Attachment 01 - Statement of Work.pdf
PDF 117 KB Posted
- Solicitation number
- 80SSC026Q0003
About this file
This is a Statement of Work (SOW) for NASA Stennis Space Center requiring the procurement of ASME-certified pressure vessels for hydrogen, methane, and nitrogen storage.
NASA Stennis Space Center requires two ASME Section VIII Division 1, 2, or 3 certified pressure vessels, each with a volume of approximately 625 cubic feet (1,250 cubic feet total). Vessels must be constructed from SA372 Grade J material or equivalent, rated for 15,000 PSIG design pressure, and feature high-quality workmanship with corrosion-resistant coating suitable for Gulf Coast environments. Vendors may propose either an Assembly Pack Configuration Option consisting of four tubes arranged vertically in an I-beam support structure with 1-inch medium pressure end connections and integrated lifting points, or a Single Bottle Option featuring a single 15,000 PSIG vessel with a 6-inch R-Con connection. All vessels must be cleaned to minimum Level 400A per RPTSTD-8070-0001 and surface-prepared for long-term outdoor corrosion protection. Delivery is required to Building 4010, NASA Stennis Space Center, Mississippi 39529, no later than 42 weeks after contract award. Vendors must provide submittal drawings for NASA Engineering approval prior to construction, technical datasheets, ASME certification documentation, hydrostatic and non-destructive examination test reports, full material and manufacturing traceability, and an ASME code stamp for each vessel. A 12-month warranty period applies from the date of delivery. Vendors shall specify their expected delivery schedule and transportation method.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 01 – Statement of Work
Statement of Work (SOW)
1. Scope NASA Stennis Space Center requires American Society of Mechanical Engineers (ASME) certified pressure vessels suitable for hydrogen, methane, and nitrogen storage. Vessels must comply with ASME Boiler Pressure Vessel Code Section VIII, Division 1,2 or 3, and meet all specifications described in this document. Total vessel volume per skid or bottle should be roughly 625 cubic feet, a quantity of two is required for a total of roughly 1250 cubic feet. Vessels shall be coated/painted and of high-quality workmanship.
2. Applicable Standards
• Vessels shall be certified to ASME Section VIII, Division 1, 2 or 3
3. Technical Requirements
3.1 Vessel Specifications
• Total volume roughly 625 cubic feet each
• Quantity – 2
• Material: SA372 Grade J or equivalent
• Design pressure: 15,000 PSIG
3.2 Assembly Pack Configuration Option
• Four (4) tubes arranged vertically in an I-beam or equivalent support structure
• 1-inch medium pressure end connections
• Integrated lifting and handling points designed for full assembly weight
• Suitable for safe transport, installation, and operation
3.3 Single Bottle Option
Vendors also have the option to provide pricing, lead time, and full specifications for the procurement of a single 15,000 PSIG ASME certified pressure vessel tube with the characteristics listed in Section 3.1. Connection shall be 6-inch R-Con.
Attachment 01 – Statement of Work
4. Cleaning and Coating Requirements
• Cleaned to minimum Level 400A per RPTSTD-8070-0001
• Corrosion resistant coating/painting required
• Surface preparation ensuring long-term outdoor corrosion protection in Gulf Coast environment
5. Delivery Requirements Delivery shall be made to Bldg. 4010, NASA Stennis Space Center (SSC), MS 39529.
Vendors shall specify their expected delivery schedule and transportation method.
6. Quality Assurance and Inspection
• ASME code stamp and certification for each vessel
• Full material and manufacturing traceability
• Hydrostatic and non-destructive examination (NDE) test reports
• Option for NASA or delegated source inspection access during fabrication
7. Required Vendor Documentation
• Submittal drawings to be provided to and approved by NASA Engineering personnel prior to construction
• Technical datasheets demonstrating compliance
• ASME certification documentation
• Schedule – Delivery shall be No Later Than (NLT) 42 weeks after contract award.
• Warranty terms – 12 Months after date of delivery
| 1. Scope |
| 2. Applicable Standards |
| 3. Technical Requirements |
| 3.1 Vessel Specifications |
| 3.2 Assembly Pack Configuration Option |
| 3.3 Single Bottle Option |
| 4. Cleaning and Coating Requirements |
| 5. Delivery Requirements |
| 6. Quality Assurance and Inspection |
| 7. Required Vendor Documentation |