Attachment 01 - Drawings Plumbing Stamped Part III of V - 5 pages.pdf

PDF 4 MB Posted

Attached to
Z2DA--Replace Boiler #2 and Correct Deficiencies at Boiler Plant
Solicitation number
36C24824R0178
Issued by

About this file

This document is a set of construction drawings for a federal facility project to replace boiler #2 and correct deficiencies at the boiler plant located in the VA Caribbean Healthcare System, San Juan, PR. The drawings include plumbing demolition plans, floor plans, isometrics, and details. The key requirements are to comply with all applicable codes and ordinances, coordinate equipment with manufacturer specifications, and provide new plumbing materials and workmanship. The project also requires the contractor to verify existing conditions, secure necessary permits, and coordinate with other trades. The plumbing work includes replacing domestic water, sanitary, and compressed air piping systems as well as relocating a water softener system. The federal contract opportunity associated with this project is solicitation 36C24824R0178, issued by the Department of Veterans Affairs for construction services.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDITIONAL NOTES

MATERIALS AND WORKMANSHIP SHALL COMPLY WITH ALL APPLICABLE CODES AND

ORDINANCES IN THEIR LATEST REVISIONS.

CONTRACTOR SHALL COORDINATE SPECIFIC REQUIREMENTS OF EQUIPMENT WITH

MANUFACTURER SHOP DRAWINGS.

ALL EQUIPMENT SHALL BE INSTALLED STRICTLY IN ACCORDANCE WITH THE

MANUFACTURERS WRITTEN INSTALLATION INSTRUCTIONS.

APPLICABLE BUILDING CODES

INTERNATIONAL BUILDING CODE 2018

INTERNATIONAL BUILDING CODE PLUMBING 2018

INTERNATIONAL FIRE PREVENTION CODE 2018

GENERAL PLUMBING NOTES

1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN STRICT ACCORDANCE WITH APPLICABLE CODES AS SHOWN.

2. THE PLUMBING CONTRACTOR SHALL BE HELD TO HAVE VERIFIED ALL EXISTING CONDITIONS, INCLUDING SITE VISITATION, AND REVIEW OF AS BUILT DOCUMENTATION AS APPLICABLE PRIOR TO BIDDING, ORDERING, FABRICATION OR

INSTALLATION OF ANY MATERIALS OR EQUIPMENT ON THIS PROJECT.

3. UNLESS OTHERWISE SPECIFIED, ALL MATERIALS SHALL BE NEW. ALL WORK SHALL BE PERFORMED BY A LICENSED PLUMBING CONTRACTOR IN A FIRST CLASS WORKMANLIKE MANNER. THE COMPLETED SYSTEM SHALL BE FULLY OPERATIVE. ALL EXCAVATION AND BACK FILL AS REQUIRED FOR THIS PHASE OF CONSTRUCTION SHALL BE A PART OF

THIS CONTRACT.

4. REQUIRED INSURANCE SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR FOR PROTECTION AGAINST PUBLIC

LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK.

5. PLUMBING CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, FEES, INSPECTION AND TESTS, PLUMBING CONTRACTOR TO OBTAIN PERMIT AND APPROVED SUBMITTALS PRIOR TO BEGINNING WORK OR ORDERING EQUIPMENT.

PLUMBING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS OF HIS WORK BY REGULATORY AUTHORITIES.

6. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE TO BE READ IN CONJUNCTION WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL AND STRUCTURAL DRAWINGS AND ARE CONSIDERED TO BE ONE SET OF DOCUMENTS. BENDS OFFSETS AND TRANSITIONS WILL BE REQUIRED TO PROVIDE AND INSTALL A COMPLETE AND FUNCTIONAL SYSTEM AND SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR AT NO ADDITIONAL COST. DO NOT SCALE FOR THE EXACT LOCATION OF

FIXTURES, PIPING, EQUIPMENT, ETC.

7. CONTRACTOR SHALL SUBMIT FOR APPROVAL ELECTRONIC PDF COPIES OF MANUFACTURER DRAWINGS FOR ALL PLUMBING FIXTURES AND EQUIPMENT INCLUDED IN CONTRACT. ALL MATERIAL SHALL BE NEW FROM A U.S.

MANUFACTURER OF GOOD QUALITY. ALL WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER BY SKILLED

TRADESMEN.

8. ENGINEER OF RECORD RECOGNIZES THE GENERAL CONTRACTOR AND ALL OTHER CONTRACTORS TO BE LICENSED SAN JUAN PUERTO RICO. GENERAL CONTRACTOR SHALL CONSIDER THE PROJECT AS ONE SET OF DOCUMENTS. GENERAL CONTRACTOR SHALL PROVIDE AN ENTIRE SET OF DOCUMENTS SHOWING ALL TRADES TO EACH SUBCONTRACTOR PRIOR TO BIDDING AND CONSTRUCTION. GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER CONTRACTORS TO INFORM ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONFLICTS ON THE DOCUMENTS PRIOR TO SUBMITTING FINAL BID AND COMMENCING ANY WORK. CONTRACTOR SHALL MAKE HIMSELF AVAILABLE FOR REVIEWING DOCUMENTS WITH

ARCHITECT/ENGINEER UPON REQUEST

9. THE GENERAL CONTRACTOR SHALL PROVIDE IN WRITING ON COMPANY LETTER HEAD ALL ITEMS VALUE ENGINEERED OR OMITTED FROM ENTIRE PROJECT. THIS DOCUMENT SHALL HAVE DETAILED DESCRIPTION AND TRANSPARENCY OF ALL ITEMS IN EACH DISCIPLINE AND TRADE. INFORMATION SHALL BE PROVIDED TO ARCHITECT AND ENGINEER FOR REVIEW PRIOR TO SUBMITTING FINAL BID. CONTRACTOR SHALL MAKE HIMSELF AVAILABLE FOR REVIEWING DOCUMENTS WITH

ARCHITECT/ENGINEER/OWNER UPON REQUEST.

10. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID INTERFERENCE WITH THE PROGRESS OF CONSTRUCTION. REPORT ANY DISCREPANCY TO ENGINEER/ARCHITECT PRIOR TO BEGINNING CONSTRUCTION.

11. VERIFY LOCATION, SIZE, DIRECTION OF FLOW AND INVERTS OF ALL EXISTING UTILITIES PRIOR TO BEGINNING OF

CONSTRUCTION. ADVISE ENGINEER OF ANY DISCREPANCIES.

12. THE INVERT ELEVATIONS OF DRAINAGE PIPING LEAVING THE BUILDING ARE APPROXIMATE AND MAY VARY DEPENDING ON FIELD CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING CIVIL AS REQUIRED TO ASSURE THAT CONNECTIONS TO THE STORM AND/OR SANITARY SEWER SYSTEM CAN BE COMPLETED. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER IN WRITING PRIOR TO COMMENCEMENT OF THE GROUND ROUGH.

13. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE INVERT ELEVATIONS OF EXISTING DRAINAGE PIPING AS REQUIRED TO ASSURE THAT CONNECTIONS TO EXISTING STORM AND/OR SANITARY SYSTEMS CAN BE COMPLETED. THE CONTRACTOR SHALL SCOPE, X-RAY, AND TEST AS NECESSARY TO VERIFY EXISTING INVERT ELEVATIONS. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER IN WRITING PRIOR TO COMMENCEMENT OF THE

GROUND ROUGH.

14. WATER DISTRIBUTION PIPING SHALL BE TYPE "L" COPPER PIPING.

15. ALL PVC SHALL BE SOLID CORE NO CELLULAR CORE.

16. UNLESS OTHERWISE INDICATED ON THE PLAN, THE SOIL, WASTE AND STORM WATER PIPING SHALL BE CAST IRON ABOVE

AND BELOW SLAB. CAST IRON FOR VENT PIPE ABOVE A TRAP.

17. ALL FIXTURES MUST BE PROVIDED WITH READILY ACCESSIBLE STOPS AND APPROPRIATELY MARKED ACCESS PANELS.

ISOLATION VALVES LOCATED IN CEILING CAVITIES ABOVE HARD CEILINGS SHALL BE SUPPLIED WITH APPROVED ACCESS PANELS. COORDINATE LOCATIONS WITH GENERAL CONTRACTOR PRIOR TO INSTALLATION. ALL VALVES TO BE LOCATED

NO MORE THAN 24" ABOVE THE ACCESS PANEL.

18. DIELECTRIC COUPLINGS ARE REQUIRED BETWEEN ALL DISSIMILAR METAL IN PIPING AND EQUIPMENT CONNECTIONS.

19. ISOLATE COPPER PIPE FROM HANGER OR SUPPORTS WITH ISOLATOR PAD.

20. ALL FIRE RATED FLOOR AND WALL PENETRATIONS SHALL BE PROPERLY PROTECTED FROM FIRE, SMOKE AND WATER PENETRATION BY FILLING VOIDS BETWEEN PIPE AND WALL/FLOOR SLEEVES WITH FIRE RATED FOAM, TO ACHIEVE THE

SAME RATING AS WALLS OR FLOORS AS PART OF THE PLUMBER'S WORK.

21. PLUMBING CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FREE FROM DEFECTS FOR A PERIOD OF NOT LESS THAN ONE (1) YEAR FROM DATE OF ACCEPTANCE BY OWNER. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENT OR REPAIR OF ANY OTHER PHASE OF

THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED.

22. PROVIDE CHROME PLATED COMBINATION COVER PLATE AND CLEAN OUT PLUG OR ACCESS PANEL FOR ALL WALL CLEAN

OUTS

23. ALL CONTROL VALVES SHALL BE TAGGED AND MARKED. A REPRODUCIBLE DIAGRAM LOCATING ALL VALVES SHALL BE

PROVIDED FOR OWNER/OPERATOR.

24. ALL CONDENSATE DRAIN PIPING SHALL BE TYPE "L" COPPER WITH 1/2" THICK ARMAFLEX INSULATION. ALL CONDENSATE PIPING SHALL BE PROVIDED AND INSTALLED BY THE PLUMBING CONTRACTOR, EXCEPT FOR THE FINAL CONNECTIONS (INCLUDING THE TRAP). THE FINAL CONNECTIONS (INCLUDING TRAP) AND ALL PIPING ON ROOFTOPS SHALL BE PROVIDED AND INSTALLED BY THE MECHANICAL CONTRACTOR. COORDINATE FINAL EQUIPMENT LOCATIONS WITH MECHANICAL

CONTRACTOR.

25. IN THE EVENT THAT THE CONDENSATE DRAIN PIPE CANNOT ACHIEVE POSITIVE DRAINAGE AS A RESULT OF BLOCKAGE FROM OTHER EQUIPMENT, THE CONTRACTOR SHALL SUPPLY A CONDENSATE PUMP WITH DISCHARGE TO A POINT WHERE

POSITIVE DRAINAGE CAN BE ACHIEVED.

26. PROVIDE ANGLE STOPS ON ALL WATER SERVICE LINES TO FIXTURES FOR INDIVIDUAL SHUT-OFF.

27. FOR PIPES SMALLER THAN 1-1/2"Ø, HOT WATER AND HOT WATER RECIRCULATION PIPING INSULATION SHALL BE 1" THICK ARMAFLEX. PIPES 1-1/2"Ø AND LARGER, USE 1-1/2" THICK ARMAFLEX INSULATION. INSULATION IS TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. WHERE DOMESTIC WATER TEMPERATURES CAN CAUSE SWEATING ALL COLD WATER PIPING SHALL BE INSULATED WITH 1/2" THICK ARMAFLEX INSULATION.

28. CONTRACTOR TO PROVIDE BALL VALVES FOLLOWED BY BALANCING VALVES AFTER EACH TEE OFF OF THE HOT WATER RECIRCULATION MAIN PIPES. VALVES SHALL BE ACCESSIBLE. LOCATE VALVES WITHIN 12" FROM FINISHED CEILING FOR

VALVES LOCATED IN CEILING SPACE.

29. ANY DISCHARGE AT OR ABOVE 140°F SHALL BE MITIGATED BY A DRAIN TEMPERING VALVE AND/OR CAST IRON DRAIN LINE

FOR THE FIRST 10' FROM THE WASTE RECEPTOR.

30. ALL FLOOR DRAINS NOT OTHERWISE PRIMED WITH INDIRECT WASTE SHALL BE PRIMED FROM THE NEAREST DOMESTIC

WATER FIXTURE. REFERENCE FLOOR DRAIN PRIMING DETAIL.

31. PLUMBING CONTRACTOR SHALL PROVIDE ENGINEER WITH AS-BUILT DRAWINGS UPON COMPLETION.

32. UNLESS OTHERWISE SPECIFIED, THE PLUMBING CONTRACTOR SHALL PROVIDE MOTOR STARTERS AS REQUIRED FOR ALL PLUMBING RELATED EQUIPMENT. THE STARTERS SHALL BE MATCHED TO THE EQUIPMENT AND THE SERVICE VOLTAGE.

PHASE LOSS MONITORS/PROTECTION SHALL BE REQUIRED ALL THREE PHASE EQUIPMENT. COORDINATE PRIOR TO

ORDERING/PURCHASING/INSTALLATION.

33. CONTRACTOR SHALL SUBMIT FOR APPROVAL (BEFORE ORDERING OR INSTALLING SUCH UNITS) TO THE MECHANICAL

ENGINEER A TYPED LIST OF ALL BACKFLOW PREVENTERS TO BE USED FOR PROJECT.

34. REVERSE OSMOSIS SYSTEMS (RO SYSTEMS) SHALL BE PIPED WITH COPPER.

35. TEMPERATURE-ACTUATED MIXING VALVES, WHICH ARE INSTALLED TO REDUCE WATER TEMPERATURES TO DEFINED

LIMITS, SHALL COMPLY WITH ASSE 1017.

36. ALL PIPING TO BE TESTED IN ACCORDANCE WITH SECTION 312 OF THE INTERNATIONAL PLUMBING CODE.

AAV AIR ADMITTANCE VALVE

ACW AUTOMATIC CLOTHES WASHER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

CI CAST IRON

CFU COLD WATER FIXTURE UNIT

CO CLEANOUT

COND CONDENSATE

CTG CLEANOUT TO GRADE

CM COFFEE MAKER

CW COLD WATER

DFU DRAINAGE FIXTURE UNIT

DW DISHWASHER

EFD EMERGENCY FLOOR DRAIN

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EX EXISTING

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FF FINISHED FLOOR

FLR FLOOR

GWH GAS WATER HEATER

HB HOSE BIBB

HC HANDICAP

HFU HOT WATER FIXTURE UNIT

HW HOT WATER

HWR HOT WATER RECIRC.

IE INVERT ELEVATION

LAV LAVATORY

NTS NOT TO SCALE

OD ROOF OVERFLOW DRAIN

RD ROOF DRAIN

RE RELOCATE EXISTING

REF REFERENCE

REF REFRIGERATOR

RO REVERSE OSMOSIS

SK SINK

SH SHOWER

SST STAINLESS STEEL

TFU TOTAL FIXTURE UNIT

TUB BATH TUB

UR URINAL

VTR VENT TO ROOF

WC WATER CLOSET

WCO WALL CLEANOUT

NOTE: NOT ALL ABBREVIATIONS MAY APPLY TO PLANS

PLUMBING ABBREVIATIONS

PLUMBING SYMBOL LEGEND

X"Ø SAN

SANITARY DRAIN

X"Ø VNT

SANITARY VENT

X"Ø GW

GREASE WASTE DRAIN

X"Ø STM

STORM WATER DRAIN

X"Ø COND

CONDENSATE DRAIN

X"Ø CW

COLD WATER SUPPLY PIPE

X"Ø HW

HOT WATER SUPPLY PIPE

EXISTING PIPE

DEMOLISHED PIPE

WATER SUPPLY PIPE WITH

CAPPED END

DOMESTIC WATER DOWN

DOMESTIC WATER UP

FULL-OPEN VALVE

FULL-OPEN VALVE W/

ACCESS DOOR

HOT WATER RECIRCULATION

PIPE

X"Ø HW 140°

140°F HOT WATER SUPPLY

PIPE

CONNECT TO EXISTING AT

THIS LOCATION

POINT OF DEMO

X"Ø HWR

NOTE: NOT ALL SYMBOLS MAY APPLY TO PLANS

PHASING NARRATIVE

REFERENCE SHEETS GI-101 TO GI106 FOR PHASING INFORMATION

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:4

:0

P

M

PLUMBING COVER SHEET

P-001

01-03-2024 RM VMC

PLUMBING SHEET INDEX

P-001 PLUMBING COVER SHEET

PD-101 PLUMBING DEMOLITION PLANS

PL-101 PLUMBING FLOOR PLANS

PL-102 PLUMBING ISOMETRICS

PL-103 PLUMBING DETAILS & SCHEDULES

NO. DESCRIPTION DATE

bob.davenport Date 01/03/2024

"Ø

S A

N

E X

4"Ø SAN (EX) 4"Ø SAN (EX)

"Ø

S A

N

E X

4"Ø SAN (EX)

FD (EX)

FD (EX)

FD (EX)

FD (EX)

3"Ø SAN (EX)

4"Ø SAN (EX)

CONNECTION

TO SEWER

PD03

PD02

PD01

PD06

PD06

PD01

PD02 PD04

PD05

PD05

PD02

PD02

PD08

PD08

PD02

PD01

PD01

PD07

PD09

PD10

PD04

PD04

PD04

PD04

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:4

:1

P

M

PLUMBING DEMOLITION

PLANS

PD-101

01-03-2024 RM VMC

1/4" = 1'-0"

SANITARY DEMOLITION PLAN - BOILER ROOM

PLUMBING KEYNOTES

PD01 DEMOLISH AND REMOVE PIPING FROM THIS POINT UP TO EXISTING

FIXTURES/EQUIPMENT.

PD02 CUT EXISTING PIPING AT THIS POINT.

PD03 EXISTING PIPING TO BE ABANDONED IN PLACE. CAP BOTH ENDS OF PIPING.

PD04 EXISTING PIPING TO BE DEMOLISHED AND REMOVED.

PD05 EXISTING PIPING TO BE REMAIN AND RECONNECTED TO PROPOSED NEW

SYSTEM. REFERENCE PL-101 FOR INFORMATION.

PD06 DEMOLISH FIXTURE.

PD07 EXISTING PVC PIPING FOR WATER SOFTENER SYSTEM TO BE REPLACED

WITH COPPER PIPING AND FITTINGS. EXISTING SYSTEM TO BE

OPERATIONAL DURING CONSTRUCTION.

PD08 EXISTING AIR COMPRESSOR TO BE REMOVED. EXISTING PIPING TO BE

DEMOLISHED.

PD09 EXISTING WATER SOFTENER SYSTEM TO BE RELOCATED. REFERENCE

PL-101 FOR NEW LOCATION.

PD10 EXISTING WATER SOFTENER SYSTEM TO REMAIN.

1/4" = 1'-0"

PRESSURE PIPING DEMOLITION PLAN - BOILER ROOM

NO. DESCRIPTION DATE

bob.davenport

3"Ø SAN (EX)

"Ø

S A

N

E X

FD(EX)

FD(EX)

FD(EX)

FD-1 FD-1

"Ø

S A

N

E X

1 1/2"Ø SAN

1 1/2"Ø SAN

2"Ø SAN

1 1/2"Ø SAN

1 1/2"Ø SAN

4"Ø SAN

WC-1

SH-1

SK-2

SK-1

LAV-1

FD-2

3"Ø SAN

4"Ø SAN

"Ø

S A

N "Ø

S A

N

4"Ø SAN

4"Ø SAN 4"Ø SAN

FCO

FCO

4"Ø SAN (EX)

I.E. = -16.75" F.F.= 0'-0"

I.E.= -34.00" F.F.= 0'-0"

I.E. = -40.00" F.F.= 0'-0"

I.E. = -38.00" F.F.= 0'-0"

OS-1

P01

2" VTR

P02

P02

P03 P03

CONNECTION

TO SEWER

4"Ø SAN

4"Ø SAN

"Ø

S A

N

2"Ø CW

3/4"Ø HW

1"Ø CW

WC-1

SH-1

SK-2

SK-1

LAV-1

3/4"Ø HW (EX)

1"Ø CW

3/4"Ø HW

1"Ø CW

1/2"Ø HW

1/2"Ø CW

P04

P07

"Ø

A

IR

"Ø

A

IR

1"Ø AIR 1"Ø AIR

1"Ø AIR 1"Ø AIR1"Ø AIR

P05

P08

P06

P06 P06

"Ø

A

IR

"Ø

A

IR

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:4

:3

P

M

PLUMBING FLOOR PLANS

PL-101

01-03-2024 RM VMC

1/4" = 1'-0"

SANITARY FLOOR PLAN - BOILER ROOM

PLUMBING KEYNOTES

P01 EXISTING PIPING IS ABANDONED IN PLACE WITH NEW CAPS ON BOTH

SIDES.

P02 COORDINATE CLOSELY WITH STRUCTURAL DESIGN. PIPING IS CLOSE TO

NEW FOOTERS AND COLUMNS.

P03 PIPING TO BE INSTALLED BELOW TRENCH. BOTTOM OF TRENCH IS

APPROXIMATELY 2'-6" BELOW FINISHED FLOOR.

P04 EXISTING WATER SOFTENER SYSTEM TO THIS LOCATION.

P05 NEW OIL-LESS COMPRESSOR.

P06 CONNECT COMPRESSED AIR PIPING TO ECONOMIZER. FOLLOW

MANUFACTURERS INSTRUCTIONS.

P07 REFERENCE SHEET PL-103 FOR WATER SOFTENER PIPING DESIGN.

P08 300 GAL COMPRESSED AIR STORAGE TANK.

1/4" = 1'-0"

PRESSURE PIPING FLOOR PLAN - BOILER ROOM

NO. DESCRIPTION DATE

bob.davenport

SK-1

WC-1

SH-1

SK-2

LAV-1

/4

"Ø C

W

/4

"Ø H

W

"Ø

C W

/2

"Ø H

W

1/2"Ø HW

1/2"Ø CW

2"Ø

C W

2"Ø CW (EX)

1"Ø CW

3/4"Ø HW (EX)

3/4"Ø HW

1"Ø CW

1"Ø C

W

3/4"Ø H

W

CONNECTION TO

EXISTING SYSTEM

CONNECTION TO

EXISTING SYSTEM

AC-1

ST-1

1"Ø AIR

1"Ø AIR

1"Ø AIR

1"Ø AIR

1"Ø AIR

1"Ø AIR

1"Ø AIR

1"Ø

AIR

1"Ø

AIR

1"Ø

AIR

1"Ø AIR

TO ECONOMIZER

TO ECONOMIZER

TO ECONOMIZER

4"Ø

SAN (E

X)

3"Ø SAN (EX)

4"Ø SAN

4"Ø

SAN

3"Ø

SAN (E

X)

1 1/2"Ø SAN

3"Ø SAN

2"Ø SAN

1 1/2"Ø SAN

4"Ø SAN 4"Ø SAN

4"Ø

SAN

1 1/2"Ø SAN

1 1/2"Ø VNT

1 1/2"Ø VNT

1 1/2"Ø VNT

2"Ø VNT

4"Ø SAN

4"Ø SAN

4"Ø SAN4"Ø SAN

SK-1

FD-1

WC-1

SH-1

SK-2

LAV-1

FCO

WCO

WCO

3"Ø SAN

FD-1

FD-1

FD (EX)

FD (EX)

FD (EX)

4"Ø SAN (EX)

OS-1

TO SEWER

CAPPED AND

ABANDONED IN PLACE

VTR

4"Ø SAN

4"Ø SAN

4"Ø SAN

EXISTING PIPE TO NEW SYSTEM.

EXISTING PIPE TO NEW SYSTEM.

FCO

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:4

:3

P

M

PLUMBING ISOMETRICS

PL-102

01-03-2024 RM VMC

DOMESTIC WATER ISOMETRIC

COMPRESSED AIR ISOMETRIC

SANITARY ISOMETRIC

NO. DESCRIPTION DATE

bob.davenport

S

O

F T

E

N

E R

S

O

F T

E

N

E R

S

O

F T

E

N

E R

S

O

F T

E

N

E R

BRINE

TANK

BRINE

TANK

TO BOILER SYSTEM

FROM

EXISTING

PIPING

TO

OPERATORS

AREA

NOTES:

1. ALL PIPING TO BE COPPER.

2. FITTINGS SHALL BE SOLDER TYPE.

3. NEW SYSTEM TO REPLICATE PIPE

SIZES FROM EXISTING SYSTEM.

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:4

:4

P

M

PLUMBING DETAILS &

SCHEDULES

PL-103

01-03-2024 RM VMC

12" = 1'-0"

WATER SOFTENER DIAGRAM

OS-1

ST-1

NO. DESCRIPTION DATE

bob.davenport

Sheets
P-001 - PLUMBING COVER SHEET
PD-101 - PLUMBING DEMOLITION PLANS
PL-101 - PLUMBING FLOOR PLANS
PL-102 - PLUMBING ISOMETRICS
PL-103 - PLUMBING DETAILS & SCHEDULES
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:30:41-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:30:51-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:30:56-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:31:02-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:31:09-0500
Robert G Davenport
I have reviewed this document.

File details come from the government source that posted it. Updated .