This document is a set of construction drawings for a federal facility project to replace boiler #2 and correct deficiencies at the boiler plant located in the VA Caribbean Healthcare System, San Juan, PR. The drawings include plumbing demolition plans, floor plans, isometrics, and details. The key requirements are to comply with all applicable codes and ordinances, coordinate equipment with manufacturer specifications, and provide new plumbing materials and workmanship. The project also requires the contractor to verify existing conditions, secure necessary permits, and coordinate with other trades. The plumbing work includes replacing domestic water, sanitary, and compressed air piping systems as well as relocating a water softener system. The federal contract opportunity associated with this project is solicitation 36C24824R0178, issued by the Department of Veterans Affairs for construction services.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDITIONAL NOTES
MATERIALS AND WORKMANSHIP SHALL COMPLY WITH ALL APPLICABLE CODES AND
ORDINANCES IN THEIR LATEST REVISIONS.
CONTRACTOR SHALL COORDINATE SPECIFIC REQUIREMENTS OF EQUIPMENT WITH
MANUFACTURER SHOP DRAWINGS.
ALL EQUIPMENT SHALL BE INSTALLED STRICTLY IN ACCORDANCE WITH THE
MANUFACTURERS WRITTEN INSTALLATION INSTRUCTIONS.
APPLICABLE BUILDING CODES
INTERNATIONAL BUILDING CODE 2018
INTERNATIONAL BUILDING CODE PLUMBING 2018
INTERNATIONAL FIRE PREVENTION CODE 2018
GENERAL PLUMBING NOTES
1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN STRICT ACCORDANCE WITH APPLICABLE CODES AS SHOWN.
2. THE PLUMBING CONTRACTOR SHALL BE HELD TO HAVE VERIFIED ALL EXISTING CONDITIONS, INCLUDING SITE VISITATION, AND REVIEW OF AS BUILT DOCUMENTATION AS APPLICABLE PRIOR TO BIDDING, ORDERING, FABRICATION OR
INSTALLATION OF ANY MATERIALS OR EQUIPMENT ON THIS PROJECT.
3. UNLESS OTHERWISE SPECIFIED, ALL MATERIALS SHALL BE NEW. ALL WORK SHALL BE PERFORMED BY A LICENSED PLUMBING CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER. THE COMPLETED SYSTEM SHALL BE FULLY OPERATIVE. ALL EXCAVATION AND BACK FILL AS REQUIRED FOR THIS PHASE OF CONSTRUCTION SHALL BE A PART OF
THIS CONTRACT.
4. REQUIRED INSURANCE SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR FOR PROTECTION AGAINST PUBLIC
LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK.
5. PLUMBING CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, FEES, INSPECTION AND TESTS, PLUMBING CONTRACTOR TO OBTAIN PERMIT AND APPROVED SUBMITTALS PRIOR TO BEGINNING WORK OR ORDERING EQUIPMENT.
PLUMBING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS OF HIS WORK BY REGULATORY AUTHORITIES.
6. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE TO BE READ IN CONJUNCTION WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL AND STRUCTURAL DRAWINGS AND ARE CONSIDERED TO BE ONE SET OF DOCUMENTS. BENDS OFFSETS AND TRANSITIONS WILL BE REQUIRED TO PROVIDE AND INSTALL A COMPLETE AND FUNCTIONAL SYSTEM AND SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR AT NO ADDITIONAL COST. DO NOT SCALE FOR THE EXACT LOCATION OF
FIXTURES, PIPING, EQUIPMENT, ETC.
7. CONTRACTOR SHALL SUBMIT FOR APPROVAL ELECTRONIC PDF COPIES OF MANUFACTURER DRAWINGS FOR ALL PLUMBING FIXTURES AND EQUIPMENT INCLUDED IN CONTRACT. ALL MATERIAL SHALL BE NEW FROM A U.S.
MANUFACTURER OF GOOD QUALITY. ALL WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER BY SKILLED
TRADESMEN.
8. ENGINEER OF RECORD RECOGNIZES THE GENERAL CONTRACTOR AND ALL OTHER CONTRACTORS TO BE LICENSED SAN JUAN PUERTO RICO. GENERAL CONTRACTOR SHALL CONSIDER THE PROJECT AS ONE SET OF DOCUMENTS. GENERAL CONTRACTOR SHALL PROVIDE AN ENTIRE SET OF DOCUMENTS SHOWING ALL TRADES TO EACH SUBCONTRACTOR PRIOR TO BIDDING AND CONSTRUCTION. GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER CONTRACTORS TO INFORM ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONFLICTS ON THE DOCUMENTS PRIOR TO SUBMITTING FINAL BID AND COMMENCING ANY WORK. CONTRACTOR SHALL MAKE HIMSELF AVAILABLE FOR REVIEWING DOCUMENTS WITH
ARCHITECT/ENGINEER UPON REQUEST
9. THE GENERAL CONTRACTOR SHALL PROVIDE IN WRITING ON COMPANY LETTER HEAD ALL ITEMS VALUE ENGINEERED OR OMITTED FROM ENTIRE PROJECT. THIS DOCUMENT SHALL HAVE DETAILED DESCRIPTION AND TRANSPARENCY OF ALL ITEMS IN EACH DISCIPLINE AND TRADE. INFORMATION SHALL BE PROVIDED TO ARCHITECT AND ENGINEER FOR REVIEW PRIOR TO SUBMITTING FINAL BID. CONTRACTOR SHALL MAKE HIMSELF AVAILABLE FOR REVIEWING DOCUMENTS WITH
ARCHITECT/ENGINEER/OWNER UPON REQUEST.
10. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID INTERFERENCE WITH THE PROGRESS OF CONSTRUCTION. REPORT ANY DISCREPANCY TO ENGINEER/ARCHITECT PRIOR TO BEGINNING CONSTRUCTION.
11. VERIFY LOCATION, SIZE, DIRECTION OF FLOW AND INVERTS OF ALL EXISTING UTILITIES PRIOR TO BEGINNING OF
CONSTRUCTION. ADVISE ENGINEER OF ANY DISCREPANCIES.
12. THE INVERT ELEVATIONS OF DRAINAGE PIPING LEAVING THE BUILDING ARE APPROXIMATE AND MAY VARY DEPENDING ON FIELD CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING CIVIL AS REQUIRED TO ASSURE THAT CONNECTIONS TO THE STORM AND/OR SANITARY SEWER SYSTEM CAN BE COMPLETED. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER IN WRITING PRIOR TO COMMENCEMENT OF THE GROUND ROUGH.
13. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE INVERT ELEVATIONS OF EXISTING DRAINAGE PIPING AS REQUIRED TO ASSURE THAT CONNECTIONS TO EXISTING STORM AND/OR SANITARY SYSTEMS CAN BE COMPLETED. THE CONTRACTOR SHALL SCOPE, X-RAY, AND TEST AS NECESSARY TO VERIFY EXISTING INVERT ELEVATIONS. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER IN WRITING PRIOR TO COMMENCEMENT OF THE
GROUND ROUGH.
14. WATER DISTRIBUTION PIPING SHALL BE TYPE "L" COPPER PIPING.
15. ALL PVC SHALL BE SOLID CORE NO CELLULAR CORE.
16. UNLESS OTHERWISE INDICATED ON THE PLAN, THE SOIL, WASTE AND STORM WATER PIPING SHALL BE CAST IRON ABOVE
AND BELOW SLAB. CAST IRON FOR VENT PIPE ABOVE A TRAP.
17. ALL FIXTURES MUST BE PROVIDED WITH READILY ACCESSIBLE STOPS AND APPROPRIATELY MARKED ACCESS PANELS.
ISOLATION VALVES LOCATED IN CEILING CAVITIES ABOVE HARD CEILINGS SHALL BE SUPPLIED WITH APPROVED ACCESS PANELS. COORDINATE LOCATIONS WITH GENERAL CONTRACTOR PRIOR TO INSTALLATION. ALL VALVES TO BE LOCATED
NO MORE THAN 24" ABOVE THE ACCESS PANEL.
18. DIELECTRIC COUPLINGS ARE REQUIRED BETWEEN ALL DISSIMILAR METAL IN PIPING AND EQUIPMENT CONNECTIONS.
19. ISOLATE COPPER PIPE FROM HANGER OR SUPPORTS WITH ISOLATOR PAD.
20. ALL FIRE RATED FLOOR AND WALL PENETRATIONS SHALL BE PROPERLY PROTECTED FROM FIRE, SMOKE AND WATER PENETRATION BY FILLING VOIDS BETWEEN PIPE AND WALL/FLOOR SLEEVES WITH FIRE RATED FOAM, TO ACHIEVE THE
SAME RATING AS WALLS OR FLOORS AS PART OF THE PLUMBER'S WORK.
21. PLUMBING CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FREE FROM DEFECTS FOR A PERIOD OF NOT LESS THAN ONE (1) YEAR FROM DATE OF ACCEPTANCE BY OWNER. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENT OR REPAIR OF ANY OTHER PHASE OF
THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED.
22. PROVIDE CHROME PLATED COMBINATION COVER PLATE AND CLEAN OUT PLUG OR ACCESS PANEL FOR ALL WALL CLEAN
OUTS
23. ALL CONTROL VALVES SHALL BE TAGGED AND MARKED. A REPRODUCIBLE DIAGRAM LOCATING ALL VALVES SHALL BE
PROVIDED FOR OWNER/OPERATOR.
24. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE "L" COPPER WITH 1/2" THICK ARMAFLEX INSULATION. ALL CONDENSATE PIPING SHALL BE PROVIDED AND INSTALLED BY THE PLUMBING CONTRACTOR, EXCEPT FOR THE FINAL CONNECTIONS (INCLUDING THE TRAP). THE FINAL CONNECTIONS (INCLUDING TRAP) AND ALL PIPING ON ROOFTOPS SHALL BE PROVIDED AND INSTALLED BY THE MECHANICAL CONTRACTOR. COORDINATE FINAL EQUIPMENT LOCATIONS WITH MECHANICAL
CONTRACTOR.
25. IN THE EVENT THAT THE CONDENSATE DRAIN PIPE CANNOT ACHIEVE POSITIVE DRAINAGE AS A RESULT OF BLOCKAGE FROM OTHER EQUIPMENT, THE CONTRACTOR SHALL SUPPLY A CONDENSATE PUMP WITH DISCHARGE TO A POINT WHERE
POSITIVE DRAINAGE CAN BE ACHIEVED.
26. PROVIDE ANGLE STOPS ON ALL WATER SERVICE LINES TO FIXTURES FOR INDIVIDUAL SHUT-OFF.
27. FOR PIPES SMALLER THAN 1-1/2"Ø, HOT WATER AND HOT WATER RECIRCULATION PIPING INSULATION SHALL BE 1" THICK ARMAFLEX. PIPES 1-1/2"Ø AND LARGER, USE 1-1/2" THICK ARMAFLEX INSULATION. INSULATION IS TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. WHERE DOMESTIC WATER TEMPERATURES CAN CAUSE SWEATING ALL COLD WATER PIPING SHALL BE INSULATED WITH 1/2" THICK ARMAFLEX INSULATION.
28. CONTRACTOR TO PROVIDE BALL VALVES FOLLOWED BY BALANCING VALVES AFTER EACH TEE OFF OF THE HOT WATER RECIRCULATION MAIN PIPES. VALVES SHALL BE ACCESSIBLE. LOCATE VALVES WITHIN 12" FROM FINISHED CEILING FOR
VALVES LOCATED IN CEILING SPACE.
29. ANY DISCHARGE AT OR ABOVE 140°F SHALL BE MITIGATED BY A DRAIN TEMPERING VALVE AND/OR CAST IRON DRAIN LINE
FOR THE FIRST 10' FROM THE WASTE RECEPTOR.
30. ALL FLOOR DRAINS NOT OTHERWISE PRIMED WITH INDIRECT WASTE SHALL BE PRIMED FROM THE NEAREST DOMESTIC
WATER FIXTURE. REFERENCE FLOOR DRAIN PRIMING DETAIL.
31. PLUMBING CONTRACTOR SHALL PROVIDE ENGINEER WITH AS-BUILT DRAWINGS UPON COMPLETION.
32. UNLESS OTHERWISE SPECIFIED, THE PLUMBING CONTRACTOR SHALL PROVIDE MOTOR STARTERS AS REQUIRED FOR ALL PLUMBING RELATED EQUIPMENT. THE STARTERS SHALL BE MATCHED TO THE EQUIPMENT AND THE SERVICE VOLTAGE.
PHASE LOSS MONITORS/PROTECTION SHALL BE REQUIRED ALL THREE PHASE EQUIPMENT. COORDINATE PRIOR TO
ORDERING/PURCHASING/INSTALLATION.
33. CONTRACTOR SHALL SUBMIT FOR APPROVAL (BEFORE ORDERING OR INSTALLING SUCH UNITS) TO THE MECHANICAL
ENGINEER A TYPED LIST OF ALL BACKFLOW PREVENTERS TO BE USED FOR PROJECT.
34. REVERSE OSMOSIS SYSTEMS (RO SYSTEMS) SHALL BE PIPED WITH COPPER.
35. TEMPERATURE-ACTUATED MIXING VALVES, WHICH ARE INSTALLED TO REDUCE WATER TEMPERATURES TO DEFINED
LIMITS, SHALL COMPLY WITH ASSE 1017.
36. ALL PIPING TO BE TESTED IN ACCORDANCE WITH SECTION 312 OF THE INTERNATIONAL PLUMBING CODE.
AAV AIR ADMITTANCE VALVE
ACW AUTOMATIC CLOTHES WASHER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
CI CAST IRON
CFU COLD WATER FIXTURE UNIT
CO CLEANOUT
COND CONDENSATE
CTG CLEANOUT TO GRADE
CM COFFEE MAKER
CW COLD WATER
DFU DRAINAGE FIXTURE UNIT
DW DISHWASHER
EFD EMERGENCY FLOOR DRAIN
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EX EXISTING
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FF FINISHED FLOOR
FLR FLOOR
GWH GAS WATER HEATER
HB HOSE BIBB
HC HANDICAP
HFU HOT WATER FIXTURE UNIT
HW HOT WATER
HWR HOT WATER RECIRC.
IE INVERT ELEVATION
LAV LAVATORY
NTS NOT TO SCALE
OD ROOF OVERFLOW DRAIN
RD ROOF DRAIN
RE RELOCATE EXISTING
REF REFERENCE
REF REFRIGERATOR
RO REVERSE OSMOSIS
SK SINK
SH SHOWER
SST STAINLESS STEEL
TFU TOTAL FIXTURE UNIT
TUB BATH TUB
UR URINAL
VTR VENT TO ROOF
WC WATER CLOSET
WCO WALL CLEANOUT
NOTE: NOT ALL ABBREVIATIONS MAY APPLY TO PLANS
PLUMBING ABBREVIATIONS
PLUMBING SYMBOL LEGEND
X"Ø SAN
SANITARY DRAIN
X"Ø VNT
SANITARY VENT
X"Ø GW
GREASE WASTE DRAIN
X"Ø STM
STORM WATER DRAIN
X"Ø COND
CONDENSATE DRAIN
X"Ø CW
COLD WATER SUPPLY PIPE
X"Ø HW
HOT WATER SUPPLY PIPE
EXISTING PIPE
DEMOLISHED PIPE
WATER SUPPLY PIPE WITH
CAPPED END
DOMESTIC WATER DOWN
DOMESTIC WATER UP
FULL-OPEN VALVE
FULL-OPEN VALVE W/
ACCESS DOOR
HOT WATER RECIRCULATION
PIPE
X"Ø HW 140°
140°F HOT WATER SUPPLY
PIPE
CONNECT TO EXISTING AT
THIS LOCATION
POINT OF DEMO
X"Ø HWR
NOTE: NOT ALL SYMBOLS MAY APPLY TO PLANS
PHASING NARRATIVE
REFERENCE SHEETS GI-101 TO GI106 FOR PHASING INFORMATION
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:4
:0
P
M
PLUMBING COVER SHEET
P-001
01-03-2024 RM VMC
PLUMBING SHEET INDEX
P-001 PLUMBING COVER SHEET
PD-101 PLUMBING DEMOLITION PLANS
PL-101 PLUMBING FLOOR PLANS
PL-102 PLUMBING ISOMETRICS
PL-103 PLUMBING DETAILS & SCHEDULES
NO. DESCRIPTION DATE
bob.davenport Date 01/03/2024
"Ø
S A
N
E X
4"Ø SAN (EX) 4"Ø SAN (EX)
"Ø
S A
N
E X
4"Ø SAN (EX)
FD (EX)
FD (EX)
FD (EX)
FD (EX)
3"Ø SAN (EX)
4"Ø SAN (EX)
CONNECTION
TO SEWER
PD03
PD02
PD01
PD06
PD06
PD01
PD02 PD04
PD05
PD05
PD02
PD02
PD08
PD08
PD02
PD01
PD01
PD07
PD09
PD10
PD04
PD04
PD04
PD04
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:4
:1
P
M
PLUMBING DEMOLITION
PLANS
PD-101
01-03-2024 RM VMC
1/4" = 1'-0"
SANITARY DEMOLITION PLAN - BOILER ROOM
PLUMBING KEYNOTES
PD01 DEMOLISH AND REMOVE PIPING FROM THIS POINT UP TO EXISTING
FIXTURES/EQUIPMENT.
PD02 CUT EXISTING PIPING AT THIS POINT.
PD03 EXISTING PIPING TO BE ABANDONED IN PLACE. CAP BOTH ENDS OF PIPING.
PD04 EXISTING PIPING TO BE DEMOLISHED AND REMOVED.
PD05 EXISTING PIPING TO BE REMAIN AND RECONNECTED TO PROPOSED NEW
SYSTEM. REFERENCE PL-101 FOR INFORMATION.
PD06 DEMOLISH FIXTURE.
PD07 EXISTING PVC PIPING FOR WATER SOFTENER SYSTEM TO BE REPLACED
WITH COPPER PIPING AND FITTINGS. EXISTING SYSTEM TO BE
OPERATIONAL DURING CONSTRUCTION.
PD08 EXISTING AIR COMPRESSOR TO BE REMOVED. EXISTING PIPING TO BE
DEMOLISHED.
PD09 EXISTING WATER SOFTENER SYSTEM TO BE RELOCATED. REFERENCE
PL-101 FOR NEW LOCATION.
PD10 EXISTING WATER SOFTENER SYSTEM TO REMAIN.
1/4" = 1'-0"
PRESSURE PIPING DEMOLITION PLAN - BOILER ROOM
NO. DESCRIPTION DATE
bob.davenport
3"Ø SAN (EX)
"Ø
S A
N
E X
FD(EX)
FD(EX)
FD(EX)
FD-1 FD-1
"Ø
S A
N
E X
1 1/2"Ø SAN
1 1/2"Ø SAN
2"Ø SAN
1 1/2"Ø SAN
1 1/2"Ø SAN
4"Ø SAN
WC-1
SH-1
SK-2
SK-1
LAV-1
FD-2
3"Ø SAN
4"Ø SAN
"Ø
S A
N "Ø
S A
N
4"Ø SAN
4"Ø SAN 4"Ø SAN
FCO
FCO
4"Ø SAN (EX)
I.E. = -16.75" F.F.= 0'-0"
I.E.= -34.00" F.F.= 0'-0"
I.E. = -40.00" F.F.= 0'-0"
I.E. = -38.00" F.F.= 0'-0"
OS-1
P01
2" VTR
P02
P02
P03 P03
CONNECTION
TO SEWER
4"Ø SAN
4"Ø SAN
"Ø
S A
N
2"Ø CW
3/4"Ø HW
1"Ø CW
WC-1
SH-1
SK-2
SK-1
LAV-1
3/4"Ø HW (EX)
1"Ø CW
3/4"Ø HW
1"Ø CW
1/2"Ø HW
1/2"Ø CW
P04
P07
"Ø
A
IR
"Ø
A
IR
1"Ø AIR 1"Ø AIR
1"Ø AIR 1"Ø AIR1"Ø AIR
P05
P08
P06
P06 P06
"Ø
A
IR
"Ø
A
IR
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:4
:3
P
M
PLUMBING FLOOR PLANS
PL-101
01-03-2024 RM VMC
1/4" = 1'-0"
SANITARY FLOOR PLAN - BOILER ROOM
PLUMBING KEYNOTES
P01 EXISTING PIPING IS ABANDONED IN PLACE WITH NEW CAPS ON BOTH
SIDES.
P02 COORDINATE CLOSELY WITH STRUCTURAL DESIGN. PIPING IS CLOSE TO
NEW FOOTERS AND COLUMNS.
P03 PIPING TO BE INSTALLED BELOW TRENCH. BOTTOM OF TRENCH IS
APPROXIMATELY 2'-6" BELOW FINISHED FLOOR.
P04 EXISTING WATER SOFTENER SYSTEM TO THIS LOCATION.
P05 NEW OIL-LESS COMPRESSOR.
P06 CONNECT COMPRESSED AIR PIPING TO ECONOMIZER. FOLLOW
MANUFACTURERS INSTRUCTIONS.
P07 REFERENCE SHEET PL-103 FOR WATER SOFTENER PIPING DESIGN.
P08 300 GAL COMPRESSED AIR STORAGE TANK.
1/4" = 1'-0"
PRESSURE PIPING FLOOR PLAN - BOILER ROOM
NO. DESCRIPTION DATE
bob.davenport
SK-1
WC-1
SH-1
SK-2
LAV-1
/4
"Ø C
W
/4
"Ø H
W
"Ø
C W
/2
"Ø H
W
1/2"Ø HW
1/2"Ø CW
2"Ø
C W
2"Ø CW (EX)
1"Ø CW
3/4"Ø HW (EX)
3/4"Ø HW
1"Ø CW
1"Ø C
W
3/4"Ø H
W
CONNECTION TO
EXISTING SYSTEM
CONNECTION TO
EXISTING SYSTEM
AC-1
ST-1
1"Ø AIR
1"Ø AIR
1"Ø AIR
1"Ø AIR
1"Ø AIR
1"Ø AIR
1"Ø AIR
1"Ø
AIR
1"Ø
AIR
1"Ø
AIR
1"Ø AIR
TO ECONOMIZER
TO ECONOMIZER
TO ECONOMIZER
4"Ø
SAN (E
X)
3"Ø SAN (EX)
4"Ø SAN
4"Ø
SAN
3"Ø
SAN (E
X)
1 1/2"Ø SAN
3"Ø SAN
2"Ø SAN
1 1/2"Ø SAN
4"Ø SAN 4"Ø SAN
4"Ø
SAN
1 1/2"Ø SAN
1 1/2"Ø VNT
1 1/2"Ø VNT
1 1/2"Ø VNT
2"Ø VNT
4"Ø SAN
4"Ø SAN
4"Ø SAN4"Ø SAN
SK-1
FD-1
WC-1
SH-1
SK-2
LAV-1
FCO
WCO
WCO
3"Ø SAN
FD-1
FD-1
FD (EX)
FD (EX)
FD (EX)
4"Ø SAN (EX)
OS-1
TO SEWER
CAPPED AND
ABANDONED IN PLACE
VTR
4"Ø SAN
4"Ø SAN
4"Ø SAN
EXISTING PIPE TO NEW SYSTEM.
EXISTING PIPE TO NEW SYSTEM.
FCO
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:4
:3
P
M
PLUMBING ISOMETRICS
PL-102
01-03-2024 RM VMC
DOMESTIC WATER ISOMETRIC
COMPRESSED AIR ISOMETRIC
SANITARY ISOMETRIC
NO. DESCRIPTION DATE
bob.davenport
S
O
F T
E
N
E R
S
O
F T
E
N
E R
S
O
F T
E
N
E R
S
O
F T
E
N
E R
BRINE
TANK
BRINE
TANK
TO BOILER SYSTEM
FROM
EXISTING
PIPING
TO
OPERATORS
AREA
NOTES:
1. ALL PIPING TO BE COPPER.
2. FITTINGS SHALL BE SOLDER TYPE.
3. NEW SYSTEM TO REPLICATE PIPE
SIZES FROM EXISTING SYSTEM.
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:4
:4
P
M
PLUMBING DETAILS &
SCHEDULES
PL-103
01-03-2024 RM VMC
12" = 1'-0"
WATER SOFTENER DIAGRAM
OS-1
ST-1
NO. DESCRIPTION DATE
bob.davenport
| Sheets |
| P-001 - PLUMBING COVER SHEET |
| PD-101 - PLUMBING DEMOLITION PLANS |
| PL-101 - PLUMBING FLOOR PLANS |
| PL-102 - PLUMBING ISOMETRICS |
| PL-103 - PLUMBING DETAILS & SCHEDULES |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:30:41-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:30:51-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:30:56-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:31:02-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:31:09-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |