Attachment 01 - Drawings Mechanical Stamped Part IV of V - 22 pages.pdf
PDF 16 MB Posted
- Solicitation number
- 36C24824R0178
About this file
The provided document appears to be Attachment 01 - Drawings Mechanical Stamped Part IV of V related to the federal contract opportunity "Z2DA--Replace Boiler #2 and Correct Deficiencies at Boiler Plant" (Solicitation Number: 36C24824R0178).
This solicitation is for construction services to replace boiler #2 and correct deficiencies at the boiler plant located in the VA Caribbean Healthcare System, San Juan, PR. The federal agency issuing the solicitation is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The document contains 22 pages of mechanical drawings and specifications for the construction project. No additional details about pricing, set asides, award dates, or other key contract information are provided in this specific attachment.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOILER PLANT COMPLIANCE NOTE:
ALL NEW WORK WITHIN THE BOILER PLANT SHALL BE IN COMPLIANCE WITH THE “VHA BOILER ASSOCIATED PLANT SAFETY DEVICE TESTING MANUAL - SEVENTH EDITION” (SDTM-7) AND DESIGN DIRECTIVE FY2022-01.
NEW COMPONENTS SHALL BE CAST-STEEL OR FORGED STEEL. NEW COMPONENTS WITH CAST-IRON MATERIAL, INSTALLED IN THE HIGH-PRESSURE STEAM DISTRIBUTION SYSTEM IN THE BOILER PLANT, IS FORBIDDEN.
CONTRACTOR SHALL NOTIFY THE VA COR OF ANY EXISTING COMPONENTS WHICH DO NOT COMPLY WITH THE
ABOVE REFRENCED SDTM-7 REQUIREMENTS.
PHASING NARRATIVE
THE BOILER PLANT SHALL CONTINUE TO OPERATE DURING ALL CONSTRUCTION PHASES.
THE BOILER PLANT SHALL HAVE A MINIMUM OF TWO (2) FULLY FUNCTIONAL BOILERS (N) AND (N+1) OPERABLE AT
ALL TIMES.
IN THE EVENT THAT THE (N) AND (N+1) OPERATING REQUIREMENT CAN NOT BE MET BY THE BOILER PLANT, THE CONTRACTOR SHALL PROVIDE AN ADDITIONAL TEMPORARY (RENTAL) BOILER, CONTRACTOR SHALL COORDINATE WITH THE VA AND FACILITATE THE IMPLENTATION OF THE CONNECTIONS FROM THE TEMPORARY
BOILER TO THE BOILER PLANT.
REFER TO THE GENERAL SHEETS PHASING DOCUMENTS FOR COMPLETE SCOPE-OF-WORK PHASING
INFORMATION.
FUEL OIL BOILER PLANT NOTE
DURING CONSTRUCTION, THE BOILER PLANT MUST REMAIN OPERATIONAL AT ALL TIMES. ANY FUEL OIL RELATED DEMOLITION SHALL OCCUR AFTER THE COMPLETE INSTALLATION & VERIFICATION OF THE NEW FUEL OIL
SYSTEM AND ITS RELATED COMPONENTS.
ONLY ONE BOILER AT A TIME SHALL BE SWITCHED OVER FROM THE EXISTING FUEL OIL DISTRIBUTION SYSTEM
TO THE NEW FUEL OIL SYSTEM.
EXCEPTION: THE EXISTING PRIMARY FUEL OIL PUMP WILL BE REMOVED FOR THE INSTALLATION OF THE NEW FUEL OIL PUMP AND POLISHER. THE EXISTING TEMPORARY SECONDARY FUEL OIL PUMP TRANSFERRING THE FUEL OIL TO THE EXISTING EXTERIOR ABOVE-GROUND FUEL OIL DAY-TANK SHALL REMAIN OPERATIONAL
DURING CONSTRUCTION.
WHEN THE NEW FUEL OIL DISTRIBUTION SYSTEM IS FULLY OPERATIONAL SERVING ALL THREE (3) BOILERS, THE EXISTING FUEL OIL DAY-TANK AND OVERHEAD FUEL OIL PIPING DISTRIBUTION SYSTEM SHALL BE DEMOLISHED.
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:4
P M
MECHANICAL COVER SHEET
M-001
01-03-2024 RSM PJG
MECHANICAL SHEET INDEX
M-001 MECHANICAL COVER SHEET
MD-101 MECHANICAL DEMOLITION - OVERALL PLAN
MD-102 MECHANICAL DEMOLITION - BOILER ROOM - HVAC
MD-103 MECHANICAL DEMOLITION - BOILER ROOM - STEAM
MD-104 MECHANICAL DEMOLITION - BOILER ROOM - FUEL OIL
MD-201 MECHANICAL DEMOLITION - ROOF PLAN
MH-101 MECHANICAL NEW WORK - OVERALL PLAN
MH-102 MECHANICAL FLOOR PLAN - BOILER ROOM - HVAC
MH-201 MECHANICAL ROOF PLAN
MP-101 MECHANICAL PIPING PLAN - BOILER ROOM - STEAM
MP-102 MECHANICAL PIPING PLAN - BOILER ROOM - FUEL OIL
MS-101 MECHANICAL SITE PLAN
MT-101 MECHANICAL TEMPORARY FUEL OIL PLAN
MH-301 BOILER FLOW DIAGRAM
MH-302 MECHANICAL STEAM - SECTION & ISOMETRIC VIEWS
MH-501 MECHANICAL DETAILS
MH-502 MECHANICAL DETAILS
MH-503 MECHANICAL DETAILS
MH-504 MECHANICAL DETAILS
MH-505 MECHANICAL DETAILS
MH-601 MECHANICAL SCHEDULES
MI-101 MECHANICAL CONTROLS
NO. DESCRIPTION DATE
bob.davenport Date 01/03/2024
PRIMARY FUEL
OIL PUMP (D)
SG-2 (D)
SECONDARY FUEL
OIL PUMP (D)
DAY TANK
EF-1(D)
AHU-1(D)
CU-1(D)
SG-1(EX)
SG-3(EX)
EF-05(EX) EF-06(EX)
EF-02(EX) EF-03(EX)
EF-01(EX) EF-04(EX)
OVERALL DEMOLITION NOTE
OVERALL PLAN SHOWN FOR REFERENCE ONLY. REFER TO INDIVIDUAL SHEETS FOR CONTENTS.
SHEET MD-102: HVAC DEMOLITION
SHEET MD-103: STEAM DEMOLITION
SHEET MD-104: FUEL OIL DEMOLITION
SHEET MD-201: ROOF DEMOLITION
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:5
P M
MECHANICAL DEMOLITION -
OVERALL PLAN
MD-101
01-03-2024 RSM PJG
TRUE
1/4" = 1'-0"
MECHANICAL DEMOLITION - OVERALL FLOOR PLAN
1/4" = 1'-0"
MECHANICAL DEMOLITION - OVERALL ROOF PLAN
NO. DESCRIPTION DATE
bob.davenport
CU-1(D)
AHU-1(D)
EF-1(D)
MD08
MD08
MD15
SG-1(EX)
SG-3(EX)
SG-2(D)
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:0
P M
MECHANICAL DEMOLITION -
BOILER ROOM - HVAC
MD-102
01-03-2024 RSM PJG
1/4" = 1'-0"
MECHANICAL DEMOLITION - HVAC PLAN
MECHANICAL KEYNOTES
MD08 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING AHU/CU SPLIT SYSTEM AND ASSOCIATED
COMPONENTS.
MD15 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCTWORK.
WALL SHALL BE PATCHED.
TRUE
NO. DESCRIPTION DATE
bob.davenport
EX LINE FROM
TEMP BOILER
DAY TANK
20"Ø FLUE STACK UP
THROUGH ROOF (EX)
20"Ø FLUE STACK UP
THROUGH ROOF (EX)
18"Ø FLUE STACK UP
THROUGH ROOF (D)
4"Ø HPS
4"Ø HPS
"Ø
H P
S
"Ø
H P
S
"Ø
H P
S
8"Ø STEAM HEADER
8"Ø HPS EXHAUST
"Ø
H P
S
6"Ø HPS
MD03
MD03
MD02
MD01
MD06
MD09
4"Ø HPS
2 1/2"Ø COND
"Ø
B F
W
/2 "Ø
B F
W
2"Ø BFW
2"Ø BFW
"Ø
B F
W
EXISTING
CONDENSATE HEADER
MD-103
PRIMARY FUEL
OIL PUMP (D)
SECONDARY FUEL
OIL PUMP (D)
MD10
MD11
6"Ø HPS
2"Ø BFW
MD12
MD12
MD12
1 1/2"Ø BD
"Ø
H P
S
/2 "Ø
B D
4"Ø HPS
/2 "Ø
B D
1 1/2"Ø BD
1 1/2"Ø BD
/4
"Ø B
D
/2 "Ø
B D
1 1/2"Ø BD
6"Ø HPS
/4
"Ø B
D
BS-1(E)
1/2"Ø D
/2
"Ø D
4"Ø VENT UP
THROUGH ROOF (EX)
4"Ø VENT UP
THROUGH ROOF (EX)
DEMOLISH 4"Ø VENT
UP THROUGH ROOF
SG-3(EX)
SG-1(EX)
SG-2(D)
EXISTING SAMPLE
COOLER
Level 2 17' - 10"
T.O. SLAB
0' - 0"
BOT TRUSS
15' - 6"
EXIST EXHAUST SILENCER
10"Ø VENT THRU ROOF
EXISTING 8"Ø
STEAM HEADER
PITCH
"Ø
V N
T4"Ø HPS - TO B-9
6"Ø HPS - FROM BOILER #1
4"Ø HPS - TO SOUTH BED TOWER
6"Ø HPS - FROM BOILER #3
6"Ø HPS - FROM BOILER #2
4"Ø HPS - TO LAUNDRY
EXISTING FLANGE
DEMOLISH NON STEAM
RATED VALVE
MD09
MD11
MD12
MD12
"Ø
V N
T
4"Ø HPS - TO B-9
EXISTING
BLOWDOWN
SEPARATOR
/2 "Ø
B D
EXISTING RELIEF
EXISTING 1-1/2"Ø
CITY WATER
EXISTING SAMPLE
COOLER
1"Ø D
3/4"Ø CW
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:1
P M
MECHANICAL DEMOLITION -
BOILER ROOM - STEAM
MD-103
01-03-2024 RSM PJG
1/4" = 1'-0"
MECHANICAL DEMOLITION - STEAM PIPING PLAN
1/4" = 1'-0"
STEAM PIPING HEADER - DEMOLITION SECTION VIEW
MECHANICAL KEYNOTES
MD01 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING BOILER 2 AND SHALL DEMOLISH ALL EXISTING
CONNECTIONS.
MD02 CONTRACTOR SHALL DEMOLISH AND REMOVE BOILER FEED WATER FOR BOILER 2 AND ALL ITS PIPING
COMPONENTS.
MD03 CONTRACTOR SHALL DEMOLISH AND REMOVE CONNECTION FROM EXISTING FLUE STACK UP TO
PENETRATION THROUGH ROOF. PENETRATION SHALL BE CAPPED AND SEALED.
MD06 CONTRACTOR SHALL DEMOLISH AND REMOVE ALL FLUE FROM BOILER 2. ROOF THIMBLE SHALL BE CAPPED AND SEALED. NEW ROOF PENETRATION SHALL BE PROVIDED FOR NEW BOILER 2 FLUE WITH
NEW ECONOMIZER.
MD09 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING NON STEAM RATED GATE VALVE. PROVIDE NEW
STEAM RATED GATE VALVE. NEW VALVE SHALL NOT BE MADE OF CAST IRON.
MD10 CONTRACTOR SHALL DEMOLISH AND REMOVE STEAM PIPING FROM TEMP BOILER CONNECTION TO
BOILER #3 CONNECTION.
MD11 CONTRACTOR SHALL DEMOLISH AND REMOVE PARTIAL STEAM HEADER.
MD12 CONTRACTOR SHALL DEMOLISH AND REMOVE STEAM PIPING.
TRUE
NO. DESCRIPTION DATE
bob.davenport
DAY TANK (D)
OIL PUMP (D)
1"Ø FOR(TYP)
1"Ø FOS
"Ø
F O
R "Ø
F O
R "Ø
F O
S
1"Ø FOS
1/2"Ø FOR
MD05
MD04
MD01
SECONDARY FUEL
OIL PUMP (D)
MD17
1"Ø FOS
MD04
MD04
MD16
MD16
SG-3(EX)
SG-1(EX)
SG-2 (D)
FUEL OIL BOILER PLANT NOTE
DURING CONSTRUCTION, THE BOILER PLANT MUST REMAIN OPERATIONAL AT ALL TIMES. ANY FUEL OIL RELATED DEMOLITION SHALL OCCUR AFTER THE COMPLETE INSTALLATION & VERIFICATION OF THE NEW FUEL OIL
SYSTEM AND ITS RELATED COMPONENTS.
ONLY ONE BOILER AT A TIME SHALL BE SWITCHED OVER FROM THE EXISTING FUEL OIL DISTRIBUTION SYSTEM
TO THE NEW FUEL OIL SYSTEM.
EXCEPTION: THE EXISTING PRIMARY FUEL OIL PUMP WILL BE REMOVED FOR THE INSTALLATION OF THE NEW FUEL OIL PUMP AND POLISHER. THE EXISTING TEMPORARY SECONDARY FUEL OIL PUMP TRANSFERRING THE FUEL OIL TO THE EXISTING EXTERIOR ABOVE-GROUND FUEL OIL DAY-TANK SHALL REMAIN OPERATIONAL
DURING CONSTRUCTION.
WHEN THE NEW FUEL OIL DISTRIBUTION SYSTEM IS FULLY OPERATIONAL SERVING ALL THREE (3) BOILERS, THE EXISTING FUEL OIL DAY-TANK AND OVERHEAD FUEL OIL PIPING DISTRIBUTION SYSTEM SHALL BE DEMOLISHED.
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:1
P M
MECHANICAL DEMOLITION -
BOILER ROOM - FUEL OIL
MD-104
01-03-2024 RSM PJG
1/4" = 1'-0"
MECHANICAL DEMOLITION - FUEL OIL PIPING PLAN
MECHANICAL KEYNOTES
MD01 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING BOILER 2 AND SHALL DEMOLISH ALL EXISTING
CONNECTIONS.
MD04 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING DIESEL DAY TANK AND ALL DIESEL PIPING FROM TANK TO BRANCH FEEDING BOILERS. DEMOLITION SHALL OCCUR AT THE END OF PHASE 6 (G.C. TO COORDINATE), AFTER FUEL OIL SYSTEM HAS SWITCHED OVER FROM THE EXISTING SYSTEM TO THE NEW
SYSTEM.
MD05 CONTRACTOR SHALL TEMPORARILY RELOCATE EXISTING PRIMARY FUEL OIL PUMP FOR INSTALLATION OF NEW FUEL OIL PUMP. SEE SHEET MT-101 FOR PUMP LOCATION. RELOCATION SHALL OCCUR DURING PHASE 1 (G.C. TO COORDINATE). DURING PUMP RELOCATION, FUEL OIL SYSTEM SHALL BE SERVED BY DAY TANK. PRIMARY FUEL OIL PUMP SHALL BE DEMOLISHED AFTER NEW FUEL OIL SYSTEM IN INSTALLED AND OPERATIONAL. DEMOLITION SHALL OCCUR AT THE END OF PHASE 6 (G.C. TO COORDINATE), AFTER FUEL OIL SYSTEM HAS SWITCHED OVER FROM THE EXISTING SYSTEM TO THE NEW OPERATIONAL
SYSTEM.
MD16 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING BOILER CIRCULATOR.
MD17 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING SECONDARY FUEL OIL PUMP. DEMOLITION SHALL OCCUR AT THE END OF PHASE 6 (G.C. TO COORDINATE), AFTER FUEL OIL SYSTEM HAS SWITCHED OVER
FROM THE EXISTING SYSTEM TO THE NEW OPERATIONAL SYSTEM.
TRUE
NO. DESCRIPTION DATE
bob.davenport
20"Ø FLUE (EX)
18"Ø FLUE (D)
10"Ø HPS EXHAUST (EX)
MD06
4"Ø HPS TO B-9 (EX)
4"Ø HPS EXHAUST (EX)
2"Ø VENT (EX)
EF-05(EX) EF-06(EX)
EF-02(EX) EF-03(EX)
EF-01(EX) EF-04(EX)
EXISTING 4" VENT
FROM SAFETY
VALVE
EXISTING 4" VENT
FROM SAFETY
VALVE
REMOVE 4" VENT
FROM BOILER #1
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:2
P M
MECHANICAL DEMOLITION -
ROOF PLAN
MD-201
01-03-2024 RSM PJG
1/4" = 1'-0"
MECHANICAL DEMOLITION - ROOF PLAN
MECHANICAL KEYNOTES
MD06 CONTRACTOR SHALL DEMOLISH AND REMOVE ALL FLUE FROM BOILER 2. ROOF THIMBLE SHALL BE CAPPED AND SEALED. NEW ROOF PENETRATION SHALL BE PROVIDED FOR NEW BOILER 2 FLUE WITH
NEW ECONOMIZER.
TRUE
NO. DESCRIPTION DATE
bob.davenport
MP-101
MH-302ERV-1(N)
SG-1 (EX)
SG-3 (EX)
CU-01(N)
AHU-01(N)
ERV-2(N)
EF-1(N)
EF-2(N)
FOFP-1(N)
SG-2(N)
FOP-1(N)
ERV-3(N)
EF-01(EX) EF-04(EX)
EF-02(EX) EF-03(EX)
EF-05(EX) EF-06(EX)
OVERALL NEW WORK NOTE
OVERALL PLAN SHOWN FOR REFERENCE ONLY. REFER TO INDIVIDUAL SHEETS FOR CONTENTS.
SHEET MH-102: HVAC FLOOR PLAN
SHEET MH-201: ROOF PLAN
SHEET MP-101: STEAM FLOOR PLAN
SHEET MP-102: FUEL OIL PLAN
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:3
P M
MECHANICAL NEW WORK -
OVERALL PLAN
MH-101
01-03-2024 RSM PJG
1/4" = 1'-0"
MECHANICAL FLOOR PLAN - OVERALL FLOOR PLAN
1/4" = 1'-0"
MECHANICAL ROOF PLAN - OVERALL FLOOR PLAN
TRUE
NO. DESCRIPTION DATE
bob.davenport
OIL PUMP (RE)
SECONDARY FUEL
OIL PUMP (E)
1"Ø FOS
SG-3(EX)
SG-1(EX)
SG-2 (D)
AREA OF WORK FOR TEMPORARY PHASE
1"Ø FOS
1"Ø FOS
T01
T02 T03
T04
T04
T04
1"Ø
FOS
1"Ø
FOS
1"Ø FOS
1"Ø FOS
NEW 1" FOS TO NEW
FUTURE FUEL OIL PUMP
SYSTEM (FOFS-1 & FOP-1)
NEW 1" FOS TO RELOCATED
PRIMARY FUEL OIL PUMP
EXISTING 1" FOS TO
EXISTING DAY DANK
1"Ø FOS
1"Ø FOS
1"Ø FOS
EXISTING 1" FOS FROM EXISTING
UNDERGROUND 20,000 GAL FUEL OIL TANK
EXISTING 1" FOS TO EXISTING
SECONDARY FUEL OIL PUMP
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:4
P M
MECHANICAL TEMPORARY
FUEL OIL PLAN
MT-101
01-03-2024 RSM PJG
1/4" = 1'-0"
MECHANICAL TEMPORARY FUEL PHASE - FUEL OIL PIPING PLAN
MECHANICAL KEYNOTES
T01 RELOCATE EXISTING PRIMARY FUEL OIL PUMP TO NEW INDICATED LOCATION. PROVIDE FUEL OIL PUMP WITH NEW SHEET METAL OIL CONTAINMENT BAY. EXTEND FUEL OIL SUPPLY LINE AS SHOWN TO RELOCATED FUEL OIL PUMP. PROVIDE ISOLATION VALVES BEFORE AND AFTER FUEL OIL PUMP. EXTEND ELECTRICAL WIRING AND COMPONENTS FOR RELOCATED SPOT. DEMOLITION OF FUEL OIL PUMP SHALL OCCUR AT THE END OF PHASE 6 (G.C. TO COORDINATE), AFTER FUEL OIL SYSTEM HAS SWITCHED OVER
FROM THE EXISTING SYSTEM TO THE NEW OPERATIONAL SYSTEM.
T02 EXISTING SECONDARY FUEL OIL PUMP AND PIPING SHALL REMAIN IN EXISTING LOCATION DURING TEMPORARY FUEL OIL PHASE.DEMOLITION OF FUEL OIL PUMP SHALL OCCUR AT THE END OF PHASE 6 (G.C. TO COORDINATE), AFTER FUEL OIL SYSTEM HAS SWITCHED OVER FROM THE EXISTING SYSTEM TO
THE NEW OPERATIONAL SYSTEM.
T03 PROVIDE NEW CHECK VALVE IN FUEL OIL PIPING.
T04 PROVIDE NEW ISOLATION VALVE IN FUEL OIL PIPING.
TEMPORARY FUEL OIL ISOMETRIC VIEW
EXISTING SECONDARY
FUEL OIL PUMP
RELOCATED PRIMARY
FUEL OIL PUMP
NO. DESCRIPTION DATE
bob.davenport
SG-1 (EX)
SG-3 (EX)
CU-01(N)
AHU-01(N)
EF-1(N)
EF-2(N)
T
AHU-01
SG-2(N)
TG-1(2)
M02
M03
M03
M04
M05
EG-1
U /C
M06
4"Ø EA
12"Ø EA
"Ø
E A
EF-3(N)
M01
M03
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:5
P M
MECHANICAL FLOOR PLAN -
BOILER ROOM - HVAC
MH-102
01-03-2024 RSM PJG
TRUE
1/4" = 1'-0"
MECHANICAL FLOOR PLAN - HVAC PLAN
MECHANICAL KEYNOTES
M01 PROVIDE WALL CAP FOR 12"Ø EXHAUST DUCT.
M02 PROVIDE NEW AHU/CU SPLIT SYSTEM AND ASSOCIATED COMPONENTS. CONDENSATE SHALL FOLLOW
EXISTING PATH.
M03 PROVIDE NEW EXHAUST FAN.
M04 PROVIDE NEW SOLID CORE STEEL DOOR.
M05 PROVIDE NEW FULLY LOUVERED DOOR.
M06 PROVIDE NEW TRANSFER GRILLE BETWEEN OPERATORS OFFICE & WATER SAMPLING ROOM.
NO. DESCRIPTION DATE
bob.davenport
10"Ø HPS EXHAUST (EX)
4"Ø HPS TO B-9 (EX)
4"Ø HPS EXHAUST (EX)
2"Ø VENT (EX)
EF-01(EX) EF-04(EX)
EF-02(EX) EF-03(EX)
EF-05(EX) EF-06(EX)
NEW 20"Ø FLUE
FROM BOILER #2
S01
S01
S08
EXISTING 4" VENT
FROM SAFETY
VALVE
EXISTING 4" VENT
FROM SAFETY
VALVE
NEW 4" VENT FROM
SAFETY VALVE OF NEW
BOILER #2
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:5
P M
MECHANICAL ROOF PLAN
MH-201
01-03-2024 RSM PJG
TRUE
1/4" = 1'-0"
MECHANICAL ROOF PLAN
MECHANICAL KEYNOTES
S01 PROVIDE NEW 20"Ø FLUE FROM EXISTING BOILER AND REUSE EXISTING ROOF THIMBLE. PROVIDE
ECONOMIZER ON STACK.
S08 PROVIDE NEW 20"Ø FLUE FROM BOILER #2 THROUGH NEW ROOF PENETRATION. PROVIDE NEW ROOF
THIMBLE. REFER TO STRUCTURAL FOR SUPPORT DETAIL.
NO. DESCRIPTION DATE
bob.davenport
UP
UP
DOWN
"Ø
F O
S
"Ø
F O
R
EXISTING UNDERGROUND 20,000
GAL FUEL-OIL TANK MAN-HOLE
CONNECTIONS
F06
F04
F07
(E
F05
"Ø
F O
R
UP
UP
DOWN
"Ø
F O
S
"Ø
F O
R
EXISTING UNDERGROUND 20,000
GAL FUEL-OIL TANK MAN-HOLE
CONNECTIONS
F06
F04
F07
(E
F05
"Ø
F O
R
/1
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:1
P M
MECHANICAL SITE PLAN
MS-101
01-03-2024 RSM PJG
1/16" = 1'-0"
MECHANICAL SITE PLAN
MECHANICAL KEYNOTES
F04 PROVIDE NEW 1"Ø FUEL OIL RETURN LINE SHALL RUN ALONG CEP (16' ABOVE GRADE) BUILDING OUTER
PERIMETER WALL.
F05 PROVIDE NEW 1"Ø FUEL OIL RETURN LINE FROM EXISTING UNDERGROUND 20,000 GALLON FUEL OIL TANK
TO RUN ALONG GENERATOR WALL (2' ABOVE GRADE).
F06 1"Ø FUEL OIL SUPPLY LINE FROM EXISTING UNDERGROUND 20,000 GALLON FUEL OIL TANK TO BOILER
PLANT IS EXISTING TO REMAIN.
F07 PROVIDE NEW 1"Ø FUEL OIL RETURN LINE UNDERGROUND PIPING. ALL NEW FUEL OIL LINE UNDERGROUND SHALL BE INCLUDE FACTORY-ENGINEERED AND FABRICATED SECONDARY CONTAIMENT
CONDUIT SYSTEM WITH LEAK DETECTION SYSTEM.
TRUE
1/8" = 1'-0"
MECHANICAL SITE PLAN - ENLARGED
NO. DESCRIPTION DATE
bob.davenport
"Ø
H P
S
EXISTING 8"Ø HPS HEADER
ERV-1(N)
4"Ø HPS
4"Ø HPS
"Ø
H P
S
"Ø
H P
S
4"Ø HPS
4"Ø HPS
EXISTING 8"Ø STEAM EXHAUST
ERV-2(N)
"Ø
H P
S
ERV-3(N)
EXISTING
DEAERATOR MAKE-
UP CONTROL VALVE
2 1/2"Ø COND
EXISTING 6"Ø
CONDENSATE HEADER
S01
S01
2"Ø BFW
2"Ø BFW
2"Ø BFW
2"Ø BFW
S03
2"Ø BFW
2"Ø BFW
EXISTING PRV STATION
"Ø
H P
S
MP-101
"Ø
E A
S04
6"Ø HPS
6"Ø HPS
6"Ø HPS
S02
2"Ø BFW
S02
S12
S02
S05
"Ø
E A
20"Ø EA
BS-1(E)
S02
NEW 8"Ø HPS HEADER EXTENSION
"Ø
B F
W
1 1/2"Ø BD
/4
"Ø B
D
/4
"Ø B
D
1 1/2"Ø BD
S06
S07
1 1/2"Ø BD
1 1/2"Ø BD
S08
"Ø
H P
S
/2 "Ø
B D
4"Ø VENT UP
THROUGH ROOF (EX)
4"Ø VENT UP
THROUGH
ROOF (EX)
NEW 4"Ø VENT UP
THROUGH ROOF
S09
S11
S10
S10
S10
S10
S10
S10
S10
SG-3(EX)
SG-1(EX)
SG-2(N)
S10
S10
S03 co co co co S14
S13
S13
S13
S02
S02
Level 2 17' - 10"
"Ø
V N
T
T.O. SLAB
0' - 0"
BOT TRUSS
15' - 6"
4"Ø HPS - TO B-9
6"Ø HPS FROM BOILER #1
4"Ø HPS - TO SOUTH BED TOWER
6"Ø HPS - FROM BOILER #3
NEW 6"Ø HPS - FROM BOILER #2
(C.O.P. EL-11'-6")
4"Ø HPS - TO LAUNDRY
6"Ø HPS FOR FUTURE USE
NEW 6"Ø HPS FROM TEMPORARY BOILER
(C.O.P. EL-14'-0")
NEW 8" HPS HEADER
S04
EXISTING 8"Ø
STEAM HEADER
PITCH
/2 "Ø
B D
"Ø
V N
T
EXISTING EXHAUST SILENCER
10"Ø VENT THRU ROOF
4"Ø HPS - TO B-9
EXISTING
BLOWDOWN
SEPARATOR
EXISTING 1-1/2"Ø
CITY WATER
NEW STEAM
RATED FLANGE
S02
EXISTING SAMPLE
COOLER
EXISTING FLANGE
EXISTING RELIEF
1"Ø D
3/4"Ø CW
S09
S10
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:2
P M
MECHANICAL PIPING PLAN -
BOILER ROOM - STEAM
MP-101
01-03-2024 RSM PJG
1/4" = 1'-0"
MECHANICAL FLOOR PLAN - STEAM PIPING
MECHANICAL KEYNOTES
S01 PROVIDE NEW 20"Ø FLUE FROM EXISTING BOILER AND REUSE EXISTING ROOF THIMBLE. PROVIDE
ECONOMIZER ON STACK.
S02 CONTRACTOR SHALL PROVIDE NEW STEAM RATED GATE VALVE.
S03 CONNECT STACK ECONOMIZER FEED LINES TO EXISTING SYSTEM. PROVIDE BYPASS VALVE FOR WHEN
ECONOMIZER IS NOT USED.
S04 6"Ø STEAM CONNECTION WITH FLAGED CONNECTION FOR FUTURE USE.
S05 6"Ø HPS PIPE WITH FLAGED CONNECTION FOR FUTURE TEMPORARY BOILER.
S06 1-1/2"Ø BLOWDOWN WITH FLAGED CONNECTION FOR FUTURE TEMPORARY BOILER.
S07 2"Ø BOILER FEEDWATER WITH FLAGED CONNECTION FOR FUTURE TEMPORARY BOILER.
S08 PROVIDE NEW 20"Ø FLUE FROM BOILER #2 THROUGH NEW ROOF PENETRATION. PROVIDE NEW ROOF
THIMBLE. REFER TO STRUCTURAL FOR SUPPORT DETAIL.
S09 EXTEND 8"Ø STEAM HEADER FROM EXISTING FLANGE. MATCH PITCH OF EXISTING HEADER.
S10 PROVIDE NEW FLANGED STEAM FLOW METER & MATCH PIPE SIZE. CONNECT TO NEW BOILER
MONITORING HOST PANEL.
S11 PROVIDE NEW BLOWDOWN PIPE AND CONNECT TO EXISITNG BLOWDOWN PIPE LOCATED IN TRENCH.
S12 CONTRACTOR SHALL PROVIDE NEW GATE VALVE RATED FOR BOILER FEEDWATER.
S13 PROVIDE CO SENSOR AT EACH BOILER. CO SENSOR TO BE LOCATED AT CATWALK LEVEL. CONNECT TO
MONITORING SYSTEM AT OPERATORS OFFICE.
S14 PROVIDE CO SENSOR IN OPERATORS OFFICE. CONNECT TO MONITORING SYSTEM AT OPERATORS
OFFICE.
1/4" = 1'-0"
STEAM PIPING HEADER - SECTION VIEW
TRUE
NO. DESCRIPTION DATE
bob.davenport
MH-302
EXISTING
DEAERATOR MAKE-
UP CONTROL VALVE
F01
F01
F03
EXISTING PRV STATION
1"Ø FOR
1/2"Ø FOR
1"Ø FOR
1"Ø FOS
1"Ø FOR
1"Ø FOS
1"Ø FOR
F10
1/2"Ø LPG
1/2"Ø LPG
"Ø
L P
G
/4
"Ø L
P G
FOP-1(N)
FOFP-1(N)
SG-2(N)
SG-3(EX)
SG-1(EX)
F02
F11
F12
"Ø
F O
S
"Ø
F O
R
1"Ø FOS
1"Ø FOR
1"Ø FOS
1"Ø FOR
1"Ø FOS
1"Ø FOR
1/2"Ø FOR
1"Ø FOR
F01
F01
"Ø
F O
S
"Ø
F O
R
F02
F01
1"Ø FOR
1/2"Ø FOR
1"Ø FOR
1"Ø FOS
1"Ø FOS
1"Ø FOR 1/2"Ø FOR
1"Ø FOR
SG-1 (EX)
SG-3 (EX)
SG-2 (N)
F09
F03
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:5
:4
P M
MECHANICAL PIPING PLAN -
BOILER ROOM - FUEL OIL
MP-102
01-03-2024 RSM PJG
1/4" = 1'-0"
MECHANICAL FLOOR PLAN - FUEL OIL - ABOVE GROUND
1/4" = 1'-0"
MECHANICAL FLOOR PLAN - FUEL OIL - TRENCH PIPING
MECHANICAL KEYNOTES
F01 FUEL OIL LINES TURN DOWN INSIDE TRENCH. FUEL OIL SHALL BE DISTRIBUTED INSIDE TRENCH.
F02 FUEL OIL SUPPLY FROM FUEL OIL PUMP TURNS DOWN AND CONTINUES INSIDE TRENCH.
F03 FUEL OIL RETURN TURNS UP AND CONTINUES ABOVE TRENCH.
F09 PROVIDE ISOLATION VALVE FOR FUEL OIL LINES.
F10 1"Ø FUEL OIL PIPE WITH FLANGED CONNECTION FOR FUTURE TEMPORARY BOILER.
F11 PROVIDE NEW FUEL OIL DUPLEX PUMP WITH FUEL OIL CONTAINMENT BAY. CONNECT NEW FUEL OIL PUMP
DOWNSTREAM OF NEW FUEL OIL FILTRATION POLISHER PUMP. PROVIDE NEW OVERFLOW PIPE
CONNECTION WITH ISOLATION VALVE TO TRENCH.
F12 PROVIDE NEW FUEL OIL FILTRATION POLISHER PUMP SYSTEM. NEW PUMP SHALL BE MOUNTED 1' AFF.
PROVIDE BYPASS WITH ISOLATION VALVE.
TRUE
NO. DESCRIPTION DATE
bob.davenport
LEGEND
NEW WORK
EXISTING TO REMAIN
CAPPED LINE
FLANGED LINE
VALVE (NORMALLY OPEN)
VALVE (NORMALLY CLOSED)
NO
NC
CHECK VALVE
STEAM RATED GATE VALVE
BALL VALVE
ANGLE VALVE
PRESSURE SAFETY VALVE
CONNECT TO EXISTING
(N) NEW
EXISTING TO REMAIN
FLOW METER
CONTROL VALVE
PRESSURE RELIEF VALVE
PRESSURE SAFETY VALVE
(EX)
FM
CV
PRV
PSV
GENERAL BOILER FLOW DIAGRAM NOTES
ALL INFORMATION SHOWN ON THE PLANS ARE SCHEMATIC IN NATURE. SEE FLOOR PLANS, DETAILS, SECTION VIEWS & ISOMETRICS FOR ADDITIONAL NOTES, SPECIFIC COMPONENTS, DESIGN LAYOUTS & KEYNOTES.
BOILER NOTES
• CAST IRON COMPONENTS, FITTINGS AND PIPING IS NOT ACCEPTED.
• BOILER SHALL HAVE FLANGED RELIEF VALVES.
• STEAM TRAPS SHALL BE FORGED STEEL; CAST IRON IS NOT ALLOWED.
• KNIFE TYPE BLOWDOWN VALES ARE NOT ACCEPTED.
• TEES AND/OR HARD ELBOWS FOR BLOWDOWN PIPING IS NOT ACCEPTED.
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:0
:0
P M
BOILER FLOW DIAGRAM
MH-301
01-03-2024 RSM PJG
ALL EXISTING CPVC
PIPPING IN SOFT WATER
TO BE REPLACED W/
COPPER
NO. DESCRIPTION DATE
bob.davenport
SIGHT GLASS
SIGHT GLASS
3 WAY FUEL OIL PRV
1"Ø FOS TO BURNER
BOILER #2
BURNER
1"Ø FOR FROM BURNER
ANGLE STEAM VALVE
TO NEW EXTENDED
STEAM HEADER
1"Ø FOR TO
TRENCH
1"Ø FOS
1"Ø FOR
STUB UP FROM TRENCH 1/2"Ø FOR
TO TRENCH
"Ø
E A
FROM EXISTING SOFT
WATER MAIN
CAP FOR FUTURE USE
2"Ø BFW
2"Ø BFW
ERV-2 (N)
2"Ø BFW TO
BOILER
BOT BEAM
14' - 2"
BOT BEAM
14' - 11"
THERMAL THIMBLE
1 1/2"Ø BD
SG-2(N)
O2
CO
EXISTING DERATER & CRT TANKS
TO REMAIN. SEE SHEET S-101
FOR ACCESS "CATWALK" DETAIL
FOP-1 (N)
FOFP-1 (N)
NEW 20"Ø FLUE FROM BOILER #2 &
ERV-2 TO NEW STACK ABOVE ROOF.
ERV-2 (N)
ERV-3 (N)
ERV-1 (N)
CU-01 (N)
AHU-01 (N)
EF-2 (N)
EXTEND 8"Ø HPS STEAM HEADER
EF-1 (N)
TRANSFER GRILLE (N)
6"Ø FLANGED CONNECTION FOR FUTURE USE
6"Ø FLANGED CONNECTION FOR FUTURE USE
NEW 6"Ø HPS STEAM PIPING
FROM NEW BOILER #2 INTO
EXTENDED STEAM HEADER
NEW WALL CAP
NEW 6"Ø HPS STEAM PIPING FROM NEW BOILER #3 INTO EXTENDED STEAM HEADER
NEW 6"Ø HPS STEAM PIPING FROM NEW
TEMPORARY BOILER INTO EXTENDED
STEAM HEADER
NEW 2"Ø BOILER FEED CONNECTION
FOR TEMPORARY BOILER.
NEW 20"Ø FLUE FROM ERV-3 TO
EXISTING FLUE BELOW ROOF.
NEW 20"Ø FLUE FROM ERV-1 TO
EXISTING FLUE BELOW ROOF.
NEW 1"Ø FOR TO 20,000 GAL TANK
NEW 1"Ø FOS TO BOILER PLANT
NEW 1-1/2"Ø
BD FROM
BOILER #2
NEW 6"Ø STEAM
PIPING ELBOW
EXISTING 8"Ø HPS STEAM HEADER
CAP OLD BOILER #2 BLOWDOWN CONNECTION
EF-3 (N)
SG-1(EX)
SG-2(N)
SG-3(EX)
EXISTING 1"Ø FOS FROM 20,000 GAL TANK
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:0
:2
P M
MECHANICAL STEAM -
SECTION & ISOMETRIC
VIEWS
MH-302
01-03-2024 RSM PJG
1/4" = 1'-0"
BOILER FUEL OIL AND BLOWDOWN PIPING - SECTION VIEW
BOILER ISOMETRIC VIEW
NOTE:
GC SHALL REVIEW & COORDINATE ALL SYSTEMS WITH THE
BOILER FLOW DIAGRAM. THIS 3D ISOMETRIC SHALL BE USED
FOR VISUAL REFERENCE.
S-201
S-201
S-201 3
S-201
NO. DESCRIPTION DATE
bob.davenport
EG-1 TITUS 350FL 12" X 12" SEE PLANS FIXED SURFACE NOTE 1 NOTE 2 N/A 1,2
TG-1 TITUS 350FL 7.75" X 7.75" SEE PLANS FIXED SURFACE NOTE 1 NOTE 2 N/A 1,2
SPECIAL NOTES: ** ALL DIFFUSERS SELECTED WITH NC RATING < 20 **
1. COORDINATE COLOR WITH ARCHITECT
2. PROVIDE VOLUME DAMPER AT THE FLEX TAP. PROVIDE YOUNG REGULATOR FOR VOLUME DAMPERS IN INACCESSIBLE AREAS.
3. PROVIDE TITUS RAPID MOUNT FRAME FOR STANDARD 24" x 24" LAY-IN STYLE DIFFUSERS MOUNTED IN HARD CEILINGS, & FOR ALL 12" X 12" SUPPLY DIFFUSERS - REGARDLESS OF THE
MOUNTING LOCATION.
GRILLE, REGISTER, & DIFFUSER SCHEDULE
MARK MANUF. MODEL NO. FACE SIZE
NECK SIZE /
LENGTH
THROW /
SLOTS
FRAME
TYPE
FINISH
VOLUME
DAMPER
FIRE
DAMPER
NOTES
4. PROVIDE OPTIONAL R-6 MOLDED INSULATION BLANKET FOR ALL LAY-IN STYLE DIFFUSERS.
5. PROVIDE TITUS MPI INSULATED PLENUM.
6. PROVIDE WITH OPPOSED BLADE DAMPER. FOR CT DIFFUSERS LESS THAN 3" WIDE, PROVIDE WITH SINGLE BLADE DAMPER.
7. THROW IS ASSUMED TO BE 4-WAY UNLESS SPECIFIED OTHERWISE ON PLANS.
8. FOR PROJECTS WITH EXISTING DIFFUSERS: CONTRACTOR SHALL PROVIDE SUBMITTAL OF DIFFUSERS WHICH MATCH EXISTING FIELD CONDITIONS.
APPROVED ALTERNATES: PRICE, NAILOR, TUTTLE & BAILEY, KRUEGER
NOTES: 1,2,4 1,2,3 1,2,4
NOTES:
1. PROVIDE WITH BACKDRAFT DAMPER.
2. PROVIDE WITH SPEED CONTROLLER.
3. INTERLOCK WITH ROOM LIGHTS.
4. FAN SHALL RUN CONTINUOUSLY.
V 120 120 208
PH 1 1 1
Hz 60 60 60
MODEL NUMBER SP-A80 SP-A90 CSP-A390-VG
STATIC PRESSURE IN. WG. 0.15 0.15 0.25
AIRFLOW CFM 50 75 300
DUCT SIZE 4" OVAL 6" 10"
MOUNTING CEILING CEILING CEILING
MANUFACTURER GREENHECK GREENHECK GREENHECK
FAN SCHEDULE
MARK EF-1 EF-2 EF-3
LOCATION WATER TESTING LAB TOILET/SHOWER ELECTRICAL ROOM
RPM 710 772 1152
MOTOR INFORMATION
POWER (W) 9 10 52
CURRENT (A) 0.16 0.17 0.9
APPROVED ALTERNATES: NUTONE, GREENHECK, FANTECH, PANASONIC
COMPRESSOR RLA / LRA 13.8 / 17.3
CONDENSER FAN FLA 0.93
CIRCUIT BREAKER AMPACITY
MCA 22
MOCP 25
CONDENSER ELECTRICAL V/P/HZ 208/1/60
MINI SPLIT SYSTEM SCHEDULE
UNIT NUMBER AHU / CU-1-01
NOMINAL TONS 2.5
SEER 19.1
MANUFACTURER TRANE-MITSUBISHI
S.C. 23.9
ENTERING TEMPERATURE
DB (°F) 75.0
WB (°F) 63.0
LEAVING TEMPERATURE
DB (°F) 55.0
WB (°F) 54.0
ID DIMENSION (IN / LBS) W X D X H / # 46-1/16" x 11-5/8" x 14-3/8" / 45
HEAT NO HEAT
NOTES: 1-6
NOTES:
1. ALTERNATE EQUIPMENT SHALL BE EQUAL TO THE EQUIPMENT LISTED IN ALL RESPECTS.
OD DIMENSIONS (IN / LBS) W X D X H / # 33-1/16" x 13" x 34-5/8" / 121
REF. LINE SIZE O.D.
SUCT. 5/8
LIQ. 1/4
AIR HANDLER FAN MOTOR
FLA 0.76
V/P/HZ 24V DC
MODEL # CONDENSER NTYSST30B112AA
MODEL # INDOOR UNIT NTYWST30B112AA
DESIGN AIRFLOW (CFM) 600
DESIGN MBTU/H @75/63° F
T.C. 30.6
2. ELECTRICAL SPECIFICATIONS LISTED ARE CONSISTENT WITH THE EQUIPMENT LISTED. ALTERNATE
EQUIPMENT MAY VARY. COORDINATE VARIANCES WITH THE ELECTRICAL CONTRACTOR.
3. CONSULT MANUFACTURER DOCUMENTATION TO SET EQUIPMENT TO MEET AIRFLOW REQUIREMENTS
LISTED.
4. ADDITIONAL REFRIGERANT MAY BE REQUIRED WHERE PIPE LENGTHS EXCEED 70 FT. REFER TO
MANUFACTURER DOCUMENTATION FOR PROPER INSTALLATION.
5. PROVIDE WIRED ROOM CONTROLLER.
6. PROVIDE WITH MANUFACTURER'S OPTIONAL CONDENSATE PUMP.
LBS/HR [kg/HR] HP [kW] PSIG [kPa] PSIG [kPa]
CAPACITY
LBS/HR
PSIG [kPa]
CAPACITY
LBS/HR
SQ FT [SQ M] LBS/HR [kg/HR] MBH [kW] MBH [kW] PSIG [kPa] PSIG [kPa] HP [W] HP [W]
SG-2 BOILER PLANT CLEAVER BOOKS 4WG-100-350-250ST STEAM 12,075 [ 5500 ] 350 [ 260 ] 110 [ 760 ] 130 [ 900 ] 9660 135 [ 930 ] 12075 1384 [ 129 ] 2975 [ 1400 ] 10,042,000 [ 2900000 ] 12,246,000 [ 3600000 ] 120 [ 830 ] 125 [ 860 ] 7.5 [ 5600 ] 460 3 10 [ 7500 ] 3 460
NOTES:
BOILER SHALL FOLLOW VA SPECIFICATION SECTION 23 52 39 AND "VHA BOILER AND ASSOCIATED PLANT SAFETY DEVICE TESTING MANUAL SEVENTH EDITION".
4. ALTITUDE IS 77.75 FT ABOVE SEA LEVEL.
5. THERE SHALL BE 5 PSIG [35 kPa] BETWEEN RELIEF VALVES.
6. PROVIDE BOILER WITH FACTORY LADDER AND PLATFORM.
1. STEAM QUALITY IS 99% MINIMUM.
2. BOILER DESIGN PRESSURE IS 200 PSIG [1378 kPa] MINIMUM.
3. FEEDWATER TEMPERATURE IS 212 ˚F [100 ˚C] MINIMUM, AND 228 ˚F [109 ˚C] NORMAL.
7. PROVIDE SEISMIC RATED REQUIREMENTS.
8. PROVIDE BOILER WITH VSD WITH BYPASS.
9. BASIS OF DESIGN: HAWK PACKAGE: 4000 CONTROL PANEL. CONTRACTOR IS RESPONSIBLE FOR PROVIDING A CONTROL PANEL THAT MEETS ALL THE VA REQUIREMENTS FOR BOILER CONTROLLERS. THE CONTRACTOR SHALL COVER ALL COSTS RELATED TO REPLACEMENT IF BOILER CONTROLLER DOES NOT MEET ALL THE VA TIL REQUIREMENTS AND SPECIFICATIONS. ENSURE BOILER CONTROL PANEL WILL BE COMPATIABLE WITH BOILER MONITORING SYSTEM.
10. PROVIDE PREMIUM BLOWER MOTOR, AIR COMPRESSOR.
11. 7 PPM NOx EMISSIONS
BOILER PLANT · FIRE TUBE STEAM BOILER SCHEDULE, PACKAGED TYPE, SHOP ASSEMBLED
MARK LOCATION MANUFACTURER MODEL TYPE
MAX CAPACITY BOILER
OPERATING
PRESS
RELIEF VALVE 1 SETTING RELIEF VALVE 2 SETTING
HEATING
SURFACE
MIN CONT FIRING
RATE
# 2 OIL FIRST CUTOUT
SETTINGS
SECOND CUTOUT
SETTINGS
OIL ATOM COMPRESS MOTOR FAN MOTOR
INPUT OUTPUT POWER
PHASE VOLT
POWER
PHASE VOLT
3. MINIMUM ALOWABLE FLUE GAS TEMPERATURE AFTER THE ECONOMIZER SHALL BE 650 DEG F.
NOTES
ERV-2 CAIN RTR-124C24SSS BOILER PLANT SG-2 (N) 281 [ 82 ] 46 [ 3 ] 306 [ 1200 ] 0.46 [ 3 ] 0.08 [ 2 ] 228 244.2
ERV-3 CAIN RTR-124C24SSS BOILER PLANT SG-3 (E) 281 [ 82 ] 46 [ 3 ] 306 [ 1200 ] 0.46 [ 3 ] 0.08 [ 2 ] 228 244.2
MBH [KW] GPM [L/s] GAL [L] PSIG [kPa] IN [mm] IN OUT
ERV-1 CAIN RTR-124C24SSS BOILER PLANT SG-1 (E) 281 [ 82 ] 46 [ 3 ] 306 [ 1200 ] 0.46 [ 3 ] 0.08 [ 2 ] 228 244.2
1. FEEDWATER INLET TEMPERATURE SHALL BE 228 °F [109 °C].
2. MINIMUM HEAT EXCHANGED AT 100% BOILER LOAD.
BOILER PLANT · ECONOMIZER SCHEDULE, FLUE GAS/FEEDWATER HEAT EXCHANGERS
MARK MANUFACTURER MODEL LOCATION SYSTEM
MIN HEAT EXCHANGED WATER FLOW MIN NET CAPACITY MAX PRESS DROP WATER SIDE MIN PRESS DROP GAS SIDE WC DESIGN WATER TEMPERATURES DEG F
FOFP-1 BOILER PLANT
PREFERRED UTILITIES
MFG CORP.
PF-505 TYPE 40 20.00 7.00 25 [ 170 ] #2 60 [ 16 ] 45 - 0.75 [ 560 ] 1 115
PSIG [kPa] °F [°C] IN HG HP [W] PHASE VOLT
FOP-1 BOILER PLANT
PREFERRED UTILITIES
MFG CORP.
ATPSF-***-460-50-L TYPE 40 12.62 7.00 50 [ 350 ] #2 60 [ 16 ] 45 10 1 [ 750 ] 3 460
NOTES
1. PROVIDE FUEL OIL PUMP AS PARALLEL PUMP STYLE. PUMPS ARE 100% REDUNDANT.
2. PROVIDE FUEL OIL PUMP WITH DUPLEX STRAINER DIFFERENTIAL PRESSURE SWITCH.
3. PROVIDE FUEL OIL PUMP WITH PUMP SET LEAK DETECTION SWITCH.
4. PROVIDE AUTOMATIC FUEL OIL FILTRATION SET.
5. PROVIDE FUEL OIL PUMP TO MEET DESIGN GPM VALUE.
6. PROVIDE FUEL OIL PUMP WITH CONTAINMENT BASIN LEAK DETECTION SWITCH. ENERGIZE AN AUDIBLE AND VISUAL ALARM. PUMP SHALL REMAIN OPERATIONAL.
7. FUEL OIL PUMPS ARE DESIGNED WITH TWO (2) BOILERS OPERATING. TWO (2) BOILERS OPERATING AT 105 GPH (MAXIMUM FLOW) PER BOILER. SYSTEM DESIGNED FLOW SET AT 420 GPH.
BOILER PLANT · FUEL OIL PUMP SCHEDULE
MARK LOCATION MANUFACTURER MODEL TYPE
RATED CAPACITY
GPM
DESIGN
GPM
DISCHARGE PRESS
OIL GRADE
OIL TEMP VISCOSITY RANGE
(SSU)
SUCTION LIFT MOTOR
FLOWMETERS LAUNDRY BLDG ROSEMOUNT 8600DF040SA1N1P1E6MTAM5R30Q4 6,000 - 750 LB.HR
FLOWMETERS SOUTH BED BLDG ROSEMOUNT 8600DF040SA1N1P1E6MTAM5R30Q4 6,000 - 750 LB.HR
FLOWMETERS MAKE-UP WATER ROSEMOUNT 8750WDMR2A1FPSA010CA1Z5M4G1Q4 18 - 64 GPM - ASSUMING 50%+ CONDENSATE RECOVERY
FLOWMETERS MAIN BLDG ROSEMOUNT 8600DF040SA1N1P1E6MTAM5R30Q4 12,000--1500 LB/HR
FLOWMETERS STEAM BOILER OUTPUT 1-3 ROSEMOUNT 8600DF040SA1N1P1E6MTAM5R30Q4 12,000--1500 LB/HR - ONE PER BOILER
EQUIPMENT APPLICATION MANUFACTURER MODEL NOTES 1 ELECTRICAL
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:0
:3
P M
MECHANICAL SCHEDULES
MH-601
01-03-2024 RSM PJG
NO. DESCRIPTION DATE
bob.davenport
REVISIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:0
:4
P M
MECHANICAL DETAILS
MH-501
01-03-2024 RSM PJG
NO. DESCRIPTION DATE
bob.davenport
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:0
:0
P M
MECHANICAL DETAILS
MH-502
01-03-2024 RSM PJG
NO. DESCRIPTION DATE
bob.davenport
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:0
:1
P M
MECHANICAL DETAILS
MH-503
01-03-2024 RSM PJG
NO. DESCRIPTION DATE
bob.davenport
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:0
:2
P M
MECHANICAL DETAILS
MH-504
01-03-2024 RSM PJG
NO. DESCRIPTION DATE
bob.davenport
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:0
:3
P M
MECHANICAL DETAILS
MH-505
01-03-2024 RSM PJG
NO. DESCRIPTION DATE
bob.davenport
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CD-FINAL (100% CD) SUBMITTAL 01-03-2024
CD-FINAL (100% CD)
SUBMITTAL
10 CALLE CASIA - ADM. BLDG.
SUITE 4M456
672-20-602
FULLY SPRINKLERED
REPLACE BOILER #2 AND
CORRECT BOILER PLAN
DEFICIENCIES
/3
/2
:0
:4
P M
MECHANICAL CONTROLS
MI-101
01-03-2024 RSM PJG
NO. DESCRIPTION DATE
bob.davenport
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:52:21-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:52:47-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:52:58-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:53:08-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:53:18-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:53:33-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:53:56-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:54:14-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:54:24-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:54:38-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:54:48-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:55:00-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:55:25-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:55:34-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:55:44-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:55:55-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:56:05-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:56:17-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:56:28-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:56:39-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:56:50-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
| THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | |
| 2024-01-03T16:57:02-0500 | |
| Robert G Davenport | |
| I have reviewed this document. |
File details come from the government source that posted it. Updated .