Attachment 01 - Drawings Mechanical Stamped Part IV of V - 22 pages.pdf

PDF 16 MB Posted

Attached to
Z2DA--Replace Boiler #2 and Correct Deficiencies at Boiler Plant
Solicitation number
36C24824R0178
Issued by

About this file

The provided document appears to be Attachment 01 - Drawings Mechanical Stamped Part IV of V related to the federal contract opportunity "Z2DA--Replace Boiler #2 and Correct Deficiencies at Boiler Plant" (Solicitation Number: 36C24824R0178).

This solicitation is for construction services to replace boiler #2 and correct deficiencies at the boiler plant located in the VA Caribbean Healthcare System, San Juan, PR. The federal agency issuing the solicitation is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The document contains 22 pages of mechanical drawings and specifications for the construction project. No additional details about pricing, set asides, award dates, or other key contract information are provided in this specific attachment.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOILER PLANT COMPLIANCE NOTE:

ALL NEW WORK WITHIN THE BOILER PLANT SHALL BE IN COMPLIANCE WITH THE “VHA BOILER ASSOCIATED PLANT SAFETY DEVICE TESTING MANUAL - SEVENTH EDITION” (SDTM-7) AND DESIGN DIRECTIVE FY2022-01.

NEW COMPONENTS SHALL BE CAST-STEEL OR FORGED STEEL. NEW COMPONENTS WITH CAST-IRON MATERIAL, INSTALLED IN THE HIGH-PRESSURE STEAM DISTRIBUTION SYSTEM IN THE BOILER PLANT, IS FORBIDDEN.

CONTRACTOR SHALL NOTIFY THE VA COR OF ANY EXISTING COMPONENTS WHICH DO NOT COMPLY WITH THE

ABOVE REFRENCED SDTM-7 REQUIREMENTS.

PHASING NARRATIVE

THE BOILER PLANT SHALL CONTINUE TO OPERATE DURING ALL CONSTRUCTION PHASES.

THE BOILER PLANT SHALL HAVE A MINIMUM OF TWO (2) FULLY FUNCTIONAL BOILERS (N) AND (N+1) OPERABLE AT

ALL TIMES.

IN THE EVENT THAT THE (N) AND (N+1) OPERATING REQUIREMENT CAN NOT BE MET BY THE BOILER PLANT, THE CONTRACTOR SHALL PROVIDE AN ADDITIONAL TEMPORARY (RENTAL) BOILER, CONTRACTOR SHALL COORDINATE WITH THE VA AND FACILITATE THE IMPLENTATION OF THE CONNECTIONS FROM THE TEMPORARY

BOILER TO THE BOILER PLANT.

REFER TO THE GENERAL SHEETS PHASING DOCUMENTS FOR COMPLETE SCOPE-OF-WORK PHASING

INFORMATION.

FUEL OIL BOILER PLANT NOTE

DURING CONSTRUCTION, THE BOILER PLANT MUST REMAIN OPERATIONAL AT ALL TIMES. ANY FUEL OIL RELATED DEMOLITION SHALL OCCUR AFTER THE COMPLETE INSTALLATION & VERIFICATION OF THE NEW FUEL OIL

SYSTEM AND ITS RELATED COMPONENTS.

ONLY ONE BOILER AT A TIME SHALL BE SWITCHED OVER FROM THE EXISTING FUEL OIL DISTRIBUTION SYSTEM

TO THE NEW FUEL OIL SYSTEM.

EXCEPTION: THE EXISTING PRIMARY FUEL OIL PUMP WILL BE REMOVED FOR THE INSTALLATION OF THE NEW FUEL OIL PUMP AND POLISHER. THE EXISTING TEMPORARY SECONDARY FUEL OIL PUMP TRANSFERRING THE FUEL OIL TO THE EXISTING EXTERIOR ABOVE-GROUND FUEL OIL DAY-TANK SHALL REMAIN OPERATIONAL

DURING CONSTRUCTION.

WHEN THE NEW FUEL OIL DISTRIBUTION SYSTEM IS FULLY OPERATIONAL SERVING ALL THREE (3) BOILERS, THE EXISTING FUEL OIL DAY-TANK AND OVERHEAD FUEL OIL PIPING DISTRIBUTION SYSTEM SHALL BE DEMOLISHED.

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:4

P M

MECHANICAL COVER SHEET

M-001

01-03-2024 RSM PJG

MECHANICAL SHEET INDEX

M-001 MECHANICAL COVER SHEET

MD-101 MECHANICAL DEMOLITION - OVERALL PLAN

MD-102 MECHANICAL DEMOLITION - BOILER ROOM - HVAC

MD-103 MECHANICAL DEMOLITION - BOILER ROOM - STEAM

MD-104 MECHANICAL DEMOLITION - BOILER ROOM - FUEL OIL

MD-201 MECHANICAL DEMOLITION - ROOF PLAN

MH-101 MECHANICAL NEW WORK - OVERALL PLAN

MH-102 MECHANICAL FLOOR PLAN - BOILER ROOM - HVAC

MH-201 MECHANICAL ROOF PLAN

MP-101 MECHANICAL PIPING PLAN - BOILER ROOM - STEAM

MP-102 MECHANICAL PIPING PLAN - BOILER ROOM - FUEL OIL

MS-101 MECHANICAL SITE PLAN

MT-101 MECHANICAL TEMPORARY FUEL OIL PLAN

MH-301 BOILER FLOW DIAGRAM

MH-302 MECHANICAL STEAM - SECTION & ISOMETRIC VIEWS

MH-501 MECHANICAL DETAILS

MH-502 MECHANICAL DETAILS

MH-503 MECHANICAL DETAILS

MH-504 MECHANICAL DETAILS

MH-505 MECHANICAL DETAILS

MH-601 MECHANICAL SCHEDULES

MI-101 MECHANICAL CONTROLS

NO. DESCRIPTION DATE

bob.davenport Date 01/03/2024

PRIMARY FUEL

OIL PUMP (D)

SG-2 (D)

SECONDARY FUEL

OIL PUMP (D)

DAY TANK

EF-1(D)

AHU-1(D)

CU-1(D)

SG-1(EX)

SG-3(EX)

EF-05(EX) EF-06(EX)

EF-02(EX) EF-03(EX)

EF-01(EX) EF-04(EX)

OVERALL DEMOLITION NOTE

OVERALL PLAN SHOWN FOR REFERENCE ONLY. REFER TO INDIVIDUAL SHEETS FOR CONTENTS.

SHEET MD-102: HVAC DEMOLITION

SHEET MD-103: STEAM DEMOLITION

SHEET MD-104: FUEL OIL DEMOLITION

SHEET MD-201: ROOF DEMOLITION

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:5

P M

MECHANICAL DEMOLITION -

OVERALL PLAN

MD-101

01-03-2024 RSM PJG

TRUE

1/4" = 1'-0"

MECHANICAL DEMOLITION - OVERALL FLOOR PLAN

1/4" = 1'-0"

MECHANICAL DEMOLITION - OVERALL ROOF PLAN

NO. DESCRIPTION DATE

bob.davenport

CU-1(D)

AHU-1(D)

EF-1(D)

MD08

MD08

MD15

SG-1(EX)

SG-3(EX)

SG-2(D)

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:0

P M

MECHANICAL DEMOLITION -

BOILER ROOM - HVAC

MD-102

01-03-2024 RSM PJG

1/4" = 1'-0"

MECHANICAL DEMOLITION - HVAC PLAN

MECHANICAL KEYNOTES

MD08 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING AHU/CU SPLIT SYSTEM AND ASSOCIATED

COMPONENTS.

MD15 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING EXHAUST FAN AND ASSOCIATED DUCTWORK.

WALL SHALL BE PATCHED.

TRUE

NO. DESCRIPTION DATE

bob.davenport

EX LINE FROM

TEMP BOILER

DAY TANK

20"Ø FLUE STACK UP

THROUGH ROOF (EX)

20"Ø FLUE STACK UP

THROUGH ROOF (EX)

18"Ø FLUE STACK UP

THROUGH ROOF (D)

4"Ø HPS

4"Ø HPS

"Ø

H P

S

"Ø

H P

S

"Ø

H P

S

8"Ø STEAM HEADER

8"Ø HPS EXHAUST

"Ø

H P

S

6"Ø HPS

MD03

MD03

MD02

MD01

MD06

MD09

4"Ø HPS

2 1/2"Ø COND

"Ø

B F

W

/2 "Ø

B F

W

2"Ø BFW

2"Ø BFW

"Ø

B F

W

EXISTING

CONDENSATE HEADER

MD-103

PRIMARY FUEL

OIL PUMP (D)

SECONDARY FUEL

OIL PUMP (D)

MD10

MD11

6"Ø HPS

2"Ø BFW

MD12

MD12

MD12

1 1/2"Ø BD

"Ø

H P

S

/2 "Ø

B D

4"Ø HPS

/2 "Ø

B D

1 1/2"Ø BD

1 1/2"Ø BD

/4

"Ø B

D

/2 "Ø

B D

1 1/2"Ø BD

6"Ø HPS

/4

"Ø B

D

BS-1(E)

1/2"Ø D

/2

"Ø D

4"Ø VENT UP

THROUGH ROOF (EX)

4"Ø VENT UP

THROUGH ROOF (EX)

DEMOLISH 4"Ø VENT

UP THROUGH ROOF

SG-3(EX)

SG-1(EX)

SG-2(D)

EXISTING SAMPLE

COOLER

Level 2 17' - 10"

T.O. SLAB

0' - 0"

BOT TRUSS

15' - 6"

EXIST EXHAUST SILENCER

10"Ø VENT THRU ROOF

EXISTING 8"Ø

STEAM HEADER

PITCH

"Ø

V N

T4"Ø HPS - TO B-9

6"Ø HPS - FROM BOILER #1

4"Ø HPS - TO SOUTH BED TOWER

6"Ø HPS - FROM BOILER #3

6"Ø HPS - FROM BOILER #2

4"Ø HPS - TO LAUNDRY

EXISTING FLANGE

DEMOLISH NON STEAM

RATED VALVE

MD09

MD11

MD12

MD12

"Ø

V N

T

4"Ø HPS - TO B-9

EXISTING

BLOWDOWN

SEPARATOR

/2 "Ø

B D

EXISTING RELIEF

EXISTING 1-1/2"Ø

CITY WATER

EXISTING SAMPLE

COOLER

1"Ø D

3/4"Ø CW

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:1

P M

MECHANICAL DEMOLITION -

BOILER ROOM - STEAM

MD-103

01-03-2024 RSM PJG

1/4" = 1'-0"

MECHANICAL DEMOLITION - STEAM PIPING PLAN

1/4" = 1'-0"

STEAM PIPING HEADER - DEMOLITION SECTION VIEW

MECHANICAL KEYNOTES

MD01 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING BOILER 2 AND SHALL DEMOLISH ALL EXISTING

CONNECTIONS.

MD02 CONTRACTOR SHALL DEMOLISH AND REMOVE BOILER FEED WATER FOR BOILER 2 AND ALL ITS PIPING

COMPONENTS.

MD03 CONTRACTOR SHALL DEMOLISH AND REMOVE CONNECTION FROM EXISTING FLUE STACK UP TO

PENETRATION THROUGH ROOF. PENETRATION SHALL BE CAPPED AND SEALED.

MD06 CONTRACTOR SHALL DEMOLISH AND REMOVE ALL FLUE FROM BOILER 2. ROOF THIMBLE SHALL BE CAPPED AND SEALED. NEW ROOF PENETRATION SHALL BE PROVIDED FOR NEW BOILER 2 FLUE WITH

NEW ECONOMIZER.

MD09 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING NON STEAM RATED GATE VALVE. PROVIDE NEW

STEAM RATED GATE VALVE. NEW VALVE SHALL NOT BE MADE OF CAST IRON.

MD10 CONTRACTOR SHALL DEMOLISH AND REMOVE STEAM PIPING FROM TEMP BOILER CONNECTION TO

BOILER #3 CONNECTION.

MD11 CONTRACTOR SHALL DEMOLISH AND REMOVE PARTIAL STEAM HEADER.

MD12 CONTRACTOR SHALL DEMOLISH AND REMOVE STEAM PIPING.

TRUE

NO. DESCRIPTION DATE

bob.davenport

DAY TANK (D)

OIL PUMP (D)

1"Ø FOR(TYP)

1"Ø FOS

"Ø

F O

R "Ø

F O

R "Ø

F O

S

1"Ø FOS

1/2"Ø FOR

MD05

MD04

MD01

SECONDARY FUEL

OIL PUMP (D)

MD17

1"Ø FOS

MD04

MD04

MD16

MD16

SG-3(EX)

SG-1(EX)

SG-2 (D)

FUEL OIL BOILER PLANT NOTE

DURING CONSTRUCTION, THE BOILER PLANT MUST REMAIN OPERATIONAL AT ALL TIMES. ANY FUEL OIL RELATED DEMOLITION SHALL OCCUR AFTER THE COMPLETE INSTALLATION & VERIFICATION OF THE NEW FUEL OIL

SYSTEM AND ITS RELATED COMPONENTS.

ONLY ONE BOILER AT A TIME SHALL BE SWITCHED OVER FROM THE EXISTING FUEL OIL DISTRIBUTION SYSTEM

TO THE NEW FUEL OIL SYSTEM.

EXCEPTION: THE EXISTING PRIMARY FUEL OIL PUMP WILL BE REMOVED FOR THE INSTALLATION OF THE NEW FUEL OIL PUMP AND POLISHER. THE EXISTING TEMPORARY SECONDARY FUEL OIL PUMP TRANSFERRING THE FUEL OIL TO THE EXISTING EXTERIOR ABOVE-GROUND FUEL OIL DAY-TANK SHALL REMAIN OPERATIONAL

DURING CONSTRUCTION.

WHEN THE NEW FUEL OIL DISTRIBUTION SYSTEM IS FULLY OPERATIONAL SERVING ALL THREE (3) BOILERS, THE EXISTING FUEL OIL DAY-TANK AND OVERHEAD FUEL OIL PIPING DISTRIBUTION SYSTEM SHALL BE DEMOLISHED.

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:1

P M

MECHANICAL DEMOLITION -

BOILER ROOM - FUEL OIL

MD-104

01-03-2024 RSM PJG

1/4" = 1'-0"

MECHANICAL DEMOLITION - FUEL OIL PIPING PLAN

MECHANICAL KEYNOTES

MD01 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING BOILER 2 AND SHALL DEMOLISH ALL EXISTING

CONNECTIONS.

MD04 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING DIESEL DAY TANK AND ALL DIESEL PIPING FROM TANK TO BRANCH FEEDING BOILERS. DEMOLITION SHALL OCCUR AT THE END OF PHASE 6 (G.C. TO COORDINATE), AFTER FUEL OIL SYSTEM HAS SWITCHED OVER FROM THE EXISTING SYSTEM TO THE NEW

SYSTEM.

MD05 CONTRACTOR SHALL TEMPORARILY RELOCATE EXISTING PRIMARY FUEL OIL PUMP FOR INSTALLATION OF NEW FUEL OIL PUMP. SEE SHEET MT-101 FOR PUMP LOCATION. RELOCATION SHALL OCCUR DURING PHASE 1 (G.C. TO COORDINATE). DURING PUMP RELOCATION, FUEL OIL SYSTEM SHALL BE SERVED BY DAY TANK. PRIMARY FUEL OIL PUMP SHALL BE DEMOLISHED AFTER NEW FUEL OIL SYSTEM IN INSTALLED AND OPERATIONAL. DEMOLITION SHALL OCCUR AT THE END OF PHASE 6 (G.C. TO COORDINATE), AFTER FUEL OIL SYSTEM HAS SWITCHED OVER FROM THE EXISTING SYSTEM TO THE NEW OPERATIONAL

SYSTEM.

MD16 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING BOILER CIRCULATOR.

MD17 CONTRACTOR SHALL DEMOLISH AND REMOVE EXISTING SECONDARY FUEL OIL PUMP. DEMOLITION SHALL OCCUR AT THE END OF PHASE 6 (G.C. TO COORDINATE), AFTER FUEL OIL SYSTEM HAS SWITCHED OVER

FROM THE EXISTING SYSTEM TO THE NEW OPERATIONAL SYSTEM.

TRUE

NO. DESCRIPTION DATE

bob.davenport

20"Ø FLUE (EX)

18"Ø FLUE (D)

10"Ø HPS EXHAUST (EX)

MD06

4"Ø HPS TO B-9 (EX)

4"Ø HPS EXHAUST (EX)

2"Ø VENT (EX)

EF-05(EX) EF-06(EX)

EF-02(EX) EF-03(EX)

EF-01(EX) EF-04(EX)

EXISTING 4" VENT

FROM SAFETY

VALVE

EXISTING 4" VENT

FROM SAFETY

VALVE

REMOVE 4" VENT

FROM BOILER #1

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:2

P M

MECHANICAL DEMOLITION -

ROOF PLAN

MD-201

01-03-2024 RSM PJG

1/4" = 1'-0"

MECHANICAL DEMOLITION - ROOF PLAN

MECHANICAL KEYNOTES

MD06 CONTRACTOR SHALL DEMOLISH AND REMOVE ALL FLUE FROM BOILER 2. ROOF THIMBLE SHALL BE CAPPED AND SEALED. NEW ROOF PENETRATION SHALL BE PROVIDED FOR NEW BOILER 2 FLUE WITH

NEW ECONOMIZER.

TRUE

NO. DESCRIPTION DATE

bob.davenport

MP-101

MH-302ERV-1(N)

SG-1 (EX)

SG-3 (EX)

CU-01(N)

AHU-01(N)

ERV-2(N)

EF-1(N)

EF-2(N)

FOFP-1(N)

SG-2(N)

FOP-1(N)

ERV-3(N)

EF-01(EX) EF-04(EX)

EF-02(EX) EF-03(EX)

EF-05(EX) EF-06(EX)

OVERALL NEW WORK NOTE

OVERALL PLAN SHOWN FOR REFERENCE ONLY. REFER TO INDIVIDUAL SHEETS FOR CONTENTS.

SHEET MH-102: HVAC FLOOR PLAN

SHEET MH-201: ROOF PLAN

SHEET MP-101: STEAM FLOOR PLAN

SHEET MP-102: FUEL OIL PLAN

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:3

P M

MECHANICAL NEW WORK -

OVERALL PLAN

MH-101

01-03-2024 RSM PJG

1/4" = 1'-0"

MECHANICAL FLOOR PLAN - OVERALL FLOOR PLAN

1/4" = 1'-0"

MECHANICAL ROOF PLAN - OVERALL FLOOR PLAN

TRUE

NO. DESCRIPTION DATE

bob.davenport

OIL PUMP (RE)

SECONDARY FUEL

OIL PUMP (E)

1"Ø FOS

SG-3(EX)

SG-1(EX)

SG-2 (D)

AREA OF WORK FOR TEMPORARY PHASE

1"Ø FOS

1"Ø FOS

T01

T02 T03

T04

T04

T04

1"Ø

FOS

1"Ø

FOS

1"Ø FOS

1"Ø FOS

NEW 1" FOS TO NEW

FUTURE FUEL OIL PUMP

SYSTEM (FOFS-1 & FOP-1)

NEW 1" FOS TO RELOCATED

PRIMARY FUEL OIL PUMP

EXISTING 1" FOS TO

EXISTING DAY DANK

1"Ø FOS

1"Ø FOS

1"Ø FOS

EXISTING 1" FOS FROM EXISTING

UNDERGROUND 20,000 GAL FUEL OIL TANK

EXISTING 1" FOS TO EXISTING

SECONDARY FUEL OIL PUMP

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:4

P M

MECHANICAL TEMPORARY

FUEL OIL PLAN

MT-101

01-03-2024 RSM PJG

1/4" = 1'-0"

MECHANICAL TEMPORARY FUEL PHASE - FUEL OIL PIPING PLAN

MECHANICAL KEYNOTES

T01 RELOCATE EXISTING PRIMARY FUEL OIL PUMP TO NEW INDICATED LOCATION. PROVIDE FUEL OIL PUMP WITH NEW SHEET METAL OIL CONTAINMENT BAY. EXTEND FUEL OIL SUPPLY LINE AS SHOWN TO RELOCATED FUEL OIL PUMP. PROVIDE ISOLATION VALVES BEFORE AND AFTER FUEL OIL PUMP. EXTEND ELECTRICAL WIRING AND COMPONENTS FOR RELOCATED SPOT. DEMOLITION OF FUEL OIL PUMP SHALL OCCUR AT THE END OF PHASE 6 (G.C. TO COORDINATE), AFTER FUEL OIL SYSTEM HAS SWITCHED OVER

FROM THE EXISTING SYSTEM TO THE NEW OPERATIONAL SYSTEM.

T02 EXISTING SECONDARY FUEL OIL PUMP AND PIPING SHALL REMAIN IN EXISTING LOCATION DURING TEMPORARY FUEL OIL PHASE.DEMOLITION OF FUEL OIL PUMP SHALL OCCUR AT THE END OF PHASE 6 (G.C. TO COORDINATE), AFTER FUEL OIL SYSTEM HAS SWITCHED OVER FROM THE EXISTING SYSTEM TO

THE NEW OPERATIONAL SYSTEM.

T03 PROVIDE NEW CHECK VALVE IN FUEL OIL PIPING.

T04 PROVIDE NEW ISOLATION VALVE IN FUEL OIL PIPING.

TEMPORARY FUEL OIL ISOMETRIC VIEW

EXISTING SECONDARY

FUEL OIL PUMP

RELOCATED PRIMARY

FUEL OIL PUMP

NO. DESCRIPTION DATE

bob.davenport

SG-1 (EX)

SG-3 (EX)

CU-01(N)

AHU-01(N)

EF-1(N)

EF-2(N)

T

AHU-01

SG-2(N)

TG-1(2)

M02

M03

M03

M04

M05

EG-1

U /C

M06

4"Ø EA

12"Ø EA

"Ø

E A

EF-3(N)

M01

M03

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:5

P M

MECHANICAL FLOOR PLAN -

BOILER ROOM - HVAC

MH-102

01-03-2024 RSM PJG

TRUE

1/4" = 1'-0"

MECHANICAL FLOOR PLAN - HVAC PLAN

MECHANICAL KEYNOTES

M01 PROVIDE WALL CAP FOR 12"Ø EXHAUST DUCT.

M02 PROVIDE NEW AHU/CU SPLIT SYSTEM AND ASSOCIATED COMPONENTS. CONDENSATE SHALL FOLLOW

EXISTING PATH.

M03 PROVIDE NEW EXHAUST FAN.

M04 PROVIDE NEW SOLID CORE STEEL DOOR.

M05 PROVIDE NEW FULLY LOUVERED DOOR.

M06 PROVIDE NEW TRANSFER GRILLE BETWEEN OPERATORS OFFICE & WATER SAMPLING ROOM.

NO. DESCRIPTION DATE

bob.davenport

10"Ø HPS EXHAUST (EX)

4"Ø HPS TO B-9 (EX)

4"Ø HPS EXHAUST (EX)

2"Ø VENT (EX)

EF-01(EX) EF-04(EX)

EF-02(EX) EF-03(EX)

EF-05(EX) EF-06(EX)

NEW 20"Ø FLUE

FROM BOILER #2

S01

S01

S08

EXISTING 4" VENT

FROM SAFETY

VALVE

EXISTING 4" VENT

FROM SAFETY

VALVE

NEW 4" VENT FROM

SAFETY VALVE OF NEW

BOILER #2

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:5

P M

MECHANICAL ROOF PLAN

MH-201

01-03-2024 RSM PJG

TRUE

1/4" = 1'-0"

MECHANICAL ROOF PLAN

MECHANICAL KEYNOTES

S01 PROVIDE NEW 20"Ø FLUE FROM EXISTING BOILER AND REUSE EXISTING ROOF THIMBLE. PROVIDE

ECONOMIZER ON STACK.

S08 PROVIDE NEW 20"Ø FLUE FROM BOILER #2 THROUGH NEW ROOF PENETRATION. PROVIDE NEW ROOF

THIMBLE. REFER TO STRUCTURAL FOR SUPPORT DETAIL.

NO. DESCRIPTION DATE

bob.davenport

UP

UP

DOWN

"Ø

F O

S

"Ø

F O

R

EXISTING UNDERGROUND 20,000

GAL FUEL-OIL TANK MAN-HOLE

CONNECTIONS

F06

F04

F07

(E

F05

"Ø

F O

R

UP

UP

DOWN

"Ø

F O

S

"Ø

F O

R

EXISTING UNDERGROUND 20,000

GAL FUEL-OIL TANK MAN-HOLE

CONNECTIONS

F06

F04

F07

(E

F05

"Ø

F O

R

/1

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:1

P M

MECHANICAL SITE PLAN

MS-101

01-03-2024 RSM PJG

1/16" = 1'-0"

MECHANICAL SITE PLAN

MECHANICAL KEYNOTES

F04 PROVIDE NEW 1"Ø FUEL OIL RETURN LINE SHALL RUN ALONG CEP (16' ABOVE GRADE) BUILDING OUTER

PERIMETER WALL.

F05 PROVIDE NEW 1"Ø FUEL OIL RETURN LINE FROM EXISTING UNDERGROUND 20,000 GALLON FUEL OIL TANK

TO RUN ALONG GENERATOR WALL (2' ABOVE GRADE).

F06 1"Ø FUEL OIL SUPPLY LINE FROM EXISTING UNDERGROUND 20,000 GALLON FUEL OIL TANK TO BOILER

PLANT IS EXISTING TO REMAIN.

F07 PROVIDE NEW 1"Ø FUEL OIL RETURN LINE UNDERGROUND PIPING. ALL NEW FUEL OIL LINE UNDERGROUND SHALL BE INCLUDE FACTORY-ENGINEERED AND FABRICATED SECONDARY CONTAIMENT

CONDUIT SYSTEM WITH LEAK DETECTION SYSTEM.

TRUE

1/8" = 1'-0"

MECHANICAL SITE PLAN - ENLARGED

NO. DESCRIPTION DATE

bob.davenport

"Ø

H P

S

EXISTING 8"Ø HPS HEADER

ERV-1(N)

4"Ø HPS

4"Ø HPS

"Ø

H P

S

"Ø

H P

S

4"Ø HPS

4"Ø HPS

EXISTING 8"Ø STEAM EXHAUST

ERV-2(N)

"Ø

H P

S

ERV-3(N)

EXISTING

DEAERATOR MAKE-

UP CONTROL VALVE

2 1/2"Ø COND

EXISTING 6"Ø

CONDENSATE HEADER

S01

S01

2"Ø BFW

2"Ø BFW

2"Ø BFW

2"Ø BFW

S03

2"Ø BFW

2"Ø BFW

EXISTING PRV STATION

"Ø

H P

S

MP-101

"Ø

E A

S04

6"Ø HPS

6"Ø HPS

6"Ø HPS

S02

2"Ø BFW

S02

S12

S02

S05

"Ø

E A

20"Ø EA

BS-1(E)

S02

NEW 8"Ø HPS HEADER EXTENSION

"Ø

B F

W

1 1/2"Ø BD

/4

"Ø B

D

/4

"Ø B

D

1 1/2"Ø BD

S06

S07

1 1/2"Ø BD

1 1/2"Ø BD

S08

"Ø

H P

S

/2 "Ø

B D

4"Ø VENT UP

THROUGH ROOF (EX)

4"Ø VENT UP

THROUGH

ROOF (EX)

NEW 4"Ø VENT UP

THROUGH ROOF

S09

S11

S10

S10

S10

S10

S10

S10

S10

SG-3(EX)

SG-1(EX)

SG-2(N)

S10

S10

S03 co co co co S14

S13

S13

S13

S02

S02

Level 2 17' - 10"

"Ø

V N

T

T.O. SLAB

0' - 0"

BOT TRUSS

15' - 6"

4"Ø HPS - TO B-9

6"Ø HPS FROM BOILER #1

4"Ø HPS - TO SOUTH BED TOWER

6"Ø HPS - FROM BOILER #3

NEW 6"Ø HPS - FROM BOILER #2

(C.O.P. EL-11'-6")

4"Ø HPS - TO LAUNDRY

6"Ø HPS FOR FUTURE USE

NEW 6"Ø HPS FROM TEMPORARY BOILER

(C.O.P. EL-14'-0")

NEW 8" HPS HEADER

S04

EXISTING 8"Ø

STEAM HEADER

PITCH

/2 "Ø

B D

"Ø

V N

T

EXISTING EXHAUST SILENCER

10"Ø VENT THRU ROOF

4"Ø HPS - TO B-9

EXISTING

BLOWDOWN

SEPARATOR

EXISTING 1-1/2"Ø

CITY WATER

NEW STEAM

RATED FLANGE

S02

EXISTING SAMPLE

COOLER

EXISTING FLANGE

EXISTING RELIEF

1"Ø D

3/4"Ø CW

S09

S10

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:2

P M

MECHANICAL PIPING PLAN -

BOILER ROOM - STEAM

MP-101

01-03-2024 RSM PJG

1/4" = 1'-0"

MECHANICAL FLOOR PLAN - STEAM PIPING

MECHANICAL KEYNOTES

S01 PROVIDE NEW 20"Ø FLUE FROM EXISTING BOILER AND REUSE EXISTING ROOF THIMBLE. PROVIDE

ECONOMIZER ON STACK.

S02 CONTRACTOR SHALL PROVIDE NEW STEAM RATED GATE VALVE.

S03 CONNECT STACK ECONOMIZER FEED LINES TO EXISTING SYSTEM. PROVIDE BYPASS VALVE FOR WHEN

ECONOMIZER IS NOT USED.

S04 6"Ø STEAM CONNECTION WITH FLAGED CONNECTION FOR FUTURE USE.

S05 6"Ø HPS PIPE WITH FLAGED CONNECTION FOR FUTURE TEMPORARY BOILER.

S06 1-1/2"Ø BLOWDOWN WITH FLAGED CONNECTION FOR FUTURE TEMPORARY BOILER.

S07 2"Ø BOILER FEEDWATER WITH FLAGED CONNECTION FOR FUTURE TEMPORARY BOILER.

S08 PROVIDE NEW 20"Ø FLUE FROM BOILER #2 THROUGH NEW ROOF PENETRATION. PROVIDE NEW ROOF

THIMBLE. REFER TO STRUCTURAL FOR SUPPORT DETAIL.

S09 EXTEND 8"Ø STEAM HEADER FROM EXISTING FLANGE. MATCH PITCH OF EXISTING HEADER.

S10 PROVIDE NEW FLANGED STEAM FLOW METER & MATCH PIPE SIZE. CONNECT TO NEW BOILER

MONITORING HOST PANEL.

S11 PROVIDE NEW BLOWDOWN PIPE AND CONNECT TO EXISITNG BLOWDOWN PIPE LOCATED IN TRENCH.

S12 CONTRACTOR SHALL PROVIDE NEW GATE VALVE RATED FOR BOILER FEEDWATER.

S13 PROVIDE CO SENSOR AT EACH BOILER. CO SENSOR TO BE LOCATED AT CATWALK LEVEL. CONNECT TO

MONITORING SYSTEM AT OPERATORS OFFICE.

S14 PROVIDE CO SENSOR IN OPERATORS OFFICE. CONNECT TO MONITORING SYSTEM AT OPERATORS

OFFICE.

1/4" = 1'-0"

STEAM PIPING HEADER - SECTION VIEW

TRUE

NO. DESCRIPTION DATE

bob.davenport

MH-302

EXISTING

DEAERATOR MAKE-

UP CONTROL VALVE

F01

F01

F03

EXISTING PRV STATION

1"Ø FOR

1/2"Ø FOR

1"Ø FOR

1"Ø FOS

1"Ø FOR

1"Ø FOS

1"Ø FOR

F10

1/2"Ø LPG

1/2"Ø LPG

"Ø

L P

G

/4

"Ø L

P G

FOP-1(N)

FOFP-1(N)

SG-2(N)

SG-3(EX)

SG-1(EX)

F02

F11

F12

"Ø

F O

S

"Ø

F O

R

1"Ø FOS

1"Ø FOR

1"Ø FOS

1"Ø FOR

1"Ø FOS

1"Ø FOR

1/2"Ø FOR

1"Ø FOR

F01

F01

"Ø

F O

S

"Ø

F O

R

F02

F01

1"Ø FOR

1/2"Ø FOR

1"Ø FOR

1"Ø FOS

1"Ø FOS

1"Ø FOR 1/2"Ø FOR

1"Ø FOR

SG-1 (EX)

SG-3 (EX)

SG-2 (N)

F09

F03

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:5

:4

P M

MECHANICAL PIPING PLAN -

BOILER ROOM - FUEL OIL

MP-102

01-03-2024 RSM PJG

1/4" = 1'-0"

MECHANICAL FLOOR PLAN - FUEL OIL - ABOVE GROUND

1/4" = 1'-0"

MECHANICAL FLOOR PLAN - FUEL OIL - TRENCH PIPING

MECHANICAL KEYNOTES

F01 FUEL OIL LINES TURN DOWN INSIDE TRENCH. FUEL OIL SHALL BE DISTRIBUTED INSIDE TRENCH.

F02 FUEL OIL SUPPLY FROM FUEL OIL PUMP TURNS DOWN AND CONTINUES INSIDE TRENCH.

F03 FUEL OIL RETURN TURNS UP AND CONTINUES ABOVE TRENCH.

F09 PROVIDE ISOLATION VALVE FOR FUEL OIL LINES.

F10 1"Ø FUEL OIL PIPE WITH FLANGED CONNECTION FOR FUTURE TEMPORARY BOILER.

F11 PROVIDE NEW FUEL OIL DUPLEX PUMP WITH FUEL OIL CONTAINMENT BAY. CONNECT NEW FUEL OIL PUMP

DOWNSTREAM OF NEW FUEL OIL FILTRATION POLISHER PUMP. PROVIDE NEW OVERFLOW PIPE

CONNECTION WITH ISOLATION VALVE TO TRENCH.

F12 PROVIDE NEW FUEL OIL FILTRATION POLISHER PUMP SYSTEM. NEW PUMP SHALL BE MOUNTED 1' AFF.

PROVIDE BYPASS WITH ISOLATION VALVE.

TRUE

NO. DESCRIPTION DATE

bob.davenport

LEGEND

NEW WORK

EXISTING TO REMAIN

CAPPED LINE

FLANGED LINE

VALVE (NORMALLY OPEN)

VALVE (NORMALLY CLOSED)

NO

NC

CHECK VALVE

STEAM RATED GATE VALVE

BALL VALVE

ANGLE VALVE

PRESSURE SAFETY VALVE

CONNECT TO EXISTING

(N) NEW

EXISTING TO REMAIN

FLOW METER

CONTROL VALVE

PRESSURE RELIEF VALVE

PRESSURE SAFETY VALVE

(EX)

FM

CV

PRV

PSV

GENERAL BOILER FLOW DIAGRAM NOTES

ALL INFORMATION SHOWN ON THE PLANS ARE SCHEMATIC IN NATURE. SEE FLOOR PLANS, DETAILS, SECTION VIEWS & ISOMETRICS FOR ADDITIONAL NOTES, SPECIFIC COMPONENTS, DESIGN LAYOUTS & KEYNOTES.

BOILER NOTES

• CAST IRON COMPONENTS, FITTINGS AND PIPING IS NOT ACCEPTED.

• BOILER SHALL HAVE FLANGED RELIEF VALVES.

• STEAM TRAPS SHALL BE FORGED STEEL; CAST IRON IS NOT ALLOWED.

• KNIFE TYPE BLOWDOWN VALES ARE NOT ACCEPTED.

• TEES AND/OR HARD ELBOWS FOR BLOWDOWN PIPING IS NOT ACCEPTED.

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:0

:0

P M

BOILER FLOW DIAGRAM

MH-301

01-03-2024 RSM PJG

ALL EXISTING CPVC

PIPPING IN SOFT WATER

TO BE REPLACED W/

COPPER

NO. DESCRIPTION DATE

bob.davenport

SIGHT GLASS

SIGHT GLASS

3 WAY FUEL OIL PRV

1"Ø FOS TO BURNER

BOILER #2

BURNER

1"Ø FOR FROM BURNER

ANGLE STEAM VALVE

TO NEW EXTENDED

STEAM HEADER

1"Ø FOR TO

TRENCH

1"Ø FOS

1"Ø FOR

STUB UP FROM TRENCH 1/2"Ø FOR

TO TRENCH

"Ø

E A

FROM EXISTING SOFT

WATER MAIN

CAP FOR FUTURE USE

2"Ø BFW

2"Ø BFW

ERV-2 (N)

2"Ø BFW TO

BOILER

BOT BEAM

14' - 2"

BOT BEAM

14' - 11"

THERMAL THIMBLE

1 1/2"Ø BD

SG-2(N)

O2

CO

EXISTING DERATER & CRT TANKS

TO REMAIN. SEE SHEET S-101

FOR ACCESS "CATWALK" DETAIL

FOP-1 (N)

FOFP-1 (N)

NEW 20"Ø FLUE FROM BOILER #2 &

ERV-2 TO NEW STACK ABOVE ROOF.

ERV-2 (N)

ERV-3 (N)

ERV-1 (N)

CU-01 (N)

AHU-01 (N)

EF-2 (N)

EXTEND 8"Ø HPS STEAM HEADER

EF-1 (N)

TRANSFER GRILLE (N)

6"Ø FLANGED CONNECTION FOR FUTURE USE

6"Ø FLANGED CONNECTION FOR FUTURE USE

NEW 6"Ø HPS STEAM PIPING

FROM NEW BOILER #2 INTO

EXTENDED STEAM HEADER

NEW WALL CAP

NEW 6"Ø HPS STEAM PIPING FROM NEW BOILER #3 INTO EXTENDED STEAM HEADER

NEW 6"Ø HPS STEAM PIPING FROM NEW

TEMPORARY BOILER INTO EXTENDED

STEAM HEADER

NEW 2"Ø BOILER FEED CONNECTION

FOR TEMPORARY BOILER.

NEW 20"Ø FLUE FROM ERV-3 TO

EXISTING FLUE BELOW ROOF.

NEW 20"Ø FLUE FROM ERV-1 TO

EXISTING FLUE BELOW ROOF.

NEW 1"Ø FOR TO 20,000 GAL TANK

NEW 1"Ø FOS TO BOILER PLANT

NEW 1-1/2"Ø

BD FROM

BOILER #2

NEW 6"Ø STEAM

PIPING ELBOW

EXISTING 8"Ø HPS STEAM HEADER

CAP OLD BOILER #2 BLOWDOWN CONNECTION

EF-3 (N)

SG-1(EX)

SG-2(N)

SG-3(EX)

EXISTING 1"Ø FOS FROM 20,000 GAL TANK

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:0

:2

P M

MECHANICAL STEAM -

SECTION & ISOMETRIC

VIEWS

MH-302

01-03-2024 RSM PJG

1/4" = 1'-0"

BOILER FUEL OIL AND BLOWDOWN PIPING - SECTION VIEW

BOILER ISOMETRIC VIEW

NOTE:

GC SHALL REVIEW & COORDINATE ALL SYSTEMS WITH THE

BOILER FLOW DIAGRAM. THIS 3D ISOMETRIC SHALL BE USED

FOR VISUAL REFERENCE.

S-201

S-201

S-201 3

S-201

NO. DESCRIPTION DATE

bob.davenport

EG-1 TITUS 350FL 12" X 12" SEE PLANS FIXED SURFACE NOTE 1 NOTE 2 N/A 1,2

TG-1 TITUS 350FL 7.75" X 7.75" SEE PLANS FIXED SURFACE NOTE 1 NOTE 2 N/A 1,2

SPECIAL NOTES: ** ALL DIFFUSERS SELECTED WITH NC RATING < 20 **

1. COORDINATE COLOR WITH ARCHITECT

2. PROVIDE VOLUME DAMPER AT THE FLEX TAP. PROVIDE YOUNG REGULATOR FOR VOLUME DAMPERS IN INACCESSIBLE AREAS.

3. PROVIDE TITUS RAPID MOUNT FRAME FOR STANDARD 24" x 24" LAY-IN STYLE DIFFUSERS MOUNTED IN HARD CEILINGS, & FOR ALL 12" X 12" SUPPLY DIFFUSERS - REGARDLESS OF THE

MOUNTING LOCATION.

GRILLE, REGISTER, & DIFFUSER SCHEDULE

MARK MANUF. MODEL NO. FACE SIZE

NECK SIZE /

LENGTH

THROW /

SLOTS

FRAME

TYPE

FINISH

VOLUME

DAMPER

FIRE

DAMPER

NOTES

4. PROVIDE OPTIONAL R-6 MOLDED INSULATION BLANKET FOR ALL LAY-IN STYLE DIFFUSERS.

5. PROVIDE TITUS MPI INSULATED PLENUM.

6. PROVIDE WITH OPPOSED BLADE DAMPER. FOR CT DIFFUSERS LESS THAN 3" WIDE, PROVIDE WITH SINGLE BLADE DAMPER.

7. THROW IS ASSUMED TO BE 4-WAY UNLESS SPECIFIED OTHERWISE ON PLANS.

8. FOR PROJECTS WITH EXISTING DIFFUSERS: CONTRACTOR SHALL PROVIDE SUBMITTAL OF DIFFUSERS WHICH MATCH EXISTING FIELD CONDITIONS.

APPROVED ALTERNATES: PRICE, NAILOR, TUTTLE & BAILEY, KRUEGER

NOTES: 1,2,4 1,2,3 1,2,4

NOTES:

1. PROVIDE WITH BACKDRAFT DAMPER.

2. PROVIDE WITH SPEED CONTROLLER.

3. INTERLOCK WITH ROOM LIGHTS.

4. FAN SHALL RUN CONTINUOUSLY.

V 120 120 208

PH 1 1 1

Hz 60 60 60

MODEL NUMBER SP-A80 SP-A90 CSP-A390-VG

STATIC PRESSURE IN. WG. 0.15 0.15 0.25

AIRFLOW CFM 50 75 300

DUCT SIZE 4" OVAL 6" 10"

MOUNTING CEILING CEILING CEILING

MANUFACTURER GREENHECK GREENHECK GREENHECK

FAN SCHEDULE

MARK EF-1 EF-2 EF-3

LOCATION WATER TESTING LAB TOILET/SHOWER ELECTRICAL ROOM

RPM 710 772 1152

MOTOR INFORMATION

POWER (W) 9 10 52

CURRENT (A) 0.16 0.17 0.9

APPROVED ALTERNATES: NUTONE, GREENHECK, FANTECH, PANASONIC

COMPRESSOR RLA / LRA 13.8 / 17.3

CONDENSER FAN FLA 0.93

CIRCUIT BREAKER AMPACITY

MCA 22

MOCP 25

CONDENSER ELECTRICAL V/P/HZ 208/1/60

MINI SPLIT SYSTEM SCHEDULE

UNIT NUMBER AHU / CU-1-01

NOMINAL TONS 2.5

SEER 19.1

MANUFACTURER TRANE-MITSUBISHI

S.C. 23.9

ENTERING TEMPERATURE

DB (°F) 75.0

WB (°F) 63.0

LEAVING TEMPERATURE

DB (°F) 55.0

WB (°F) 54.0

ID DIMENSION (IN / LBS) W X D X H / # 46-1/16" x 11-5/8" x 14-3/8" / 45

HEAT NO HEAT

NOTES: 1-6

NOTES:

1. ALTERNATE EQUIPMENT SHALL BE EQUAL TO THE EQUIPMENT LISTED IN ALL RESPECTS.

OD DIMENSIONS (IN / LBS) W X D X H / # 33-1/16" x 13" x 34-5/8" / 121

REF. LINE SIZE O.D.

SUCT. 5/8

LIQ. 1/4

AIR HANDLER FAN MOTOR

FLA 0.76

V/P/HZ 24V DC

MODEL # CONDENSER NTYSST30B112AA

MODEL # INDOOR UNIT NTYWST30B112AA

DESIGN AIRFLOW (CFM) 600

DESIGN MBTU/H @75/63° F

T.C. 30.6

2. ELECTRICAL SPECIFICATIONS LISTED ARE CONSISTENT WITH THE EQUIPMENT LISTED. ALTERNATE

EQUIPMENT MAY VARY. COORDINATE VARIANCES WITH THE ELECTRICAL CONTRACTOR.

3. CONSULT MANUFACTURER DOCUMENTATION TO SET EQUIPMENT TO MEET AIRFLOW REQUIREMENTS

LISTED.

4. ADDITIONAL REFRIGERANT MAY BE REQUIRED WHERE PIPE LENGTHS EXCEED 70 FT. REFER TO

MANUFACTURER DOCUMENTATION FOR PROPER INSTALLATION.

5. PROVIDE WIRED ROOM CONTROLLER.

6. PROVIDE WITH MANUFACTURER'S OPTIONAL CONDENSATE PUMP.

LBS/HR [kg/HR] HP [kW] PSIG [kPa] PSIG [kPa]

CAPACITY

LBS/HR

PSIG [kPa]

CAPACITY

LBS/HR

SQ FT [SQ M] LBS/HR [kg/HR] MBH [kW] MBH [kW] PSIG [kPa] PSIG [kPa] HP [W] HP [W]

SG-2 BOILER PLANT CLEAVER BOOKS 4WG-100-350-250ST STEAM 12,075 [ 5500 ] 350 [ 260 ] 110 [ 760 ] 130 [ 900 ] 9660 135 [ 930 ] 12075 1384 [ 129 ] 2975 [ 1400 ] 10,042,000 [ 2900000 ] 12,246,000 [ 3600000 ] 120 [ 830 ] 125 [ 860 ] 7.5 [ 5600 ] 460 3 10 [ 7500 ] 3 460

NOTES:

BOILER SHALL FOLLOW VA SPECIFICATION SECTION 23 52 39 AND "VHA BOILER AND ASSOCIATED PLANT SAFETY DEVICE TESTING MANUAL SEVENTH EDITION".

4. ALTITUDE IS 77.75 FT ABOVE SEA LEVEL.

5. THERE SHALL BE 5 PSIG [35 kPa] BETWEEN RELIEF VALVES.

6. PROVIDE BOILER WITH FACTORY LADDER AND PLATFORM.

1. STEAM QUALITY IS 99% MINIMUM.

2. BOILER DESIGN PRESSURE IS 200 PSIG [1378 kPa] MINIMUM.

3. FEEDWATER TEMPERATURE IS 212 ˚F [100 ˚C] MINIMUM, AND 228 ˚F [109 ˚C] NORMAL.

7. PROVIDE SEISMIC RATED REQUIREMENTS.

8. PROVIDE BOILER WITH VSD WITH BYPASS.

9. BASIS OF DESIGN: HAWK PACKAGE: 4000 CONTROL PANEL. CONTRACTOR IS RESPONSIBLE FOR PROVIDING A CONTROL PANEL THAT MEETS ALL THE VA REQUIREMENTS FOR BOILER CONTROLLERS. THE CONTRACTOR SHALL COVER ALL COSTS RELATED TO REPLACEMENT IF BOILER CONTROLLER DOES NOT MEET ALL THE VA TIL REQUIREMENTS AND SPECIFICATIONS. ENSURE BOILER CONTROL PANEL WILL BE COMPATIABLE WITH BOILER MONITORING SYSTEM.

10. PROVIDE PREMIUM BLOWER MOTOR, AIR COMPRESSOR.

11. 7 PPM NOx EMISSIONS

BOILER PLANT · FIRE TUBE STEAM BOILER SCHEDULE, PACKAGED TYPE, SHOP ASSEMBLED

MARK LOCATION MANUFACTURER MODEL TYPE

MAX CAPACITY BOILER

OPERATING

PRESS

RELIEF VALVE 1 SETTING RELIEF VALVE 2 SETTING

HEATING

SURFACE

MIN CONT FIRING

RATE

# 2 OIL FIRST CUTOUT

SETTINGS

SECOND CUTOUT

SETTINGS

OIL ATOM COMPRESS MOTOR FAN MOTOR

INPUT OUTPUT POWER

PHASE VOLT

POWER

PHASE VOLT

3. MINIMUM ALOWABLE FLUE GAS TEMPERATURE AFTER THE ECONOMIZER SHALL BE 650 DEG F.

NOTES

ERV-2 CAIN RTR-124C24SSS BOILER PLANT SG-2 (N) 281 [ 82 ] 46 [ 3 ] 306 [ 1200 ] 0.46 [ 3 ] 0.08 [ 2 ] 228 244.2

ERV-3 CAIN RTR-124C24SSS BOILER PLANT SG-3 (E) 281 [ 82 ] 46 [ 3 ] 306 [ 1200 ] 0.46 [ 3 ] 0.08 [ 2 ] 228 244.2

MBH [KW] GPM [L/s] GAL [L] PSIG [kPa] IN [mm] IN OUT

ERV-1 CAIN RTR-124C24SSS BOILER PLANT SG-1 (E) 281 [ 82 ] 46 [ 3 ] 306 [ 1200 ] 0.46 [ 3 ] 0.08 [ 2 ] 228 244.2

1. FEEDWATER INLET TEMPERATURE SHALL BE 228 °F [109 °C].

2. MINIMUM HEAT EXCHANGED AT 100% BOILER LOAD.

BOILER PLANT · ECONOMIZER SCHEDULE, FLUE GAS/FEEDWATER HEAT EXCHANGERS

MARK MANUFACTURER MODEL LOCATION SYSTEM

MIN HEAT EXCHANGED WATER FLOW MIN NET CAPACITY MAX PRESS DROP WATER SIDE MIN PRESS DROP GAS SIDE WC DESIGN WATER TEMPERATURES DEG F

FOFP-1 BOILER PLANT

PREFERRED UTILITIES

MFG CORP.

PF-505 TYPE 40 20.00 7.00 25 [ 170 ] #2 60 [ 16 ] 45 - 0.75 [ 560 ] 1 115

PSIG [kPa] °F [°C] IN HG HP [W] PHASE VOLT

FOP-1 BOILER PLANT

PREFERRED UTILITIES

MFG CORP.

ATPSF-***-460-50-L TYPE 40 12.62 7.00 50 [ 350 ] #2 60 [ 16 ] 45 10 1 [ 750 ] 3 460

NOTES

1. PROVIDE FUEL OIL PUMP AS PARALLEL PUMP STYLE. PUMPS ARE 100% REDUNDANT.

2. PROVIDE FUEL OIL PUMP WITH DUPLEX STRAINER DIFFERENTIAL PRESSURE SWITCH.

3. PROVIDE FUEL OIL PUMP WITH PUMP SET LEAK DETECTION SWITCH.

4. PROVIDE AUTOMATIC FUEL OIL FILTRATION SET.

5. PROVIDE FUEL OIL PUMP TO MEET DESIGN GPM VALUE.

6. PROVIDE FUEL OIL PUMP WITH CONTAINMENT BASIN LEAK DETECTION SWITCH. ENERGIZE AN AUDIBLE AND VISUAL ALARM. PUMP SHALL REMAIN OPERATIONAL.

7. FUEL OIL PUMPS ARE DESIGNED WITH TWO (2) BOILERS OPERATING. TWO (2) BOILERS OPERATING AT 105 GPH (MAXIMUM FLOW) PER BOILER. SYSTEM DESIGNED FLOW SET AT 420 GPH.

BOILER PLANT · FUEL OIL PUMP SCHEDULE

MARK LOCATION MANUFACTURER MODEL TYPE

RATED CAPACITY

GPM

DESIGN

GPM

DISCHARGE PRESS

OIL GRADE

OIL TEMP VISCOSITY RANGE

(SSU)

SUCTION LIFT MOTOR

FLOWMETERS LAUNDRY BLDG ROSEMOUNT 8600DF040SA1N1P1E6MTAM5R30Q4 6,000 - 750 LB.HR

FLOWMETERS SOUTH BED BLDG ROSEMOUNT 8600DF040SA1N1P1E6MTAM5R30Q4 6,000 - 750 LB.HR

FLOWMETERS MAKE-UP WATER ROSEMOUNT 8750WDMR2A1FPSA010CA1Z5M4G1Q4 18 - 64 GPM - ASSUMING 50%+ CONDENSATE RECOVERY

FLOWMETERS MAIN BLDG ROSEMOUNT 8600DF040SA1N1P1E6MTAM5R30Q4 12,000--1500 LB/HR

FLOWMETERS STEAM BOILER OUTPUT 1-3 ROSEMOUNT 8600DF040SA1N1P1E6MTAM5R30Q4 12,000--1500 LB/HR - ONE PER BOILER

EQUIPMENT APPLICATION MANUFACTURER MODEL NOTES 1 ELECTRICAL

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:0

:3

P M

MECHANICAL SCHEDULES

MH-601

01-03-2024 RSM PJG

NO. DESCRIPTION DATE

bob.davenport

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:0

:4

P M

MECHANICAL DETAILS

MH-501

01-03-2024 RSM PJG

NO. DESCRIPTION DATE

bob.davenport

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:0

:0

P M

MECHANICAL DETAILS

MH-502

01-03-2024 RSM PJG

NO. DESCRIPTION DATE

bob.davenport

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:0

:1

P M

MECHANICAL DETAILS

MH-503

01-03-2024 RSM PJG

NO. DESCRIPTION DATE

bob.davenport

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:0

:2

P M

MECHANICAL DETAILS

MH-504

01-03-2024 RSM PJG

NO. DESCRIPTION DATE

bob.davenport

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:0

:3

P M

MECHANICAL DETAILS

MH-505

01-03-2024 RSM PJG

NO. DESCRIPTION DATE

bob.davenport

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 01-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:0

:4

P M

MECHANICAL CONTROLS

MI-101

01-03-2024 RSM PJG

NO. DESCRIPTION DATE

bob.davenport

THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:52:21-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:52:47-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:52:58-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:53:08-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:53:18-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:53:33-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:53:56-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:54:14-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:54:24-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:54:38-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:54:48-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:55:00-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:55:25-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:55:34-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:55:44-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:55:55-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:56:05-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:56:17-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:56:28-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:56:39-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:56:50-0500
Robert G Davenport
I have reviewed this document.
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY ROBERT G DAVENPORT, PE USING A DIGITAL SIGNATURE AND DATE. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
2024-01-03T16:57:02-0500
Robert G Davenport
I have reviewed this document.

File details come from the government source that posted it. Updated .