE421

INTERIOR ELEVATIONS

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES - FAYETTEVILLE

FAYETTEVILLE, ARKANSAS

564-21-700

12/13/2024 MA RB

100% CONSTRUCTION

DOCUMENTS

GENERAL NOTES

1. CONTRACTOR SHALL LEAVE FIRE RATING STAMP UNPAINTED

AND VISIBLE ON NEW INSTALLED FR PLYWOOD.

2. PROVIDE NEW 3/4" FR PLYWOOD ON WALLS WHERE

INDICATED ON PLANS. PAINT WITH FIRE RETARDANT PAINT

(P-02), REFERENCE DETAIL 3/AE421.

3. REFER TO DETAIL #3 ON SHEET AE421 FOR A TYPICAL

TELECOMMUNICATION ROOM INTERIOR ELEVATION.

4. INSTALL VERTICAL STUD OR HORIZONTAL BLOCKING AT ALL

GWB EDGES.

5. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING

OR ADJACENT UNLESS OTHERWISE NOTED.

3/4" = 1'-0"

EXTERIOR TR ELEVATION - TYP DOOR ELEVATION

3/4" = 1'-0"

INTERIOR TR ENTRANCE - TYP INTERIOR ELEVATION

3/4" = 1'-0"

INTERIOR ELEVATION - TYP PLYWOOD

3/4" = 1'-0"

TYP TR WALL - PLAN VIEW

3/4" = 1'-0"

FIRE STAMP UNPAINTED - DETAIL

( + ) PRESSURE

CONSTRUCTION ZONE, ( - - ) PRESSURE

ANTE ROOM, ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACKY MATT

NEGATIVE AIR MACHINE

INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER

TO SEPARATE CONSTRUCTION AREA FROM OCCUPIED

SPACE.

INSTALL TEMPORARY PLASTIC FIRE RESISTANT, DUST

BARRIER. MAY ONLY BE DURING NON FUNCTIONAL

MEDICAL CENTER HOURS.

INSTALL FIRE RESISTANT TEMPORARY DOOR AT OPENING

AND MATCH RATING OF ICRA BARRIER, TYPICAL.

PLACE TACKY CONSTRUCTION WALK-OFF MATS AT

ENTRANCE AND EXIT SIDE OF CONSTRUCTION ACTIVITY

AREAS, TYPICAL.

FOR CLASS III, NEGATIVE AIR MACHINE IS REQUIRED AND

SHALL BE LOCATED EITHER AT THE ICRA BARRIER OR AT

AN EXTERIOR WINDOW. COORDINATE WITH VA

INFECTIOUS PREVENTION TEAM AND COR.

1. PROJECT SHALL COMPLY WITH CLASS, I, II, III & IV ICRA

REQUIREMENTS.

2. COMPLY WITH ALL REQUIREMENTS LISTED IN THE

INFECTION CONTROL SECTION OF SPECIFICATION 01 35

26 - SAFETY REQUIREMENTS.

3. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING

ALL ICRA REQUIREMENTS. AT ANY TIME, THE COR MAY

HALT WORK UNTIL ALL REQUIREMENTS ARE MET.

4. REMOVE OR ISOLATE EXISTING HVAC SYSTEMS WITHIN

CONSTRUCTION AREA TO PREVENT DUST

CONTAMINATION.

5. CONTAIN ALL CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS. WHEN

POSSIBLE, REMOVE CONSTRUCTION DEBRIS WHEN AREA

IS IN ACTIVE ISOLATION.

6. CONSTRUCTION ZONE ENTRANCES AND EXITS SHALL BE

LOCKED AT ALL TIMES UNLESS IN USE BY THE

CONTRACTOR. WHEN IN USE, ACCESS WILL BE

CONTROLLED AND MONITORED BY THE CONTRACTOR.

7. ADHESIVE WALK-OFF CONSTRUCTION MATS TO BE USED

AT ALL CONSTRUCTION ZONE AND ANTE ROOM

ENTRANCES AND EXITS.

8. TEMPORARY BARRIERS AND DOORS MAY ONLY BE

DEMOLISHED ONCE GIVEN FINAL APPROVAL BY THE VA

COR.

9. SEAL OFF ANY EXISTING, UNUSED DOORS WITH TAPE

DURING CONSTRUCTION, TYPICAL.

EXISTING SUSPENDED

CEILING TO REMAIN ON

CORRIDOR SIDE

EXISTING

WALLS TO

REMAIN

EXISTING

WALLS TO

REMAIN

EXISTING DOOR BEHIND

VISQUEEN BARRIER

NON-SKID PLATE JACK

SCREWED FROM END OF

POLE TO TOP OF CEILING,

TYPICAL

FIRE RESISTANT PLASTIC

DUST BARRIER

SURROUNDING DOOR,

TYPICAL

EXTENSION POLES, TYPICAL

NON-SKID PLATE JACK

SCREWED FROM END OF

POLE TO BOTTOM OF

FLOOR, TYPICAL

BOTTOM OF CEILING

ZIPPER OPENING, TYPICAL

STICKY TACKY MATT

INFRONT OF VISQUEEN

BARRIER

TAPE TOP OF

CONSTRUCTION BARRIER

TO BOTTOM OF CEILING

CONSTRUCTION BARRIER

SURROUNDING EXIST

DOOR, TYPICAL

TAPE BOTTOM OF

CONSTRUCTION BARRIER TO

FLOOR SURFACE, TYPICAL

STICKY TACKY MATT IN FRONT

OF FIRE RESISTANT PLASTIC

BARRIER, TYPICAL

NEGATIVE AIR MACHINE,

TYPICAL (INSTALL AT ICRA

BARRIER IF EXTERIOR

WINDOW IS NOTAVAILABLE).

TEMPORARY FIRE

RATED DOOR, TYPICAL

PATCH, REPAIR AND PAINT GWB WHERE ICRA

BARRIERS ARE CONSTRUCTED AND REMOVED.

PATCH AND REPAIR CEILINGS AND FLOORS AS

REQUIRED WHERE ICRA BARRIERS ARE

CONSTRUCTED AND REMOVED.

PATCH, REPAIR AND PAINT GWB WHERE ICRA

BARRIERS ARE CONSTRUCTED AND REMOVED.

PATCH AND REPAIR CEILINGS AND FLOORS AS

REQUIRED WHERE ICRA BARRIERS ARE

CONSTRUCTED AND REMOVED.

ANTE

ROOM

PROJECT AREA

OUTSIDE

PROJECT AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

AS101

ICRA DETAILS

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES - FAYETTEVILLE

FAYETTEVILLE, ARKANSAS

564-21-700

12/13/2024 MA RB

100% CONSTRUCTION

DOCUMENTS

LEGEND

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

1/2" = 1'-0"

ICRA CLASS I DETAIL

1/2" = 1'-0"

ICRA CLASS II DETAIL

1/2" = 1'-0"

ICRA CLASS III DETAIL

1/2" = 1'-0"

TYPICAL ICRA CLASS II BARRIER - PLAN VIEW

1/2" = 1'-0"

TYPICAL ICRA CLASS III DETAIL - PLAN VIEW

1/2" = 1'-0"

TYPICAL ICRA CLASS IV BARRIER - PLAN VIEW

CLASS I ICRA REQUIREMENTS

A. DURING CONSTRUCTION WORK:

1. NOTIFY THE CONTRACTING OFFICER's REPRESENTATIVE.

2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.

3. CEILING TILES: IMMEDIATELY REPLACE A CEILING TILES DISPLACED FOR VISUAL INSPECTION.

B. UPON COMPLETION:

1. CLEAN WORK AREA UPON COMPLETION OF TASK.

2. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

CLASS II ICRA REQUIREMENTS

A. DURING CONSTRUCTION WORK:

1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE. SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS WHERE

POSSIBLE.

3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

4. SEAL UNUSED DOORS WITH DUCT TAPE.

5. BLOCK OFF AND SEAL AIR VENTS.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

B. UPON COMPLETION:

1. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK

AREA.

4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

5. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE.

CLASS III ICRA REQUIREMENTS

A. DURING CONSTRUCTION WORK:

1. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA

FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING

PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

B. UPON COMPLETION:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED

BY THE SAFETY DEPARTMENT AND INFECTION CONTROL, THOROUGHLY CLEANED BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

5. WET MOP AREA WITH DISINFECTANT.

6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

CLASS IV ICRA REQUIREMENTS

A. DURING CONSTRUCTION WORK:

1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION

OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA

FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING

PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO

THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR

THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE

THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE

COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

B. UPON COMPLETION:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED

BY THE SAFETY DEPARTMENT AND INFECTION CONTROL, THOROUGHLY CLEANED BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

5. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

6. WET MOP AREA WITH DISINFECTANT.

7. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

0.1 0.8 0.9 3 3.5 3.7 4.3 4.5 86 7 12

J

L

N

N.4

P

Q

F.9

G

H.6

H.9

K.1

K.9

M

M.5

L.5

M.1

S

R

T

U

V

W

Y

13 14 15 16 17 18

350 SF

GENERAL STORAGE

175 SF

GENERAL

STORAGE

13A

123 SF

GENERAL STORAGE

91 SF

OFFICE

S F

V C

S C

H

IE

F

A

557 SF

STORE

272 SF

LOUNGE

216 SF

LOUNGE

151 SF

RESTROOM

316 SF

VENDING

151 SF

EMS

155 SF

MECHANICAL

MB03

16 SF

ELCT

MB01

177 SF

RESTROOM

12A

223 SF

LOCKERS

12B

302 SF

LOCKERS

11A

149 SF

WASHING

129 SF

GENERAL STO.

230 SF

GENERAL STORAGE

1107 SF

CANTEEN

525 SF

SERVING

03A

88 SF

GENERAL

STORAGE

02A

434 SF

UNION

239 SF

OPERATOR

331 SF

EMS STORAGE

102 SF

CHARGING

178 SF

BATTERIES

T10A

34 SF

STORE

16A

38 SF

ELECT

E01

251 SF

CORRIDOR

C12

216 SF

STAIRS

S01 132 SF

EMS

115 SF

OFFICE

129 SF

EMS

138 SF

EMS

216 SF

HIMS

165 SF

ELEV

L04

51 SF

DRESSING

ROOM

22B

407 SF

CLOTHING

22C

79 SF

SHOWER

25B

182 SF

UNIFORM

288 SF

CORRIDOR

C14

227 SF

ALARM

E3

316 SF

ELEC

E5

36 SF

CHASE PIPE

427 SF

CORRIDOR

C010

119 SF

ELEV LOBBY

C01

203 SF

STAIRS

S02

889 SF

CORRIDOR

C13

26 SF

HAC

83 SF

WOMEN

92 SF

MEN

164 SF

HVAC

148 SF

REL. OF INFO

143 SF

CHF HIMS

191 SF

REL OF INFO

404 SF

FIRE PUMP

MB02

84 SF

CODING SUPER

MB7

82 SF

BREAK

C40S

29 SF

CHASE

MB06

1045 SF

MEDICAL RECORDS

750 SF

OFFICE

26 SF

ELEC

E2 129 SF

CHIEF NVCC

101 SF

OFFICE

357 SF

BIOMED SERVER

1003 SF

OI & T SERVERS

109 SF

OFFICE

201 SF

BREAKROOM

70 SF

OFFICE

11 SF

ELECT

9 SF

ELECT

1579 SF

OPEN WORK AREA

125 SF

EXAM

PC06

142 SF

NURSE OFFICE

PC05

154 SF

VSO

PC03

137 SF

EXAM

PC12

138 SF

EXAM

PC13

131 SF

EXAM

PC14

300 SF

CLERK & NURSE

PC07

137 SF

EXAM

PC11

138 SF

EXAM

PC10

131 SF

EXAM

PC09

50 SF

UNISEX

PC15

50 SF

UNISEX

PC16

214 SF

BREAK

PC17

58 SF

VITAL SIGNS

PC20

133 SF

WAITING

PC08

227 SF

CORRIDOR

PCC04

153 SF

STAIRS

PCS01

114 SF

WAITING

PC18

90 SF

CORRIDOR

PCC005

483 SF

CHECK & NURSE

PC019

156 SF

ELEVATOR LOBBY

PCC01

185 SF

WAITING

PC01

337 SF

CORRIDOR

PCC03

83 SF

CORRIDOR

PCC02

158 SF

EXAM

PC04

64 SF

ELEVATOR

PCL02

50 SF

ELEVATOR

PCL42

264 SF

ELEV LOBBY

PCC08

279 SF

CORRIDOR

PCC07

241 SF

CORRIDOR

PCC06

70 SF

GENERAL STORAGE

PC44

157 SF

WAITING

PC29

110 SF

EXAM

PC30

74 SF

OFFICE

PC35

115 SF

EXAM

PC34

159 SF

EXAM

PC37

120 SF

EXAM

PC38

123 SF

EXAM

PC33

130 SF

EXAM

PC39

130 SF

EXAM

PC32

117 SF

EXAM

PC41

478 SF

CLERK & NURSE

PC31

314 SF

CLERK & NURSE

PC40

342 SF

CORRIDOR

PCC10

273 SF

WAITING

PC36

138 SF

EXAM

PC25

197 SF

OFFICE

PC26

100 SF

OFFICE

PC27

137 SF

MEN

PC23

137 SF

WOMEN

PC24

44 SF

ALCOVE

PC22

111 SF

ELEV EQUIP

PC45

111 SF

VESTIBULE

PCC09

147 SF

RECEPTION

PC28

586 SF

MECHANICAL

PC43

1176 SF

PRIMARY CARE

PC21

177 SF

ELEVATOR EQUIPMENT

MB11

300 SF

SERVICE ELEVATOR LOBBY

C24

113 SF

ELEVATOR

L06

113 SF

ELEVATOR

L05

233 SF

SERVICE VESTIBULE

C22

2252 SF

MECHANICAL / ELECTRICAL

MB 10

595 SF

CORRIDOR

C21

605 SF

CORRIDOR

C20

134 SF

EMS

123 SF

ENG

390 SF

KITCHEN

147 SF

CORRIDOR

C16

158 SF

CONNECTING

CORRIDOR

CC13

212 SF

MORGUE

111 SF

REFR.

25A

155 SF

E04

69 SF

ANTE

212 SF

STAIRS

S03

46 SF

OFFICE

39A

318 SF

MECH

MBO5

711 SF

CORRIDOR

C11

389 SF

MECH & LAUNDRY

MB04

164 SF

CORRIDOR

C15

PHASE 1:

CONTRACTOR TO COMPLETE THE WORK OF THIS

TR AND ASSOCIATED DATA DROPS. COMPLETE

ONE SECTION AT A TIME AS DIRECTED BY COR.

SECTION 1A:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

SECTION 1B:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

SECTION 1C:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

DIAMOND LINE

D

IA

M O

N D

L

IN

E

716 SF

TR / TELEPHONE EQUIPMENT

T10

FE

FE

EXISTING FE

NEW SEMI-RECESSED FEC, TO MATCH OR EXCEED

EXISTING EXTINGUISHER IN ABC RATING AND SIZE.

SEE DET 1/A-606.

KEY AREA SHOWN

PROJECT

NORTH

ICRA CLASS III

ICRA CLASS IV

FEC

FE

FIRE EXTINGUISHER CABINET

FIRE EXTINGUISHER

TR

ICRA PHASING LINE

ICRA CLASS II

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

RM T10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

01-AS-100

BUILDING 01 - LEVEL 00 - OVERALL

PLANSPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES - FAYETTEVILLE

FAYETTEVILLE, ARKANSAS

564-21-700

12/13/2024 MA CA

100% CONSTRUCTION

DOCUMENTS

1/16" = 1'-0"

BUILDING 01 - LEVEL 00 - OVERALL PLAN

LEGENDLEGEND

KEY PLAN

PROJECT

NORTH

0' 8' 16' 32'

L

N

N.4

P

Q

F.9

G

H.6

H.9

K.1

K.9

M

M.5

L.5

M.1

S

R

T

U

V

W

Y

13 14 15 16 17 18

350 SF

GENERAL STORAGE

175 SF

GENERAL

STORAGE

13A

123 SF

GENERAL STORAGE

91 SF

OFFICE

51 SF

VCS CHIEF

15A

557 SF

STORE

272 SF

LOUNGE

216 SF

LOUNGE

151 SF

RESTROOM

316 SF

VENDING

151 SF

EMS

155 SF

MECHANICAL

MB03

16 SF

ELCT

MB01

177 SF

RESTROOM

12A

223 SF

LOCKERS

12B

302 SF

LOCKERS

11A

149 SF

WASHING

129 SF

GENERAL STO.

230 SF

GENERAL STORAGE

1107 SF

CANTEEN

525 SF

SERVING

03A

88 SF

GENERAL

STORAGE

02A

434 SF

UNION

239 SF

OPERATOR

331 SF

EMS STORAGE

102 SF

CHARGING

178 SF

BATTERIES

T10A

716 SF

TR / TELEPHONE EQUIPMENT

T10

34 SF

STORE

16A

38 SF

ELECT

E01

251 SF

CORRIDOR

C12

216 SF

STAIRS

S01 132 SF

EMS

115 SF

OFFICE

129 SF

EMS

138 SF

EMS

216 SF

HIMS

165 SF

ELEV

L04

51 SF

DRESSING

ROOM

22B

407 SF

CLOTHING

22C

79 SF

SHOWER

25B

182 SF

UNIFORM

288 SF

CORRIDOR

C14

227 SF

ALARM

E3

316 SF

ELEC

E5

36 SF

CHASE PIPE

427 SF

CORRIDOR

C010

119 SF

ELEV LOBBY

C01

203 SF

STAIRS

S02

889 SF

CORRIDOR

C13

26 SF

HAC

83 SF

WOMEN

92 SF

MEN

164 SF

HVAC

148 SF

REL. OF INFO

143 SF

CHF HIMS

191 SF

REL OF INFO

404 SF

FIRE PUMP

MB02

84 SF

CODING SUPER

MB7

82 SF

BREAK

C40S

29 SF

CHASE

MB06

1045 SF

MEDICAL RECORDS

750 SF

OFFICE

26 SF

ELEC

E2

129 SF

CHIEF NVCC

101 SF

OFFICE

038357 SF

BIOMED SERVER

1003 SF

OI & T SERVERS

109 SF

OFFICE

201 SF

BREAKROOM

70 SF

OFFICE

11 SF

ELECT

9 SF

ELECT

1579 SF

OPEN WORK AREA

125 SF

EXAM

PC06

142 SF

NURSE OFFICE

PC05

154 SF

VSO

PC03

137 SF

EXAM

PC12

138 SF

EXAM

PC13

131 SF

EXAM

PC14

300 SF

CLERK & NURSE

PC07

137 SF

EXAM

PC11

138 SF

EXAM

PC10

131 SF

EXAM

PC09

50 SF

UNISEX

PC15

50 SF

UNISEX

PC16

214 SF

BREAK

PC17

58 SF

VITAL SIGNS

PC20

133 SF

WAITING

PC08

227 SF

CORRIDOR

PCC04

153 SF

STAIRS

PCS01

114 SF

WAITING

PC18

90 SF

CORRIDOR

PCC005

483 SF

CHECK & NURSE

PC019

156 SF

ELEVATOR LOBBY

PCC01

185 SF

WAITING

PC01

337 SF

CORRIDOR

PCC03

83 SF

CORRIDOR

PCC02

158 SF

EXAM

PC04

64 SF

ELEVATOR

PCL02

50 SF

ELEVATOR

PCL42

264 SF

ELEV LOBBY

PCC08

279 SF

CORRIDOR

PCC07

70 SF

GENERAL STORAGE

PC44

157 SF

WAITING

PC29

110 SF

EXAM

PC30

74 SF

OFFICE

PC35

115 SF

EXAM

PC34

159 SF

EXAM

PC37

120 SF

EXAM

PC38

123 SF

EXAM

PC33

130 SF

EXAM

PC39

130 SF

EXAM

PC32

117 SF

EXAM

PC41

478 SF

CLERK & NURSE

PC31

314 SF

CLERK & NURSE

PC40

342 SF

CORRIDOR

PCC10

273 SF

WAITING

PC36

138 SF

EXAM

PC25

197 SF

OFFICE

PC26

100 SF

OFFICE

PC27

137 SF

MEN

PC23

137 SF

WOMEN

PC24

44 SF

ALCOVE

PC22

111 SF

ELEV EQUIP

PC45

111 SF

VESTIBULE

PCC09

147 SF

RECEPTION

PC28

586 SF

MECHANICAL

PC43

1176 SF

PRIMARY CARE

PC21

177 SF

ELEVATOR EQUIPMENT

MB11

300 SF

SERVICE ELEVATOR LOBBY

C24

113 SF

ELEVATOR

L06

113 SF

ELEVATOR

L05

233 SF

SERVICE VESTIBULE

C22

2252 SF

MECHANICAL / ELECTRICAL

MB 10595 SF

CORRIDOR

C21

605 SF

CORRIDOR

C20

134 SF

EMS

123 SF

ENG

390 SF

KITCHEN

147 SF

CORRIDOR

C16

158 SF

CONNECTING

CORRIDOR

CC13

212 SF

MORGUE

111 SF

REFR.

25A

155 SF

E04

69 SF

ANTE

212 SF

STAIRS

S03

46 SF

OFFICE

39A

318 SF

MECH

MBO5

711 SF

CORRIDOR

C11

389 SF

MECH & LAUNDRY

MB04

164 SF

CORRIDOR

C15

214 SF

T10B

50 SF

T10C

29 SF

T10D

163 SF

T10E

74 SF

T10F

95 SF

T10G

344 SF

T10H

16 SF

T10I

24 SF

T10J

16 SF

T10K

40 SF

T10L

2'x2' ACOUSTICAL CEILING TILE

2'x4' ACOUSTICAL CEILING TILE

GYPSUM/HARD LID CEILING

KEY AREA SHOWN

PROJECT

NORTH

RM T10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

01-AC-100

BUILDING 01 - LEVEL 00 - OVERALL

RCPSPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES - FAYETTEVILLE

FAYETTEVILLE, ARKANSAS

564-21-700

12/13/2024 MA CA

100% CONSTRUCTION

DOCUMENTS

LEGEND

1/16" = 1'-0"

BUILDING 01 - LEVEL 00 - OVERALL RCP

PROJECT

NORTH

KEY PLAN

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

EXISTING LIGHTS TO DEMOLISH

NEW LIGHTS (SEE ELECTRICAL DETAILS)

CEILING TO DEMOLISH

2 HR FIRE RATED WALL

KEY AREA SHOWN

PROJECT

NORTH

ENLARGED AREA

3.7 4.3 4.5 6

T

U

178 SF

BATTERIES

T10A

716 SF

TR / TELEPHONE

EQUIPMENT

T10

427 SF

CORRIDOR

C010

889 SF

CORRIDOR

C13

NEW

FLOORING

EXISTING

FLOORING

10' x 10' TR

FORM FACTOR T

2"x2" TRENCH ALONG WALL WITH

SLOTTED METAL COVER.

COORDINATE WATER SENSOR WITH

MECHANICAL AND ELECTRICAL.

TELEPHONE TERMINAL

BOARDS AND SURGE

PROTECTIONS

6 7

EXISTING FE TO REMAIN

NEW SEMI-RECESSED FEC,

TO MATCH OR EXCEED

EXISTING EXTINGUISHER

IN ABC RATING AND SIZE.

SEE DET 1/A-606.

3.7 4.3 4.5 6

T

U

3.7 4.3 4.5 6

T

U

ENTRY POINT

1 2

9 10 10

3.7 4.3 4.5 6

T

U

427 SF

CORRIDOR

C010

889 SF

CORRIDOR

C13

716 SF

TR / TELEPHONE

EQUIPMENT

T10

EXPOSED

9' - 0" AFF

FLR TO EXIST. CLNG.

1' - 3" 8' - 8" 8' - 2" 8' - 2" 8' - 2" 8' - 2"

4' - 6"

716 SF

TELEPHONE

EQUIPMENT

T10

427 SF

CORRIDOR

C010

889 SF

CORRIDOR

C13

178 SF

BATTERIES

T10A

427 SF

CORRIDOR

C010

889 SF

CORRIDOR

C13

178 SF

BATTERIES

T10A

716 SF

TELEPHONE

EQUIPMENT

T10

POLYETHYLENE SHEETING

CONSTRUCTION TACKY MATT

HEPA EQUIPPED AIR FILTER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

01-A-100

BUILDING 01 - LEVEL 00 - DEMO,

FLOOR PLANS & RCPSSPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES - FAYETTEVILLE

FAYETTEVILLE, ARKANSAS

564-21-700

12/13/2024 MA ME / CA

100% CONSTRUCTION

DOCUMENTS

KEY PLAN

1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING

OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.

2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING,

AND ELECTRICAL ITEMS ARE DEMOLISHED.

3. PROTECT FINISHES IN ROOMS ADJACENT TO NEW

TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED

FOR NEW WORK.

4. CONTRACTOR SHALL LEAVE FIRE RATING STAMP

UNPAINTED AND VISIBLE ON THE NEW INSTALLED FRT

PLYWOOD. SEE DETAILS 5/AE421.

5. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND

DETAILS.

6. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS

REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED

AND REMOVED.

7. ALL EXISTING WALLS SURROUNDING TR'S IN SCOPE GO TO

STRUCTURE EXCEPT WHERE NOTED.

1/4" = 1'-0"

RM T10 - FLOOR PLAN

1/4" = 1'-0"

RM T10 - DEMO RCP

1/4" = 1'-0"

RM T10 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM T10 -RCP

LEGEND GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)ICRA LEGEND - CLASS II

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

9 INSTALL POLYETHYLENE SHEETING TO ISOLATE

CONSTRUCTION ZONE. TAPE AND SEAL ALONG EDGES, AND

ANY AREAS WHERE POTENTIAL DUST MAY BE EXPOSED

OUTSIDE OF CONSTRUCTION AREA.

10 PLACE TACKY MATS AT ENTRANCE AND EXIT OF

CONSTRUCTION AREA, MINIMUM SIZE 24"x36", TYPICAL.

1 DEMOLISH EXISTING FLOOR FINISH TO EXPOSE FLOOR

STRUCTURE UNDERNEATH. REMOVE ANY EXISTING

SUBSTANCE/BONDING AGENT IF ANY. PREPARE FLOORING

FOR NEW WORK.

2 DEMOLISH EXISTING BASE. REMOVE EXISTING ADHESIVE AND

PREPARE FOR NEW BASE.

3 DEMOLISH EXISTING DOOR/FRAME.

4 DEMOLISH EXISTING ACT COMPLETELY INCLUDING ALL GRIDS,

SUPPORTING WIRES, CLIPS, AND PERIMETER WALL ANGLES

TO EXPOSE UNDERSIDE OF STRUCTURE ABOVE. PATCH

WALLS WHERE CEILING IS REMOVED.

5 INSTALL NEW DOOR/FRAME.

6 INSTALL NEW RESILIENT RUBBER BASE AT ROOM PERIMETER

WITH SEALANT AT THE BOTTOM.

7 APPLY ANTI-STATIC COATING TO EXPOSED FLOOR. PROVIDE

VINYL REDUCER STRIP AT EXISTING FLOORING TRANSITION.

8 INSTALL FRT PLYWOOD OVER WALLS AS NEEDED PER DETAIL

3/AE421, TYPICAL.

ICRA KEYNOTES

L

N

N.4

P

Q

F.9

G

H.6

H.9

K.1

K.9

M

M.5

L.5

M.1

S

R

T

U

V

W

Y

13 14 15 16 17 18

PHASE 1:

CONTRACTOR TO COMPLETE THE WORK OF THIS

TR AND ASSOCIATED DATA DROPS. COMPLETE

ONE SECTION AT A TIME AS DIRECTED BY COR.

SECTION 1B:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

SECTION 1A:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

368 SF

MECH RM.

M1-1

115 SF

1 BED RM.

38 SF

REST

ROOM

103A

34 SF

ANTE

ROOM

103B

21 SF

HVAC

248B

62 SF

RESTROOM

105A119 SF

1 BED RM.

248C

148 SF

1 BED RM.

49 SF

SOILED

UTILITY

40 SF

RESTROOM

102A

53 SF

RESTROOM

100C

75 SF

KITCHEN

100A

369 SF

3 BED RM

248D

49 SF

RESTROOM

108A

46 SF

RESTROOM

106A

269 SF

2 BED RM.

248E

291 SF

2 BED RM.

49 SF

RESTROOM

109A

207 SF

NRS. LOUNGE

305 SF

2 BED RM.

50 SF

RESTROOM

111A

33 SF

MEDICATION

100B

280 SF

NURSE STA.

200 SF

CORRIDOR

C101

114 SF

CORRIDOR

C102

24 SF

ELECT.

CLOSET

E100

10 SF

EMP. HEALTH

NUTRITION

213 SF

STAIR

S-101

111 SF

GENERAL

STORAGE

196 SF

EMP. HEALTH OFFICE

255 SF

2 BED RM.

107 SF

LAUNDRY

73 SF

RESTROOM

112A

235 SF

2 BED RM.

82 SF

VITALS

73 SF

RESTROOM

114A

267 SF

LOUNGE

209 SF

CONFERENCE

438 SF

DINING

121 SF

CONF RM.

50 SF

GENERAL STO.

120A

109 SF

OFFICE

118C

171 SF

OFFICE

118B

120 SF

OFFICE

118A

359 SF

VESTIBULE

C118

260 SF

CORRIDOR

C103A

532 SF

CORRIDOR

C103

97 SF

CORRIDOR

C104

401 SF

MENTAL HEALTH

B-44

30 SF

NITROUS

OXIDE

M14488 SF

MECH. RM.

M13

86 SF

DIRTY LINEN

CART HOLDING

1-1264C

114 SF

FULL CYLINDER MED.

GAS STO. RM

1-1264B

65 SF

EMPTY CYLINDER

MEDICAL GAS

STORAGE RM

248F

1265 SF

COVERED DOCK

1-1264

61 SF

TEMP CHAPLIN

SERVICES OFFICE

141A

57 SF

RESTRM.

141B

53 SF

VACANT

144 54 SF

ELECTRICAL

E-102

17 SF

IT

T-100

101 SF

TEMP CHAPLIN

SERVICES OFFICE

150 SF

OI&T CLOSET

162 SF

OI&T CLOSET

146A

193 SF

SPECIAL SYSTEMS

DATA ROOM

489 SF

VACANT

383 SF

SPEC.PROC.

140 SF

CORRIDOR

C107

506 SF

CORRIDOR

C108

270 SF

VACANT

311 SF

RADIOLOGIST

97 SF

STO.

31 SF

VACANT

150A

331 SF

CAT SCAN EXAM

17 SF

VACANT

150B

349 SF

CORRIDOR

C106

247 SF

CHEST ROOM

284 SF

VACANT

230 SF

X-RAY CLERK

128 SF

CAT SCAN CONTROL

149A

15 SF

VACANT

152A

272 SF

CORRIDOR

C105

39 SF

RESTROOM

134A

113 SF

R.T. BREAKROOM

186 SF

VACANT

131 76 SF

ULTRASOUND

131A

54 SF

CARDIO

PULMON.

157 SF

EMP. HEALTH OFFICE

186 SF

EMP. HEALTH EXAM

248G

146 SF

EMP. HEALTH

OFFICE

S F

E M

P

H E

A L

T H

O F

F

IC

E

133 SF

RESPIRATORY

EXAM

102 SF

VACANT

124A

313 SF

RECEPTION

61 SF

BREAK

ROOM

293 SF

DOCK MANAGER

1-1263

140 SF

SERVICE HOLDING

1-1262 132 SF

STAIR 5

248H

161 SF

EXIST. ELEV

LOBBY

248I

135 SF

ELEV EQUIP

248J

98 SF

SERVICE

ELEVATOR

248K

370 SF

SERVICE ELEVATOR

LOBBY

C 121

98 SF

SERVICE

ELEVATOR

248L

331 SF

SERVICE ELEVATOR LOBBY

C 120

131 SF

GENERAL STORAGE

1-1259

200 SF

ELEC. SW. GEAR

E103

58 SF

CABLE TV

178 SF

DISPATCH

135 SF

ARMORY OFFICE

226 SF

OPERATIONS

44 SF

TOILET

64 SF

HOLDING

461 SF

CORRIDOR

C100

313 SF

LOBBY

488 SF

GENERAL WAITING

160 SF

ELEV. LOBBY

C 118

155 SF

INFORMATION

199A

148 SF

ELEV

248M

206 SF

CORRIDOR

C 110

147 SF

DRUG RECEIVING

1-1229

110 SF

INVENTORY

CONTROL

1-1231

81 SF

INVENTORY

CONTROL

1-1230

297 SF

STO. PROSTHETICS

& MED SUPPLIES

1-1228

109 SF

CORRIDOR

C-1205

324 SF

BREAKROOM

1-1232

146 SF

CHIEF OFFICE

1-1237

110 SF

ADPAC TECH

SUPERVISOR

1-1239

178 SF

SECRETARY OF WAITING

1-1236

116 SF

ASSISTANT

CHIEF OFFICE

1-1238

104 SF

SUPEVISORY

PHARMACIST

1-1240

106 SF

PHARMACY TECH

SUPERVISOR

1-1241

238 SF

STERILE FLUIDS &

ADMIXTURE STO

1-1227

68 SF

HAZ STO

1-1226

41 SF

HSKP

AID

1-1225

56 SF

IV ANTEROOM &

CLEAN STORAGE

1-1223

259 SF

STO. CLEAN

& DECONTAM

1-1219

88 SF

INTRAVENOUS

ADMIXTURE

1-1224

74 SF

ONCOLOGY

PREP AREA

1-1222

51 SF

CHANGE

1-1220

60 SF

IV ANTEROOM &

CLEAN STORAGE

1-1221

237 SF

STAIRWELL

1-1233

76 SF

WOMENS

178 SF

MENS

60 SF

HAC

504 SF

CORRIDOR

C-1202

167 SF

CORRIDOR

C-1203

197 SF

CORRIDOR

C-1201

61 SF

STAFF

TOILET

1-1235

66 SF

STAFF

TOILET

1-1234

51 SF

HSKP AID

248N

270 SF

CLINICAL PHARM TEACHING

1-1218

165 SF

DRUG

INFORMATION

1-1252

127 SF

EXTEM REPACKING

1-1217

198 SF

EXTEMP COMPOUNDING

1-1216

121 SF

VAULT

1-1215

269 SF

SECURED DISPENSING

1-1214

200 SF

STAIR

S-103

289 SF

TRAVEL

127 SF

TRAVEL

112 SF

TRAVEL

154 SF

AGENT CASHIER

478 SF

CORRIDOR

C111

217 SF

VACANT

175 SF

TELEPHONE TECHS

1-1213

21 SF

ELECTRICAL

E101

238 SF

DISPENSING STATION

1-1212

789 SF

PRESCR RECEIVING FILLING/DISPENSING

1-1242

884 SF

PRESCR RECEIVING / FILLING / DISPENSING

1-1243

679 SF

ACTIVE STORAGE

1-1244

75 SF

TOILET/

SHOWER

1-1251

143 SF

ON DUTY ROOM

1-1250

118 SF

CONSULT

1-1249

100 SF

CORRIDOR

C-1024

85 SF

COUNSELING BOOTH

1-1248

97 SF

COUNSELING BOOTH

1-1247

92 SF

COUNSELING BOOTH

1-1246

96 SF

COUNSELING BOOTH

1-1245

512 SF

CORRIDOR

C-1200

143 SF

CORRIDOR

C-1008

301 SF

CORRIDOR

C-1007

183 SF

STAIRS

PC S200

S

F

O U

T S

ID

E

P

IG

E O

N R

O O

S T

84 SF

MECH.

PC 105A

98 SF

MECH.

PC 105

116 SF

EXAM

PC 107

S F

O I

T

C L

O S

E T

P C

107 SF

MENS

RESTROOM

PC 104

115 SF

WOMENS RESTROOM

PC 103

305 SF

WORKSTATIONS

PC 109

136 SF

WAITING

PC 110

129 SF

EXAM

PC 114

59 SF

MECH.

PC 115

409 SF

CORRIDOR

PCC101

149 SF

EXAM

PC 111

143 SF

EXAM

PC 112

143 SF

EXAM

PC 113

120 SF

WAITING

PC 125

73 SF

GENERAL STORAGE

PC124A

52 SF

ELEVATOR

PC 142

254 SF

ELEVATOR

LOBBY

PCC113

83 SF

VITALS

PC 116

284 SF

CORRIDOR

PCC100

128 SF

EXAM

PC 119

71 SF

ELEVATOR

248O 142 SF

EXAM

PC 120

143 SF

EXAM

PC 121

149 SF

EXAM

PC 122

264 SF

ELEVATOR LOBBY

PCC104

ELECTRICAL

PC102

84 SF

DATA

PC 173

150 SF

PATIENT ADVOCATE

PC 129

161 SF

PATIENT ADVOCATE

PC 131

324 SF

DRUG PICK -UP

1-1211

352 SF

PHARMACY WAITING

1-1210

188 SF

STAIRS

PCS100

145 SF

OFFICE

PC124

23 SF

EMS

PC123

287 SF

PCC102

315 SF

WORK STATIONS

PC 126

101 SF

LOCKERS

PC 136

112 SF

EXAM

PC 164 106 SF

CLEAN UTILITY

PC 167

67 SF

SOILED

UTILITY

PC 168

59 SF

CLEAN

LINEN

PC 169

139 SF

EXAM

PC 166

118 SF

EXAM

PC 165

159 SF

LOUNGE

PC 135

40 SF

WOMEN

PC 133

39 SF

MEN

PC 132

95 SF

POLICE

PC 140

122 SF

VESTIBULE

PC 139

815 SF

AOD

PC 137

132 SF

RECEPTION

PC 141

97 SF

INTERVIEW

248P

92 SF

OFFICE

PC 143

189 SF

LOBBY

PC 100

405 SF

MECHANICAL

M12

1050 SF

WAITING

PC 138

219 SF

CORRIDOR

PCC 114

39 SF

PATIENT

TOILET

PC 163

134 SF

CORRIDOR

PCC 107

103 SF

CORRIDOR

PCC 109

120 SF

OFFICE

PC 147

121 SF

OFFICE

PC 144

121 SF

EXAM

PC 145

119 SF

EXAM

PC 146

S

F

C O

R R

ID

O

R

P C

C

162 SF

EXAM

PC 148

144 SF

EXAM

PC 149

31 SF

GENERAL

STORAGE

PC 146A

125 SF

EXAM

PC 150

99 SF

VESTIBULE

PC 151

153 SF

EXAM

PC 152

146 SF

EXAM

PC 154

116 SF

EQUIPMENT

STORAGE

PC 153

170 SF

EXAM

PC 155

62 SF

PATIENT TOILET

PC 156

163 SF

EXAM

PC 157

644 SF

CORRIDOR

PCC110

261 SF

NURSE STATION

PC 171

157 SF

WORK

PC 170

314 SF

CORRIDOR

PCC 111

43 SF

GENERAL

STORAGE

PC 172

153 SF

EXAM

PC 158

157 SF

EXAM

PC 159

65 SF

KITCHEN

PC 160

38 SF

WOMEN

PC 161

41 SF

MEN

PC 162

258 SF

CORRIDOR

PCC 105

167 SF

CORRIDOR

248Q

157 SF

WAITING

PC 128

91 SF

COUNSELLING

PC 127

298 SF

CORRIDOR

PCC 112

320 SF

CORRIDOR

PCC103

127 SF

TR

167A

140 SF

TELEPHONE

129A

SECTION 1C:

CONTRACTOR TO COORDINATE WITH VA

FOR ROOM CLOSURES AND AVAILABILITY

TO COMPLETE DATA WIRING IN THIS AREA.

DIAMOND LINE

D

IA

M O

N D

L

IN

E

FEC

NEW SEMI-RECESSED

FEC, TO MATCH OR

EXCEED EXISTING

EXTINGUISHER IN ABC

RATING AND SIZE. SEE

DET 1/A-606

KEY AREA SHOWN

PROJECT

NORTH

RM 167A

ICRA CLASS III

ICRA CLASS IV

FEC

FE

FIRE EXTINGUISHER CABINET

FIRE EXTINGUISHER

TR

ICRA PHASING LINE

ICRA CLASS II

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

01-AS-101

BUILDING 01 - LEVEL 01 - OVERALL

PLANSPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES - FAYETTEVILLE

FAYETTEVILLE, ARKANSAS

564-21-700

12/13/2024 MA CA

100% CONSTRUCTION

DOCUMENTS

1/16" = 1'-0"

BUILDING 01 - LEVEL 01 - OVERALL PLAN

LEGENDLEGEND

KEY PLAN

PROJECT

NORTH

L

N

N.4

P

Q

F.9

G

H.6

H.9

K.1

K.9

M

M.5

L.5

M.1

S

R

T

U

V

W

Y

13 14 15 16 17 18

368 SF

MECH RM.

M1-1

115 SF

1 BED RM.

38 SF

REST

ROOM

103A

34 SF

ANTE

ROOM

103B

21 SF

HVAC

248B

62 SF

RESTROOM

105A

119 SF

1 BED RM.

248C

148 SF

1 BED RM.

49 SF

SOILED

UTILITY

101 40 SF

RESTROOM

102A

S F

R E

S T

R O

O M

C

369 SF

3 BED RM

248D

49 SF

RESTROOM

108A

46 SF

RESTROOM

106A

269 SF

2 BED RM.

248E

291 SF

2 BED RM.

109 49 SF

RESTROOM

109A

207 SF

NRS. LOUNGE

305 SF

2 BED RM.

50 SF

RESTROOM

111A

M E

D

IC

A T

IO

N

B

280 SF

NURSE STA.

100 200 SF

CORRIDOR

C101

114 SF

CORRIDOR

C102

24 SF

ELECT.

CLOSET

E100

10 SF

EMP. HEALTH

NUTRITION

213 SF

STAIR

S-101111 SF

GENERAL

STORAGE

140 SF

TELEPHONE

129A

196 SF

EMP. HEALTH OFFICE

255 SF

2 BED RM.

107 SF

LAUNDRY

73 SF

RESTROOM

112A

235 SF

2 BED RM.

82 SF

VITALS

73 SF

RESTROOM

114A

267 SF

LOUNGE

209 SF

CONFERENCE

438 SF

DINING

121 SF

CONF RM.

50 SF

GENERAL STO.

120A

109 SF

OFFICE

118C

171 SF

OFFICE

118B

120 SF

OFFICE

118A

359 SF

VESTIBULE

C118

260 SF

CORRIDOR

C103A

532 SF

CORRIDOR

C103

97 SF

CORRIDOR

C104

401 SF

MENTAL HEALTH

B-44

30 SF

NITROUS

OXIDE

M14

488 SF

MECH. RM.

M13

86 SF

DIRTY LINEN

CART HOLDING

1-1264C

114 SF

FULL CYLINDER MED.

GAS STO. RM

1-1264B

65 SF

EMPTY CYLINDER

MEDICAL GAS

STORAGE RM

248F

1265 SF

COVERED DOCK

1-1264

61 SF

TEMP CHAPLIN

SERVICES OFFICE

141A

57 SF

RESTRM.

141B

53 SF

VACANT

144 54 SF

ELECTRICAL

E-102

17 SF

IT

T-100 101 SF

TEMP CHAPLIN

SERVICES OFFICE

150 SF

OI&T CLOSET

162 SF

OI&T CLOSET

146A

193 SF

SPECIAL SYSTEMS

DATA ROOM

489 SF

VACANT

383 SF

SPEC.PROC.

140 SF

CORRIDOR

C107

506 SF

CORRIDOR

C108

270 SF

VACANT

311 SF

RADIOLOGIST

97 SF

STO.

31 SF

VACANT

150A

331 SF

CAT SCAN EXAM

17 SF

VACANT

150B

349 SF

CORRIDOR

C106

247 SF

CHEST ROOM

284 SF

VACANT

230 SF

X-RAY CLERK

128 SF

CAT SCAN CONTROL

149A

15 SF

VACANT

152A

272 SF

CORRIDOR

C105

39 SF

RESTROOM

134A

113 SF

R.T. BREAKROOM

186 SF

VACANT

76 SF

ULTRASOUND

131A

54 SF

CARDIO

PULMON.

157 SF

EMP. HEALTH OFFICE

186 SF

EMP. HEALTH EXAM

248G

146 SF

EMP. HEALTH

OFFICE

90 SF

EMP. HEALTH

OFFICE

133 SF

RESPIRATORY

EXAM

102 SF

VACANT

124A

313 SF

RECEPTION

61 SF

BREAK

ROOM

293 SF

DOCK MANAGER

1-1263

140 SF

SERVICE HOLDING

1-1262 132 SF

STAIR 5

248H

161 SF

EXIST. ELEV

LOBBY

248I

135 SF

ELEV EQUIP

248J

98 SF

SERVICE

ELEVATOR

248K

370 SF

SERVICE ELEVATOR

LOBBY

C 121

98 SF

SERVICE

ELEVATOR

248L 331 SF

SERVICE ELEVATOR LOBBY

C 120

131 SF

GENERAL STORAGE

1-1259

200 SF

ELEC. SW. GEAR

E103

58 SF

CABLE TV

178 SF

DISPATCH

135 SF

ARMORY OFFICE

226 SF

OPERATIONS

44 SF

TOILET

64 SF

HOLDING

461 SF

CORRIDOR

C100

313 SF

LOBBY

488 SF

GENERAL WAITING

160 SF

ELEV. LOBBY

C 118

155 SF

INFORMATION

199A

148 SF

ELEV

248M

206 SF

CORRIDOR

C 110

147 SF

DRUG RECEIVING

1-1229

110 SF

INVENTORY

CONTROL

1-1231

81 SF

INVENTORY

CONTROL

1-1230

297 SF

STO. PROSTHETICS

& MED SUPPLIES

1-1228

109 SF

CORRIDOR

C-1205

324 SF

BREAKROOM

1-1232 146 SF

CHIEF OFFICE

1-1237

110 SF

ADPAC TECH

SUPERVISOR

1-1239 178 SF

SECRETARY OF WAITING

1-1236

116 SF

ASSISTANT

CHIEF OFFICE

1-1238

104 SF

SUPEVISORY

PHARMACIST

1-1240

106 SF

PHARMACY TECH

SUPERVISOR

1-1241

238 SF

STERILE FLUIDS &

ADMIXTURE STO

1-1227

68 SF

HAZ STO

1-1226

41 SF

HSKP

AID

1-1225

56 SF

IV ANTEROOM &

CLEAN STORAGE

1-1223

259 SF

STO. CLEAN

& DECONTAM

1-1219

88 SF

INTRAVENOUS

ADMIXTURE

1-1224

74 SF

ONCOLOGY

PREP AREA

1-1222

51 SF

CHANGE

1-1220

60 SF

IV ANTEROOM &

CLEAN STORAGE

1-1221

237 SF

STAIRWELL

1-1233

76 SF

WOMENS

178 SF

MENS

504 SF

CORRIDOR

C-1202

167 SF

CORRIDOR

C-1203

197 SF

CORRIDOR

C-1201

61 SF

STAFF

TOILET

1-1235

66 SF

STAFF

TOILET

1-1234

51 SF

HSKP AID

248N

270 SF

CLINICAL PHARM TEACHING

1-1218

165 SF

DRUG

INFORMATION

1-1252

127 SF

EXTEM REPACKING

1-1217

198 SF

EXTEMP COMPOUNDING

1-1216

121 SF

VAULT

1-1215

269 SF

SECURED DISPENSING

1-1214

200 SF

STAIR

S-103

289 SF

TRAVEL

127 SF

TRAVEL

112 SF

TRAVEL

195 154 SF

AGENT CASHIER

478 SF

CORRIDOR

C111

217 SF

VACANT

175 SF

TELEPHONE TECHS

1-1213

21 SF

ELECTRICAL

E101

238 SF

DISPENSING STATION

1-1212

789 SF

PRESCR RECEIVING FILLING/DISPENSING

1-1242

884 SF

PRESCR RECEIVING / FILLING / DISPENSING

1-1243

679 SF

ACTIVE STORAGE

1-1244

75 SF

TOILET/

SHOWER

1-1251

143 SF

ON DUTY ROOM

1-1250

118 SF

CONSULT

1-1249

100 SF

CORRIDOR

C-1024

85 SF

COUNSELING BOOTH

1-1248

97 SF

COUNSELING BOOTH

1-1247

92 SF

COUNSELING BOOTH

1-1246

96 SF

COUNSELING BOOTH

1-1245

512 SF

CORRIDOR

C-1200

143 SF

CORRIDOR

C-1008

301 SF

CORRIDOR

C-1007

183 SF

STAIRS

PC S200

S

F

O U

T S

ID

E

P

IG

E O

N R

O O

S T

84 SF

MECH.

PC 105A 98 SF

MECH.

PC 105

116 SF

EXAM

PC 107

48 SF

OI & T CLOSET

PC 108

107 SF

MENS

RESTROOM

PC 104

115 SF

WOMENS RESTROOM

PC 103

305 SF

WORKSTATIONS

PC 109

136 SF

WAITING

PC 110

129 SF

EXAM

PC 114

409 SF

CORRIDOR

PCC101

149 SF

EXAM

PC 111

143 SF

EXAM

PC 112

143 SF

EXAM

PC 113

120 SF

WAITING

PC 125

73 SF

GENERAL STORAGE

PC124A

52 SF

ELEVATOR

PC 142

254 SF

ELEVATOR

LOBBY

PCC113

83 SF

VITALS

PC 116

284 SF

CORRIDOR

PCC100

128 SF

EXAM

PC 119

71 SF

ELEVATOR

248O 142 SF

EXAM

PC 120

143 SF

EXAM

PC 121

149 SF

EXAM

PC 122

264 SF

ELEVATOR LOBBY

PCC104

ELECTRICAL

PC102

84 SF

DATA

PC 173

150 SF

PATIENT ADVOCATE

PC 129

161 SF

PATIENT ADVOCATE

PC 131

324 SF

DRUG PICK -UP

1-1211

352 SF

PHARMACY WAITING

1-1210

188 SF

STAIRS

PCS100

145 SF

OFFICE

PC12423 SF

EMS

PC123

287 SF

PCC102

315 SF

WORK STATIONS

PC 126

101 SF

LOCKERS

PC 136

112 SF

EXAM

PC 164

106 SF

CLEAN UTILITY

PC 167

67 SF

SOILED

UTILITY

PC 168

59 SF

CLEAN

LINEN

PC 169

139 SF

EXAM

PC 166

118 SF

EXAM

PC 165

159 SF

LOUNGE

PC 135

95 SF

POLICE

PC 140

122 SF

VESTIBULE

PC 139

815 SF

AOD

PC 137

132 SF

RECEPTION

PC 141

97 SF

INTERVIEW

248P

92 SF

OFFICE

PC 143

189 SF

LOBBY

PC 100

405 SF

MECHANICAL

M12

1050 SF

WAITING

PC 138

219 SF

CORRIDOR

PCC 114

39 SF

PATIENT

TOILET

PC 163

134 SF

CORRIDOR

PCC 107

S

F

C O

R R

ID

O

R

P C

C

120 SF

OFFICE

PC 147

121 SF

OFFICE

PC 144

121 SF

EXAM

PC 145 119 SF

EXAM

PC 146

S

F

C O

R R

ID

O

R

P C

C

8 162 SF

EXAM

PC 148

144 SF

EXAM

PC 149

31 SF

GENERAL

STORAGE

PC 146A

125 SF

EXAM

PC 150

99 SF

VESTIBULE

PC 151

153 SF

EXAM

PC 152

146 SF

EXAM

PC 154

116 SF

EQUIPMENT

STORAGE

PC 153

170 SF

EXAM

PC 155

62 SF

PATIENT TOILET

PC 156

163 SF

EXAM

PC 157

644 SF

CORRIDOR

PCC110

261 SF

NURSE STATION

PC 171

157 SF

WORK

PC 170

314 SF

CORRIDOR

PCC 111

43 SF

GENERAL

STORAGE

PC 172

153 SF

EXAM

PC 158

157 SF

EXAM

PC 15965 SF

KITCHEN

PC 160

38 SF

WOMEN

PC 161

41 SF

MEN

PC 162

258 SF

CORRIDOR

PCC 105

167 SF

CORRIDOR

248Q

157 SF

WAITING

PC 128

91 SF

COUNSELLING

PC 127

298 SF

CORRIDOR

PCC 112

320 SF

CORRIDOR

PCC103

2'x2' ACOUSTICAL CEILING TILE

2'x4' ACOUSTICAL CEILING TILE

GYPSUM/HARD LID CEILING

KEY AREA SHOWN

PROJECT

NORTH

RM 167A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .