Attachment 02 - VHA Required Div 01 Specification Sections.pdf

PDF 108 KB Posted

Attached to
Y1DA--590-25-701 | Design EHRM Data Center | Hampton, VA |
Solicitation number
36C77625R0054
Issued by

About this file

This document is a list of VHA Required Division 01 - General Requirement Specification Sections for an Electronic Health Records Management (EHRM) project. The specification sections cover a comprehensive range of general requirements including project scheduling, shop drawings, safety requirements, reference standards, quality control, testing laboratory services, environmental controls, construction waste management, sustainable construction requirements, and commissioning requirements. The document indicates that these are the minimum required specifications, and the Architect-Engineer (A-E) is responsible for determining if additional specifications are needed for the project.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements