Attachment 03 - DRAWINGS VOL 1.pdf
PDF 31 MB Posted
- Attached to
- Z1DA--564-21-700 | Construct EHRM Infrastructure Upgrades | Fayetteville, AR Federal contract opportunity
- Solicitation number
- 36C77625R0039
About this file
This document is a set of architectural and engineering design drawings for the EHRM Infrastructure Upgrades project at the Fayetteville, Arkansas Veterans Affairs (VA) facility. The comprehensive drawing set includes civil, structural, and communication infrastructure details for a new Main Communications Room (MCR) Building and campus-wide fiber optic backbone infrastructure.
The project scope involves constructing a new Building 50 MCR with associated mechanical yards, utility connections, and a comprehensive fiber optic network that will establish physically secure, scalable telecommunications infrastructure across multiple campus buildings. The design includes underground ductbanks with concrete-encased conduits, underground handholes, and detailed routing for both "A" and "B" fiber optic pathways. The infrastructure will support two independent conduit pathways with air-assisted fiber optic cables, providing dedicated communication routes from the MCR to Telecommunications Rooms (TR) and Telecommunications Enclosures (TE) in various campus buildings. The project is part of VA solicitation 36C77625R0039, with design documents dated December 13, 2024, and involves multiple engineering disciplines including civil, structural, and communications infrastructure.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C77625R0039 0003.pdf | ||
| 36C77625R0039 0003 Attachment A - Addendums.zip | ZIP file | |
| 36C77625R0039 0003 Attachment C - RFI Response.pdf | ||
| 36C77625R0039 0003 ATTACHMENT B - REVISED WAGE DETERMINATION.pdf | ||
| 36C77625R0039 0002.pdf | ||
| 36C77625R0039 0002 - Attachment A - Spec 01 31 00.01 Project Management and Coordination.pdf | ||
| 36C77625R0039 0001 Attachment 1 - SITE VISIT Sign In Rosters.zip | ZIP file | |
| 36C77625R0039 0001.pdf | ||
| Attachment 02 - Specifications.zip | ZIP file | |
| Attachment 03 - DRAWINGS VOL 5.pdf | ||
| Attachment 03 - DRAWINGS VOL 3.pdf | ||
| Attachment 03 - DRAWINGS VOL 2.pdf | ||
| Attachment 03 - DRAWINGS VOL 4.pdf | ||
| 36C77625R0039.pdf | ||
| Attachment 01 - Wage Determination_Washington County_Arkansas.pdf | ||
| Attachment 04 - Limitations on Subcontracting - Construction.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECTURAL
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
DESIGN TEAM
FIRE PROTECTION
SPEES DESIGN BUILD
STRUCTURAL
WSP USA SOLUTIONS, INC.
ELECTRICAL
SPEES DESIGN BUILD
PLUMBING
SPEES DESIGN BUILD
MECHANICAL
SPEES DESIGN BUILD
33301 NINTH AVENUE SOUTH, SUITE 300
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
PHONE: (206) 590-2118
CIVIL
WSP USA SOLUTIONS, INC.
33301 NINTH AVENUE SOUTH, SUITE 300
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
COMMUNICATIONS
WSP USA SOLUTIONS, INC.
33301 NINTH AVENUE SOUTH, SUITE 300
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
PROJECT INFORMATION
STATE:
COUNTY:
JURISTICTION:
OWNER:
CODE ANALYSIS
PROJECT DESCRIPTION
THE PROPOSED DESIGN SHALL IMPROVE,
RECONFIGURE, EXPAND AND RENOVATE
EXISTING SPACES FOR NEW
TELECOMMUNICATION ROOMS.
APPLICABLE BUILDING
BUILDING 01, 02, 03, 04, 05, 06, 07, 08,
09, 10, 21, 29, 31, 33, 34, 37, 42, 44, 46, 49, 50 (DATA CENTER)
ICRA CLASS REQUIREMENTS
REQUIREMENTS DEPENDENT ON
EACH INDIVIDUAL ROOM LOCATION.
ARKANSAS
WASHINGTON
FAYETTEVILLE
GOV, VETERANS AFFAIRS
GENERAL NOTES
1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &
SPECIFICATIONS.
2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.
BRING TO THE AWARENESS OF, AND VERIFY WITH VA COR PRIOR TO PROCEEDING.
3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE
TO VISIT THE SITE.
4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT
IMMEDIATELY TO THE ATTENTION OF THE COR.
5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.
6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK
THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.
7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE
WITH THE CONTRACT DOCUMENTS.
FAYETTEVILLE, ARKANSAS
BUILDINGS WITHIN THE SCOPE OF THIS PROJECT
08 1021
50' SETBACK FROM ROADS
/ PERIMETER FENCE
DATA CENTER
TRANSFORMER
MECHANICAL YARD A&B
75'x75' LAYDOWN AREA
VEHICLE BARRIER GATE -
SEE DET 2/A-606
BUILDING TYPE
BUILDING 01 - MEDICAL
BUILDING 02 - MEDICAL
BUILDING 03 - NON- MEDICAL
BUILDING 04 - NON- MEDICAL
BUILDING 05 - NON- MEDICAL
BUILDING 07 - NON- MEDICAL
BUILDING 08 - NON- MEDICAL
BUILDING 09 - NON- MEDICAL
BUILDING 10 - NON- MEDICAL
BUILDING 21 - MEDICAL
BUILDING 29 - NON- MEDICAL
BUILDING 31 - MEDICAL
BUILDING 33 - NON- MEDICAL
BUILDING 34 - NON- MEDICAL
BUILDING 37 - NON- MEDICAL
BUILDING 42 - NON- MEDICAL
BUILDING 44 - MEDICAL
BUILDING 50 - NON-MEDICAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPRINKLERED G-001
COVER
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
08/15/2024 MA CA
100% CONSTRUCTION
DOCUMENTS
EHRM INFRASTRUCTURE UPGRADES - VOL. 1
FAYETTEVILLE, ARKANSAS
PROJECT #: 564-21-700
NTS
ENLARGED LOCATION MAP
TRUE
NORTH
TRUE
NORTH
1" = 200'-0"
SITE PLAN
Revisions: Date: 1 OF 49
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPRINKLERED G-002
DRAWING INDEX
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
FAYETTEVILLE, ARKANSAS
564-21-700
08/15/2024 MA CA
100% CONSTRUCTION
DOCUMENTS
Revisions: Date: 2 OF 49
SHEET # SHEET NAME
1 OF 49 G-001 COVER PAGE
2 OF 49 G-002 SHEET INDEX
3 OF 49 C-001 CIVIL SHEET INDEX AND GENERAL NOTES
4 OF 49 C-002 GENERAL NOTES AND LEGEND
5 OF 49 CD150 MCR BUILDING DEMOLITION PLAN
6 OF 49 CS100 OVERALL CIVIL SITE PLAN
7 OF 49 CS150 MCR BUILDING SITE PLAN
8 OF 49 CG100 OVERALL EROSION CONTROL PLAN
9 OF 49 CG101 EROSION CONTROL GENERAL NOTES AND DETAILS
10 OF 49 CG150 MCR BUILDING EROSION CONTROL PLAN
11 OF 49 CG151 MCR BUILDING GRADING AND DRAINAGE PLAN
12 OF 49 CG152 MCR BUILDING STORMWATER BMP PLAN
13 OF 49 CU150 MCR BUILDING UTILITY PLAN
14 OF 49 CU151 BUILDING 49 JOINT TRENCH PLAN AND PROFILE
15 OF 49 CU160 CIVIL UTILITY CONSTRUCTION DETAILS
16 OF 49 CU161 CIVIL UTILITY CONSTRUCTION DETAILS
17 OF 49 CU200 FIBER OPTIC GENERAL NOTES
18 OF 49 CU300 OVERALL FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
19 OF 49 CU301 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
20 OF 49 CU302 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
21 OF 49 CU303 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
22 OF 49 CU304 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
23 OF 49 CU305 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
24 OF 49 CU400 FIBER OPTIC RISER DIAGRAMS
25 OF 49 CU401 FIBER OPTIC RISER DIAGRAMS
26 OF 49 CU500 CAMPUS FIBER RISER DIAGRAM -A SIDE
27 OF 49 CU501 CAMPUS FIBER RISER DIAGRAM -B SIDE
28 OF 49 CU502 COMMUNICATIONS DETAILS
29 OF 49 CU503 COMMUNICATIONS DETAILS
30 OF 49 CU504 COMMUNICATIONS DETAILS
31 OF 49 CU505 COMMUNICATIONS DETAILS
32 OF 49 CU506 COMMUNICATIONS DETAILS
33 OF 49 S-001 STRUCTURAL GENERAL NOTES
34 OF 49 S-002 STRUCTURAL GENERAL NOTES
35 OF 49 S-003 ABRREVIATIONS AND SYMBOLS
36 OF 49 S-101 FOUNDATION PLAN
37 OF 49 S-111 ROOF PLAN
38 OF 49 S-201 STRUCTURAL WALL ELEVATIONS
39 OF 49 S-202 STRUCTURAL WALL ELEVATIONS
40 OF 49 S-501 TYPICAL CONCRETE DETAILS
41 OF 49 S-502 CONCRETE FOUNDATION DETAILS
42 OF 49 S-511 TYPICAL STRUCTURAL STEEL DETAILS
43 OF 49 S-512 TYPICAL STRUCTURAL STEEL DETAILS
44 OF 49 S-531 TYPICAL CMU WALL DETAILS
45 OF 49 S-532 TYPICAL CMU WALL DETAILS
46 OF 49 S-541 MECHANICAL ANCHORAGE DETAILS
47 OF 49 S-542 TYPICAL DETAILS-CABINET TO CFS FRAMED WALL
48 OF 49 S-543 TYPICAL DETAILS-CABINET TO WOOD FRAMED WALL
49 OF 49 S-544 TYPICAL DETAILS-CABINET TO CONCRETE AND CMU WALL
STRUCTURAL
PAGE #
DRAWING INDEX - VOLUME 1
GENERAL
CIVIL
ABBREVIATIONS
AAF AIR ASSISTED FIBER
ABAN ABANDONED
APROX APPROXIMATELY
APWA AMERICAN PUBLIC WORKS
ASSOCIATION
ASPH ASPHALT CONCRETE
AVE AVENUE
AWWA AMERICAN WATER WORKS
ASSOCIATION
BLDG BUILDING
BMP BEST MANAGEMENT
PRACTICES
BOT BOTTOM
BVC BEGIN VERTICAL CURVE
CL or ℄ CENTERLINE
CDF CONTROLLED DENSITY FILL
CFS CUBIC FEET PER SECOND
CLR CLEAR
CM CENTIMETER
CMP CORRUGATED METAL PIPE
COMM COMMUNICATION(S)
CONC PORTLAND CONCRETE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CPEP CORRUGATED
POLYETHELENE PIPE (N-12)
CSBC CRUSHED SURFACING BASE
COURSE
CSTC CRUSHED SURFACING TOP
COURSE
CTR CENTER
CY CUBIC YARDS
DDCV DOUBLE DETECTOR CHECK
VALVE
DI DUCTILE IRON
DIA or Ø DIAMETER
DWG DRAWING
E EAST
EA EACH
EG EXISTING GROUND
ELEC ELECTRICAL
ELEV ELEVATION
EP EDGE OF PAVEMENT
ESMT EASEMENT
EVC END VERTICAL CURVE
EXIST EXISTING
FG FINISH GRADE
FL FLANGE
FM FORCE MAIN
FT FEET
HDPE HIGH DENSITY
POLYETHYLENE PIPE
HP HIGH POINT
HMA HOT MIX ASPHALT
HORIZ HORIZONTAL
HWY HIGHWAY
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCH(ES)
ISP INTERNET SERVICE
PROVIDER
LBS POUNDS
LF LINEAR FEET
LT LEFT
LP LOW POINT
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
N NORTH
NAD NORTH AMERICAN DATUM
NAVD NORTH AMERICAN
VERTICAL DATUM
NE NORTHEAST
NOM NOMINAL
NTS NOT TO SCALE
NW NORTHWEST
OC ON CENTER
OD OUTSIDE DIAMETER
OSP OUTSIDE PLANT
OS1 OPTICAL SINGLEMODE
FIBER (LEGACY STANDARD)
OS2 OPTICAL SINGLEMODE
FIBER (LATEST STANDARD)
OVHD OVERHEAD
PC POINT OF CURVATURE
PE PROJECT ENGINEER
PI POINT OF HORIZONTAL
INTERSECTION
PHH PHYSICAL HAND HOLE
POC POINT ON CURVE
POB POINT OF BEGINNING
POP POINT OF PRESENCE
PPM PARTS PER MILLION
PROP PROPOSED
PT POINT OR POINT OF
TANGENCY
PVC POLYVINYL CHLORIDE PIPE
PVI POINT OF VERTICAL
INTERSECTION
R RADIUS
RJ RESTRAINED JOINT
RT RIGHT
S SOUTH
SD STORM DRAIN
SDCB STORM DRAIN CATCH BASIN
SDCO STORM DRAIN CLEANOUT
SDMH STORM DRAIN MANHOLE
SE SOUTHEAST
SEC SECTION
SF SQUARE FOOT
SMFO SINGLE MODE FIBER
OPTICS
SPEC SPECIFICATION
SS SANITARY SEWER
SSFM SANITARY SEWER FORCE
MAIN
SSMH SANITARY SEWER MANHOLE
ST STREET
STA STATION
STD STANDARD
SW SOUTHWEST
SWPPP STORMWATER POLLUTION
PREVENTION PLAN
TAN TANGENT POINT
TDR TELECOMMUNICATIONS
DISTRIBUTION ROOM
TDU TUBE CABLE DISTRIBUTION
UNIT
TESC TEMPORARY EROSION &
SEDIMENT CONTROL
TOC TOP OF CURB
TR TELECOMMUNICATIONS
ROOM
TYP TYPICAL
UFC UNIFIED FACILITIES
CRITERIA
UG UNDERGROUND
VC VERTICAL CURVE
VERT VERTICAL
W WEST or WATER
WM WATER METER
WSEL WATER SURFACE
ELEVATION
W/ WITH
GENERAL NOTES:
1. CONTRACTOR MUST COMPLY WITH ALL LOCAL, STATE AND FEDERAL LAWS PERTINENT TO THE
WORK, AND AS DESCRIBED IN THE SPECIFICATIONS AND ON THESE DESIGN DRAWINGS. ALL
WORKMANSHIP AND MATERIALS MUST BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS RESPONSIBLE FOR BECOMING FAMILIARIZED WITH THE EXISTING
CONDITIONS AND VERIFYING CONSISTENCY WITH DESIGN DRAWINGS AND SPECIFICATIONS. THE
CONTRACTOR MUST REPORT ANY DISCREPANCY TO THE CONTRACTING OFFICER IMMEDIATELY
AND AWAIT FURTHER INSTRUCTIONS.
3. IT MUST BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL APPLICABLE PERMITS, LICENSES AND CERTIFICATES, AND MAKE ALL REQUIRED AGENCY NOTIFICATIONS TO COMPLETE THE PROJECT. COMPLIANCE MUST BE AT ALL LEVELS: FEDERAL, STATE, AND LOCAL RELATING TO
THE PERFORMANCE OF THE WORK.
4. PRIOR TO BEGINNING WORK AND PROCURING MATERIALS THAT COULD BE IMPACTED,
CONTRACTOR SHALL INSPECT AND CONFIRM ALL POINTS OF CONNECTIONS TO EXISTING
UTILITIES OR SYSTEMS. POTHOLE WHERE NECESSARY TO VERIFY THE DRAWINGS AGAINST ALL
APPLICABLE EXISTING CONDITIONS. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY UPON
DISCOVERY OF UNFORESEEN SITE CONDITIONS OR DISCREPANCIES.
5. CALL THE UNDERGROUND LOCATE LINE (811) A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATIONS, AND HIRE PRIVATE UTILITY LOCATE COMPANY TO CONFIRM PRESENCE OF
EXISTING BURIED UTILITIES PRIOR TO EXCAVATION. LOCATIONS OF EXISTING UTILITIES SHOWN
HEREIN HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS
AND SHOULD BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT
SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THESE PLANS.
6. UTILITY SYSTEMS MUST BE CONSTRUCTED ACCORDING TO APPROVED PLANS. ANY DEVIATION
FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CONTRACTING
OFFICER.
6. CONTRACTOR SHALL PREPARE CONSTRUCTION STORM WATER POLLUTION PREVENTION PLAN
(SWPPP) IN ACCORDANCE WITH ALL APPLICABLE FEDERAL AND STATE REQUIREMENTS AND
OBTAIN PERMIT FOR PROPOSED WORK. CONTRACTOR SHALL MAINTAIN AND UPDATE SWPPP AS
REQUIRED THROUGHOUT CONSTRUCTION. A COPY OF THE APPROVED CONSTRUCTION SWPPP
MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
7. CONTRACTOR MUST TAKE ALL POSSIBLE CARE TO PROTECT PERSONAL AND ADJACENT
PROPERTY AND TO ENSURE THE SAFETY OF THOSE INVOLVED DIRECTLY OR INDIRECTLY WITH
THE WORK.
8. THE CONTRACTOR MUST PERFORM ANY AND ALL CUTTING, PATCHING, REPAIRING, RESTORING
AND THE LIKE NECESSARY TO RETURN ALL SURFACES AFFECTED BY THE WORK TO THEIR
ORIGINAL CONDITION.
9. DEMOLITION MUST BE TO THE LIMITS SHOWN ON THE PLANS. THE DEMOLITION LIMITS DEPICTED IN THE PLANS ARE BASED ON THE AVAILABLE INFORMATION OR SURVEY. DEMOLITION LIMITS MAY
VARY DEPENDING ON CHANGED SITE CONDITIONS AT THE TIME OF CONSTRUCTION.
10. EXISTING PAVEMENT, LANDSCAPING, SURFACE OR SUBSURFACE FACILITIES, WITHIN OR
ADJACENT TO THE CONTRACTOR'S WORK AREA OR INDICATED ON THE PLANS TO REMAIN MUST
BE PROTECTED FROM DAMAGE. ANY FACILITIES DAMAGED BY THE CONTRACTOR'S ACTIVITIES
MUST BE IMMEDIATELY REPAIRED TO MATCH ITS ORIGINAL CONDITION AND THE SATISFACTION OF
THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT.
11. ALL MATERIALS MUST BE NEW MATERIALS AND PURCHASED IN ACCORDANCE WITH THE BUY
AMERICAN ACT.
12. WRITTEN DIMENSIONS IN SCHEDULES AND DRAWINGS TAKE PRECEDENCE OVER SCALED
DRAWINGS. DO NOT SCALE DRAWINGS, AND BRING ALL DISCREPANCIES TO THE ATTENTION OF
THE CONTRACTING OFFICER AND AWAIT FURTHER INSTRUCTIONS.
13. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE CONSTRUCTION PHASING AND
STAGING. NO ADDITIONAL COST TO THE OWNER MUST BE PERMITTED FOR THE RELOCATION OF
TRAILERS, STORED MATERIAL, REMOVAL AND REINSTALLATION OF BARRICADES, FENCING, OR
ANY OTHER INCIDENTAL ITEMS THAT ARE REQUIRED AND NECESSARY TO ACCOMPLISH THE
WORK UNDER THIS CONTRACT. COMPLETE RESTORATION BETWEEN CONSTRUCTION PHASES IS
REQUIRED, UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.
14. THE CONTRACTOR MUST NOTIFY VA OF ANY WORK TO BE PERFORMED IN CONFINED SPACE.
CONTRACTOR MUST CREATE AND SUBMIT INDIVIDUAL CONFINED SPACE WORK PLAN.
CONTRACTOR MUST RECEIVE APPROVAL FROM VA PRIOR TO BEGINNING WORK.
15. ANY U.S.G.S. OR CAMPUS SURVEY MONUMENTS WITHIN THE LIMITS OF DEMOLITION OR
CONSTRUCTION MUST BE PROTECTED. IF A MONUMENT IS IN DANGER OF BEING DESTROYED AND
HAS NOT BEEN PROPERLY REFERENCED IN THE PLANS, THE CONTRACTOR MUST IMMEDIATELY
NOTIFY THE CONTRACTING OFFICER. CONTRACTOR MUST REPAIR ANY DAMAGED BENCH MARKS
IN ACCORDANCE WITH N.O.A.A. NATIONAL GEODETIC SURVEY GUIDELINES, AND TO THE
SATISFACTION OF THE FACILITY'S G.I.S. BENCHMARK REPRESENTATIVE.
16. CONTRACTOR MUST PROVIDE AND MAINTAIN ACCESS, AT ALL TIMES DURING CONSTRUCTION, TO ALL EXISTING FACILITIES AND THOSE THAT MAY BE UNDER CONSTRUCTION IN THE IMMEDIATE
VICINITY. FIRE TRUCK AND EMERGENCY VEHICLE ACCESS MUST NOT BE BLOCKED.
17. THE CONTRACTOR MUST BE SOLELY RESPONSIBLE FOR DETERMINING THE ADEQUACY OF
EXISTING STRUCTURES AND UTILITIES TO SUPPORT CONSTRUCTION EQUIPMENT AND LOADS.
18. ALL DEVIATIONS FROM THESE PLANS MUST BE RECORDED ON A SET OF "AS-BUILT" OR RECORD
REDLINE DRAWINGS. THE CONTRACTOR MUST SUBMIT "AS-BUILT" REDLINE DRAWINGS TO THE
CONTRACTING OFFICER.
19. ALL DEMOLITION MATERIAL, INCLUDING PAVEMENT AND EXCESS SOIL, EXCEPT AS NOTED IN THE CONTRACT DRAWINGS / SPECIFICATIONS AND / OR SPECIFIED BY THE CONTRACTING OFFICER, MUST BECOME THE PROPERTY OF THE CONTRACTOR AND BE COMPLETELY REMOVED FROM VA
CAMPUS AND DISPOSED OF BY THE CONTRACTOR.
20. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN
SHORING AND BRACING NECESSARY TO PROTECT WORKERS, UTILITIES AND OTHER
IMPROVEMENTS AND EXCAVATIONS PER STATE AND FEDERAL REGULATIONS. THE CONTRACTOR
SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF TEMPORARY SHORING AND BRACING.
EXISTING DATA NOTES:
1. THE EXISTING INFORMATION SHOWN ON THESE DRAWINGS HAVE BEEN PREPARED BASED UPON
INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, GOVERNMENT CANNOT ENSURE ACCURACY AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY
OF THAT INFORMATION OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN
INCORPORATED INTO THESE DRAWINGS AS A RESULT.
2. THE ENGINEER ASSUMES NO LIABILITY FOR DAMAGES TO ANY UTILITIES DURING CONSTRUCTION.
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO REPAIR ANY DAMAGES THAT MAY OCCUR
DURING CONSTRUCTION.
3. THE CONTRACTOR MAY CONDUCT TEST PITS (POTHOLE) TO VERIFY EXISTING CONDITIONS. THE
CONTRACTOR SHALL COORDINATE ALL TEST PITS WITH THE COR.
RESTORATION NOTES:
1. RESTORATION MUST BE IN ACCORDANCE WITH VA AND UFC REQUIREMENTS.
2. RESTORE ALL DISTURBED AREAS AS SHOWN ON PLANS OR AS DIRECTED BY THE CONTRACTING
OFFICER.
3. REPAIR ALL UTILITIES DAMAGED BY CONSTRUCTION IN ACCORDANCE WITH CONTRACTING
OFFICER'S REQUIREMENTS.
4. CONTRACTOR MUST RESTORE THE SITE AND ALL OTHER PHYSICAL FEATURES TO MATCH
EXISTING CONDITIONS WHERE CONSTRUCTION WORK IS PERFORMED.
5. CONTRACTOR TO RETURN DISTURBED SOIL AND LANDSCAPING TO ITS ORIGINAL CONDITION.
DEMOLITION NOTES:
1. PERFORM DEMOLITION IN SUCH MANNER AS TO ELIMINATE HAZARDS TO PERSONS AND
PROPERTY; TO MINIMIZE INTERFERENCE WITH USE OF ADJACENT AREAS, UTILITIES AND
STRUCTURES OR INTERRUPTION OF USE OF SUCH UTILITIES; AND TO PROVIDE FREE PASSAGE
TO AND FROM SUCH ADJACENT AREAS OR STRUCTURES.
2. PROVIDE SAFEGUARDS, INCLUDING WARNING SIGNS, BARRICADES, TEMPORARY FENCES,
WARNING LIGHTS, AND OTHER SIMILAR ITEMS THAT ARE REQUIRED FOR PROTECTION OF ALL
PERSONNEL DURING DEMOLITION AND REMOVAL OPERATIONS.
3. MAINTAIN FENCES, BARRICADES, LIGHTS AND OTHER SIMILAR ITEMS AROUND EXPOSED
EXCAVATIONS UNTIL SUCH EXCAVATIONS HAVE BEEN COMPLETELY FILLED.
4. PREVENT SPREAD OF FLYING PARTICLES AND DUST. SPRINKLE RUBBISH AND DEBRIS WITH
WATER TO KEEP DUST TO A MINIMUM. DO NOT USE WATER IF IT RESULTS IN HAZARDOUS OR
OBJECTIONABLE CONDITIONS SUCH AS, BUT NOT LIMITED TO; ICE, FLOODING OR POLLUTION.
VACUUM, SWEEP, AND DUST THE WORK AREA DAILY.
5. BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE AND
EXAMINE THE DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK.
THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID DAMAGES TO EXISTING
ITEMS TO REMAIN IN PLACE, TO BE REUSED, OR TO REMAIN THE PROPERTY OF THE MEDICAL
CENTER; AND DAMAGED ITEMS SHALL BE REPAIRED OR REPLACED AS APPROVED BY THE
CONTRACTING OFFICER REPRESENTATIVE (COR). THE CONTRACTOR SHALL COORDINATE THE
WORK WITH ALL OTHER WORK AND SHALL CONSTRUCT AND MAINTAIN SHORING, BRACING,
AND SUPPORTS AS REQUIRED. THE CONTRACTOR SHALL ENSURE THAT STRUCTURAL
ELEMENTS ARE NOT OVERLOADED AND SHALL BE RESPONSIBLE FOR INCREASING
STRUCTURAL SUPPORTS OR ADDING NEW SUPPORTS AS MAY BE REQUIRED AS A RESULT OF
ANY CUTTING, REMOVAL, OR DEMOLITION WORK PERFORMED.
6. DEMOLISH AND REMOVE OUTSIDE UTILITY SERVICE LINES SHOWN TO BE REMOVED.
7. REMOVE ABANDONED OUTSIDE UTILITY LINES THAT WOULD INTERFERE WITH INSTALLATION
OF NEW UTILITY LINES AND NEW CONSTRUCTION.
8. COMPLETELY DEMOLISH AND REMOVE BUILDINGS AND STRUCTURES, INCLUDING ALL
APPURTENANCES RELATED OR CONNECTED THERETO, AS NOTED BELOW:
8.A. AS REQUIRED FOR INSTALLATION OF NEW UTILITY SERVICE LINES.
8.B. TO FULL DEPTH WITHIN AN AREA DEFINED BY HYPOTHETICAL LINES LOCATED 5 FT (1500
MM) OUTSIDE BUILDING LINES OF NEW STRUCTURES.
9. ALL WASTE DEBRIS, UNSUITABLE, AND EXCESS MATERIAL SHALL BE REMOVED FROM THE SITE
AND LAWFULLY DISPOSED OF. DEBRIS, INCLUDING BRICK, CONCRETE STONE, METALS AND
SIMILAR MATERIALS SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE
DISPOSED OF BY THE CONTRACTOR DAILY, OFF THE MEDICAL CENTER TO AVOID
ACCUMULATION AT THE DEMOLITION SITE. MATERIALS THAT CANNOT BE REMOVED DAILY
SHALL BE STORED IN AREAS SPECIFIED BY THE CONTRACTING OFFICERS REPRESENTATIVE.
CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF MATERIALS UNCOVERED DURING
ANY PART OF THE WORK APPEAR TO BE CONTAMINATED. ALL LOCAL, STATE AND FEDERAL
LAWS SHALL PREVAIL IN THE EVENT OF CONTAMINATED MATERIALS.
10. BREAK UP CONCRETE SLABS BELOW GRADE THAT DO NOT REQUIRE REMOVAL FROM
PRESENT LOCATION INTO PIECES NOT EXCEEDING 24 INCHES (600 MM) SQUARE TO PERMIT
DRAINAGE. CONTRACTOR SHALL DISPOSE OF DEBRIS IN COMPLIANCE WITH APPLICABLE
FEDERAL, STATE AND LOCAL PERMITS, RULES AND/OR REGULATIONS.
TRAFFIC MANAGEMENT NOTES:
1. ALL ROADWAYS MUST REMAIN OPEN DURING CONSTRUCTION, UNLESS OTHERWISE APPROVED BY
THE CONTRACTING OFFICER. ROADWAY CLOSURE DURING CONSTRUCTION REQUIRES THE
CONTRACTOR SUBMIT A TRAFFIC CONTROL PLAN FOR REVIEW AND APPROVAL IN ADVANCE. IF
REQUIRED, ALL TEMPORARY TRAFFIC CONTROL DEVICES MUST BE IN ACCORDANCE WITH THE
MOST CURRENT EDITION OF "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS
AND HIGHWAYS".
2. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF ONE MOVING LANE ALONG ROADWAYS AT
ALL TIMES, EXCEPT WHERE GIVEN PERMISSION BY THE VAMC AND CONTRACTING OFFICERS
REPRESENTATIVE.
3. THE CONTRACTOR SHALL PROVIDE ALL SIGNAGE, BARRICADES, CAUTION TAPE, CONES AND
BARRELS REQUIRED TO FACILITATE A SAFE LANE OR SIDEWALK CLOSURE.
4. PEDESTRIAN ACCESS SHALL BE MAINTAINED AND MANAGED DURING SIDEWALK AND
CROSSWALK CLOSURES.
5. ACCESS TO ALL ROADWAYS, DRIVEWAYS AND LOADING RAMPS SHALL BE MAINTAINED DAILY
AFTER CONSTRUCTION ACTIVITIES HAVE CONCLUDED.
6. THE CONTRACTOR SHALL COORDINATE ANY ROADWAY, DRIVEWAY, LOADING RAMP AND/OR
SIDEWALK CLOSURES WITH THE VAMC PRIOR TO PERFORMING WORK.
7. ALL ROAD CLOSURES SHALL BE OUTSIDE NORMAL WORKING HOURS OF 8:00 AM TO 5:00 PM
MONDAY THROUGH FRIDAY. ROAD CLOSURES AND TRAFFIC CONTROL PLAN SHALL BE
APPROVED BY COR PRIOR TO CONSTRUCTION. CONTRACTOR TO MAINTAIN ONE ACCESS TO
THE EMERGENCY ROOM AMBULANCE BAY AT ALL TIMES.
GENERAL UTILITY NOTES:
1. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR MUST VERTICALLY AND
HORIZONTALLY FIELD LOCATE BY POTHOLING AND SURVEY ALL PROPOSED UTILITY CONFLICTS
AND CROSSINGS. IF THE EXISTING UTILITY LOCATION DIFFERS FROM WHAT IS SHOWN ON THE
PLANS, THE CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER AND/OR CONTRACTING
OFFICER'S REPRESENTATIVE IMMEDIATELY AND AWAIT FURTHER INSTRUCTIONS.
2. THE CONTRACTOR IS ADVISED THAT ALL EXISTING UNDERGROUND UTILITIES, CABLES, DUCTS, MANHOLES, ETC. (UNDERGROUND FACILITIES) SHOWN ON PLANS WERE LOCATED USING THE
BEST INFORMATION AVAILABLE. INFORMATION SHOWN ON THE DRAWING CONCERNING TYPE, SIZE
AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR
ALL-INCLUSIVE, AND IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR IS
SOLELY RESPONSIBLE FOR LOCATING AND PROTECTING ALL UTILITIES. CONTRACTOR MUST BE
RESPONSIBLE FOR CONTACTING GOVERNMENT UTILITY OWNERS TO IDENTIFY UNDERGROUND
UTILITIES AND/OR CABLES WITHIN THE PROJECT LIMITS AND STAGING AREAS. THE CONTRACTOR
MUST ASSIST UTILITY OWNERS IN EFFORTS TO FIELD VERIFY UNDERGROUND UTILITIES.
CONTRACTOR MUST ALSO REVIEW ALL UTILITIES WITH THE CAMPUS MAINTENANCE STAFF PRIOR
TO BEGINNING WORK. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, THE
CONTRACTOR MUST CONDUCT A FIELD UTILITY LOCATION SURVEY USING ELECTRONIC,
MAGNETIC OR OTHER UNDERGROUND UTILITY LOCATING PRACTICES. UTILITY OWNERS MUST BE
NOTIFIED AND MUST HAVE THE OPTION TO ACCOMPANY THIS FIELD INVESTIGATION.
EXPLORATORY EXCAVATIONS IN THE VICINITY OF EXISTING UNDERGROUND UTILITIES,
PARTICULARLY THOSE ASSOCIATED WITH OPERATING NAVIGATIONAL AIDS, MUST BE CARRIED
OUT WITH HAND TOOLS UNTIL THE EXACT CHARACTER AND LOCATION OF SUCH FACILITIES ARE DETERMINED. ALL INFORMATION SO OBTAINED FROM THIS UTILITY LOCATION SURVEY MUST BE
FURNISHED TO THE CONTRACTING OFFICER AND/OR CONTRACTING OFFICER'S REPRESENTATIVE
AND THE A/E PRIOR TO CONSTRUCTION.
3. ALL UNDERGROUND CABLE, UTILITIES, AND ASSOCIATED STRUCTURES MUST BE PROTECTED
FROM DAMAGE BY THE CONTRACTOR. ANY DAMAGE TO EXISTING UNDERGROUND CABLES
AND/OR UTILITIES CAUSED BY THE CONTRACTOR (REGARDLESS OF WHETHER THEY WERE
LOCATED OR NOT BY THE COMPUS, UTILITY COMPANY, ETC.) MUST BE REPAIRED BY THE
CONTRACTOR AT THE CONTRACTOR'S OWN EXPENSE AND TO THE SATISFACTION OF THE UTILITY OWNER'S AUTHORIZED REPRESENTATIVES. ALL EXISTING UTILITIES, CABLE, DUCTS, EQUIPMENT, DEVICES, ETC. OUTSIDE THE AREA OF DEMOLITION OR CONSTRUCTION LIMITS WHICH ARE
DAMAGED OR DISRUPTED AS A RESULT OF THE CONTRACTOR'S OPERATIONS, MUST BE
IMMEDIATELY REPAIRED AT THE EXPENSE OF THE CONTRACTOR AND TO THE SATISFACTION OF
THE UTILITY OWNER'S AUTHORIZED REPRESENTATIVE.
4. ALL UTILITY OUTAGES MUST BE SCHEDULED AND APPROVED THROUGH THE COR (CONTRACTING
OFFICER) PER THE APPLICABLE OUTAGE NOTIFICATION REQUIREMENTS.
5. UNLESS ALREADY SPECIFIED IN THE CONTRACT DRAWINGS, CONTRACTOR MUST RETROFIT ALL EXISTING UTILITY ACCESS POINTS TO BRING FLUSH WITH FINISHED SURFACE WITHIN AREAS OF
WORK IN WHICH THE EXISTING GRADE IS MODIFIED BY CONSTRUCTION. THIS WORK IS
CONSIDERED PART OF THE CONTRACTED SCOPE, AND APPLIES TO EXISTING UTILITIES THAT ARE
NOT TO BE DEMOLISHED OR ABANDONED WITHIN THE PROJECT LIMITS.
6. ALL MATERIALS, WORKMANSHIP, AND TESTING MUST BE IN ACCORDANCE WITH THE
REQUIREMENTS OF THE CONTRACT SPECIFICATIONS.
7. FIELD VERIFY LOCATION (INCLUDING POT HOLING FOR VERTICAL DEPTH) OF EXISTING UTILITIES
AND INVERT ELEVATIONS OF THE POINT OF CONNECTION PRIOR TO CONSTRUCTION.
8. COMPRESSIBLE MATERIALS:
FOR USE IN AREAS ABOVE BURIED PIPES WHERE OTHER PIPES ARE CROSSING WITH LESS THAN
1'-0" VERTICAL SEPARATION OR WHERE CALLED OUT ON DRAWINGS: POLYETHYLENE PLASTIC
FOAM IN ACCORDANCE WITH FEDERAL SPECIFICATION PPP-C-1752C, TYPE 1, CLASS 2, SUCH AS "ETHAFOAM". AT PIPE CROSSINGS, MATERIAL SHALL BE A MIN OF 2-INCH THK, 2-FT WIDE, AND 4-FT LONG, BUT SHALL BE A MINIMUM OF 6-IN WIDER THAT OUTSIDE DIAMETER OF PIPE ON EACH SIDE.
9. GATE VALVES INSTALLED UNDER PAVEMENT SHALL HAVE A 2-INCH OPERATING NUT AND VALVE BOX W/ COVER FLUSH WITH ASPHALT SURFACE. GATE VALVES INSTALLED IN AREAS WHERE THE SURFACE IS OTHER THAN ASPHALT OR CONCRETE, TOP OF VALVE BOX SHALL BE EMBEDDED IN A CAST-IN-PLACE COLLAR THAT IS 3'-0" MIN SQUARE BY 8-INCHES THICK PLACED ON 4-INCH THICK
(MIN) COMPACTED BASE COURSE WITH SURFACE FLUSH WITH EXISTING GRADE
10. TESTING OF ALL INSTALLED UTILITY LINES AND STRUCTURES MUST BE IN ACCORDANCE WITH
CONTRACT SPECIFICATIONS.
11. ANY REVISIONS TO THESE PLANS, ONCE APPROVED BY THE ENGINEER OF RECORD, MUST BE
REVIEWED AND RE-APPROVED BY THE CONTRACTING OFFICER.
12. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR UTILITY TRENCH SAFETY INCLUDING SHORING
(IF REQUIRED) DESIGNED BY A REGISTERED ENGINEER AND WORKER SAFETY WHILE WORKING
WITHIN THE TRENCH.
GRADING & BACKFILL NOTES:
1. BACKFILL MATERIAL MUST NOT CONTAIN PETROLEUM PRODUCTS, OR SUBSTANCES WHICH ARE
HAZARDOUS, DANGEROUS, TOXIC, OR WHICH OTHERWISE VIOLATE ANY STATE, FEDERAL. OR
LOCAL LAW, ORDINANCE, CODE, REGULATION, RULE, ORDER, OR STANDARD.
2. GENERAL SITE BACKFILL MATERIAL MUST MEET THE VA REQUIREMENTS FOR EARTHWORK AND BE
IN ACCORDANCE WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT FOR THIS
PROJECT.
3. SLOPE FINISH GRADE SURFACES UNIFORMLY BETWEEN ELEVATIONS SHOWN ON DRAWINGS
UNLESS SPECIFIED OTHERWISE. GRADE AREAS TO ELIMINATE LOW SPOTS AND MAINTAIN
POSITIVE DRAINAGE AWAY FROM BUILDING AND STRUCTURES.
SECURITY:
1. THE CONTRACTOR MUST COMPLY WITH ALL REQUIREMENTS OF THE VA SECURITY PROGRAM.
2. THE CONTRACTOR MUST BE RESPONSIBLE FOR BRIEFING ALL CONTRACTOR'S PERSONNEL OF
THE VA SECURITY REQUIREMENTS. ALL NEW CONTRACTOR EMPLOYEES MUST BE BRIEFED ON
THESE REQUIREMENTS PRIOR TO WORKING IN THE CONSTRUCTION AREA.
3. CONTRACTOR IS SOLELY RESPONSIBLE FOR SECURING JOBSITE AT ALL TIMES THROUGHOUT
CONSTRUCTION.
PROJECT PHASING:
1. FOR SPECIFIC TECHNOLOGY SYSTEM PHASING AND CUTOVER PLANS AND SCHEDULES PER
BUILDING, SEE SPECIFICATION SECTION 27 06 00.
La st
S av ed b y:
U
SR
M o n:
D ec
2, :2
AM
F ile : C
:\U se rs \U
SR
M
\W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
8\
C
AD
D \D w gs
\V A
Fa ye tte vi lle
C iv il.
dw g
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
A/E:CIVIL ENGINEER:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Solutions Inc.
1201 Pacific Aveue Suite 550 Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
PB RDM
CIVIL SHEET INDEX AND GENERAL
NOTES
C-001
N/A
100% CONSTRUCTION
DOCUMENTS
FAYETTEVILLE, ARKANSAS
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
564-21-700
12/13/24 3 OF 49
BEST INFORMATION AVAILABLE. INFORMATION SHOWN ON THE DRAWING CONCERNING TYPE, SIZE
"ETHAFOAM". AT PIPE CROSSINGS, MATERIAL SHALL BE A MIN OF 2-INCH THK, 2-FT WIDE, AND 4-FT
SD
C(B)
C(A)
PROPOSED LEGEND
SIDE A FIBER PATHWAY
SIDE A UNDERGROUND HANDHOLE
SIDE B FIBER PATHWAY
SIDE B UNDERGROUND HANDHOLE
SERVICE PROVIDER FIBER PATHWAY
SERVICE PROVIDER UNDERGROUND HANDHOLE
UNDERGROUND POWER PATHWAY
UNDERGROUND POWER HANDHOLE
WATER LINE
WATER LINE BEND
FIRE DEPARTMENT CONNECTION (FDC)
POST INDICATOR VALVE (PIV)
FIRE SUPPRESSION LINE
CHILLED WATER LINE
SANITARY SEWER LINE
STORM DRAIN LINE
STORM DRAIN INLET
STORM DRAIN MANHOLE
STORM DRAIN CLEANOUT
STORM DRAIN SWALE FLOWPATH
CONTOUR
LIGHTPOLE
FENCE
ASPHALT PAVEMENT
CONCRETE PAVEMENT
W
F
C(ISP)
SAN
E
E
COMM
SAN
W
G
F
T
E
T
E
W
S
SD
G
EXISTING LEGEND
COMMUNICATION LINE
COMMUNICATION MANHOLE / HANDHOLE
POWER LINE
POWER MANHOLE / HANDHOLE
WATER LINE
WATER METER / VALVE
FIRE SUPPRESSION LINE
FIRE HYDRANT
SANITARY SEWER LINE
SANITARY SEWER MANHOLE
STORM DRAIN LINE
STORM DRAIN INLET
STORM DRAIN MANHOLE
GAS LINE
GAS METER
CONTOUR
FENCE
ASPHALT PAVEMENT
CONCRETE PAVEMENT
X
X
CHWS
GENERAL NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE
IN ACCORDANCE WITH OSHA STANDARDS, STATE AND LOCAL REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE FENCING OR BARRIERS WHEN CONSTRUCTION IS BEING PERFORMED ADJACENT TO BUILDING ENTRANCES/WALKWAYS.
2. THE CONTRACTOR SHALL NOT COMMENCE CONSTRUCTION NOR CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS AND/OR
FIRE HYDRANTS WITHOUT APPROPRIATE PERMITS AND/OR PERMISSIONS.
3. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK THAT BECOME DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
4. VEGETATED AREAS DISTURBED DURING CONSTRUCTION SHALL RECEIVE A MINIMUM OF FOUR (4) INCHES OF TOPSOIL.
THESE ARES SHALL BE IMMEDIATELY SEEDED AND STABILIZED.
5. DAMAGE TO SURFACE FEATURES, SUBSURFACE FEATURES AND SUBSURFACE INFRASTRUCTURE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
6. THE CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OFF-SITE AREAS, AND SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY, AT NO COST TO OWNER.
7. THE CONTRACTOR IS REQUIRED TO BACKFILL TRENCHES OR SECURE WITH METAL PLATES OR CONSTRUCTION FENCE
DAILY. NO OPEN TRENCHES SHALL BE LEFT UNATTENDED.
8. THE CONTRACTOR IS RESPONSIBLE FOR ALL FIELD MEASUREMENTS. THE GOVERNMENT WILL NOT BE HELD RESPONSIBLE FOR BIDDING ERRORS MADE OR FOR THE FAILURE TO ADEQUATELY INSPECT THE JOB SITE FOR EXISTING
CONDITIONS, DIMENSIONS, AND GRADES.
9. THE CONTRACTOR SHALL VERIFY THE PROPOSED LAYOUT WITH ITS RELATIONSHIP TO THE EXISTING SITE. THE CONTRACTOR SHALL ALSO VERIFY ALL DIMENSIONS, SITE CONDITIONS, AND MATERIAL SPECIFICATIONS AND SHALL NOTIFY THE OWNER AND ENGINEER OF ANY DISCREPANCIES BEFORE COMMENCING OR PROCEEDING WITH WORK.
10. THE CONTRACTOR SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATION AT LEAST TWO WORKING DAYS, BUT NOT MORE THAN TEN WORKING DAYS, PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. ALL WATER, GAS, SEWER, ELECTRIC AND OTHER UTILITIES SHALL BE
MAINTAINED AT ALL TIMES DURING CONSTRUCTION.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, WITH MATCHING MATERIALS, ANY PAVEMENT, WALKS, CURBS, ETC. THAT MUST BE CUT OR THAT ARE DAMAGED DURING CONSTRUCTION.
12. CONSTRUCTION ACTIVITIES SHALL NOT CONFLICT WITH THE VAMC OPERATIONS AND EMPLOYEE/PATIENT PARKING. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE VAMC POLICE DEPARTMENT AND COR. WORK AFFECTING BUILDING ENTRANCES, WALKWAYS, LOADING AREAS, PARKING, ETC. SHALL BE COORDINATED AND SCHEDULED WITH
THE VAMC.
13. THE CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES ("AS-BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ENGINEER UPON COMPLETION OF CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS. RECORD DOCUMENTS SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK, PRODUCTS AND/OR SYSTEMS VARY FROM THE DESIGN INTENT EXPRESSED/SPECIFIED IN THE CONTRACTOR DOCUMENTS. **NO
EXCEPTION ALLOWED**
14. ANY EXISTING PROPERTY LINE MONUMENTATION DISTURBED DURING CONSTRUCTION SHALL BE RESET BY A
PROFESSIONAL LICENSED SURVEYOR AT THE CONTRACTOR'S EXPENSE.
15. THE CONTRACTOR SHALL PROTECT THE VA PROPERTY FROM DUST AND DAMAGE AT ALL TIMES. ANY RESULTING DAMAGE TO THE VA PROPERTY SHALL BE IMMEDIATELY CORRECTED BY THE CONTRACTOR AT THE CONTRACTOR'S
EXPENSE.
CONTRACTORS ACCESS & STORAGE AREAS:
1. THE CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER FOR EXACT LOCATION OF STAGING AREA(S) TO BE USED DURING CONSTRUCTION FOR STORAGE / STOCKPILING OF MATERIALS. CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER PRIOR TO OCCUPYING STAGING AREA. THE CONTRACTOR MUST VERIFY WITH THE CONTRACTING OFFICER'S REPRESENTATIVE OF ANY CHANGES IN STAGING / LAYDOWN AREAS THAT MAY HAVE
OCCURRED AFTER PLANS WERE ISSUED.
2. UPON COMPLETION OF THE WORK, THE STAGING AREAS MUST BE CLEANED AND RESTORED TO THEIR ORIGINAL
CONDITION.
3. CONTRACTOR MUST PROVIDE TEMPORARY SECURITY FENCING AROUND THE CONSTRUCTION STAGING AREAS WHERE REQUIRED BY COR. CONTRACTOR TO COORDINATE PRIVACY FABRIC REQUIREMENTS WITH COR. CONTRACTOR MUST BE AWARE OF THE VERTICAL HEIGHTS OF OBJECTS NEAR FENCE LINES; NO EQUIPMENT OR MATERIAL MUST BE PLACED NEAR FENCE LINES THAT WOULD ALLOW THE FENCE TO BE SCALED. MAINTAIN A 10 FOOT MINIMUM SEPARATION FROM ALL FENCES FROM STOCKPILES, PARKED VEHICLES, OR OTHER MATERIALS WHICH COULD BE CLIMBED. POST A
METALLIC SIGN DISPLAYING THE CONTRACTOR'S 24 HOUR EMERGENCY CONTACT NUMBER.
4. ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY TO THE SITE MUST USE THE ACCESS POINT AS DETERMINED BY THE COR. ALL ASSOCIATED FEES AND COST MUST BE PAID BY CONTRACTOR AND ARE CONSIDERED INCIDENTAL TO THE
VARIOUS BID ITEMS.
5. CONTRACTOR MUST BE RESPONSIBLE FOR TRAFFIC CONTROL TO AND FROM THE CONSTRUCTION AND STAGING AREAS.
THE TRAFFIC CONTROL MEASURES MUST BE DIRECTED AND APPROVED BY THE CONTRACTING OFFICER AND/OR
CONTRACTING OFFICER'S REPRESENTATIVE.
6. CONTRACTOR MUST COORDINATE LOCATION(S) OF SOIL STOCKPILE AREAS WITH THE CONTRACTING OFFICER IN ADVANCE OF CONSTRUCTION START. AT A MINIMUM, SOIL STOCKPILES WILL CONSIST OF CLEAN IMPORTED FILL, AND EXCAVATED SOILS WAITING FOR REUSE OR OFF-SITE DISPOSAL, AND STOCKPILES MUST BE ADEQUATELY SEPARATED
FROM EACH OTHER WITHIN THE STOCKPILE AREA(S).
CONTRACTOR'S VEHICLES:
1. CONTRACTOR'S VEHICLES MUST BE IN GOOD WORKING ORDER. CONTRACTOR'S PERSONNEL MUST PARK WITHIN THE
CONTRACTOR'S STAGING AREA OR AREAS APPROVED BY THE COR.
2. ALL TRUCKS AND/OR ASSOCIATED VEHICLE HAULING TOOLS, LABOR, EQUIPMENT, MATERIAL OR DEBRIS ON THE VA CAMPUS MUST BE EQUIPPED AND PREPARED TO PREVENT SPILLAGE OF DEBRIS DURING TRANSPORTATION. TRUCK BEDS MUST BE SWEPT CLEAN BEFORE LEAVING THE WORK AREA. SIDEBOARDS MUST BE KEPT IN GOOD REPAIR. UNDER NO CIRCUMSTANCES MUST A VEHICLE BE LOADED BEYOND ITS LEGAL LIMITS OR HIGHER THAN THE SIDEBOARDS.
La st
S av ed b y:
U
SR
M o n:
D ec
2, :2
: C
:\U se rs \U
SR
M
\W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
8\
C
AD
D \D w gs
\V A
Fa ye tte vi lle
C iv il.
dw g
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
A/E:CIVIL ENGINEER:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Solutions Inc.
1201 Pacific Aveue Suite 550 Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
PB RDM
GENERAL NOTES AND LEGEND
C-002
N/A
100% CONSTRUCTION
DOCUMENTS
FAYETTEVILLE, ARKANSAS
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
12/13/24 4 OF 49
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
W
W
W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SD
SD
SD
SD
SD
SD
SAN
SAN
SAN
SAN
SAN
SA
N
SA
N
SD
SD
SD
G
G
G
G
G
G
G
G
ES
ES
ES
ES
ES
ES
XFMR
XXX
X
X
FREE CLINIC
X
SD
SD
SD
SD
SD
W
W
W W
W
SSFM
SS
FM
E E
E
E
E
E
E
E
E
E
E
E
C O
M M
COMM
COMM
COMM
COMM
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
X
X
X
X
SD
SD
La st
S av ed b y:
U
SR
M o n:
D ec
2, :2
: C
:\U se rs \U
SR
M
\W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
8\
C
AD
D \D w gs
\V A
Fa ye tte vi lle
C iv il.
dw g
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
A/E:CIVIL ENGINEER:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Solutions Inc.
1201 Pacific Aveue Suite 550 Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
1" = 20' scale feet
4020020
DEMOLITION KEYNOTES#
EXISTING STORM DRAIN TO REMAIN, CONTRACTOR TO PROTECT IN PLACE
EXISTING LIGHT POLE TO REMAIN, CONTRACTOR TO PROTECT IN PLACE
EXISTING STORM DRAIN LINE TO BE REMOVED
EXISTING TREE, STUMP, AND ROOT BALL TO BE REMOVED (TYP.)
EXISTING STORM DRAIN MANHOLE TO BE REMOVED
6 EXISTING TRAILER TO BE REMOVED BY OTHERS. COORDINATE WITH COR.
7 EXISTING SIDEWALK TO BE REMOVED
PB RDM
MCR BUILDING DEMOLITION PLAN
CD150
N/A
100% CONSTRUCTION
DOCUMENTS
FAYETTEVILLE, ARKANSAS
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
12/13/24 5 OF 49
W
W
W
SAN
W
W
W
W
W W
SAN
G
G G
W
G
G
G
W
SAN
SAN
SAN
G
GG G
G
G
G
G
G
G
G
G
G
W
W
W W
W W
W
W
W
W
W
W
WW
SD
SD
W W
W
W
W W
W
W
W
W
SD
G
G
SA
N
SAN
G
G
W
SAN
SA
N
SA
N
SAN
SAN
SA
N
SD
SD
SD
SD
SD
SAN
SAN
SD
PP
PP
E
E
E
E
COMM
XFMR
XFMR
XFMR
XFMR
XFMR
XFMR
XFMR
E
E
COMM
COMM
ES
COMM
COMM
4.
1d
COMM
G
G
G
S&C
T
W
T
G
E
AC
AC
C/E C/E
E
E
E
E
E
E
E
E
E
E E
E
E
COMM
T
T
T
T
C /E
S
G
BENCHMARK
ELEV = 1478.17
E
E
E E
AC
AC
E
S
T
G
T
E
XFMR
AC
AC
AC
AC
E
E
T
G
T
E
E
E
E
EE
E
E
E
E
E
E
E
T
T
T
C /E
C /E
C /E
E
S
G
S
E
T
S
E E
ACAC
AC
AC
S
E T
ABANDONED GAS LINE
T
E
E
S
S
G
S
S
S
S
G
S
S
G
G G
E E
E
E
S
S
C /E
E
E
COM
M
E
COM
M
COM
M
E
T
S S
EC
COMM
E
C
E
COMM
E
XFMR
E T
T T
X X
X
X
ONE WAY
X
ESES
S
S
S
S30° 07' 38.73"E
38.651
S1 1°
6'
8.
"E
.5
S47 ° 1
5'
.45 "W
.98
S0 3°
3'
7.
"W
7.
L=
.17 4, R= 4 9
.9
S2 5°
1'
.8
3" W
.5
BP: 0+00.00
PC: 2+23.73
M id:
+3
1.
PT
: 2
+3 9.
EP
: 2
+7 9.
L= 3 5
.8
R=
.0
L= 7.174 , R=
22.0 00
1+00
2+
3+
4+
5+00
6+00
7+00
8+00
9+00
10+00
PC
: 0
+8 8.
Mid: 1+64.24
PT: 2+39.93
PC: 4+09.16
Mid: 4+59.82
PT: 5+10.47PC: 5+36.69
M id
: 6 +4
9.
PT: 7+62.15
PC: 8+04.43
Mid:
8+
.06
PT
: 8
+5 9.
PC
: 9
+3 5.
M id:
+6
7.
EP: 1
0+00.50
S1 1°
2'
9.
"E
9.
L=
1.3
R=
.0
0 0
S61° 21' 15.45"W
26.216
L= 225.462, R= 140.159
N26° 28' 43.61"W
42.283
L= 55.262 , R= 75.000
N77° 28' 15.46"W
88.548
S
S
S
S
S
C
E
E
X
X
X
H
W O
O
LS
EY
A
VE
N
U E
WEST NORTH STREET
C O
LL
EG
E
AV
EN
U
E
W O
O
LS
EY
A
VE
N
U E
ARKANSAS
VETERANS
HOME
31 32
UNIVERSITY OF ARKANSAS FOR MEDICAL SCIENCES
GAS STATION
ASKEW
ENTERPRISES
FREE
CLINIC
43 45
E
SD
SD
SD
C(B)
C
(IS
P)
E E
C(B) C(A)
C(B)
C(B)
C (A
C
(B
C
(IS
P)
C (B
C
(IS
P)
E
E
C(ISP)
C(ISP)
C
(ISP)
C(A)
E
C(ISP)
C(A)
E
E
C(B)
C (B
C
(B )C
(IS
P) C
(IS
P)
C(A)
C(ISP)
C (A)
C(A)
C (B)
NOT A W
ALKWAY
NOT A WALKWAY
C(B)
1" = 100' feet
200100100 0 scale
La st
S av ed b y:
U
SR
M o n:
D ec
2, :2
: C
:\U se rs \U
SR
M
\W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
8\
C
AD
D \D w gs
\V A
Fa ye tte vi lle
C iv il.
dw g
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
A/E:CIVIL ENGINEER:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Solutions Inc.
1201 Pacific Aveue Suite 550 Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
BUILDING 29 DOOR
LANDING AND SIDEWALK,
SEE SHEET CU151
JOINT DUCTBANK,
SEE SHEET CU151
ISP PATHWAY POC. VA TO
COORDINATE WITH ISP.
EX. RETAINING WALL
ISP PATHWAY POC. VA TO
COORDINATE WITH ISP.
EX. RETAINING WALL
FIBER DUCT BANK TRENCHING NOTES:
1. THE CONTRACTOR IS ADVISED THAT ALL EXISTING UNDERGROUND UTILITIES, CABLES, DUCTS, MANHOLES, ETC. (UNDERGROUND FACILITIES) SHOWN ON PLANS WERE SHOWN USING THE BEST
INFORMATION AVAILABLE. INFORMATION SHOWN ON THE DRAWING CONCERNING TYPE, SIZE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL-INCLUSIVE, AND IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR LOCATING AND PROTECTING ALL UTILITIES. CONTRACTOR MUST ALSO REVIEW
ALL UTILITIES WITH THE CAMPUS MAINTENANCE STAFF PRIOR TO BEGINNING WORK.
2. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL HAVE
A GROUND PENETRATING RADAR (GPR) SURVEY CAREFULLY PERFORMED BY A CERTIFIED
TECHNICIAN TO REVEAL ALL EXISTING UNDERGROUND DUCTS, CONDUITS, CABLES, AND OTHER
UTILITY SYSTEMS ALONG THE PROPOSED FIBER DUCT BANK ROUTE.
3. EXPLORATORY EXCAVATIONS IN THE VICINITY OF EXISTING UNDERGROUND UTILITIES MUST BE
CARRIED OUT WITH EXTREME CARE USING HAND TOOLS UNTIL THE EXACT CHARACTER AND
LOCATION OF SUCH FACILITIES ARE DETERMINED.
4. THE CONTRACTOR SHALL SUBMIT ALL INFORMATION OBTAINED FROM THE GPR UTILITY LOCATION
SURVEY AND POTHOLING EFFORTS TO THE CONTRACTING OFFICER AND/OR CONTRACTING
OFFICER'S REPRESENTATIVE AND THE A/E PRIOR TO STARTING CONSTRUCTION. CONTRACTOR
SHALL RECEIVE APPROVAL FROM CONTRACTING OFFICE PRIOR TO STARTING ANY TRENCHING.
5. CONTRACTOR TO FOLLOW DEWATERING RECOMMENDATIONS PER GEOTECHICAL REPORT.
6. CONTRACTOR SHALL PERFORM ALL DUCT BANK TRENCHING IN ACCORDANCE WITH VA
STANDARDS. REFER TO STANDARD SPECIFICATION 26 05 41 AND VA DESIGN GUIDE FOR
ADDITIONAL INFORMATION.
7. CONTRACTOR TO REFER TO BUILDING TELECOMM SHEETS FOR DETAIL AND LOCATION OF
BUILDING CONNECTIONS.
C(B)
C(A)
LEGEND
PROPOSED SIDE A FIBER PATHWAY
PROPOSED SIDE A UNDERGROUND HANDHOLE
PROPOSED SIDE B FIBER PATHWAY
PROPOSED SIDE B UNDERGROUND HANDHOLE
PROPOSED SERVICE PROVIDER FIBER PATHWAY
PROPOSED SERVICE PROVIDER UNDERGROUND HANDHOLE
PROPOSED UNDERGROUND POWER PATHWAY
PROPOSED UNDERGROUND POWER HANDHOLE
C(ISP)
E
PB RDM
OVERALL CIVIL SITE PLAN
CS100
N/A
100% CONSTRUCTION
DOCUMENTS
FAYETTEVILLE, ARKANSAS
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
12/13/24 6 OF 49
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
W
W
W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SD
SD
SD
SD
SD
SD
SAN
SAN
SAN
SAN
SAN
SA
N
SA
N
SD
SD
SD
G
G
G
G
G
G
G
G
ES
ES
ES
ES
ES
ES
XFMR
XXX
X
X
FREE CLINIC
X
SD
SD
SD
SD
SD
W
W
W W
W
SSFM
SS
FM
E E
E
E
E
E
E
E
E
E
E
E
C O
M M
COMM
COMM
COMM
COMM
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
X
X
X
X
SD
SD
SD
SD
SD
SD
SD
SD
SD
W
W
W
W
W
W
W
F
F
F
F
F
F
C (A
C
(A
C (A
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C (B
C
(B
E
E
E
C
(IS
P)
C
(ISP)
C
(ISP)
C
(ISP)
C
(ISP)
SAN
SAN
SAN
SAN
SAN
C(
IS
P)
C(
IS
P)
C(
IS
P)
C(ISP)
E
E E
E
E
C(B)
C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(IS
P)
C(ISP)
C(ISP)
C(A)
C(A)
C(A)
C(A)
C(B)
C(B)
C(B)
C(B)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(A
C(A)
C(A)
C(B)
E
E
E
E
E
C (B
C
(B
C (B
C (A
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
E
E
E
E
E
E
E
E
E
E
E
E
E
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
C(B)
SD
SD
SD
C (B
C
(B
C
(IS
P) C
(IS
P)
C (A
C(A)
C(A)
C(A)
C(B) C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(ISP)
C(B)
C(B)
C(A)
C(A)
C (B)
C(B) C(B)
C(B)
C(B) C(B)
C(B)
C(B)
C(B)
C(A) C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C(A)
C (B)
C (B)
C (B)
C (B)
C (B)
C (B)
SD
SD
NOT A W
ALKWAY
NOT A WALKWAY
C (B
C (B
C(B)
C(B)
C(B)
C(B)
C(B)
C (A
C (A
C (A
)E
C(A)
C(A)
C(A)
E
E
E
L1
L2
L3
L4
C1
C2
LINE TABLE
LINE #
L1
L2
L3
L4
BEARING
N61° 37' 14"W
N04° 46' 15"W
N52° 25' 50"E
N52° 25' 50"E
LENGTH (FT)
14.56
64.85
6.66
54.30
CURVE TABLE
CURVE #
C1
C2
DELTA ANGLE
56°50'58"
57°12'05"
RADIUS (FT)
50.00
50.00
LENGTH (FT)
49.61
49.92
COORDINATES KEYNOTES
POINT #
NORTHING
642452.70
642415.39
642462.79
642462.86
642472.15
642510.36
642501.07
642508.50
642490.37
642494.81
642476.39
642463.54
642311.25
642326.46
642294.87
EASTING
673830.69
673859.39
673920.99
673920.94
673933.02
673903.63
673891.55
673885.83
673862.27
673858.85
673834.91
673844.79
673830.35
673839.96
673822.90
SD
SD
SD
SD
SD
SD
SD
NOT A W
ALKWAY
NOT A WALKWAY
C (B
C (B
C (B
C (B
C (B
C (B
C (B
C (B
C (B
C (A
C (A
C (A
C (A
C (A
C (A
C (A
C (A
C (A
E
E
E
E
E
E
E
51'
82.5'
La st
S av ed b y:
U
SR
M o n:
D ec
2, :2
: C
:\U se rs \U
SR
M
\W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
8\
C
AD
D \D w gs
\V A
Fa ye tte vi lle
C iv il.
dw g
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
A/E:CIVIL ENGINEER:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Solutions Inc.
1201 Pacific Aveue Suite 550 Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
1" = 20' scale feet
4020020
SITE KEYNOTES
PROPOSED MCR BUILDING 50, SEE ARCHITECTURAL PLANS
PROPOSED MECHANICAL YARD, SEE ARCHITECTURAL PLANS
PROPOSED RAIN GARDEN, SEE SHEET CG152
PROPOSED CONCRETE SIDEWALK, SEE DETAIL B1 ON SHEET CU160
PROPOSED VEHICLE BARRIER ARM ASSEMBLY, SEE DETAIL THIS SHEET.
SAWCUT LINE, CONTRACTOR TO PROVIDE A SMOOTH, CLEAN EDGE FOR
MATCHING INTO EXISTING PAVEMENT
PROPOSED TRANSFORMER YARD, SEE ELECTRICAL PLANS
PROPOSED ASPHALT PAVEMENT, SEE DETAIL C4 ON SHEET CU160
10'
5'
5'
10'
5'
5'
4 5
10.25'
14.5'
10.25'
CONTRACTOR TO
CONSTRUCT FIBER
DUCTBANK PRIOR
TO NEW PAVING
PROPERTY LINE
DRAINAGE SWALE
PROPOSED GUARD POSTS W/ 5' MAX SPACING ON CENTER, SEE DETAIL E9 ON
SHEET CU1609
STRIPING AND
SIGNAGE PER
MANUFACTURER
KEYPAD POST AND
PINPAD DEVICE, SEE
TELECOMMUNICATIONS
DETAILS
AUTOMATIC EXIT LOOP
(FREE EXIT) PER
MANUFACTURER
PROPOSED GUARD
POSTS, TYP.
PHOTOCELL PER
MANUFACTURER
VERTICAL BARRIER ARM
AND ASSEMBLY PER
MANUFACTURER
DOWN LOOP PER
MANUFACTURER
2'X2' CONCRETE PAD. SET TOP
OF PAD 4" ABOVE GRADE. PAD
DEPTH 24" MIN.
VEHICLE BARRIER ARM ASSEMBLY DETAILF6
CU161 SCALE: 1" = 5'
POWER AND SIGNAL LINES
FROM MCR BUILDING TO
BARRIER ARM ASSEMBLY
PROPOSED CURB WALL AND SAFETY RAIL, SEE DETAIL F8 ON SHEET CU16010
14.25'
16.25'
PROPOSED LIGHTPOLE, SEE ELECTRICAL PLANS11
40'
PB RDM
MCR BUILDING SITE PLAN
CS150
N/A
100% CONSTRUCTION
DOCUMENTS
FAYETTEVILLE, ARKANSAS
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
12/13/24 7 OF 49
W
W
W
SAN
W
W
W
W
W W
SAN
G
G G
W
G
G
G
W
SAN
SAN
SAN
G
GG G
G
G
G
G
G
G
G
G
G
W
W
W W
W W
W
W
W
W
W
W
WW
SD
SD
W W
W
W
W W
W
W
W
W
SD
G
G
SA
N
SAN
G
G
W
SAN
SA
N
SA
N
SAN
SAN
SA
N
SD
SD
SD
SD
SD
SAN
SAN
SD
PP
PP
E
E
E
E
COMM
XFMR
XFMR
XFMR
XFMR
XFMR
XFMR
XFMR
E
E
COMM
COMM
ES
COMM
COMM
4.
1d
COMM
G
G
G
S&C
T
W
T
G
E
AC
AC
C/E C/E
E
E
E
E
E
E
E
E
E
E E
E
E
COMM
T
T
T
T
C /E
S
G
BENCHMARK
ELEV = 1478.17
E
E
E E
AC
AC
E
S
T
G
T
E
XFMR
AC
AC
AC
AC
E
E
T
G
T
E
E
E
E
EE
E
E
E
E
E
E
E
T
T
T
C /E
C /E
C /E
E
S
G
S
E
T
S
E E
ACAC
AC
AC
S
E T
ABANDONED GAS LINE
T
E
E
S
S
G
S
S
S
S
G
S
S
G
G G
E E
E
E
S
S
C /E
E
E
COM
M
E
COM
M
COM
M
E
T
S S
EC
COMM
E
C
E
COMM
E
XFMR
E T
T T
X X
X
X
ONE WAY
X
ESES
S
S
S
S30° 07' 38.73"E
38.651
S1 1°
6'
8.
"E
.5
S47 ° 1
5'
.45 "W
.98
S0 3°
3'
7.
"W
7.
L=
.17 4, R= 4 9
.9
S2 5°
1'
.8
3" W
.5
BP: 0+00.00
PC: 2+23.73
M id:
+3
1.
PT
: 2
+3 9.
EP
: 2
+7 9.
L= 3 5
.8
R=
.0
L= 7.174 , R=
22.0 00
1+00
2+
3+
4+
5+00
6+00
7+00
8+00
9+00
10+00
PC
: 0
+8 8.
Mid: 1+64.24
PT: 2+39.93
PC: 4+09.16
Mid: 4+59.82
PT: 5+10.47PC: 5+36.69
M id
: 6 +4
9.
PT: 7+62.15
PC: 8+04.43
Mid:
8+
.06
PT
: 8
+5 9.
PC
: 9
+3 5.
M id:
+6
7.
EP: 1
0+00.50
S1 1°
2'
9.
"E
9.
L=
1.3
R=
.0
0 0
S61° 21' 15.45"W
26.216
L= 225.462, R= 140.159
N26° 28' 43.61"W
42.283
L= 55.262 , R= 75.000
N77° 28' 15.46"W
88.548
S
S
S
S
S
C
E
E
X
X
X
H
W O
O
LS
EY
A
VE
N
U E
WEST NORTH STREET
C O
LL
EG
E
AV
EN
U
E
W O
O
LS
EY
A
VE
N
U E
ARKANSAS
VETERANS
HOME
31 32
UNIVERSITY OF ARKANSAS FOR MEDICAL SCIENCES
GAS STATION
ASKEW
ENTERPRISES
FREE
CLINIC
43 45
E
SD
SD
SD
C(B)
C
(IS
P)
E E
C(B) C(A)
C(B)
C(B)
C (A
C
(B
C
(IS
P)
C (B
C
(IS
P)
E
E
C(ISP)
C(ISP)
C
(ISP)
C(A)
E
C(ISP)
C(A)
E
E
C(B)
C (B
C
(B )C
(IS
P) C
(IS
P)
C(A)
C(ISP)
C (A)
C(A)
C (B)
NOT A W
ALKWAY
NOT A WALKWAY
C(B)
1" = 100' feet
200100100 0 scale
La st
S av ed b y:
U
SR
M o n:
D ec
2, :2
: C
:\U se rs \U
SR
M
\W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
8\
C
AD
D \D w gs
\V A
Fa ye tte vi lle
C iv il.
dw g
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
A/E:CIVIL ENGINEER:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Solutions Inc.
1201 Pacific Aveue Suite 550 Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
NEAT LINE, TYP
TRENCH WIDTH (TYP.)
DUCT BANK TRENCH TESC DETAIL (TYP.)E8
CG100 SCALE: NTS
PERIMETER PROTECTION, TYP.LIMITS OF
CONSTRUCTION
FIBER DUCTBANK (TYP.)
SOIL STOCKPILE AREA
NOTE:
CONTRACTOR SHALL INSTALL INLET PROTECTION ON AREA CATCH BASINS IN THE DUCT BANK VICINITY
TO PREVENT SEDIMENT LADEN RUNOFF FROM ENTERING DOWNSTREAM STORM DRAIN SYSTEM.
PB RDM
OVERALL EROSION CONTROL PLAN
CG100
N/A
100% CONSTRUCTION
DOCUMENTS
FAYETTEVILLE, ARKANSAS
EHRM INFRASTRUCTURE
UPGRADES - FAYETTEVILLE
12/13/24 8 OF 49
La st
S av ed b y:
U
SR
M o n:
D ec
2, :2
: C
:\U se rs \U
SR
M
\W
SP
O
5\
Fe de ra l G ro up
Jo bs \3
8\
8\
C
AD
D \D w gs
\V A
Fa ye tte vi lle
C iv il.
dw g
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
7 8 9 10321 4 5 6
Revisions: Date:
A/E:CIVIL ENGINEER:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S, SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
WSP USA Solutions Inc.
1201 Pacific Aveue Suite 550 Tacoma, WA 98402
TEL: (206) 431-2300
FAX: (206) 431-2250
3' -0
WIRE
GROUND LINE
3' M
IN
12-1/2 GAUGE MIN.
6" MAX.
MESH SPACING
4"POST-IMBED 3'
STEEL OR WOOD
6' MAX.
TYPICAL FIBER ROLL INSTALLATION
N.T.S.
4' M
AX
VERTICAL SPACING
MEASURED ALONG
THE FACE OF THE
SLOPE VARIES
BETWEEN 10' AND
20'
4' MAXFIBER
ROLLS
SLOPE VARIES
4' MAX
NOTE: INSTALL FIBER ROLL
ALONG A LEVEL CONTOUR.
4' M
AX
NTS
PLACE A LAYER OF
GEOTEXTILE FABRIC
OVER DRAIN OPENINGS
AND ANCHOR WITH
GRAVEL BAGS
4"
TYP
MIN. 2
BAGS
HIGH
GRAVEL BAGS (TYP)
MIN. 5" THICK
SECTION A-A
1/2" MIN, TYP
ISOMETRIC VIEWCROSS SECTION
1. ACCUMULATED SEDIMENT ON OR AROUND A PROTECTED INLET MUST
BE REMOVED IMMEDIATELY. SEDIMENT MUST NOT BE REMOVED BY
FLUSHING.
2. REPLACE CATCH BASIN INSERT WHEN THE SEDIMENT HAS FILLED
ONE-THIRD OF THE AVAILABLE STORAGE. THE INSERT MUST BE
INSPECTED FREQUENTLY AND REPLACED AS NEEDED, OR AS DIRECTED
BY THE CONTRACTING OFFICER.
GRATE
FRAME
FILTERED WATER
SEDIMENT AND DEBRIS
OVERFLOW BYPASS
TRIM GEOTEXTILE
FABRIC
GEOTEXTILE
FABRIC
GRATE
RETRIEVAL SYSTEM
OVERFLOW BYPASS
SEDIMENT
AND DEBRIS
FILTERED WATER
STORM DRAIN INLET
PROTECTION,
ECOLOGY BMP C220
GEOTEXTILE FABRIC PROTECTION AT
INLET
GRAVEL BAG INSTALLATION
NEAR INLET
STORM DRAIN INLET
PROTECTION NOTES:
4" M
AX
" M
IN
INSTALL A FIBER ROLL
NEAR WHERE IT
TRANSITIONS INTO A
STEEPER SLOPE
3/4" X 3/4" WOOD STAKES
4' MAX SPACING
FIBER ROLL 8" MIN
R=24"
A
A
TEMPORARY SEDIMENT FENCEC5
CG101 SCALE: NTS
TEMPORARY FIBER ROLLC9
CG101 SCALE: NTS
TEMPORARY GRAVEL BAG INSTALLATIONF5
CG101 SCALE: NTS
TEMPORARY INLET PROTECTIONF8
CG101 SCALE: NTS
1. SET POSTS AND EXCAVATE A 4" x 4" TRENCH
UPSLOPE ALONG THE LINE OF POSTS.
2. STAPLE WIRE FENCING
TO THE POSTS.
3. ATTACH THE FILTER BARRIER FABRIC TO THE
WIRE FENCE AND EXTEND IT INTO THE TRENCH.
4. BACKFILL AND COMPACT
THE EXCAVATED SOIL.
EXTENSION OF FABRIC AND
WIRE INTO THE TRENCH.
FILTER
BARRIER
FABRIC
FILTER BARRIER
FABRIC HEIGHT LESS
THAN 36" ABOVE GRADE
TEMPORARY EROSION AND SEDIMENT CONTROL NOTES:
1. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) FACILITIES. REFER TO THE
APPLICABLE DRAWINGS AND THE SPECIFICATIONS FOR PLANS AND DETAILS THAT DESCRIBE THE MINIMUM TESC FEATURES REQUIRED.
AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE CONTRACTOR SHALL REVISE TESC FACILITIES AND CONFIGURATIONS AS NECESSARY TO ENSURE COMPLETE SILTATION CONTROL AND THAT NO SEDIMENT…
This is the start of the file's text. The full file is on GovTribe.