This document is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) for the Department of Veterans Affairs. Amendment 0003 extends the receipt of offers date to August 18, 2025 at 2:00 PM ET for solicitation 36C77625B0021, related to EHRM Infrastructure Upgrades in Jackson, MS. The amendment provides several key attachments to potential offerors, including:
- Two Geo Technical Reports
- Asbestos and Hazardous Materials Report
- General Requirements Addendum
- Technical Questions Tracker
- Sole Source Justification and Approval (Attachment 07)
The amendment was issued by the Program Contracting Activity Central located in Independence, OH, with Scott Elias listed as the Contract Specialist. Offerors are required to acknowledge receipt of this amendment and return one copy to the issuing office.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C77625B0021 0004.pdf | ||
| Amendment 0003 - Tech Questions Tracker.pdf | ||
| Amendment 0003 - General Requirements Addendum.pdf | ||
| Amendment 0003 - Geo Technical Report 2.pdf | ||
| Attachment 07 - Sole Source JA 586-21-700.pdf | ||
| Amendment 0003 - Asbestos and Hazardous Materials Report.pdf | ||
| Amendment 0003 - Geo Technical Report 1.pdf | ||
| Attachment 01 - Wage Rates - Hinds Co.pdf | ||
| 36C77625B0021 0001.pdf | ||
| 36C77625B0021 0002.pdf | ||
| Attachment 01 - Site Visit Sign-in.pdf | ||
| Attachment 05- Limitations on Subcontracting.pdf | ||
| Attachment 03 - Drawings.pdf | ||
| 36C77625B0021.pdf | ||
| Attachment 04 - Wage Determination Hinds Co.pdf | ||
| Attachment 02 - Specifications.pdf | ||
| Attachment 06 - Spec 01 31 00.01 Project Management and Coordination.pdf | ||
| Attachment 01 - Statement of Work.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0003 07-31-2025 586-21-700
36C776
Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
36C776
Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
To all Offerors/Bidders
36C77625B0021
06-24-2025
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 08-18-2025 14:00 EDT
X 1 (one)
This amendment is issued to:
1. Extend the receipt of offers date to August 18, 2025 at 2:00 PM ET.
2. Provide the Geo Technical reports (see Amendment 0003 - Geo Technical Report 1, and Geo Technical Report 2)
3. Provide the Asbestos and Hazardous Materials Report (see Amendment 0003 - Asbestos and Hazardous Materials Report).
4. Provide a General Requirements Addendum (see Amendment 0003 - General Requirements Addendum).
5. Provide responses to Technical Questions (see Amendment 0003 - Tech Questions Tracker).
6. Provide a Sole Source Justification and Approval (see Attachment 07 - Sole Source JA 586-21-700).
Scott Elias Contract Specialist
See attached document: Amendment 0003 - Geo Technical Report 1.
See attached document: Amendment 0003 - Geo Technical Report 2.
See attached document: Amendment 0003 - Asbestos and Hazardous Materials Report.
See attached document: Amendment 0003 - General Requirements Addendum.
See attached document: Amendment 0003 - Tech Questions Tracker.
See attached document: Attachment 07 - Sole Source JA 586-21-700.
End of Document