Attachment 02 - Specifications.pdf
PDF 7 MB Posted
- Attached to
- 586-21-700 EHRM Infrastructure Upgrades - Jackson, MS Federal contract opportunity
- Solicitation number
- 36C77625B0021
About this file
This document is a detailed specification for traditional asbestos abatement at the G.V. (Sonny) Montgomery VA Medical Center in Jackson, Mississippi. The project involves removing approximately 32 linear feet of pipe insulation, 13 pipe fittings, 52 square feet of foil-backed duct insulation, 300 square feet of plaster ceiling/wall, and 930 square feet of miscellaneous materials (such as flooring mastic) from multiple rooms in Buildings 1 and 5.
The specification provides comprehensive requirements for asbestos removal, including detailed procedures for site preparation, worker protection, containment, negative air pressure systems, wet removal techniques, decontamination, and disposal. Key requirements include establishing regulated work areas, using specialized personal protective equipment, implementing strict decontamination protocols, maintaining negative air pressure, wet removal methods, and conducting thorough visual and air clearance testing. The contractor must comply with OSHA, EPA, and state regulations, and will be responsible for all aspects of safe asbestos removal, including transportation and disposal at an approved landfill. The project is part of the VA's EHRM (Enterprise-wide Health Resilience Modernization) Infrastructure Upgrades, with the solicitation number 36C77625B0021.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C77625B0021 0004.pdf | ||
| Amendment 0003 - Tech Questions Tracker.pdf | ||
| Amendment 0003 - General Requirements Addendum.pdf | ||
| Amendment 0003 - Geo Technical Report 2.pdf | ||
| Attachment 07 - Sole Source JA 586-21-700.pdf | ||
| 36C77625B0021 0003.pdf | ||
| Amendment 0003 - Asbestos and Hazardous Materials Report.pdf | ||
| Amendment 0003 - Geo Technical Report 1.pdf | ||
| Attachment 01 - Wage Rates - Hinds Co.pdf | ||
| 36C77625B0021 0001.pdf | ||
| Attachment 01 - Site Visit Sign-in.pdf | ||
| 36C77625B0021 0002.pdf | ||
| Attachment 05- Limitations on Subcontracting.pdf | ||
| Attachment 03 - Drawings.pdf | ||
| 36C77625B0021.pdf | ||
| Attachment 01 - Statement of Work.pdf | ||
| Attachment 04 - Wage Determination Hinds Co.pdf | ||
| Attachment 06 - Spec 01 31 00.01 Project Management and Coordination.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Veterans Affairs
G.V.(SONNY) MONTGOMERY
VA MEDICAL CENTER
1500 EAST WOODROW
WILSON AVE.
JACKSON MS 39216
EHRM INFRASTRUCTURE
UPGRADES
ISSUED FOR FINAL SUBMISSION
1800 Diagonal Road, Suite 600
Alexandria, VA 22314 Tel: (703) 232-1491 Fax: (866) 844-4373 www.planate.com
VA Project No. 586-21-700
CONFORMED SET 2025.03.21
PROJECT
SPECIFICATION
MANUAL
VA
CIVIL ARCHITECTURAL
STRUCTURAL MECHANICAL
ELECTRICAL FIRE PROTECTION
ENVIRONMENTAL
TELECOMMUNICATIONS PHYSICAL SECURITY
ISSUED FOR
CONSTRUCTION (FINAL)
S T
AT E I S
S I P P I
1 4 1 2 2N o.
OF M I S
ALAN WATT
S
ENG I NEE
R
R
EG
IS
TERED PROFESS
IONA
L
3/21/2025
STRUCTURAL
Digitally signed by Richard R Creavalle Date: 2025.03.20 17:52:47-04'00'
CONSTRUCTION.
03/20/2024
2025.05.19 rev*
* Revisions to pages 209, 1037, & 1056 (of 1181) addressing "SPEC WRITER NOTES".
http://www.planate.com/
VA Project No.: 586-21-700 03-21-25
G.V.(SONNY)MONTGOMERY VA MEDICAL CENTER, JACKSON MS
EHRM INFRASTRUCTURE UPGRADES
Issued for Construction (Final)
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 03-20 01 33 23 Shop Drawings, Product Data, and Samples 02-23 01 35 26 Safety Requirements 10-22 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
DIVISION 05 – METALS
05 50 00 Metal Fabrications 08-18
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 01-21 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 04-22
00 01 10-2
08 71 00 Door Hardware 05-22 08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 06 00 Schedule for Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 16.13 Static dissipative resilient tile flooring 01-21 09 65 16 Resilient Sheet Flooring 06-22 09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21 10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 13 – SPECIAL CONSTRUCTION
13 05 41 Seismic restraint requirements for non-structural components 01-21
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 03-23
23 07 11 HVAC and Boiler Plant Insulation 02-20 23 23 00 Refrigerant Piping 03-23 23 81 23 Computer-Room Air-Conditioners 03-23
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22 26 05 26 Grounding and Bonding for Electrical Systems 11-22 26 05 33 Raceway and Boxes for Electrical Systems 11-22 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 11-22 26 22 00 Low-Voltage Transformers 11-22 26 24 16 Panelboards 11-22 26 27 26 Wiring Devices 11-22 23 33 53 Static Uninterrupted Power Supply 11-22 26 43 13 Surge Protective Devices 11-22 26 51 00 Interior Lighting 11-22
00 01 10-3
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements For Communications Installations 11-22 27 05 26 Grounding and Bonding for Communications Systems 12-22 27 05 33 Conduits and Backboxes for Communications Systems 12-22 27 05 36 Cable Trays for Communications Systems 12-22 27 05 53 Identification for Communications Systems 12-22 27 08 00 Commissioning of communications systems 11-16 27 10 00 Structured Cabling 12-22 27 11 16 Communications Cabinets, Racks, Frames, and Enclosures 12-22 27 11 19 Communications Termination Blocks and Patch Panels 12-22 27 11 26 Communications Rack Mounted Power Protection and Power
Strips 12-22
27 13 13 Communications Copper Backbone Cabling 12-22 27 13 13.13 Communications Copper Cable Splicing and Terminations 12-22 27 13 23 Communications Optical Fiber Backbone Cabling 12-22 27 13 23.13 Communications Optical Fiber Splicing and Terminations 12-22 27 15 13 Communications Copper Horizontal Cabling 12-22 27 16 19 Communications Patch Cords, Station Cords, and Cross-
Connect Wire 12-22
27 78 00 Closeout Submittals for Communications 03-23
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and
Security 10-18
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
10-11
28 08 00 Commissioning of for Electronic Safety and Security Systems
11-16
28 13 00 Physical Access Control System 10-11 28 16 00 Intrusion Detection System 10-11 28 23 00 Video Surveillance 09-11
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 90 00 Planting 08-16
- - - END - - -
VA Project. No: 586-21-700 03-21-25
G. V. (SONNY) MONTGOMERY VA MEDICAL CENTER, JACKSON MS
Issued For Construction (Final)
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of contract.
GENERAL INFORMATION
GI-001 COVER SHEET
GI-002A GENERAL INDEX SHEET - VOLUME 1
GI-002B GENERAL INDEX SHEET - VOLUME 2
GI-003 SYMBOLS, ABBREVIATIONS & NOTES
GI-004 GENERAL NOTES
GI-005 TYPICAL MOUNTING HEIGHTS AND DIMENSIONING CONVENTIONS
GI-006 UL ASSEMBLY DETAILS
GI-007 UL ASSEMBLY DETAILS
GI-008 UL ASSEMBLY DETAILS
AE302 TYPICAL DATA ROOM
AE500 WALL TYPES
AE501 WALL DETAILS
AE601 DOOR SCHEDULE & DETAILS
01-GC100 BUILDING 01 - BASEMENT FLOOR EXISTING OVERALL FLOOR PLAN
01-GC101 BUILDING 01 - 1ST FLOOR EXISTING OVERALL FLOOR PLAN
01-GC102 BUILDING 01 - 2ND FLOOR EXISTING OVERALL FLOOR PLAN
01-GC103 BUILDING 01 - 3RD FLOOR EXISTING OVERALL FLOOR PLAN
01-GC104 BUILDING 01 - 4TH FLOOR EXISTING OVERALL FLOOR PLAN
01-GC105 BUILDING 01 - BASEMENT FLOOR PLAN- ICRA
01-GC106 BUILDING 01 - 1ST FLOOR OVERALL FLOOR PLAN- ICRA
01-GC107 BUILDING 01 - 2ND FLOOR OVERALL FLOOR PLAN- ICRA
01-GC108 BUILDING 01 - 3RD FLOOR OVERALL FLOOR PLAN- ICRA
01-GC109 BUILDING 01 - 4TH FLOOR OVERALL FLOOR PLAN- ICRA
01-AE400a BUILDING 01 - BASEMENT FLOOR ENLARGED PLANS - DEMO AND NEW WORK 01-AE400b BUILDING 01 - BASEMENT FLOOR ENLARGED PLANS - DEMO AND NEW WORK 01-AE400c BUILDING 01 - BASEMENT FLOOR ENLARGED PLANS - DEMO AND NEW WORK 01-AE400d BUILDING 01 - BASEMENT FLOOR ENLARGED PLANS - DEMO AND NEW WORK 01-AE400e BUILDING 01 - BASEMENT FLOOR ENLARGED PLANS - DEMO AND NEW WORK 01-AE401a BUILDING 01 - 1ST FLOOR ENLARGED PLANS - DEMO AND NEW WORK 01-AE401b BUILDING 01 - 1ST FLOOR ENLARGED PLANS - DEMO AND NEW WORK 01-AE402a BUILDING 01 - 2ND FLOOR ENLARGED PLANS - DEMO AND NEW WORK 01-AE402b BUILDING 01 - 2ND FLOOR ENLARGED PLANS- DEMO AND NEW WORK 01-AE403a BUILDING 01 - 3RD FLOOR ENLARGED PLANS - DEMO AND NEW WORK 01-AE403b BUILDING 01 - 3RD FLOOR ENLARGED PLANS - DEMO AND NEW WORK 01-AE404a BUILDING 01 - 4TH FLOOR ENLARGED PLANS - DEMO AND NEW WORK 01-AE404b BUILDING 01 - 4TH FLOOR ENLARGED PLANS - DEMO AND NEW WORK 01-AE700a BUILDING 01- BASEMENT- EXISTING CEILING CONDITIONS 01-AE700b BUILDING 01- BASEMENT- REFLECTED CEILING PLANS 01-AE700c BUILDING 01- BASEMENT- REFLECTED CEILING PLANS
00 01 15 - 2
01-AE700d BUILDING 01- BASEMENT- REFLECTED CEILING PLANS 01-AE701a BUILDING 01-1ST FLOOR- EXISTING CEILING CONDITIONS 01-AE701b BUILDING 01- 1ST FLOOR- REFLECTED CEILING PLANS 01-AE701c BUILDING 01- 1ST FLOOR- REFLECTED CEILING PLANS 01-AE702a BUILDING 01- 2ND FLOOR- EXISTING CEILING CONDITIONS 01-AE702b BUILDING 01- 2ND FLOOR- REFLECTED CEILING PLANS 01-AE702c BUILDING 01- 2ND FLOOR- REFLECTED CEILING PLANS 01-AE703a BUILDING 01- 3RD FLOOR- EXISTING CEILING CONDITIONS 01-AE703b BUILDING 01- 3RD FLOOR- REFLECTED CEILING PLANS 01-AE703c BUILDING 01- 3RD FLOOR- REFLECTED CEILING PLANS 01-AE704a BUILDING 01- 4TH FLOOR- EXISTING CEILING CONDITIONS 01-AE704b BUILDING 01- 4TH FLOOR- REFLECTED CEILING PLANS 01-AE704c BUILDING 01- 4TH FLOOR- REFLECTED CEILING PLANS
03-GC100 BUILDING 03- FIRST FLOOR EXISTING OVERALL FLOOR PLAN
03-GC101 BUILDING 03- 1ST FLOOR OVERALL FLOOR PLAN - ICRA
03-AE400 BUILDING 03- 1ST FLOOR ENLARGED PLANS - DEMO AND NEW WORK
03-AE700 BUILDING 03- 1ST FLOOR- EXISTING CEILING CONDITIONS
03-AE701 BUILDING 03- 1ST FLOOR- ENLARGED RCP PLANS - DEMO AND NEW WORK
05-GC100 BUILDING 05 - SUB-BASMENT AND BASEMENT FLOOR
EXISTING OVERALL FLOOR PLAN
05-GC101 BUILDING 05 - 1ST AND 2ND FLOOR EXISTING OVERALL FLOOR PLAN
05-GC102 BUILDING 05 - 3RD AND 4TH FLOOR EXISTING OVERALL FLOOR PLAN
05-GC103 BUILDING 05 - SUB-BASEMENT AND BASEMENT FLOORS- ICRA PLANS
05-GC104 BUILDING 05 - 1ST AND 2ND FLOORS- ICRA PLANS
05-GC105 BUILDING 05 - 3RD AND 4TH FLOORS- ICRA PLANS
05-AE401 BUILDING 05 - BASEMENT FLOOR ENLARGED PLANS - DEMO AND NEW WORK
05-AE402 BUILDING 05 - 2ND FLOOR ENLARGED PLANS - DEMO AND NEW WORK
05-AE403 BUILDING 05 - 3RD FLOOR ENLARGED PLANS - DEMO AND NEW WORK
05-AE404 BUILDING 05 - 4TH FLOOR ENLARGED PLANS - DEMO AND NEW WORK
05-AE700
BUILDING 05 - BASEMENT AND SUB BASMENT EXISTING CEILING
CONDITIONS
05-AE701 BUILDING 05 - BASEMENT ENLARGED RCP PLANS - DEMO AND NEW WORK
05-AE702 BUILDING 05 - 1ST & 2ND FLOOR - EXISTING CEILING CONDITIONS
05-AE703 BUILDING 05 - 2ND FLOOR ENLARGED RCP PLANS - DEMO AND NEW WORK
05-AE704 BUILDING 05 - 3RD & 4TH FLOOR - EXISTING CEILING CONDITIONS
05-AE705 BUILDING 05 - 3RD FLOOR ENLARGED RCP PLANS - DEMO AND NEW WORK
05-AE706 BUILDING 05 - 4TH FLOOR ENLARGED RCP PLANS - DEMO AND NEW WORK
06-GC100 BUILDING 06 GROUNDS BUILDING - FIRST FLOOR PLAN
07-GC100 BUILDING 07 CLC - GROUND FLOOR EXISTING OVERALL FLOOR PLAN
07-GC101 BUILDING 07 CLC - 1ST FLOOR EXISTING OVERALL FLOOR PLAN
07-GC102 BUILDING 07 CLC - GROUND FLOOR - ICRA PLAN
07-GC103 BUILDING 07 CLC - 1ST FLOOR - ICRA PLAN
07-AE400 BUILDING 07- GROUND FLOOR ENLARGED PLANS - DEMO AND NEW WORK
00 01 15 - 3
07-AE401 BUILDING 07- 1ST FLOOR ENLARGED PLANS - DEMO AND NEW WORK
07-AE700 BUILDING 07- GROUND FLOOR - EXISTING CEILING CONDITIONS
07-AE701 BUILDING 07- 1ST FLOOR ENLARGED RCP PLANS - DEMO AND NEW WORK
07-AE702 BUILDING 07- 1ST FLOOR - EXISTING CEILING CONDITIONS
07-AE703 BUILDING 07- 1ST FLOOR ENLARGED RCP PLANS - DEMO AND NEW WORK
LIFE SAFETY
GJ101 LIFE SAFETY PLAN CODE REVIEW AND CODE ANALYSIS
GJ102 BUILDING 01, 05, & 07 BASEMENT FLOOR - LIFE SAFETY PLAN
GJ103 BUILDING 01, 05, & 07 1ST FLOOR - LIFE SAFETY PLAN
GJ104 BUILDING 01 & 05 2ND FLOOR - LIFE SAFETY PLAN
GJ105 BUILDING 01 & 05 3RD FLOOR - LIFE SAFETY PLAN
GJ106 BUILDING 01 & 05 4TH FLOOR - LIFE SAFETY PLAN
CIVIL
CJ101 NOTES & DETAILS
CD101 OVERALL EXISTING SITE CONDITIONS & DEMOLITION PLAN
CD102 DETAILED DEMOLITION PLAN 1
CS101 OVERALL SITE PLAN
CS102 DETAILED SITE PLAN 1
CG101 EROSION CONTROL PLAN
CU101 OVERALL UTILITY PLAN
CU102 DETAILED UTILITY PLAN 1
CK101 CIVIL DETAILS
S001 STRUCTURAL GENERAL NOTES, STRUCTURAL LOADS, MISCELLANEOUS
DETAILS
S501 STRUCTURAL DETAILS
MECHANICAL
MH001
MECHANICAL GENERAL NOTES, PIPING GENERAL NOTES, ABBREVIATIONS,
SYMBOLS
01-M101 BUILDING 01 - BASEMENT NEW VRF LOCATION PLAN
01-M101a
BUILDING 01 - BASEMENT MCR B-14 DEMOLITION PLAN AND NEW VRF
LAYOUT
01-M101b
BUILDING 01 - BASEMENT ROOMS M-02 & A-5 DEMOLITION PLAN AND NEW
VRF LAYOUT
01-M101c
BUILDING 01 - BASEMENT ROOM B-14A DEMOLITION PLAN AND NEW VRF
01-M101d
BUILDING 01 - BASEMENT ROOMS J-1A & C-45 DEMOLITION PLAN AND NEW
01-M102 BUILDING 01 - 1ST FLOOR NEW VRF LOCATION PLAN
01-M102a
BUILDING 01 - 1ST FLOOR ROOMS 1220 & A-110A DEMOLITION PLAN AND
NEW VRF LAYOUT
00 01 15 - 4
01-M102b
BUILDING 01 - 1ST FLOOR ROOM E-135 DEMOLITION PLAN AND NEW VRF
01-M102c
BUILDING 01 - 1ST FLOOR ROOM F-126 DEMOLITION PLAN AND NEW VRF
01-M103 BUILDING 01 - 2ND FLOOR NEW VRF LOCATION PLAN
01-M103a
BUILDING 01 - 2ND FLOOR ROOM 243 DEMOLITION PLAN AND NEW VRF
LAYOUT
01-M103b
BUILDING 01 - 2ND FLOOR ROOM B-233A DEMOLITION PLAN AND NEW VRF
LAYOUT
01-M103c
BUILDING 01 - 2ND FLOOR ROOM 250A DEMOLITION PLAN AND NEW VRF
LAYOUT
01-M104 BUILDING 01 - 3RD FLOOR NEW VRF LOCATION PLAN
01-M104a
BUILDING 01 - 3RD FLOOR ROOM A-363 DEMOLITION PLAN AND NEW VRF
LAYOUT
01-M104b
BUILDING 01 - 3RD FLOOR ROOM B-347C DEMOLITION PLAN AND NEW VRF
LAYOUT
01-M104c
BUILDING 01 - 3RD FLOOR ROOM C-339 DEMOLITION PLAN AND NEW VRF
LAYOUT
01-M105 BUILDING 01 - 4TH FLOOR NEW VRF LOCATION PLAN
01-M105a BUILDING 01 - 4TH FLOOR ROOM 4031 DEMOLITION PLAN AND NEW VRF
LAYOUT
01-M105b BUILDING 01 - 4TH FLOOR ROOM 4305 DEMOLITION PLAN AND NEW VRF
LAYOUT
01-M105c BUILDING 01 - 4TH FLOOR ROOM 4292 DEMOLITION PLAN AND NEW VRF
03-M101
BUILDING 03 - 1ST FLOOR PLAN AND ROOM 118 - DEMOLITION AND NEW
05-M101
BUILDING 05 - BASEMENT FLOOR - LOCATION & DEMOLITION AND NEW VRF
LAYOUT PLAN
05-M102
BUILDING 05 - 1ST FLOOR - NEW VRF LOCATION PLAN, DEMOLITION &
NEW VRF LAYOUT PLAN
05-M103
BUILDING 05 - 2ND FLOOR - NEW VRF LOCATION PLAN, DEMOLITION &
NEW VRF LAYOUT PLAN
05-M104
BUILDING 05 - 3RD FLOOR - NEW VRF LOCATION PLAN, DEMOLITION &
NEW VRF LAYOUT PLAN
05-M105
BUILDING 05 - 4TH FLOOR - NEW VRF LOCATION PLAN, DEMOLITION &
NEW VRF LAYOUT PLAN
06-M101 BUILDING 06 - 1ST FLOOR DEMOLITION AND NEW HVAC LAYOUT
07-M101
BUILDING 07 - GROUND FLOOR - NEW VRF LOCATION, DEMOLITION PLAN &
VRF LAYOUT PLAN
07-M102
BUILDING 07 - 1ST FLOOR - NEW VRF LOCATION, DEMOLITION PLAN &
VRF LAYOUT PLAN
M201 MECHANICAL CONDENSING UNIT LOCATION PLAN
M501 MECHANICAL DETAILS
00 01 15 - 5
M502 MECHANICAL DETAILS
M601 EQUIPMENT SCHEDULE
M602 BUILDING 01 - VRF SCHEMATIC DIAGRAM_
M603 BUILDING 03, 05, & 07 VRF SCHEMATIC DIAGRAM
M604 VRF SYSTEM CONTROL POINTS AND DIAGRAM
ELECTRICAL
E001 ELECTRICAL SYMBOLS, LEGENDS, ABBREVIATIONS AND GENERAL NOTES
01-E101 BUILDING 01 - OVERALL BASEMENT ELECTRICAL PLAN
01-E101a
BUILDING 01 - BASEMENT ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E101b
BUILDING 01 - BASEMENT ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E101c
BUILDING 01 - BASEMENT ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E101d
BUILDING 01 - BASEMENT ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E101e
BUILDING 01 - BASEMENT ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E101f
BUILDING 01 - BASEMENT ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E102 BUILDING 01 - OVERALL 1ST FLOOR ELECTRICAL PLAN
01-E102a
BUILDING 01 - 1ST FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E102b
BUILDING 01 - 1ST FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E102c
BUILDING 01 - 1ST FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E102d
BUILDING 01 - 1ST FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E102e
BUILDING 01 - 1ST FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E103 BUILDING 01 - OVERALL 2ND FLOOR ELECTRICAL PLAN
01-E103a
BUILDING 01 - 2ND FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E103b
BUILDING 01 - 2ND FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E103c
BUILDING 01 - 2ND FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E104 BUILDING 01 - OVERALL 3RD FLOOR ELECTRICAL PLAN
01-E104a
BUILDING 01 - 3RD FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E104b
BUILDING 01 - 3RD FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E104c
BUILDING 01 - 3RD FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E105 BUILDING 01 - OVERALL 4TH FLOOR ELECTRICAL PLAN
01-E105a
BUILDING 01 - 4TH FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E105b
BUILDING 01 - 4TH FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
00 01 15 - 6
01-E105c
BUILDING 01 - 4TH FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
01-E201 ELECTRICAL CONDENSING UNIT ROOF PLAN
01-E501 ELECTRICAL LIGHTING CALCULATIONS (TYPICAL TR & MCR)
01-E502 ELECTRICAL CONSTRUCTION DETAILS
01-E503 ELECTRICAL CONSTRUCTION DETAILS
01-E504 ELECTRICAL CONSTRUCTION DETAILS
01-E505 ELECTRICAL CONSTRUCTION DETAILS
01-E506 ELECTRICAL CONSTRUCTION DETAILS
01-E601 BUILDING 01 - POWER RISER DIAGRAM
01-E602 BUILDING 01 - POWER RISER DIAGRAM
01-E603 ELECTRICAL PANELBOARD SCHEDULES
01-E604 ELECTRICAL PANELBOARD SCHEDULES
01-E605 ELECTRICAL PANELBOARD SCHEDULES
01-E606 ELECTRICAL PANELBOARD SCHEDULES
01-E607 ELECTRICAL PANELBOARD SCHEDULES
01-E608 ELECTRICAL PANELBOARD SCHEDULES
01-E609 ELECTRICAL PANELBOARD SCHEDULES
01-E610 ELECTRICAL PANELBOARD SCHEDULES
01-E611 ELECTRICAL PANELBOARD SCHEDULES
01-E612 BUILDING 01 - ELECTRICAL STUDIES - I
01-E613 BUILDING 01 - ELECTRICAL STUDIES - II
03-E101 BUILDING 03 - OVERALL 1ST FLOOR ELECTRICAL PLAN
03-E101a
BUILDING 03 - 1ST FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
03-E501 ELECTRICAL CONSTRUCTION DETAILS
03-E601 ELECTRICAL RISER & PANELBOARD SCHEDULES
05-E101 BUILDING 05 - EXISTING OVERALL BASEMENT FLOOR PLAN
05-E101b
BUILDING 05 - BASEMENT ENLARGED ELECTRICAL PLANS - DEMO AND NEW
WORK
05-E102 BUILDING 05 - OVERALL 1ST AND 2ND FLOOR PLAN
05-E102b
BUILDING 05 - 2ND FLOOR ENLARGED ELECTRICAL PLANS - DEMO AND NEW
WORK
05-E103 BUILDING 05 - OVERALL 3RD AND 4TH FLOOR PLAN
05-E103a
BUILDING 05 - 3RD FLOOR ENLARGED ELECTRICAL PLANS - DEMO AND NEW
WORK
05-E103b
BUILDING 05 - 4TH FLOOR ENLARGED ELECTRICAL PLANS - DEMO AND NEW
WORK
05-E501 ELECTRICAL CONSTRUCTION DETAILS
05-E502 ELECTRICAL CONSTRUCTION DETAILS
05-E601 BUILDING 05 - POWER RISER DIAGRAM
05-E602 ELECTRICAL PANELBOARD SCHEDULES
05-E603 ELECTRICAL PANELBOARD SCHEDULES
05-E604 ELECTRICAL PANELBOARD SCHEDULES
05-E605 ELECTRICAL PANELBOARD SCHEDULES
00 01 15 - 7
06-E101 BUILDING 06 - OVERALL 1ST FLOOR ELECTRICAL PLAN
06-E501 ELECTRICAL CONSTRUCTION DETAILS
06-E601 BUILDING 06 - ELECTRICAL RISERS AND SCHEDULES
07-E101 BUILDING 07 - OVERALL GROUND FLOOR ELECTRICAL PLAN
07-E101a
BUILDING 07 - GROUND FLOOR ENLARGED ELECTRICAL PLANS - DEMO AND
NEW WORK
07-E102 BUILDING 07 - OVERALL 1ST FLOOR ELECTRICAL PLAN
07-E102a
BUILDING 07 - 1ST FLOOR ENLARGED ELECTRICAL PLANS
DEMO AND NEW WORK
07-E501 ELECTRICAL CONSTRUCTION DETAILS
07-E502 ELECTRICAL CONSTRUCTION DETAILS
07-E601 BUILDING 07 - POWER RISER DIAGRAM
07-E602 BUILDING 07 - GROUND RISER DIAGRAM
07-E603 ELECTRICAL PANELBOARD SCHEDULES
FIRE PROTECTION
F001 FIRE ALARM & FIRE SPRINKLER LEGEND, NOTES, AND RISER
01-F101 BUILDING 01 - EXISTING OVERALL BASEMENT FLOOR PLAN
01-F101a BUILDING 01 - BASEMENT FLOOR SPRINKLER LAYOUT - MCR B-14
01-F101b BUILDING 01 - BASEMENT FLOOR SPRINKLER LAYOUT - M-02, A-5, J-1A, C-45, & B-14A
01-F102 BUILDING 01 - EXISTING OVERALL 1ST FLOOR PLAN & ENLARGED FLOOR
PLANS
01-F102a BUILDING 01 - 1ST FLOOR SPRINKLER LAYOUT - 1220, A-110, E-135, & F-126
01-F103 BUILDING 01 - EXISTING OVERALL 2ND FLOOR PLAN & ENLARGED FLOOR
PLANS
01-F103a BUILDING 01 - 2ND FLOOR SPRINKLER LAYOUT - 243, B-233A & C250A
01-F104 BUILDING 01 - EXISTING OVERALL 3RD FLOOR PLAN & ENLARGED FLOOR
PLANS
01-F104a BUILDING 01 - 3RD FLOOR SPRINKLER LAYOUT - A-363, B-347C, & C339
01-F105 BUILDING 01 - EXISTING OVERALL 4TH FLOOR PLAN & ENLARGED FLOOR
PLANS
01-F105a BUILDING 01 - 4TH FLOOR SPRINKLER LAYOUT - 4031, 4305, & 4292
03-F101 BUILDING 03 - EXISTING 1ST FLOOR PLAN
05-F101 BUILDING 05 - EXISTING OVERALL BASEMENT FLOOR PLAN
05-F102 BUILDING 05 - EXISTING OVERALL 1ST AND 2ND FLOOR PLAN
05-F103 BUILDING 05 - EXISTING OVERALL 3RD AND 4TH FLOOR PLAN
06-F101 BUILDING 06 - EXISTING 1ST FLOOR PLAN
07-F101 BUILDING 07 CLC - EXISTING OVERALL GOUND FLOOR PLAN
07-F102 BUILDING 07 CLC - EXISTING OVERALL 1ST FLOOR PLAN
TELECOMMUNICATOINS
00 01 15 - 8
T-000 TELECOMMUNICATIONS SYMBOLS AND ABBREVIATIONS
T-001 SITE PLAN
T-002 SITE PLAN 2
T-003
01 - BASEMENT LEVEL FLOOR PLAN - OVERALL - INTRA-BUILDING FIBER
ROUTING DIAGRAM
T-004
01 - FIRST LEVEL FLOOR PLAN - OVERALL - INTRA-BUILDING FIBER
ROUTING DIAGRAM
T-005
01 - SECOND LEVEL FLOOR PLAN - OVERALL - INTRA-BUILDING FIBER
ROUTING DIAGRAM
T-006
01 - THIRD LEVEL FLOOR PLAN - OVERALL - INTRA-BUILDING FIBER
ROUTING DIAGRAM
T-007
01 - FOURTH LEVEL FLOOR PLAN - OVERALL - INTRA-BUILDING FIBER
ROUTING DIAGRAM
T-008
05 - BASEMENT AND SUB-BASEMENT LEVEL FLOOR PLAN - OVERALL -
INTRA-BUILDING FIBER ROUTING DIAGRAM
T-009
05 - FIRST LEVEL FLOOR PLAN - OVERALL - INTRA-BUILDING FIBER
ROUTING DIAGRAM
T-010
05 - SECOND LEVEL FLOOR PLAN - OVERALL - INTRA-BUILDING FIBER
ROUTING DIAGRAM
T-011
05 - THIRD LEVEL FLOOR PLAN - OVERALL - INTRA-BUILDING FIBER
ROUTING DIAGRAM
T-012
05 - FOURTH LEVEL FLOOR PLAN - OVERALL - INTRA-BUILDING FIBER
ROUTING DIAGRAM
T-013
06 - FIRST LEVEL FLOOR PLAN - OVERALL - INTRA-BUILDING FIBER
ROUTING DIAGRAM
T-014
07 - FIRST LEVEL FLOOR PLAN - OVERALL - INTRA-BUILDING FIBER
ROUTING DIAGRAM
T-015 FIBER RISER DIAGRAM - A SIDE AND B SIDE
T-016 FIBER RISER DIAGRAM - MCR AND DMARC CABLES
01-TD100
BASEMENT LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
TELECOMMUNICATIONS
01-TD100A
BASEMENT LEVEL FLOOR PLAN - AREA A - DEMOLITION -
TELECOMMUNICATIONS
01-TD100B
BASEMENT LEVEL FLOOR PLAN - AREA B - DEMOLITION -
TELECOMMUNICATIONS
01-TD100C
BASEMENT LEVEL FLOOR PLAN - AREA C - DEMOLITION -
TELECOMMUNICATIONS
01-TD100D
BASEMENT LEVEL FLOOR PLAN - AREA D - DEMOLITION -
TELECOMMUNICATIONS
01-TD100E
BASEMENT LEVEL FLOOR PLAN - AREA E - DEMOLITION -
TELECOMMUNICATIONS
01-TD100F
BASEMENT LEVEL FLOOR PLAN - AREA F - DEMOLITION -
TELECOMMUNICATIONS
01-TD100G
BASEMENT LEVEL FLOOR PLAN - AREA G - DEMOLITION -
TELECOMMUNICATIONS
01-TD100H
BASEMENT LEVEL FLOOR PLAN - AREA H - DEMOLITION -
TELECOMMUNICATIONS
01-TD100I
BASEMENT LEVEL FLOOR PLAN - AREA I - DEMOLITION -
TELECOMMUNICATIONS
01-TD100J
BASEMENT LEVEL FLOOR PLAN - AREA J - DEMOLITION -
TELECOMMUNICATIONS
00 01 15 - 9
01-TD101
FIRST LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
TELECOMMUNICATIONS
01-TD101A
FIRST LEVEL FLOOR PLAN - AREA A - DEMOLITION -
TELECOMMUNICATIONS
01-TD101B
FIRST LEVEL FLOOR PLAN - AREA B - DEMOLITION -
TELECOMMUNICATIONS
01-TD101C
FIRST LEVEL FLOOR PLAN - AREA C - DEMOLITION -
TELECOMMUNICATIONS
01-TD101D
FIRST LEVEL FLOOR PLAN - AREA D - DEMOLITION -
TELECOMMUNICATIONS
01-TD101E
FIRST LEVEL FLOOR PLAN - AREA E - DEMOLITION -
TELECOMMUNICATIONS
01-TD101F
FIRST LEVEL FLOOR PLAN - AREA F - DEMOLITION -
TELECOMMUNICATIONS
01-TD101G
FIRST LEVEL FLOOR PLAN - AREA G - DEMOLITION -
TELECOMMUNICATIONS
01-TD101H
FIRST LEVEL FLOOR PLAN - AREA H - DEMOLITION -
TELECOMMUNICATIONS
01-TD101I
FIRST LEVEL FLOOR PLAN - AREA I - DEMOLITION -
TELECOMMUNICATIONS
01-TD101J
FIRST LEVEL FLOOR PLAN - AREA J - DEMOLITION -
TELECOMMUNICATIONS
01-TD101K
FIRST LEVEL FLOOR PLAN - AREA K - DEMOLITION -
TELECOMMUNICATIONS
01-TD102
SECOND LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
TELECOMMUNICATIONS
01-TD102A
SECOND LEVEL FLOOR PLAN - AREA A - DEMOLITION -
TELECOMMUNICATIONS
01-TD102B
SECOND LEVEL FLOOR PLAN - AREA B - DEMOLITION -
TELECOMMUNICATIONS
01-TD102C
SECOND LEVEL FLOOR PLAN - AREA C - DEMOLITION -
TELECOMMUNICATIONS
01-TD102D
SECOND LEVEL FLOOR PLAN - AREA D - DEMOLITION -
TELECOMMUNICATIONS
01-TD102E
SECOND LEVEL FLOOR PLAN - AREA E - DEMOLITION -
TELECOMMUNICATIONS
01-TD102F
SECOND LEVEL FLOOR PLAN - AREA F - DEMOLITION -
TELECOMMUNICATIONS
01-TD102J
SECOND LEVEL FLOOR PLAN - AREA J - DEMOLITION -
TELECOMMUNICATIONS
01-TD103
THIRD LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
TELECOMMUNICATIONS
01-TD103A
THIRD LEVEL FLOOR PLAN - AREA A - DEMOLITION -
TELECOMMUNICATIONS
01-TD103B
THIRD LEVEL FLOOR PLAN - AREA B - DEMOLITION -
TELECOMMUNICATIONS
01-TD103C
THIRD LEVEL FLOOR PLAN - AREA C - DEMOLITION -
TELECOMMUNICATIONS
01-TD103D
THIRD LEVEL FLOOR PLAN - AREA D - DEMOLITION -
TELECOMMUNICATIONS
01-TD103E
THIRD LEVEL FLOOR PLAN - AREA E - DEMOLITION -
TELECOMMUNICATIONS
01-TD103F
THIRD LEVEL FLOOR PLAN - AREA F - DEMOLITION -
00 01 15 - 10
01-TD104
FOURTH LEVEL FLOOR PLAN - AREA A - DEMOLITION -
TELECOMMUNICATIONS
01-TD104A
FOURTH LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
TELECOMMUNICATIONS
01-TD104B
FOURTH LEVEL FLOOR PLAN - AREA B - DEMOLITION -
TELECOMMUNICATIONS
01-TD104C
FOURTH LEVEL FLOOR PLAN - AREA C - DEMOLITION -
TELECOMMUNICATIONS
01-TD104D
FOURTH LEVEL FLOOR PLAN - AREA D - DEMOLITION -
TELECOMMUNICATIONS
01-TD104E
FOURTH LEVEL FLOOR PLAN - AREA E - DEMOLITION -
TELECOMMUNICATIONS
01-TD104F
FOURTH LEVEL FLOOR PLAN - AREA F - DEMOLITION -
01-TD400 ENLARGED TELECOMMUNICATIONS ROOM - DEMO
01-TD401 ENLARGED TELECOMMUNICATIONS ROOM - DEMO
01-TD402 ENLARGED TELECOMMUNICATIONS ROOM - DEMO
01-TD403 ENLARGED TELECOMMUNICATIONS ROOM - DEMO
01-TN100 BASEMENT LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
01-TN100A BASEMENT LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS
01-TN100B BASEMENT LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS
01-TN100C BASEMENT LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS
01-TN100D BASEMENT LEVEL FLOOR PLAN - AREA D - TELECOMMUNICATIONS
01-TN100E BASEMENT LEVEL FLOOR PLAN - AREA E - TELECOMMUNICATIONS
01-TN100F BASEMENT LEVEL FLOOR PLAN - AREA F - TELECOMMUNICATIONS
01-TN100G BASEMENT LEVEL FLOOR PLAN - AREA G - TELECOMMUNICATIONS
01-TN100H BASEMENT LEVEL FLOOR PLAN - AREA H - TELECOMMUNICATIONS
01-TN100I BASEMENT LEVEL FLOOR PLAN - AREA I - TELECOMMUNICATIONS
01-TN100J BASEMENT LEVEL FLOOR PLAN - AREA J - TELECOMMUNICATIONS
01-TN101 FIRST LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
01-TN101A FIRST LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS
01-TN101B FIRST LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS
01-TN101C FIRST LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS
01-TN101D FIRST LEVEL FLOOR PLAN - AREA D - TELECOMMUNICATIONS
01-TN101E FIRST LEVEL FLOOR PLAN - AREA E - TELECOMMUNICATIONS
01-TN101F FIRST LEVEL FLOOR PLAN - AREA F - TELECOMMUNICATIONS
01-TN101G FIRST LEVEL FLOOR PLAN - AREA G - TELECOMMUNICATIONS
01-TN101H FIRST LEVEL FLOOR PLAN - AREA H - TELECOMMUNICATIONS
01-TN101I FIRST LEVEL FLOOR PLAN - AREA I - TELECOMMUNICATIONS
01-TN101J FIRST LEVEL FLOOR PLAN - AREA J - TELECOMMUNICATIONS
01-TN101K FIRST LEVEL FLOOR PLAN - AREA K - TELECOMMUNICATIONS
01-TN102 SECOND LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
01-TN102A SECOND LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS
01-TN102B SECOND LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS
01-TN102C SECOND LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS
01-TN102D SECOND LEVEL FLOOR PLAN - AREA D - TELECOMMUNICATIONS
00 01 15 - 11
01-TN102E SECOND LEVEL FLOOR PLAN - AREA E - TELECOMMUNICATIONS
01-TN102F SECOND LEVEL FLOOR PLAN - AREA F - TELECOMMUNICATIONS
01-TN102J SECOND LEVEL FLOOR PLAN - AREA J - TELECOMMUNICATIONS
01-TN103 THIRD LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
01-TN103A THIRD LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS
01-TN103B THIRD LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS
01-TN103C THIRD LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS
01-TN103D THIRD LEVEL FLOOR PLAN - AREA D - TELECOMMUNICATIONS
01-TN103E THIRD LEVEL FLOOR PLAN - AREA E - TELECOMMUNICATIONS
01-TN103F THIRD LEVEL FLOOR PLAN - AREA F - TELECOMMUNICATIONS
01-TN104 FOURTH LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
01-TN104A FOURTH LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS
01-TN104B FOURTH LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS
01-TN104C FOURTH LEVEL FLOOR PLAN - AREA C - TELECOMMUNICATIONS
01-TN104D FOURTH LEVEL FLOOR PLAN - AREA D - TELECOMMUNICATIONS
01-TN104E FOURTH LEVEL FLOOR PLAN - AREA E - TELECOMMUNICATIONS
01-TN104F FOURTH LEVEL FLOOR PLAN - AREA F - TELECOMMUNICATIONS
01-TN400 ENLARGED TELECOMMUNICATIONS ROOM - TR A-5
01-TN401 ENLARGED TELECOMMUNICATIONS ROOM - TR B-14A
01-TN402 ENLARGED TELECOMMUNICATIONS SERVER ROOM - TR B-14
01-TN403 ENLARGED TELECOMMUNICATIONS SERVER ROOM - TR B-14
01-TN404 ENLARGED TELECOMMUNICATIONS SERVER ROOM - TR B-14
01-TN405
ENLARGED TELECOMMUNICATIONS SERVER ROOM EAST ELEVATION VIEW PLAN
TR B-14
01-TN406 ENLARGED TELECOMMUNICATIONS ROOM - TR C-45
01-TN407 ENLARGED TELECOMMUNICATIONS ROOM - TR J-1A
01-TN408 ENLARGED TELECOMMUNICATIONS ROOM - TR M-02
01-TN409 ENLARGED TELECOMMUNICATIONS ROOM - TR 1220
01-TN410 ENLARGED TELECOMMUNICATIONS ROOM - TR A-110A
01-TN411 ENLARGED TELECOMMUNICATIONS ROOM - TR E-135
01-TN412 ENLARGED TELECOMMUNICATIONS ROOM - TR F-126
01-TN413 ENLARGED TELECOMMUNICATIONS ROOM - TR E-243
01-TN414 ENLARGED TELECOMMUNICATIONS ROOM - TR 250A
01-TN415 ENLARGED TELECOMMUNICATIONS ROOM - TR B-235A
01-TN416 ENLARGED TELECOMMUNICATIONS ROOM - TR A363
01-TN417 ENLARGED TELECOMMUNICATIONS ROOM - TR B-347C
01-TN418 ENLARGED TELECOMMUNICATIONS ROOM - TR C-339
01-TN419 ENLARGED TELECOMMUNICATIONS ROOM - TR 4305
01-TN420 ENLARGED TELECOMMUNICATIONS ROOM - TR B4031
01-TN421 ENLARGED TELECOMMUNICATIONS ROOM - TR 4292
01-TN700
BUILDING 01 - BASEMENT FLOOR PLAN - TELECOMMUNICATIONS - CABLE
DISTANCE
01-TN701
BUILDING 01 - 1ST FLOOR PLAN - TELECOMMUNICATIONS - CABLE
DISTANCE
00 01 15 - 12
01-TN702
BUILDING 01 - 2ND FLOOR PLAN - TELECOMMUNICATIONS - CABLE
DISTANCE
01-TN703
BUILDING 01 - 3RD FLOOR PLAN - TELECOMMUNICATIONS - CABLE
DISTANCE
01-TN704
BUILDING 01 - 4TH FLOOR PLAN - TELECOMMUNICATIONS - CABLE
03-TN700
BUILDING 03 - 1ST FLOOR PLAN - TELECOMMUNICATIONS - CABLE
DISTANCE
03-TD101
FIRST LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
TELECOMMUNICATIONS
03-TD400 ENLARGED TELECOMMUNICATIONS ROOM - DEMO
03-TN100 FIRST LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
03-TN400 ENLARGED TELECOMMUNICATIONS ROOM - TR 118
05-TD100
BASEMENT AND SUB-BASEMENT LEVEL FLOOR PLAN - OVERALL -
DEMOLITION - TELECOMMUNICATIONS
05-TD101
FIRST LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
TELECOMMUNICATIONS
05-TD102
SECOND LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
TELECOMMUNICATIONS
05-TD103
THIRD LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
TELECOMMUNICATIONS
05-TD104
FOURTH LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
TELECOMMUNICATIONS
05-TD400 ENLARGED TELECOMMUNICATIONS ROOM - DEMO
05-TD401 ENLARGED TELECOMMUNICATIONS EXISTING ROOM - DEMO
05-TN100
BASEMENT AND SUB-BASEMENT LEVEL FLOOR PLAN - OVERALL -
TELECOMMUNICATIONS
05-TN101 FIRST LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
05-TN102 SECOND LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
05-TN103 THIRD LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
05-TN104 FOURTH LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
05-TN401 ENLARGED TELECOMMUNICATIONS ROOM - TR RB-04A
05-TN402 ENLARGED TELECOMMUNICATIONS ROOM - TR R-202A
05-TN403 ENLARGED TELECOMMUNICATIONS ROOM - TR R-302A
05-TN404 ENLARGED TELECOMMUNICATIONS ROOM - TR R-402A
05-TN700
BUILDING 05 - BASEMENT AND SUB-BASEMENT FLOOR PLAN - TELECOM -
CABLE DISTANCE
05-TN701
BUILDING 05 - 1ST FLOOR PLAN - TELECOMMUNICATIONS - CABLE
DISTANCE
05-TN702
BUILDING 05 - 2ND FLOOR PLAN - TELECOMMUNICATIONS - CABLE
DISTANCE
05-TN703
BUILDING 05 - 3RD FLOOR PLAN - TELECOMMUNICATIONS - CABLE
DISTANCE
05-TN704
BUILDING 05 - 4TH FLOOR PLAN - TELECOMMUNICATIONS - CABLE
06-TD100
FIRST LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
06-TN101 FIRST LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
00 01 15 - 13
06-TN401 ENLARGED TELECOMMUNICATIONS ROOM - TR 1A
06-TN701
BUILDING 06 - 1ST FLOOR PLAN - TELECOMMUNICATIONS - CABLE
07-TD100
GROUND LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
TELECOMMUNICATIONS
07-TD100A
GROUND LEVEL FLOOR PLAN - AREA A - DEMOLITION -
TELECOMMUNICATIONS
07-TD100B
GROUND LEVEL FLOOR PLAN - AREA B - DEMOLITION -
TELECOMMUNICATIONS
07-TD101
FIRST LEVEL FLOOR PLAN - OVERALL - DEMOLITION -
TELECOMMUNICATIONS
07-TD101A
FIRST LEVEL FLOOR PLAN - AREA A - DEMOLITION -
TELECOMMUNICATIONS
07-TD101B
FIRST LEVEL FLOOR PLAN - AREA B - DEMOLITION -
TELECOMMUNICATIONS
07-TD400 ENLARGED TELECOMMUNICATIONS ROOM - DEMO
07-TD401 ENLARGED TELECOMMUNICATIONS EXISTING ROOM - DEMO
07-TN100 GROUND LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
07-TN100A GROUND LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS
07-TN100B GROUND LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS
07-TN101 FIRST LEVEL FLOOR PLAN - OVERALL - TELECOMMUNICATIONS
07-TN101A FIRST LEVEL FLOOR PLAN - AREA A - TELECOMMUNICATIONS
07-TN101B FIRST LEVEL FLOOR PLAN - AREA B - TELECOMMUNICATIONS
07-TN400 ENLARGED TELECOMMUNICATIONS ROOM - TR HB-15
07-TN401 ENLARGED TELECOMMUNICATIONS ROOM - TR HB-125
07-TN700
BUILDING 07 - GROUND FLOOR PLAN - TELECOMMUNICATIONS - CABLE
DISTANCE
07-TN701
BUILDING 07 - 1ST FLOOR PLAN - TELECOMMUNICATIONS - CABLE
TN500 DATA COUNTS BY TR SPACE SCHEDULE
TN501 TELECOMMUNICATIONS DETAILS
TN502 TELECOMMUNICATIONS DETAILS
TN503 TELECOMMUNICATIONS DETAILS
TN504 TELECOMMUNICATIONS DETAILS
TN505 TELECOMMUNICATIONS DETAILS
TN506 TELECOMMUNICATIONS DETAILS
TN507 TELECOMMUNICATIONS DETAILS
TN508 TELECOMMUNICATIONS DETAILS
TN509 TELECOMMUNICATIONS DETAILS
TN510 TELECOMMUNICATIONS DETAILS
ENVIRONMENTAL
H-100 HAZARDOUS MATERIALS COVER PAGE
H-101 BUILDING 01- BASEMENT FLOOR HAZARDOUS MATERIALS
H-102 BUILDING 01- 1ST FLOOR EXISTING HAZARDOUS MATERIALS
H-103 BUILDING 01- 2ND FLOOR EXISTING HAZARDOUS MATERIALS
00 01 15 - 14
H-104 BUILDING 01- 3RD FLOOR EXISTING HAZARDOUS MATERIALS
H-105 BUILDING 01- 4TH FLOOR EXISTING HAZARDOUS MATERIALS
H-106 BUILDING 05- 1ST AND 2ND FLOOR HAZARDOUS MATERIALS
H-107 BUILDING 07- GROUND FLOOR HAZARDOUS MATERIALS
H-108 BUILDING 07- 1ST FLOOR HAZARDOUS MATERIALS
SECURITY
TY000 SECURITY COVER SHEET
TY001 SITE PLAN - SECURITY
01-TY100 BUILDING 01 - BASEMENT PLAN - SECURITY
01-TY100A BUILDING 01 - BASEMENT PLAN - AREA A - SECURITY
01-TY100B BUILDING 01 - BASEMENT PLAN - AREA B - SECURITY
01-TY100C BUILDING 01 - BASEMENT PLAN - AREA C - SECURITY
01-TY100D BUILDING 01 - BASEMENT PLAN - AREA D - SECURITY
01-TY100E BUILDING 01 - BASEMENT PLAN - AREA E - SECURITY
01-TY100F BUILDING 01 - BASEMENT PLAN - AREA F - SECURITY
01-TY100G BUILDING 01 - BASEMENT PLAN - AREA G - SECURITY
01-TY100H BUILDING 01 - BASEMENT PLAN - AREA H - SECURITY
01-TY100I BUILDING 01 - BASEMENT PLAN - AREA I - SECURITY
01-TY100J BUILDING 01 - BASEMENT PLAN - AREA J - SECURITY
01-TY101 BUILDING 01 - 1ST FLOOR PLAN - SECURITY
01-TY101A BUILDING 01 - 1ST FLOOR PLAN - AREA A - SECURITY
01-TY101B BUILDING 01 - 1ST FLOOR PLAN - AREA B - SECURITY
01-TY101C BUILDING 01 - 1ST FLOOR PLAN - AREA C - SECURITY
01-TY101D BUILDING 01 - 1ST FLOOR PLAN - AREA D - SECURITY
01-TY101E BUILDING 01 - 1ST FLOOR PLAN - AREA E - SECURITY
01-TY101F BUILDING 01 - 1ST FLOOR PLAN - AREA F - SECURITY
01-TY101G BUILDING 01 - 1ST FLOOR PLAN - AREA G - SECURITY
01-TY101H BUILDING 01 - 1ST FLOOR PLAN - AREA H - SECURITY
01-TY101I BUILDING 01 - 1ST FLOOR PLAN - AREA I - SECURITY
01-TY101J BUILDING 01 - 1ST FLOOR PLAN - AREA J - SECURITY
01-TY101K BUILDING 01 - 1ST FLOOR PLAN - AREA K - SECURITY
01-TY102 BUILDING 01 - 2ND FLOOR PLAN - SECURITY
01-TY102A BUILDING 01 - 2ND FLOOR PLAN - AREA A - SECURITY
01-TY102B BUILDING 01 - 2ND FLOOR PLAN - AREA B - SECURITY
01-TY102C BUILDING 01 - 2ND FLOOR PLAN - AREA C - SECURITY
01-TY102D BUILDING 01 - 2ND FLOOR PLAN - AREA D - SECURITY
01-TY102E BUILDING 01 - 2ND FLOOR PLAN - AREA E - SECURITY
01-TY102F BUILDING 01 - 2ND FLOOR PLAN - AREA F - SECURITY
01-TY102J BUILDING 01 - 2ND FLOOR PLAN - AREA J - SECURITY
01-TY103 BUILDING 01 - 3RD FLOOR PLAN - SECURITY
01-TY103A BUILDING 01 - 3RD FLOOR PLAN - AREA A - SECURITY
01-TY103B BUILDING 01 - 3RD FLOOR PLAN - AREA B - SECURITY
01-TY103C BUILDING 01 - 3RD FLOOR PLAN - AREA C - SECURITY
01-TY103D BUILDING 01 - 3RD FLOOR PLAN - AREA D - SECURITY
01-TY103E BUILDING 01 - 3RD FLOOR PLAN - AREA E - SECURITY
00 01 15 - 15
01-TY103F BUILDING 01 - 3RD FLOOR PLAN - AREA F - SECURITY
01-TY104 BUILDING 01 - 4TH FLOOR PLAN - SECURITY
01-TY104A BUILDING 01 - 4TH FLOOR PLAN - AREA A - SECURITY
01-TY104B BUILDING 01 - 4TH FLOOR PLAN - AREA B - SECURITY
01-TY104C BUILDING 01 - 4TH FLOOR PLAN - AREA C - SECURITY
01-TY104D BUILDING 01 - 4TH FLOOR PLAN - AREA D - SECURITY
01-TY104E BUILDING 01 - 4TH FLOOR PLAN - AREA E - SECURITY
01-TY104F BUILDING 01 - 4TH FLOOR PLAN - AREA F - SECURITY
01-TY200 BUILDING 01 - TECHNOLOGY ENGLARGEMENTS
03-TY101 BUILDING 03 - 1ST FLOOR PLAN - SECURITY
05-TY009 BUILDING 05 - SUB-BASEMENT PLAN - SECURITY
05-TY100 BUILDING 05 - BASEMENT PLAN - SECURITY
05-TY101 BUILDING 05 - 1ST FLOOR PLAN - SECURITY
05-TY102 BUILDING 05 - 2ND FLOOR PLAN - SECURITY
05-TY103 BUILDING 05 - 3RD FLOOR PLAN - SECURITY
05-TY104 BUILDING 05 - 4TH FLOOR PLAN - SECURITY
07-TY100 BUILDING 07 - GROUND FLOOR PLAN - SECURITY
07-TY100A BUILDING 07 - GROUND FLOOR PLAN - AREA A - SECURITY
07-TY100B BUILDING 07 - GROUND FLOOR PLAN - AREA B - SECURITY
07-TY101 BUILDING 07 - 1ST FLOOR PLAN - SECURITY
07-TY101A BUILDING 07 - 1ST FLOOR PLAN - AREA A - SECURITY
07-TY101B BUILDING 07 - 1ST FLOOR PLAN - AREA B - SECURITY
TY300 TECHNOLOGY DETAILS AND DIAGRAMS
TY400 TECHNOLOGY SCHEDULES
- - - END - - -
01 00 00 -1
G. V. (SONNY) MONTGOMERY VA MEDICAL CENTER, JACKSON MS
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the EHRM Infrastructure
Upgrades located on multiple building across the Montgomery VA Medical
Center Jackson MS, site (VA Project #586-21-700), as required by drawings and specifications.
B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting
Officer.
Mr. Trevor Langston/COR
601-364-7948 Trevor.Langston@va.gov G.V. (Sonny) Montgomery VA Medical Center 1500 East Woodrow Wilson Ave.
Jackson, MS 39216
C. Offices of Planate Management Group, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
01 00 00 -2
G. V. (SONNY) MONTGOMERY VA MEDICAL CENTER, JACKSON MS
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
F. Schedule: See section 1.42 within this specification 01 00 00.
G. Prior to commencing work, general contractor shall provide proof that a
OSHA certified “competent person” (CP) (29 CFR 1926.20(b) (2) will maintain a presence at the work site whenever the general or subcontractors are present.
H. Training:
1. All employees of general contractor or subcontractors shall have the
10-hour OSHA certified Construction Safety course and/or other relevant competency training, as determined by the VA Contracting
Officer with input from the Infection Control Risk Assessment (ICRA) team.
2. Submit training record of all such employees for approval before the start of work.
I. Terms used in this contract such as Veterans Affairs (VA) and
Government, Contracting Officer (CO); Architect-Engineer (AE);
Contracting Officer’s Representative (COR) or COR (RE), Engineering
Officer (EO) may be used interchangeably, and refer to the same entity.
1.3 STATEMENT OF BID ITEM(S)
ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items.
ITEM II, Plumbing Work: Work includes all labor, material, equipment and supervision to perform the required plumbing construction work on this project.
ITEM III, Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required mechanical construction work on this project.
ITEM IV, Electrical Work: Work includes all labor, material, equipment and
01 00 00 -3
G. V. (SONNY) MONTGOMERY VA MEDICAL CENTER, JACKSON MS
supervision to perform the required Electrical construction work on this project.
ITEM IV, Technology Work: Work includes all labor, material, equipment and supervision to perform the required Technology construction work on this project.
ITEM VI, Civil/Landscape Work: Work includes all labor, material, equipment and supervision to perform the required civil/Landscape construction work on this project.
ITEM VII, Structural Work: Work includes all labor, material, equipment and supervision to perform the required Structural construction work on this project.
ITEM IIX, Commissioning Work: Work includes all labor, material, equipment and supervision to perform the required civil construction work on this project.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from
01 00 00 -4
G. V. (SONNY) MONTGOMERY VA MEDICAL CENTER, JACKSON MS
any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. (NOT USED)
D. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71
00, DOOR HARDWARE and coordinate.
E. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
01 00 00 -5
G. V. (SONNY) MONTGOMERY VA MEDICAL CENTER, JACKSON MS
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for General
Contractor and its employees for parking in designated areas only.
G. Fire Safety
1. Applicable Publications: Publications listed below forma part of this Article to extent referenced. Publications are referenced in text by basic designations only.
a. American Society for Testing and Materials (ASTM):
E84-15b...........Surface Burning Characteristics of Building
Materials
b. National Fire Protection Association (NFPA):
10-2018...........Standard for Portable Fire Extinguishers
01 00 00 -6
G. V. (SONNY) MONTGOMERY VA MEDICAL CENTER, JACKSON MS
30-2018...........Flammable and Combustible Liquids Code
51B-2019..........Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
70-2020...........National Electrical Code
241-2019..........Standard for Safeguarding Construction, Alteration, and Demolition Operations
c. Occupational Safety and Health Administration (OSHA):
29 CFR 1926-2015..Safety and Health Regulations for Construction
2. Prior to any worker for the Contractor or subcontractors beginning work, they shall undergo a safety briefing provided by the General
Contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc. Documentation shall be provided to the COR that individuals have undergone Contractor’s safety briefing. Contractor is to perform weekly fire hazard and
OSHA safety inspections on the entire construction area from the rime construction starts until the building is turned over to the
Government. A copy of these reports, listing all hazards identified and corrective actions taken, is to be provided weekly to the COR.
For additional requirements see Article 1.14 under Section 013526, Safety Requirements.
3. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.
4. Separate temporary facilities, such as trailers, storage sheds and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 20 feet exposing overall length, separate by 10 feet.
5. Separate temporary facilities, such as trailers, storage sheds and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 20 feet exposing overall length, separate by 10 feet.
a. Install and maintain temporary construction partitions to provide
01 00 00 -7
G. V. (SONNY) MONTGOMERY VA MEDICAL CENTER, JACKSON MS
smoke-tight separations between construction areas and adjoining areas. Construct partitions of gypsum board or treated plywood
(flame spread rating of 25 or less in accordance with ASTM E84) on both sides of fire-retardant treated wood or metal steel studs. Extend the partitions through suspended ceilings to floor slab deck or roof. Seal joints and penetrations. As a minimum at door openings, install Class C, ¾-hour fire/smoke rated doors with self-closing devices. In all cases, the temporary partition shall meet the minimum fire/smoke barrier requirements for the area affected.
b. Close all openings in smoke barriers and fire-rated construction
(walls, floors and ceilings) to maintain fire ratings. This includes any existing holes as well as Contractor caused holes.
Holes are to be sealed as soon as possible and as a minimum by the end of each workday with temporary or permanent fire sealant.
Seal penetrations with listed through-penetration fire stop materials in accordance with Section 078400, FIRESTOPPING.
6. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.
Open flame heating devices are prohibited on the Medical Center
Grounds.
7. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with COTR.
8. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily report findings and corrective actions weekly COTR.
9. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29
CFR 1926, NFPA 241 and NFPA 10.
10. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241, and NFPA 30.
11. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions
01 00 00 -8
G. V. (SONNY) MONTGOMERY VA MEDICAL CENTER, JACKSON MS
immediately under construction, and temporarily for connections.
Provide fire watch for impairments more than 1 hour in a 24-hour period. Request interruptions in accordance with Article, OPERATIONS
AND STORAGE AREAS, and coordinate with COTR. All existing temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with them medical center. Parameters for the testing and results of any tests shall be recorded by the Medical Center and copies provided to the COTR.
12. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with COTR.
13. Hot Work: Perform and safeguard jot work operations in accordance with NFPA 241 and NFPA 51B. The Contractor shall be responsible for assigning an authorized supervisory representative to issue hot work permits.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .