ATTACHMENT 02 - FINAL Specifications VOLUME 1 503-22-700 100pct 20250128.pdf
PDF 7 MB Posted
- Solicitation number
- 36C77625R0015
About this file
This file is a specifications document containing general requirements and detailed specifications for an EHRM Infrastructure Upgrades construction project at the James E. Van Zandt VA Medical Center in Altoona, PA. The document outlines comprehensive requirements for construction including safety protocols, security procedures, warranty management, temporary facilities usage, and project documentation requirements.
Key specifications include requirements for security plans, construction site access control, document control procedures, warranty management plans with defined response times for different priority levels, temporary use protocols for mechanical/electrical equipment and elevators, photographic documentation requirements, and project website specifications. The contractor must provide cloud-based construction management software accessible to all project participants. The work involves multiple buildings and systems including mechanical, electrical, plumbing, telecommunications, fire protection and security systems. The document includes detailed lists of architectural drawings, floor plans, and system diagrams covering all impacted buildings and infrastructure components. The specifications emphasize minimal disruption to hospital operations, with certain areas like Urgent Care, Pharmacy, and Radiology requiring 24/7 access during construction.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EHRM INFRASTRUCTURE
UPGRADES
Final Bid Documents – 100% Specifications
JAMES E. VAN ZANDT MEDICAL CENTER
2907 PLEASANT VALLEY BOULEVARD, ALTOONA, PENNSYLVANIA
JANUARY 24, 2025
PROJECT NO. 503-22-700
VOLUME I
James E. Van Zandt Medical Center EHRM Infrastructure Upgrades
Project No. 503-22-700 January 24, 2025
Consultants Directory 00 01 03 - 1
SECTION 00 01 03
CONSULTANTS DIRECTORY
PART 1 - GENERAL
1.1 PROJECT LISTING
A. Architect / Physical Security
Awen Solutions Group 4196 Merchant Plaza Woodbridge, Virginia 22192
B. Mechanical /Electrical / Plumbing / Fire Protection Engineer
IMEG Corp 2310 Crossroads Drive Suite 3000 Madison, WI 53718
C. Civil
The EADS Group 1126 Eighth Avenue Altoona, PA 16602
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
Table of Contents
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 03 Consultants Directory 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 31 23 Project Website 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21 01 33 23 Shop Drawings, Product Data, and Samples 02-23 01 35 26 Safety Requirements 10-22 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 04-22 01 91 00 General Commissioning Requirements 04-22
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21
DIVISION 03 – CONCRETE
(Not used)
DIVISION 04 – MASONRY
(Not used)
DIVISION 05 – METALS
05 40 00 Cold-Formed Metal Framing 01-21
00 01 10-2
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 04-22 08 71 00 Door Hardware 05-22
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 06 00 Schedule for Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 19 Resilient Tile Flooring 05-18 09 69 00 Access Flooring 01-21 09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21 10 26 00 Wall and Door Protection 01-21 10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT
(Not used)
DIVISION 12 – FURNISHINGS
(Not Used)
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural Components 01-21
00 01 10-3
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 14– CONVEYING EQUIPEMENT
(Not used)
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15 21-22-00 Clean Agent Fire Suppression Systems 05-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-23 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 40 00 Plumbing Fixtures 12-22
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 03-23 23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 03-23 23 09 23 Direct-Digital Control System for HVAC 03-23 23 21 13 Hydronic Piping 03-23 23 22 13 Steam and Condensate Heating Piping 04-23 23 23 00 Refrigerant Piping 03-23 23 31 00 HVAC Ducts and Casings 03-23 23 36 00 Air Terminal Units 03-23 23 37 00 Air Outlets and Inlets 03-23 23 81 00 Decentralized Unitary HVAC Equipment 03-23 23 81 23 Computer-Room Air-Conditioners 03-23 23 81 43 Air-Source Unitary Heat Pumps 03-23
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
00 01 10-4
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22 26 05 26 Grounding and Bonding for Electrical Systems 11-22 26 05 33 Raceway and Boxes for Electrical Systems 11-22 26 05 41 Underground Electrical Construction 11-22 26 05 73 Overcurrent Protective Device Coordination Study 11-22 26 08 00 Commissioning of Electrical Systems 11-22 26 09 23 Lighting Controls 11-22 26 22 00 Low-Voltage Transformers 11-22 26 24 16 Panelboards 11-22 26 25 11 Busways 11-22 26 27 26 Wiring Devices 11-22 26 29 11 Motor Controllers 11-22 26 29 21 Enclosed Switches and Circuit Breakers 11-22 26 33 53 Static Uninterruptible Power Supply 11-22 26 36 23 Automatic Transfer Switches 11-22 26 41 00 Facility Lightning Protection 11-22 26 43 13 Surge Protective Devices 11-22 26 51 00 Interior Lighting 11-22
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 12-22 27 05 26i Grounding and Bonding for Communications Systems 12-22 27 05 33i Raceways and Boxes for Communications Systems 12-22 27 05 36i Cable Trays for Communications Systems 12-22 27 05 53i Identification for Communications Systems 12-22 27 08 00 Commissioning of Communication Systems 27 10 00 Structured Cabling 12-22 27 11 16 Communications Cabinets, Racks, Frames, and Enclosures 12-22 27 11 19 Communications Termination Blocks and Patch Panels 12-22 27 11 26 Communications Rack Mounted Power Protection and Power Strips 12-22 27 13 23.13 Communications Optical Fiber Cable Splicing and Terminations 12-22 27 13 23 Communications Optical Fiber Backbone Cabling 27 15 13 Communications Copper Horizontal Cabling 12-22 27 16 19 Communications Patch Cords, Station Cords and Cross Connect
Wire 12-22
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and Security 10-18
00 01 10-5
SECTION NO DIVISION AND SECTION TITLES DATE
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 05 13 Soils for Earthwork 31 05 16 Aggregates for Earthwork 31 11 00 Site Clearing 31 20 11 Earthwork (Short Form) 10-12 31 23 16 Excavation 31 23 17 Trenching 31 23 18 Rock Removal 31 23 19 Dewatering 31 25 00 Erosion and Sedimentation Controls 31 41 00 Excavation Support Systems
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 11 23 Aggregate Base Courses 32 12 16 Asphalt Paving 32 13 13 Concrete Paving 32 31 13 Chain Link Fences and Gates 32 92 19 Seeding 33 05 26 Utility Identification
DIVISION 33 – UTILITIES
(Not used)
DIVISION 34 – TRANSPORTATION
(Not used)
DIVISION 48 – ELECTRICAL POWER GENERATION
(Not used)
April 29, 2024
List of Drawings 00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
SHEET INDEX
Sheet Number Sheet Name
BLDG 00
01.1 - GENERAL INFORMATION
00-GI001 COVER SHEET
00-GI002 SHEET INDEX
00-GI004 GENERAL NOTES AND CODE REQUIREMENTS
00-GI005 TIL ABBREVIATION LIST (PG-18-4)
00-GI006 SEQUENCING NOTES, SYMBOLS & ABBREVIATIONS
00-GI011 TYPICAL ADA REQUIREMENTS - INTERIOR CLEARANCES
00-GI100 BUILDING 01 - BASEMENT DIAMOND ANALYSIS
00-GI101 BUILDING 01 - FIRST FLOOR DIAMOND ANALYSIS
00-GI102 BUILDING 01 - SECOND FLOOR DIAMOND ANALYSIS
00-GI103 BUILDING 01 - THIRD FLOOR DIAMOND ANALYSIS
00-GI104 BUILDING 01 - FOURTH FLOOR DIAMOND ANALYSIS
00-GI105 BUILDING 01 - FIFTH FLOOR DIAMOND ANALYSIS
00-GI106 BUILDING 01 - SIXTH FLOOR DIAMOND ANALYSIS
00-GI107 BUILDING 01 - SEVENTH FLOOR DIAMOND ANALYSIS
01.3 - CAMPUS SITE PLAN
00-GS101 CAMPUS SITE PLAN
05 - CIVIL
C-101 OVERALL PLAN
C-401 SITE PLAN
C-402 SITE PLAN
C-403 SITE PLAN
C-404 SITE PLAN
C-405 DETAILS
C-406 DETAILS
C-407 DETAILS
08.5 - ARCHITECTURE
00-AE501 INTERIOR FRAMING DETAILS
00-AE502 INTERIOR FRAMING DETAILS
00-AE511 DOOR DETAILS
00 01 15 - 2
00-AE521 PARTITION AND MISCELLANEOUS DETAILS
00-AE531 CEILING DETAILS
08.6 - ARCHITECTURE
00-AE601 DOOR SCHEDULE
00-AE602 ROOM FINISH SCHEDULE
00-AE603 PARTITION TYPES
11 - FIRE PROTECTION
00-FX000 FIRE PROTECTION COVERSHEET
00-FX400 FIRE PROTECTION DETAILS
12 - PLUMBING
00-PL000 PLUMBING COVERSHEET
00-PL400 PLUMBING DETAILS
14 - MECHANICAL
00-MH000 MECHANICAL COVERSHEET
00-MH400 MECHANICAL DETAILS
00-MH401 MECHANICAL DETAILS
00-MH500 MECHANICAL SCHEDULES
15 - ELECTRICAL
00-EE000 ELECTRICAL COVERSHEET
00-EE001 ELECTRICAL COVERSHEET
00-EE002 ELECTRICAL DETAILS
00-EE003 ELECTRICAL DETAILS
00-EE004 ELECTRICAL DETAILS
00-EE005 ELECTRICAL SCHEDULES
00-EE006 ELECTRICAL SITE PLAN
16 - TELECOMMUNICATIONS
00-TN000 TECHNOLOGY COVERSHEET
00-TN001 TECHNOLOGY SITE PLAN
00-TN002 TECHNOLOGY SITE PLAN "A" ROUTE
00-TN003 TECHNOLOGY SITE PLAN "B" ROUTE
00-TN400 TECHNOLOGY DETAILS
00-TN401 TECHNOLOGY DETAILS
00-TN402 TECHNOLOGY DETAILS
00-TN403 TECHNOLOGY DETAILS
00-TN500 TECHNOLOGY DIAGRAMS
00-TN501 TECHNOLOGY DIAGRAMS
00-TN502 TECHNOLOGY DIAGRAMS
00-TN503 TECHNOLOGY DIAGRAMS
00-TN504 TECHNOLOGY DIAGRAMS
00-TN505 TECHNOLOGY DIAGRAMS
00-TN506 TECHNOLOGY DIAGRAMS
00 01 15 - 3
00-TN600 TECHNOLOGY SCHEDULES
16.4.1 - PHYSICAL SECURITY
00-TY001 SECURITY NOTES, SYMBOLS, AND ABBREVIATIONS
BLDG 01
01.1 - GENERAL INFORMATION
01-GI000 COVER SHEET
01-GI001 SHEET INDEX - BUILDING 1
08 - ARCHITECTURE
01-AD001 GENERAL DEMOLITION NOTES
01-AD401
BUILDING 01 - DEMOLITION TR FLOOR AND REFLECTED CEILING
PLANS
01-AD402
BUILDING 01 - DEMOLITION TR FLOOR AND REFLECTED CEILING
PLANS
01-AD403
BUILDING 01 - DEMOLITION TR FLOOR AND REFLECTED CEILING
PLANS
01-AD404
BUILDING 01 - DEMOLITION TR FLOOR AND REFLECTED CEILING
PLANS
08.2 - ARCHITECTURE
01-AE101 BUILDING 01 - BASEMENT AND SUB-BASEMENT FLOOR PLANS
01-AE102 BUILDING 01 - FIRST FLOOR PLAN
01-AE103 BUILDING 01 - SECOND FLOOR PLAN
01-AE104 BUILDING 01 - THIRD FLOOR PLAN
01-AE105 BUILDING 01 - FOURTH & FIFTH FLOOR PLANS
01-AE106 BUILDING 01 - SIX, SEVEN, EIGHT AND NINTH FLOORS
01-AE119 BUILDING 01 - ENLARGED BASEMENT FLOOR PLAN - AREA A
01-AE120 BUILDING 01 - ENLARGED BASEMENT FLOOR PLAN - AREA B
01-AE121 BUILDING 01 - ENLARGED BASEMENT FLOOR PLAN - AREA C
01-AE122 BUILDING 01 - ENLARGED FIRST FLOOR PLAN - AREA A
01-AE123 BUILDING 01 - ENLARGED FIRST FLOOR PLAN - AREA B
01-AE124 BUILDING 01 - ENLARGED FIRST FLOOR PLAN - AREA E
01-AE125 BUILDING 01 - ENLARGED FIRST FLOOR PLAN - AREA C
01-AE126 BUILDING 01 - ENLARGED FIRST FLOOR PLAN - AREA D
01-AE127 BUILDING 01 - ENLARGED SECOND FLOOR PLAN - AREA A
01-AE128 BUILDING 01 - ENLARGED SECOND FLOOR PLAN - AREA B
01-AE129 BUILDING 01 - ENLARGED SECOND FLOOR PLAN - AREA C
01-AE130 BUILDING 01 - ENLARGED SECOND FLOOR PLAN - AREA D
01-AE131 BUILDING 01 - ENLARGED THIRD FLOOR PLAN - AREA A
01-AE132 BUILDING 01 - ENLARGED THIRD FLOOR PLAN - AREA B
01-AE133 BUILDING 01 - ENLARGED THIRD FLOOR PLAN - AREA C
01-AE134 BUILDING 01 - ENLARGED FOURTH FLOOR PLAN - AREA A
01-AE135 BUILDING 01 - ENLARGED FOURTH FLOOR PLAN - AREA B
01-AE136 BUILDING 01 - ENLARGED FIFTH FLOOR PLANS
00 01 15 - 4
01-AE137 BUILDING 01 - ENLARGED SIXTH FLOOR PLANS
01-AE138 BUILDING 01 - ENLARGED SEVENTH FLOOR PLANS
08.4 - ARCHITECTURE
01-AE401
BUILDING 01 - ENLARGED FLOOR PLANS AND REFLECTED
CEILING PLANS
01-AE402
BUILDING 01 - ENLARGED FLOOR AND REFLECTED CEILING
PLANS
01-AE403
BUILDING 01 - ENLARGED FLOOR AND REFLECTED CEILING
PLANS
01-AE451 BUILDING 01 - INTERIOR ELEVATIONS
01-AE452 BUILDING 01 - INTERIOR ELEVATIONS
11 - FIRE PROTECTION
01-FX110 BUILDING 01 - BASEMENT FLOOR PLAN - FIRE PROTECTION
01-FX111 BUILDING 01 - FIRST FLOOR PLAN - FIRE PROTECTION
01-FX112 BUILDING 01 - SECOND FLOOR PLAN - FIRE PROTECTION
01-FX113 BUILDING 01 - THIRD FLOOR PLAN - FIRE PROTECTION
01-FX114 BUILDING 01 - FOURTH FLOOR PLAN - FIRE PROTECTION
01-FX115 BUILDING 01 - FIFTH FLOOR PLAN - FIRE PROTECTION
01-FX116 BUILDING 01 - SIXTH FLOOR PLAN - FIRE PROTECTION
01-FX117 BUILDING 01 - SEVENTH FLOOR PLAN - FIRE PROTECTION
12 - PLUMBING
01-PL110 BUILDING 01 - BASEMENT FLOOR PLAN - PLUMBING
01-PL111 BUILDING 01 - FIRST FLOOR PLAN - PLUMBING
01-PL112 BUILDING 01 - SECOND FLOOR PLAN - PLUMBING
01-PL113 BUILDING 01 - THIRD FLOOR PLAN - PLUMBING
01-PL114 BUILDING 01 - FOURTH FLOOR PLAN - PLUMBING
01-PL115 BUILDING 01 - FIFTH FLOOR PLAN - PLUMBING
01-PL116 BUILDING 01 - SIXTH FLOOR PLAN - PLUMBING
01-PL117 BUILDING 01 - SEVENTH FLOOR PLAN - PLUMBING
14 - MECHANICAL
01-MH110 BUILDING 01 - BASEMENT FLOOR PLAN - MECHANICAL
01-MH111 BUILDING 01 - FIRST FLOOR PLAN - MECHANICAL
01-MH112 BUILDING 01 - SECOND FLOOR PLAN - MECHANICAL
01-MH113 BUILDING 01 - THIRD FLOOR PLAN - MECHANICAL
01-MH114 BUILDING 01 - FOURTH FLOOR PLAN - MECHANICAL
01-MH115 BUILDING 01 - FIFTH FLOOR PLAN - MECHANICAL
01-MH116 BUILDING 01 - SIXTH FLOOR PLAN - MECHANICAL
01-MH117 BUILDING 01 - SEVENTH FLOOR PLAN - MECHANICAL
01-MH118 BUILDING 01 - EIGHTH FLOOR PLAN - MECHANICAL
01-MH300 MECHANICAL ENLARGED PLANS
01-MH301 MECHANICAL ENLARGED PLANS
01-MH302 MECHANICAL ENLARGED PLANS
00 01 15 - 5
01-MH303 MECHANICAL ENLARGED PLANS
01-MH304 MECHANICAL ENLARGED PLANS
01-MH305 MECHANICAL ENLARGED PLANS
01-MH306 MECHANICAL ENLARGED PLANS
01-MH307 MECHANICAL ENLARGED PLANS
15 - ELECTRICAL
01-EE100 BUILDING 01 - BASEMENT PLAN - ELECTRICAL
01-EE101 BUILDING 01 - FIRST FLOOR PLAN - ELECTRICAL
01-EE102 BUILDING 01 - SECOND FLOOR PLAN - ELECTRICAL
01-EE103 BUILDING 01 - THIRD FLOOR PLAN - ELECTRICAL
01-EE104 BUILDING 01 - FOURTH AND FIFTH FLOOR PLAN - ELECTRICAL
01-EE105 BUILDING 01 - SIXTH AND SEVENTH FLOOR PLAN - ELECTRICAL
01-EE106 BUILDING 01 - EIGHTH AND NINTH FLOOR PLAN - ELECTRICAL
01-EE200 BUILDING 01 - BASEMENT BB15L ELECTRICAL ENLARGED PLANS
01-EE201 BUILDING 01 - BASEMENT BB05 ELECTRICAL ENLARGED PLANS
01-EE202 BUILDING 01 - FIRST FLOOR 1F01 ELECTRICAL ENLARGED PLANS
01-EE203 BUILDING 01 - FIRST FLOOR 1F08 ELECTRICAL ENLARGED PLANS
01-EE204
BUILDING 01 - FIRST FLOOR 1B05 ELECTRICAL ENLARGED
PLANS
01-EE205
BUILDING 01 - SECOND FLOOR 2D29 ELECTRICAL ENLARGED
PLANS
01-EE206
BUILDING 01 - SECOND FLOOR 2A02 ELECTRICAL ENLARGED
PLANS
01-EE207
BUILDING 01 - SECOND FLOOR 2B39 ELECTRICAL ENLARGED
PLANS
01-EE208
BUILDING 01 - THIRD FLOOR 3D14 ELECTRICAL ENLARGED
PLANS
01-EE209
BUILDING 01 - THIRD FLOOR 3B01A ELECTRICAL ENLARGED
PLANS
01-EE210
BUILDING 01 - FOURTH FLOOR 4B04 ELECTRICAL ENLARGED
PLANS
01-EE211
BUILDING 01 - FIFTH FLOOR 5A01A ELECTRICAL ENLARGED
PLANS
01-EE212
BUILDING 01 - SIXTH FLOOR 6A01B ELECTRICAL ENLARGED
PLANS
01-EE213
BUILDING 01 - SEVENTH FLOOR 7B01 ELECTRICAL ENLARGED
PLANS
01-EE300 ELECTRICAL ONE-LINE DIAGRAM
01-EE301 ELECTRICAL ONE-LINE DIAGRAM
01-EE302 ELECTRICAL ONE-LINE DIAGRAM
01-EE303 ELECTRICAL ONE-LINE DIAGRAM
01-EE304 ELECTRICAL ONE-LINE DIAGRAM
01-EE305 ELECTRICAL ONE-LINE DIAGRAM
00 01 15 - 6
01-EE306 ELECTRICAL ONE-LINE DIAGRAM
01-EE600 ELECTRICAL SCHEDULES
16 - TELECOMMUNICATIONS
01-TD109
BUILDING 01 - SUB-BASEMENT FLOOR DEMO PLAN -
TECHNOLOGY
01-TD110 BUILDING 01 - BASEMENT FLOOR DEMO PLAN - TECHNOLOGY
01-TD111 BUILDING 01 - FIRST FLOOR DEMO PLAN - TECHNOLOGY
01-TD112 BUILDING 01 - SECOND FLOOR DEMO PLAN - TECHNOLOGY
01-TD113 BUILDING 01 - THIRD FLOOR DEMO PLAN - TECHNOLOGY
01-TD114 BUILDING 01 - FOURTH FLOOR DEMO PLAN - TECHNOLOGY
01-TD115 BUILDING 01 - FIFTH FLOOR DEMO PLAN - TECHNOLOGY
01-TD116 BUILDING 01 - SIXTH FLOOR DEMO PLAN - TECHNOLOGY
01-TD117 BUILDING 01 - SEVENTH FLOOR DEMO PLAN - TECHNOLOGY
01-TD118 BUILDING 01 - EIGHTH FLOOR DEMO PLAN - TECHNOLOGY
01-TD119 BUILDING 01 - NINTH FLOOR DEMO PLAN - TECHNOLOGY
01-TN109 BUILDING 01 - SUB-BASEMENT FLOOR PLAN - TECHNOLOGY
01-TN110 BUILDING 01 - BASEMENT FLOOR PLAN - TECHNOLOGY
01-TN110A BUILDING 01 - BASEMENT FLOOR PLAN - AREA A - TECHNOLOGY
01-TN110B BUILDING 01 - BASEMENT FLOOR PLAN - AREA B - TECHNOLOGY
01-TN110C BUILDING 01 - BASEMENT FLOOR PLAN - AREA C - TECHNOLOGY
01-TN111 BUILDING 01 - FIRST FLOOR PLAN - TECHNOLOGY
01-TN111A BUILDING 01 - FIRST FLOOR PLAN - AREA A - TECHNOLOGY
01-TN111B BUILDING 01 - FIRST FLOOR PLAN - AREA B - TECHNOLOGY
01-TN111C BUILDING 01 - FIRST FLOOR PLAN - AREA C - TECHNOLOGY
01-TN111D BUILDING 01 - FIRST FLOOR PLAN - AREA D - TECHNOLOGY
01-TN111E BUILDING 01 - FIRST FLOOR PLAN - AREA E - TECHNOLOGY
01-TN112 BUILDING 01 - SECOND FLOOR PLAN - TECHNOLOGY
01-TN112A BUILDING 01 - SECOND FLOOR PLAN - AREA A - TECHNOLOGY
01-TN112B BUILDING 01 - SECOND FLOOR PLAN - AREA B - TECHNOLOGY
01-TN112C BUILDING 01 - SECOND FLOOR PLAN - AREA C - TECHNOLOGY
01-TN112D BUILDING 01 - SECOND FLOOR PLAN - AREA D - TECHNOLOGY
01-TN113 BUILDING 01 - THIRD FLOOR PLAN - TECHNOLOGY
01-TN113A BUILDING 01 - THIRD FLOOR PLAN - AREA A- TECHNOLOGY
01-TN113B BUILDING 01 - THIRD FLOOR PLAN - AREA B- TECHNOLOGY
01-TN113C BUILDING 01 - THIRD FLOOR PLAN - AREA C- TECHNOLOGY
01-TN114 BUILDING 01 - FOURTH FLOOR PLAN - TECHNOLOGY
01-TN114A
BUILDING 01 - ENLARGED FOURTH FLOOR PLAN - AREA A -
TECHNOLOGY
01-TN114B
BUILDING 01 - ENLARGED FOURTH FLOOR PLAN - AREA B -
TECHNOLOGY
01-TN115 BUILDING 01 - FIFTH FLOOR PLAN - TECHNOLOGY
00 01 15 - 7
01-TN115A-B
BUILDING 01 - FIFTH FLOOR PLAN - AREA A AND B -
TECHNOLOGY
01-TN116 BUILDING 01 - SIXTH FLOOR PLAN - TECHNOLOGY
01-TN116A-B
BUILDING 01 - SIXTH FLOOR PLAN - AREA A AND B -
TECHNOLOGY
01-TN117 BUILDING 01 - SEVENTH FLOOR PLAN - TECHNOLOGY
01-TN117A-B
BUILDING 01 - SEVENTH FLOOR PLAN - AREA A AND B -
TECHNOLOGY
01-TN118 BUILDING 01 - EIGHTH FLOOR PLAN - TECHNOLOGY
01-TN119 BUILDING 01 - NINTH FLOOR PLAN - TECHNOLOGY
01-TN300 TECHNOLOGY ENLARGED PLANS
01-TN301 TECHNOLOGY ENLARGED PLANS
01-TN302 TECHNOLOGY ENLARGED PLANS
01-TN303 TECHNOLOGY ENLARGED PLANS
01-TN304 TECHNOLOGY ENLARGED PLANS
01-TN305 TECHNOLOGY ENLARGED PLANS
01-TN306 TECHNOLOGY ENLARGED PLANS
01-TN307 TECHNOLOGY ENLARGED PLANS
16.4.1 - PHYSICAL SECURITY
01-TY101 BUILDING 01 - BASEMENT FLOOR PLAN - AREA A - SECURITY
01-TY102 BUILDING 01 - BASEMENT FLOOR PLAN - AREA C - SECURITY
01-TY103 BUILDING 01 - FIRST FLOOR PLAN - AREA A - SECURITY
01-TY104 BUILDING 01 - FIRST FLOOR PLAN - AREA E - SECURITY
01-TY105 BUILDING 01 - FIRST FLOOR PLAN - AREA C -SECURITY
01-TY106 BUILDING 01 - SECOND FLOOR PLAN - AREA A - SECURITY
01-TY107 BUILDING 01 - SECOND FLOOR PLAN - AREA B - SECURITY
01-TY108 BUILDING 01 - SECOND FLOOR PLAN - AREA C - SECURITY
01-TY109 BUILDING 01 - THIRD FLOOR PLAN - AREA A - SECURITY
01-TY110 BUILDING 01 - THIRD FLOOR PLAN - AREA C - SECURITY
01-TY111 BUILDING 01 - FOURTH FLOOR PLAN - AREA A - SECURITY
01-TY112 BUILDING 01 - FIFTH FLOOR PLAN - SECURITY
01-TY113 BUILDING 01 - SIXTH FLOOR PLAN - SECURITY
01-TY114 BUILDING 01 - SEVENTH FLOOR PLAN - SECURITY
BLDG 02
01 - GENERAL
02-GI001 COVER SHEET
08.2 - ARCHITECTURE
02-AE101 BUILDING 02 - FIRST FLOOR PLAN & ENLARGED PLANS
11 - FIRE PROTECTION
02-FX101 BUILDING 02 - FIRST FLOOR PLAN - FIRE PROTECTION
14 - MECHANICAL
02-MH101 BUILDING 02 - FIRST FLOOR PLAN - MECHANICAL
00 01 15 - 8
15 - ELECTRICAL
02-EE100 BUILDING 02 - BASEMENT AND FIRST FLOOR PLAN - ELECTRICAL
02-EE300 BUILDING 02 - ELECTRICAL ENLARGED PLANS
02-EE500 ELECTRICAL ONE-LINE DIAGRAM
16 - TELECOMMUNICATIONS
02-TD100 BUILDING 02 - BASEMENT FLOOR DEMO PLAN - TECHNOLOGY
02-TD101 BUILDING 02 - FIRST FLOOR DEMO PLAN - TECHNOLOGY
02-TN101 BUILDING 02 - FIRST FLOOR PLAN - TECHNOLOGY
02-TN300 BUILDING 02 - TECHNOLOGY ENLARGED PLANS
16.4.1 - PHYSICAL SECURITY
02-TY101 BUILDING 02 - FIRST FLOOR PLAN - SECURITY
BLDG 03
01 - GENERAL
03-GI001 COVER SHEET
08.2 - ARCHITECTURE
03-AE101
BUILDING 03 - BASEMENT, FIRST FLOOR AND ENLARGED FLOOR
PLAN
11 - FIRE PROTECTION
03-FX101 BUILDING 03 - BASEMENT FLOOR PLAN - FIRE PROTECTION
14 - MECHANICAL
03-MH101 BUILDING 03 - BASEMENT FLOOR PLAN - MECHANICAL
03-MH102 BUILDING 03 - LEVEL 01 FLOOR PLAN - MECHANICAL
15 - ELECTRICAL
03-EE100 BUILDING 03 - BASEMENT PLAN - ELECTRICAL
03-EE101 BUILDING 03 - LEVEL 01 PLAN - AREA A- ELECTRICAL
03-EE300 ELECTRICAL ONE-LINE DIAGRAM
16 - TELECOMMUNICATIONS
03-TD100 BUILDING 03 - BASEMENT FLOOR DEMO PLAN - TECHNOLOGY
03-TD101 BUILDING 03 - FIRST FLOOR DEMO PLAN - TECHNOLOGY
03-TN100 BUILDING 03 - BASEMENT FLOOR PLAN - TECHNOLOGY
03-TN101 BUILDING 03 - FIRST FLOOR PLAN - TECHNOLOGY
03-TN300 BUILDING 03 - TECHNOLOGY ENLARGED PLANS
16.4.1 - PHYSICAL SECURITY
03-TY101 BUILDING 03 - BASEMENT FLOOR PLAN - SECURITY
BLDG 07
01-GENERAL
07-GI001 COVER SHEET
08.2 - ARCHITECTURE
07-AE101
BUILDING 07 - BASEMENT, FIRST FLOOR PLANS, ENLARGED
PLANS
11 - FIRE PROTECTION
00 01 15 - 9
07-FX101 BUILDING 07 - FIRST FLOOR PLAN - FIRE PROTECTION
12 - PLUMBING
07-PL101 BUILDNG 07 - FIRST FLOOR PLAN - PLUMBING
14 - MECHANICAL
07-MH101 BUILDING 07 - FIRST FLOOR PLANS - MECHANICAL
15 - ELECTRICAL
07-EE100 BUILDING 07 - BASEMENT AND FIRST FLOOR PLAN - ELECTRICAL
07-EE201 BUILDING 07 - ELECTRICAL ENLARGED PLANS
16 - TELECOMMUNICATIONS
07-TD100 BUILDING 07 - BASEMENT FLOOR DEMO PLAN - TECHNOLOGY
07-TD101 BUILDING 07 - FIRST FLOOR DEMO PLAN - TECHNOLOGY
07-TN100 BUILDING 07 - BASEMENT FLOOR PLAN - TECHNOLOGY
07-TN101 BUILDING 07 - FIRST FLOOR PLAN - TECHNOLOGY
07-TN300 BUILDING 07 - TECHNOLOGY ROOM ENLARGEMENTS
16.4.1 - PHYSICAL SECURITY
07-TY101 BUILDING 07 - BASEMENT, FIRST FLOOR PLAN - SECURITY
BLDG 11
01 - GENERAL
11-GI001 COVER SHEET
0.7 - STRUCTURAL
11-SE000 GENERAL NOTES
11-SE100 EGRESS RAMP PLAN AND DETAILS
08.2 - ARCHITECTURE
11-AE101
BUILDING 11 - FIRST FLOOR DEMO PLAN AND REFLECTED
CEILING DEMO PLAN
11-AE102
BUILDING 11 - FIRST FLOOR PLAN AND ENLARGED DATA CENTER
PLAN
11 - FIRE PROTECTION
11-FX101 BUILDING 11 - FIRST FLOOR DEMO PLAN - FIRE PROTECTION
11-FX102 BUILDING 11 - FIRST FLOOR PLAN - FIRE PROTECTION
12 - PLUMBING
11-PL101 BUILDING 11 - FIRST FLOOR PLAN - PLUMBING
14 - MECHANICAL
11-MD101 BUILDING 11 - FIRST FLOOR DEMOLITION PLAN - MECHANICAL
11-MH101 BUILDING 11 - FIRST FLOOR PLAN - MECHANICAL
15 - ELECTRICAL
11-ED100 BUILDING 11 - FIRST FLOOR DEMOLITION PLAN - ELECTRICAL
11-EE101 BUILDING 11 - FIRST FLOOR PLAN - ELECTRICAL
11-EE102 BUILDING 11 - FIRST FLOOR PLAN - ELECTRICAL
11-EE300 DEMO ONE LINE DIAGRAM
00 01 15 - 10
11-EE301 NEW ONE LINE DIAGRAM
11-EE302 ELECTRICAL SCHEDULES
11-EE303 ELECTRICAL SCHEDULES
16 - TELECOMMUNICATIONS
11-TD101 BUILDING 11 - FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY
11-TN101 BUILDING 11 - FIRST FLOOR PLAN - TECHNOLOGY
11-TN300 BUILDING 11 - TECHNOLOGY ROOM ENLARGEMENTS
11-TN301 BUILDING 11 - TECHNOLOGY ROOM ENLARGEMENTS
16.4.1 - PHYSICAL SECURITY
11-TY101 BUILDING 11 - FIRST FLOOR PLAN - SECURITY
BLDG 15
01 -GENERAL
15-GI001 COVER SHEET
08.2 - ARCHITECTURE
15-AE101 BUILDING 15 - FIRST FLOOR PLAN
14 - MECHANICAL
15-MH101 BUILDING 15 - LEVEL 01 PLAN - MECHANICAL
15 - ELECTRICAL
15-EE101 BUILDING 15 - FIRST FLOOR PLAN - ELECTRICAL
16 - TELECOMMUNICATIONS
15-TD101 BUILDING 15 - FIRST FLOOR DEMO PLAN - TECHNOLOGY
15-TN101 BUILDING 15 - FIRST FLOOR PLAN - TECHNOLOGY
15-TN300 BUILDING 15 - TECHNOLOGY ENLARGED PLANS
16.4.1 - PHYSICAL SECURITY
15-TY101 BUILDING 15 - FIRST FLOOR PLAN - SECURITY
BLDG 20
01 - GENERAL
20-GI001 COVER SHEET
08.2 - ARCHITECTURE
20-AE101 BUILDING 20 - FIRST FLOOR PLAN AND ENLARGED FLOOR PLANS
11 - FIRE PROTECTION
20-FX101 BUILDING 20 - FIRST FLOOR PLAN - FIRE PROTECTION
14 - MECHANICAL
20-MH101 BUILDING 20 - FIRST FLOOR PLAN - MECHANICAL
15 - ELECTRICAL
20-EE101 BUILDING 20 - FIRST FLOOR PLAN - ELECTRICAL
20-EE301 BUILDING 20 - ELECTRICAL ENLARGED PLANS
16 - TELECOMMUNICATIONS
20-TD101 BUILDING 20 - FIRST FLOOR DEMO PLAN - TECHNOLOGY
20-TN101 BUILDING 20 - FIRST FLOOR PLAN - TECHNOLOGY
20-TN300 BUILDING 20 - TECHNOLOGY ROOM ENLARGEMENTS
00 01 15 - 11
16.4.1 - PHYSICAL SECURITY
20-TY101 BUILDING 20 - FIRST FLOOR PLAN - SECURITY
BLDG 32
01 - GENERAL
32-GI001 COVER SHEET
08.2 - ARCHITECTURE
32-AE101
BUILDING 32 - BASEMENT FLOOR PLAN AND ENLARGED FLOOR
PLANS
32-AE102 BUILDING 32 - FIRST FLOOR PLAN AND ENLARGED FLOOR PLANS
32-AE103
BUILDING 32 - SECOND FLOOR PLAN AND ENLARGED FLOOR
PLANS
11 - FIRE PROTECTION
32-FX100 BUILDING 32 - BASEMENT FLOOR PLAN - FIRE PROTECTION
32-FX101 BUILDING 32 - FIRST FLOOR PLAN - FIRE PROTECTION
32-FX102 BUILDING 32 - SECOND FLOOR PLAN - FIRE PROTECTION
12 - PLUMBING
32-PL101 BUILDING 32 - FIRST FLOOR PLANS - PLUMBING
14 - MECHANICAL
32-MH100 BUILDING 32 - BASEMENT FLOOR PLANS - MECHANICAL
32-MH101 BUILDING 32 - FIRST FLOOR PLANS - MECHANICAL
32-MH102 BUILDING 32 - SECOND FLOOR PLAN - MECHANICAL
15 - ELECTRICAL
32-EE100 BUILDING 32 - BASEMENT FLOOR PLAN - ELECTRICAL
32-EE101 BUILDING 32 - FIRST FLOOR PLAN - ELECTRICAL
32-EE102 BUILDING 32 - SECOND FLOOR PLAN - ELECTRICAL
32-EE300 BUILDING 32 - ELECTRICAL ENLARGED PLANS
32-EE301 BUILDING 32 - ELECTRICAL ENLARGED PLANS
32-EE302 BUILDING 32 - ELECTRICAL ENLARGED PLANS
32-EE500 ELECTRICAL ONE-LINE DIAGRAM
32-EE700 ELECTRICAL PANEL SCHEDULES
16 - TELECOMMUNICATIONS
32-TD100 BUILDING 32 - BASEMENT FLOOR DEMO PLAN - TECHNOLOGY
32-TD101 BUILDING 32 - FIRST FLOOR DEMO PLAN - TECHNOLOGY
32-TD102 BUILDING 32 - SECOND FLOOR DEMO PLAN - TECHNOLOGY
32-TN100 BUILDING 32 - BASEMENT FLOOR PLAN - TECHNOLOGY
32-TN101 BUILDING 32 - FIRST FLOOR PLAN - TECHNOLOGY
32-TN102 BUILDING 32 - SECOND FLOOR PLAN - TECHNOLOGY
32-TN300 BUILDING 32 - TECHNOLOGY ENLARGED PLANS
32-TN301 BUILDING 32 - TECHNOLOGY ENLARGED PLANS
16.4.1 - PHYSICAL SECURITY
32-TY101 BUILDING 32 - BASEMENT FLOOR PLAN - SECURITY
00 01 15 - 12
32-TY102 BUILDING 32 - FIRST FLOOR PLAN - SECURITY
32-TY103 BUILDING 32 - SECOND FLOOR PLAN - SECURITY
BLDG 33
01 - GENERAL
33-GI001 COVER SHEET
14 - MECHANICAL
33-MH101 BUILDING 33 - FIRST FLOOR PLAN - MECHANICAL
15 - ELECTRICAL
33-EE101 BUILDING 33 - FIRST FLOOR PLAN - ELECTRICAL
33-EE301 BUILDING 33 - ELECTRICAL ENLARGED PLANS
16 - TELECOMMUNICATIONS
33-TD101 BUILDING 33 - FIRST FLOOR DEMO PLAN - TECHNOLOGY
33-TD102 BUILDING 33 - SECOND FLOOR DEMO PLAN - TECHNOLOGY
33-TD103 BUILDING 33 - THIRD FLOOR DEMO PLAN - TECHNOLOGY
33-TN101 BUILDING 33 - FIRST FLOOR PLAN - TECHNOLOGY
33-TN102 BUILDING 33 - SECOND FLOOR PLAN - TECHNOLOGY
33-TN103 BUILDING 33 - THIRD FLOOR PLAN - TECHNOLOGY
33-TN300 BUILDING 33 - TECHNOLOGY ROOM ENLARGEMENTS
16.4 - SECURITY
33-TY101 FIRST FLOOR SECURITY PLAN
Grand total: 348
- - - END - - -
General Requirements 01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for project 503-22-700 EHRM Infrastructure Upgrades – Altoona, PA as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the COR or
Contracting Officer.
C. Offices of Awen Solutions Group, as Architect/Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the
Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, BASE BID: Work includes, but is not limited to general construction, carpentry, mechanical, electrical, plumbing, telecommunications, utilties, cabling, necessary removal of existing structures and construction and certain other items as noted in the drawings and specifications.
01 00 00 -2
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all subcontractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without an appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the COR so that security escort can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the
Contracting Officer. Patients, staff, and computers are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General
Contractor’s employees off the premises in the event of a national emergency. The
General Contractor may return to the site only with the written approval of the
Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the
Contracting Officers Representative (COR) for the purpose of security inspections of
01 00 00 -3 every area of project including toolboxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Subcontractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked
“Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project.
Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS) or
Project Website, see Section 01 31 23.
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
01 00 00 -4
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of 2 permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA
COR and Police Department.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on
Government premises to areas authorized or approved by the Contracting Officer. The
Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and COR and shall be built with labor and materials furnished by the Contractor without expense to the
Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer and COR, the buildings and utilities may be abandoned and need not be removed. The contractor shall only be permitted to erect one building (I.e. one storage container or one office trailer).
C. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
01 00 00 -5
D. Working space and space available for storing materials shall be as shown on the drawings. Storage space within the medical center and should not be considered for the purposes of bidding. If space is available, it will be determined by the COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of Medical
Centeras a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire, safety, and infection control requirements.
H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems
(except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved.
I. Buildings will be occupied during performance of work, but immediate areas of alterations will be vacated.
01 00 00 -6
1. Certain areas of Buildings will be occupied by Medical Center personnel for various periods as listed below:
AREA PERIOD
(a) Bldg 1, Urgent Care 24/7 Operation
(b) Bldg 1, Pharmacy 24/7 Operation
(c) Bldg 1, Radiology 24/7 Operation
(d) Bldg 1, 4th Floor Acute Care 24/7 Operation
(e) Bldg 1, 5th & 6th Floors Community Living Ctr. 24/7 Operation
(f) Bldg 3 Boiler Plant 24/7 Operation
2. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of
Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.
Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
3. Immediate areas of alterations not mentioned in preceding Subparagraph 1 will be temporarily vacated while alterations are performed.
J. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (six feet) minimum height, around the construction area. Provide gates as required for access with necessary hardware, including hasps and padlocks. Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.
K. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
01 00 00 -7
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for preinspection of site with COR and Safety Manager whichever will be required to respond to an alarm from Contractor's employee or watchman.
L. Utilities Services: Maintain existing utility services for Medical Center at all times.
Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of
COR . Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the
Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL
INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC
SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 14 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical
Center. Interruption time approved by Medical Center may occur at other than
Contractor's normal working hours.
01 00 00 -8
4. Major interruptions of any system must be requested, in writing, at least 14 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the
Government and not the Contractor.
M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions;
so that they are completely behind the finished surfaces.
N. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
O. Coordinate the work for this contract with other construction operations as directed by
COR. This includes the scheduling of traffic and the use of roadways, as specified in
Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the
COR and a representative of VA Supply Service, of areas of buildings in which
01 00 00 -9 alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of buildings.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by
Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR
52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved.
They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by
Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
01 00 00 -10
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the
Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to reinstallation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by
Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government.
When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS (FAR 52.236-9)
A. The Contractor shall preserve and protect all structures, equipment, and vegetation
(such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be
01 00 00 -11 removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting
Officer or COR.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and "Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged. Existing work
(walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be
01 00 00 -12 patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems
(including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE
CONDITIONS" (FAR 52.236-2).
1.11 PHYSICAL DATA – SOIL CONDITIONS
A. Data and information furnished or referred to below is for the Contractor's information.
The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
B. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.
1.12 PROFESSIONAL SURVEYING SERVICES
A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.
This is the start of the file's text. The full file is on GovTribe.