This document contains electrical drawings and specifications for a federal construction contract opportunity to replace boiler #2 and correct deficiencies at a boiler plant. The key details are:

The contract opportunity is for construction services on project 672-20-602 to replace boiler #2 and correct deficiencies at the boiler plant located in the VA Caribbean Healthcare System in San Juan, PR. The solicitation number is 36C24824R0178 and the procuring agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The drawings and specifications cover electrical demolition, new electrical power and lighting, electrical panels and schedules, and electrical riser diagrams and details. The electrical work is phased to align with the overall construction project.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

J

M

PC

H

T

PB

NOTE: NOT ALL SYMBOLS MAY APPLY TO PLANS

TWO POLE, 30 AMP SWITCH. MOUNT ADJACENT EQUIPMENT TO BE CONTROLLED.

3-WAY, 20 AMP, SWITCH.

SINGLE POLE, 20 AMP, SWITCH.

20 AMP DUPLEX RECEPTACLE

20 AMP QUADRUPLEX RECEPTACLE

20 AMP DUPLEX RECEPTACLE WITH GROUND FAULT CIRCUIT INTERRUPTER.

RECESS FLOOR MOUNTED BOX UNLESS OTHERWISE NOTED.

SPECIAL-PURPOSE RECEPTACLE; NEMA TYPE AS INDICATED.

20 AMP DUPLEX RECEPTACLE, CEILING MOUNTED.

GFI

JUNCTION BOX

TELEPHONE/DATA OUTLET FLOOR RECESSED.

TELEPHONE/DATA OUTLET WITH 3/4" CONDUIT STUBBED OUT FROM WALL 6" ABOVE CEILING.

DATA OUTLET WITH 3/4" CONDUIT STUBBED OUT FROM WALL 6" ABOVE CEILING.

TELEPHONE OUTLET WITH 3/4" CONDUIT STUBBED OUT FROM WALL 6" ABOVE CEILING.

SINGLE PHASE MOTOR

SINGLE POLE, 20 AMP, SWITCH WITH OCCUPATIONAL SENSOR.

A - AMPERE

AC - ALTERNATING CURRENT

AF - AMP FRAME

AFF - ABOVE FINISHED FLOOR

AHJ - AUTHORITY HAVING JURISDICTION

AT - AMP TRIP

ATC,BMS,EMCS - HVAC CONTROLS

ATS - AUTOMATIC TRANSFER SWITCH

AIC - AMPS INTERRUPTING CAPACITY

BRKR - BREAKER

C or COND - CONDUIT

CD - CANDELA

CKT - CIRCUIT

CT - CURRENT TRANSFORMER

CU - COPPER

DN - DOWN

DPV - DRY PIPE VALVE CABINET

DWG - DRAWING

DC - DIRECT CURRENT

(E) or EXIST - EXISTING

EC - EMPTY CONDUIT

ELEV - ELEVATOR

EMER - EMERGENCY

EMR - ELEVATOR MACHINE ROOM

EMT - ELECTRIC METALLIC TUBING

EPO - EMERGENCY POWER OFF

EUH - ELECTRIC UNIT HEATER

EWC - ELECTRIC WATER COOLER

EWH - ELECTRICAL WATER HEATER

F - FUSE

FA - FIRE ALARM

FCA - FAULT CURRENT AVAILABLE

FCR - FAULT CURRENT RATING

FSS - FUSED SAFETY SWITCH

FTL - FEED THRU LUGS

G , GND - GROUND

GFI - GROUND FAULT INTERRUPT

GFP - GROUND FAULT PROTECTION

HZ - HERTZ

HP - HORSEPOWER

IBC - INTERNATIONAL BUILDING CODE

IG - ISOLATED GROUND

J - JUNCTION BOX

KVA - KILOVOLT-AMPERE

KW - KILOWATT

LTG - LIGHTING

M - METER

MCA - MINIMUM CIRCUIT AMPACITY

MCB - MAIN CIRCUIT BREAKER

MCC - MOTOR CONTROL CENTER

MFR - MANUFACTURER

+, MH - MOUNTING HEIGHT

MI - MINERAL INSULATED

MLO - MAIN LUGS ONLY

MOP - MAXIMUM OVERCURRENT PROTECTION

MS - MAIN SWITCHBOARD

NEC - NATIONAL ELECTRICAL CODE

N - NEW

NA - NOT APPLICABLE

NC - NORMALLY CLOSED

NF - NON-FUSED

NFPA - NATIONAL FIRE PROTECTION ASSOCIATION

NFSS - NON-FUSED SAFETY SWITCH

NIC - NOT IN CONTRACT

NO - NORMALLY OPEN

OCPD - OVERCURRENT PROTECTION DEVICE

P - POLE

PH OR Φ - PHASE

NEMA - NATIONAL ELECTRIC MANUFACTURERS

ASSOCIATION

PB - PULL BOX

PC - PHOTOCELL

PNL - PANELBOARD

PLC - PROGRAMMABLE LOGIC CONTROLLER

RECEPT - RECEPTACLE

RM - ROOM

SWBD - SWITCHBOARD

THD - TOTAL HARMONIC DISTORTION

TVSS - TRANSIENT VOLTAGE SURGE SUPPRESSION

TYP - TYPICAL

UL - UNDERWRITERS LABORATORIES

UNO - UNLESS NOTED OTHERWISE

UPS - UNINTERRUPTIBLE POWER SUPPLY

V - VOLT

VFD - VARIABLE FREQUENCY DRIVE

W - WATT

W/ - WITH

WP - WEATHERPROOF

XFMR - TRANSFORMER

DIMMER SWITCH. USE NTF-10-WH FOR FLUORESCENT FIXTURES. USE NTFTV-WH WITH PP-120H FOR LED

20 AMP DUPLEX RECEPTACLEWITH GROUND FAULT CIRCUIT INTERRUPTER, WEATHERPROOF.WP

FIXTURES. CONFIRM COLOR SELECTION WITH ARCHITECT PRIOR TO ORDERING.

4-WAY, 20 AMP, SWITCH.

PHOTO CELL

30A MANUAL SWITCH

SWITCH WITH THERMAL OVERLOAD PROTECTION (MANUAL MOTOR STARTER)

PULL BOX

20 AMP DUPLEX RECEPTACLE - ABOVE COUNTER

ELECTRICAL SYMBOL LEGEND

ELECTRICAL ABBREVIATIONS

S

S

S

S

S

S

S

S

T

TV

B

M

M

PP

M

RECESSED FLUORESCENT LAMP 2'X4'

RECESSED FIXTURE

RECESSED FLUORESCENT LAMP 2'X2'

FUSIBLE DISCONNECT SWITCH NFSS = NON FUSED, F30SS = FUSED

GROUNDING ELECTRODE & CONDUCTOR SYSTEM

ELECTRICAL PANELBOARD

TRANSFORMER

TELEPHONE WOOD BACKBOARD

WALL MOUNTED FIXTURE

GROUND WIRE IS IN ADDITION TO WIRES INDICATED. NO TICK MARKS INDICATES TWO WIRES PLUS GROUND.

WIRE CONCEALED IN WALLS/CEILINGS. NUMBER OF TICK MARKS INDICATES QUANTITY OF WIRES.

EXIT SIGN. SHADED SIDES INDICATE FACES. ARROWS INDICATE CHEVRONS.

THREE PHASE MOTOR

INTEGRAL STARTER OR CONTROLLER AND DISCONNECT CABINET BY THE MECHANICAL CONTRACTOR

CIRCUIT BREAKER

MAGNETIC MOTOR STARTER AND DISCONNECT BY THE ELECTRICAL CONTRACTOR

MAGNETIC MOTOR STARTER BY THE ELECTRICAL CONTRACTOR

T-STAT BY MECHANICAL CONTRACTOR, WIRING BY ELECTRICAL CONTRACTOR

POWER PACK USED FOR 12 OR 24V DC OCCUPANCY SENSORS

METER

MOLDED CASE CIRCUIT BREAKER

CEILING MOUNTED DUAL TECHNOLOGY OCCUPANCY SENSOR. ARROWS INDICATE DIRECTION OF COVERAGE.

CEILING MOUNTED PASSIVE INFRARED OCCUPANCY SENSOR. ARROWS INDICATE DIRECTION OF COVERAGE.

HATCHING - LIGHT FIXTURE CONNECTED TO EM SOURCE OR PROVIDED WITH EMERGENCY BATTERY BALLAST

G.P. RECEPTACLE CIRCUIT USING 2#12, 1#12 G. IN 1/2" CONDUIT.

MOTORIZED DAMPER BY MECHANICAL CONTRACTOR. ELECTRICAL CONTRACTOR SHALL WIRE TO NEAREST

T

MVD

P

P

A

NOTE: NOT ALL SYMBOLS MAY APPLY TO PLANS

PHOTOELECTRIC SMOKE DETECTOR

FIRE ALARM ELEVATOR INTERFACE MODULE

FIRE ALARM COMBINATION SPEAKER/STROBE - CANDELA AS INDICATED

FIRE ALARM COMMUNICATOR PANEL

SPRINKLER WATER FLOW DETECTOR

FIRE SYSTEM ANNUNCIATOR

FIRE ALARM CONTROL PANEL

DUCT SMOKE DETECTOR

FIRE ALARM SPEAKER

SPRINKLER VALVE TAMPER SWITCH

FIRE ALARM MANUAL PULL STATION

FIRE ALARM NOTIFICATION APPLIANCE CIRCUIT EXTENDER PANEL

FIRE ALARM STROBE - CANDELA AS INDICATED

FIRE ALARM ELEVATOR STATUS/RECALL PANELESA

FIRE ALARM SYMBOL LEGEND

FAC

FCP

FSA

NAC

HO MAGNETIC DOOR-HOLD OPEN; PROVIDE CONTACTOR AND TIE-IN TO FIRE ALARM SYSTEM

F FIRE ALARM HEAT DETECTOR

ELECTRICAL NOTESELECTRICAL NOTES

1. THE CONTRACT DOCUMENTS CONSIST OF DRAWINGS, SPECIFICATIONS AND DESIGN INFORMATION PREPARED BY MULTIPLE DISCIPLINES AND MUST BE USED AS A WHOLE AND IN COORDINATION WITH EACH OTHER. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY APPARENT DISCREPANCIES OR OMISSION OF INFORMATION NOT SHOWN ON THE ELECTRICAL DRAWINGS. SHOP DRAWINGS SHALL BE

PROVIDED WHERE NECESSARY FOR COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR

CORRECTING ERRORS RESULTING FROM LACK OF COORDINATION OF DOCUMENTS.

2. THE WORK SHALL BE IN ACCORDANCE WITH THE 2017 NATIONAL ELECTRICAL CODE (NFPA 70), INTERNATIONAL BUILDING CODE (2018), 2016 NFPA 72, INTERATIONAL FIRE CODE (2018), VA ELECTRICAL DESIGN MANUAL 2019, VA LIGHTING DESIGN MANUAL 2022 AND ANY OTHER LOCAL JURISDICTIONAL REQUIREMENTS. OMISSIONS ON THE PLANS DO NOT RELIEVE THE CONTRACTOR OF MEETING CODE REQUIREMENTS. IN ADDITION, ANY BASE BUILDING OR TENANT GENERAL CONDITIONS SHALL GOVERN

ACCEPTABLE MATERIALS AND WORK.

3. THE CONTRACTOR SHALL BRING ANY CONFLICTS OR DISCREPANCIES TO THE ATTENTION OF THE

ENGINEER IN WRITING PRIOR TO PROCEEDING WITH WORK.

4. THE CONTRACTOR SHALL FIELD VISIT THE SITE PRIOR TO BID TO FAMILIARIZE HIMSELF WITH THE SCOPE

OF WORK.

5. ALL WORK SHALL BE DONE IN A FIRST CLASS WORKMANLIKE MANNER BY A LICENSED ELECTRICAL CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A SAFE, CLEANLY, AND UNDISRUPTIVE JOB SITE THAT DOES NOT IMPEDE EGRESS PATHS OR OTHER TENANTS. DISRUPTIONS TO

POWER AFFECTING OTHER TENANTS OR AREAS OUTSIDE THE SCOPE OF WORK SHALL BE

COORDINATED WITH THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING OF HIS WORK. WHEN THE WORK IS COMPLETE, ALL ELECTRICAL DEVICES SHALL BE

VACUUMED CLEAN. THE FINAL PRODUCT SHALL BE A FULLY FUNCTIONAL SYSTEM MEETING THE INTENT

OF THE DRAWINGS/DOCUMENTS. WORKMANSHIP AND ALL MATERIALS AND EQUIPMENT SHALL BE

GUARANTEED FOR A MINIMUM OF ONE YEAR IN WRITING COMMENCING UPON ACCEPTANCE OF

INSTALLATION BY OWNER.

6. WITHIN 30 DAYS AFTER THE DATE OF THE SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING OWNER, INCLUDING A SINGLE-LINE DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM AND FLOOR PLANS INDICATING LOCATION AND AREA SERVED FOR ALL DISTRIBUTION. ADDITIONALLY, AN OPERATING MANUAL AND MAINTENANCE MANUAL SHALL BE PROVIDED TO THE BUILDING OWNER INCLUDING THE FOLLOWING: SUBMITTAL DATA STATING

EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING

MAINTENANCE, OPERATION MANUALS AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE INCLUDING CLEARLY IDENTIFIED ROUTINE MAINTENANCE ACTIONS, AND

NAMES AND ADDRESSES OF AT LEAST ONE QUALIFIED SERVICE AGENCY.

7. UNLESS PROVIDED WITH DIMENSIONS OR NOTED OTHERWISE, ELECTRICAL PLANS ARE STRICTLY DIAGRAMMATIC ONLY. REFER TO THE ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS, MOUNTING HEIGHTS, ETC. EFFORT HAS BEEN MADE TO PROPERLY ACCOUNT FOR ALL SPACE REQUIREMENTS, CLEARANCES, ETC. BUT SITE CONDITIONS AND PRODUCTS SELECTED MAY VARY AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN PROPER ARRANGEMENTS AND CLEARANCES. DRAWINGS

SHALL NOT BE SCALED.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS, PAYING ALL ASSOCIATED FEES, AND DOCUMENTING AND FILING ALL PAPERWORK ASSOCIATED WITH THIS SCOPE OF WORK.

WHEN THE WORK IS COMPLETE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL

REQUIRED CERTIFICATES OF INSPECTION.

9. UNLESS NOTED OTHERWISE ALL EXISTING ELECTRICAL DEVICES INSTALLED UNDER PREVIOUS CONTRACTS SHALL REMAIN. CONTRACTOR SHALL EXTEND AND RELOCATE EXISTING DEVICES INTO NEW

TENANT SPACE AND MOUNT TO PARTITIONS, CEILINGS, OR FINISHES AS REQUIRED.

10. THE CONTRACTOR IS EXPECTED TO HAVE A FULL FUNCTIONAL KNOWLEDGE OF ELECTRICAL SYSTEMS

AND WHETHER INDICATED ON THE DRAWINGS OR NOT SHALL PROVIDE THE CORRECT NUMBER OF

WIRES, AT NO ADDITIONAL CHARGE, TO FACILITATE PROPER OPERATION OF ALL EQUIPMENT. QUANTITY

OF WIRES WILL ONLY BE INDICATED WHERE NECESSARY FOR CLARIFICATION.

11. THE INSTALLATION SHALL BE IN COMPLIANCE WITH THE AMERICAN WITH DISABILITIES ACT (ADA), UNLESS

INSTALLED FOR SPECIFIC USES EXEMPT FROM ADA OR IN AREAS NOT NORMALLY ACCESSED BY

BUILDING OCCUPANTS.

12. THE ELECTRICAL CONTRACTOR SHALL REFER TO THE MECHANICAL AND PLUMBING DRAWINGS FOR

EXACT LOCATIONS OF EQUIPMENT. PRIOR TO ORDERING ELECTRICAL EQUIPMENT SERVING

MECHANICAL & PLUMBING EQUIPMENT, THE ELECTRICAL CONTRACTOR SHALL CONFIRM THE EQUIPMENT BEING ORDERED BY THE HVAC OR PLUMBING CONTRACTORS AND PROVIDE WIRING, CONDUIT, AND OVERCURRENT PROTECTION MEETING THE REQUIREMENTS AT NO ADDITIONAL COST. THE ELECTRICAL

CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING AND COORDINATING WITH THE HVAC

CONTRACTOR FOR PROVIDING ANY NECESSARY LINE AND LOW VOLTAGE WIRING. FINAL TERMINATION TO BE MADE BY THE HVAC CONTRACTOR. ALL BREAKERS SUPPLYING HVAC LOADS SHALL BE HACR

TYPE.

13. THE CONTRACTOR SHALL DETERMINE THE EXACT SCOPE OF WORK REQUIRED TO MODIFY THE EXISTING FIRE ALARM SYSTEM PRIOR TO PRICING AND BIDDING. THE BID SHALL INCLUDE ALL MODIFICATIONS NECESSARY INCLUDING DEVICES, WIRING, SOFTWARE, CALCULATIONS, ETC. WHETHER INDICATED ON THE DRAWINGS OR NOT. THIS SHALL INCLUDE WIRING REQUIRED TO INTERFACE WITH SECURITY LOCKS, WIRING REQUIRED FOR KITCHEN ANSUL SYSTEMS, ETC. FIRE ALARM STROBES SHALL BE INSTALLED 80” A.F.F. OR 6” BELOW THE CEILING, WHICHEVER IS LOWER. STROBES SHALL INCLUDE MULTIPLE CANDELA SETTINGS AND SHALL BE FULLY SYNCHRONIZED THROUGHOUT THE SPACE. MANUAL STATIONS SHALL BE INSTALLED AT BETWEEN 42” TO 54” A.F.F. AND WITHIN 5' OF EACH CODE REQUIRED EXIT. AUDIBLE ALARMS SHALL MEET AN OUTPUT OF AT LEAST 15 dBA ABOVE THE AMBIENT NOISE LEVEL AND SHALL INCLUDE MULTIPLE VOLUME WATTAGE TAPS TO ACHIEVE HIGHER LEVELS IF NECESSARY. SMOKE DETECTORS (NEW AND EXISTING) SHALL BE COVERED AND PROTECTED DURING CONSTRUCTION. IF EMERGENCY CIRCUITS ARE AVAILABLE, ANY FIRE ALARM EQUIPMENT REQUIRING POWER SHALL BE CONNECTED TO THE EMERGENCY STANDBY SYSTEM. BATTERY CALCULATIONS SHALL BE PROVIDED TO DETERMINE IF EXTRA EQUIPMENT SHALL BE REQUIRED. THE CONTRACTOR SHALL SUBMIT A DETAILED SET OF SHOP DRAWINGS, WIRING DIAGRAMS, FLOORPLAN DRAWINGS WITH ALL DEVICE LOCATIONS, AND ALL CALCULATIONS AT THE TIME OF SUBMISSION FOR PERMIT. AN INSTALLATION AND USER MANUAL

SHALL BE MAINTAINED AT THE MAIN FIRE ALARM CONTROL PANEL.

14. ALL EXISTING CIRCUITS INDICATED AS SPARE SHALL BE TRACED AND VERIFIED BY THE CONTRACTOR. IF A CIRCUIT IS LABELED AS SPARE OR INDICATED FOR RE-USE BUT UTILIZED BY AN ADJACENT TENANT OR OCCUPIED SPACE, THE ENGINEER SHALL BE NOTIFIED AND A NEW CIRCUIT SHALL BE ASSIGNED.

15. ALL MATERIALS AND EQUIPMENT FURNISHED SHALL BE NEW (UNLESS NOTED OTHERWISE) AND BEAR THE U.L. LISTING FOR THEIR INTENDED USE. MATCH BUILDING STANDARDS FOR MANUFACTURER AND TYPE OF EQUIPMENT FOR LIGHTS, EXIT SIGNS, FIRE ALARM DEVICES, WIRING DEVICES, AND ELECTRICAL DISTRIBUTION EQUIPMENT. WHERE NO BUILDING STANDARD EXISTS FOR ELECTRICAL EQUIPMENT, EQUIPMENT SHALL BE MANUFACTURED BY G.E., SQUARE-D, EATON CUTLER-HAMMER OR SIEMENS.

INSTALL A PLASTIC-LAMINATE SIGN ON EACH NEW UNIT OF ELECTRICAL EQUIPMENT WITH 1/2" ENGRAVED LETTERING FOR IDENTIFICATION. IDENTIFICATION SHALL MATCH CONTRACT DOCUMENTS, SHALL INDICATE SOURCE FED PER NEC 408.4(B), AND SHALL INDICATE ARC-FLASH HAZARD PER NEC 110.16.

16. THE FAULT CURRENT RATING OF ALL EQUIPMENT ADDED TO THE ELECTRICAL DISTRIBUTION SHALL MEET

THE AVAILABLE FAULT CURRENT. EQUIPMENT ADDED TO THE EMERGENCY SYSTEM SHALL BE

SELECTIVELY COORDINATED. EQUIPMENT SHALL BE FULLY RATED UNLESS NOTED OTHERWISE.

17. THE CONTRACTOR SHALL GIVE PERMISSION FOR THE AHJ, ENGINEER, ARCHITECT, INSPECTOR, ETC. TO

PERFORM TESTS OF THE ELECTRICAL SYSTEM AS REQUIRED.

18. SWITCH OUTLETS SHALL NOT BE OBSTRUCTED BY DOORSWINGS AND OCCUPANCY SENSORS SHALL

HAVE FULL VIEW OF THE INTENDED SPACE.

19. SWITCH AND RECEPTACLES INDICATED IN THE SAME LOCATION SHALL BE MOUNTED UNDER A COMMON

COVERPLATE UNLESS OTHERWISE NOTED.

20. EVEN IF THE PLANS INDICATE, OUTLETS SHALL NOT BE INSTALLED PRECISELY BACK TO BACK ON

COMMON WALLS. REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT MOUNTING METHODS AND

LOCATIONS.

21. JUNCTION AND PULL BOXES ARE ONLY INDICATED WHERE REQUIRED FOR LARGE SCALE COORDINATION.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING JUNCTION AND PULL BOXES AS REQUIRED BY THE CODE AND PER A STANDARD INSTALLATION, AND SHALL INCLUDE THIS IN THEIR BID. BOXES SHALL BE STEEL AND INCLUDE EARS INSIDE TO ATTACH COVERS. OUTLET BOXES SHALL BE FOUR INCH SQUARE DEEP TYPE. OUTLET BOXES FOR 120V OR HIGHER CIRCUITS SHALL INCLUDE A #12 AWG SOLID

COPPER PIGTAIL. OUTLET BOXES LOCATED OUTDOOR OR EXPOSED TO WET CONDITIONS SHALL

INCLUDE GASKETED COVERS. THE MAXIMUM GAP AROUND BOXES SHALL BE 1/8" OR SMALLER ON ALL EDGES. JUNCTION BOXES SHALL BE COLOR CODED WITH PAINT TO INDICATE THEIR USE AS FOLLOWS:

NORMAL POWER - BLACK, STANDBY POWER - ORANGE, FIRE ALARM - RED, TELEPHONE/DATA - YELLOW, HVAC CONTROLS - BLUE.

22. CONDUCTORS SHALL BE LOOPED AROUND SCREW POSTS SO THAT ROTATION OF THE SCREW TENDS TO FURTHER WRAP THE CONNECTION. SCREW TERMINALS SHALL BE WRAPPED IN ELECTRICAL TAPE. AT LEAST 6" OF FREE CONDUCTOR SHALL BE LEFT AT EACH J-BOX, OUTLET AND SWITCH BACK-BOX, ETC

FOR FUTURE SPLICING.

23. THE CONTRACTOR SHALL MAINTAIN THE FIRE RATING OF ALL FIRE-RATED PARTITIONS, AS INDICATED IN IEEE RED BOOK. IF A DEVICE WILL VOID THE FIRE RATING OF A WALL, IT SHALL BE INSTALLED IN AN ALTERNATE LOCATION PER THE ARCHITECT OR ENGINEER'S DIRECTION. ALL VOIDS AROUND CONDUITS AND/OR CORE DRILLS PENETRATING FIRE RATED PARTITIONS SHALL BE FILLED WITH FIRE-SAFING MATERIAL OR UL APPROVED FIRE RATING DEVICE. THE FIRE RATING OF A PARTITION SHALL NEVER BE

COMPROMISED.

24. THE CONTRACTOR SHALL MAINTAIN THE INSULATION RATING AND VAPOR BARRIERS ON ALL PERIMETER WALLS. IF A DEVICE WILL DAMAGE OR COMPROMISE THE VAPOR BARRIER OR INSULATION, IT SHALL BE

INSTALLED IN AN ALTERNATE LOCATION PER THE ARCHITECT OR ENGINEER'S DIRECTION.

25. PRIOR TO PENETRATING STRUCTURE, THE CONTRACTOR SHALL X-RAY THE SLABS. CONCRETE CUTTING, CORE DRILLING, AND ANY OTHER ACTION THAT COULD AFFECT OTHER SPACES BY NOISE OR INTRUSION SHALL BE DONE AFTER HOURS. ALL SLAB/STRUCTURE PENETRATIONS SHALL BE COORDINATED WITH

THE STRUCTURAL ENGINEER FOR APPROVAL.

26. ALL EQUIPMENT REQUIRING ACCESS SUCH AS J-BOXES, PULL BOXES, TRANSFORMERS, DRIVERS, ETC.

SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS. EXISTING ELECTRICAL DEVICES WHICH ARE LOCATED

BEHIND INACCESSIBLE LOCATIONS DUE TO THE RENOVATION SHALL BE REROUTED AND MADE

ACCESSIBLE.

27. CONDUITS AND/OR MATERIALS LOCATED IN ENVIRONMENTAL AIR PLENUMS SHALL BE PROPERLY LISTED FOR THE APPLICATION. INTERIOR CONCEALED RACEWAYS MAY BE AC OR MC CABLE IF ALLOWED BY THE

AHJ. EXPOSED RACEWAYS, INCLUDING RACEWAYS EXPOSED IN THE BACK OF HOUSE SHALL BE

GALVANIZED STEEL OR ALUMINUM EMT. MOTOR CONNECTIONS SHALL BE FLEXIBLE METAL CONDUIT FOR INTERIOR APPLICATIONS AND LIQUID TIGHT FLEX FOR EXTERIOR APPLICATIONS. ALL OTHER EXTERIOR CONDUITS SHALL BE GALVANIZED STEEL, ALUMINUM EMT OR RIGID STEEL IF EXPOSED TO STRIKING. EXTERIOR CONDUITS SHALL UTILIZE COMPRESSION CONNECTORS. AC/MC CABLE SHALL NOT TERMINATE AT PANELBOARDS. A GUTTER OUTSIDE THE ELECTRICAL CLOSET SHALL BE PROVIDED WITH

CONDUIT FROM THE GUTTER TO THE PANELBOARD.

28. CABLE AND CONDUIT ROUTING SHALL BE DONE IN A NEAT AND ORDERLY FASHION. LINES SHALL BE RUN

PARALLEL TO ALL BUILDING FEATURES, AND SHALL BE GROUPED TOGETHER TO CREATE AN

AESTHETICALLY PLEASING AND EASY TO FOLLOW ROUTE. CABLES SHALL BE PERMITTED TO BE

BUNDLED BUT SHALL NOT EXCEED TEN IN QUANTITY. ROUTING SHALL BE COORDINATED WITH OTHER

TRADES TO AVOID CONFLICT.

29. CONDUITS SHALL BE RIGIDLY SUPPORTED TO THE BUILDING STRUCTURE. AC AND MC CABLES SHALL BE SUPPORTED WITHIN 12" OF EVERY BOX, FITTING, ETC. AND SUPPORT SPACINGS SHALL NOT EXCEED 6' INTERVALS. RIGID CONDUIT SUPPORT SPACINGS SHALL NOT EXCEED 10'-0” FOR VERTICAL RUNS AND 8'-0” FOR HORIZONTAL RUNS, HOWEVER ALL SUPPORT SPACINGS FOR ALL CONDUIT TYPES SHALL BE IN ACCORDANCE WITH THE NEC REGARDLESS OF WHAT IS STATED HERE. COUPLINGS AND FITTINGS SHALL BE STEEL WITH COMPRESSION OR SET STEEL SCREW CONNECTIONS. THERE SHALL NOT BE MORE THAN THE EQUIVALENT OF FOUR QUARTER BENDS (360 DEGREES TOTAL) BETWEEN PULL POINTS FOR POWER (120V OR HIGHER) CIRCUITS AND NOT MORE THAN THE EQUIVALENT OF TWO QUARTER BENDS (180 DEGREES TOTAL) BETWEEN PULL POINTS FOR LOW VOLTAGE (TELEPHONE, DATA, ETC) CIRCUITS. LOW VOLTAGE CONDUIT RUNS SHALL ALSO NOT EXCEED 100' BETWEEN PULL POINTS. ALL CONDUITS SHALL BE TERMINATED WITH INSULATED THROAT CONNECTORS FOR CONDUITS 1” AND SMALLER, AND WITH INSULATED BUSHINGS AND LOCKNUTS FOR CONDUITS OVER 1”. EMPTY CONDUIT RUNS EXCEEDING 10' SHALL BE PROVIDED WITH PULL WIRES SECURELY FASTENED AT BOTH ENDS. EXPANSION FITTINGS SHALL BE PROVIDED AT ALL BUILDING EXPANSION JOINTS OR WHERE NEEDED TO ALLOW FOR THERMAL

EXPANSION.

30. CONDUIT SIZES INDICATED IN PANEL SCHEDULES AND ON THE SINGLE LINE ARE BASED ON TYPE THHN IN EMT. AS OTHER TYPES OF CONDUIT AND CONDUCTORS ARE PERMISSIBLE IN THIS PROJECT, THE CONTRACTOR SHALL ADJUST THE DIMENSION OF THE CONDUIT TO COMPLY WITH CHAPTER 9, TABLE 1 IN THE NEC. ADJUSTMENTS TO THE CONDUIT SIZE SHALL BE PART OF THE BID AND SHALL BE AT NO

ADDITIONAL EXPENSE TO THE OWNER.

31. PROVIDE A 3/4" CONDUIT WITH PULLSTRING FOR ALL TELEPHONE AND A 1" CONDUIT WITH PULLSTRING FOR ALL DATA OUTLETS LOCATED IN INSULATED AND LOW HEIGHT WALLS, TERMINATED ABOVE THE ACCESSIBLE CEILING. GROMMETS SHALL BE PROVIDED AT THE END OF THE CONDUIT AT THE CEILING

SPACE. OUTLETS LOCATED IN NON-INSULATED WALLS WILL REQUIRE PULLSTRING ONLY.

32. WIRE SIZES INDICATED ARE BASED UPON DIRECT ORTHOGONAL PATHS TO THE PANELBOARD. FEEDERS ARE SIZED FOR A MAXIMUM OF 3% VOLTAGE DROP, AND BRANCH CIRCUITS ARE DESIGNED FOR A MAXIMUM OF 5% VOLTAGE DROP. IF FIELD CONDITIONS DO NOT ALLOW THESE PATHS OR IF THE CONTRACTOR RUNS ADDITIONAL LENGTHS, THEY SHALL BE RESPONSIBLE FOR INCREASING WIRE SIZE TO ACCOUNT FOR VOLTAGE DROP AT NO ADDITIONAL COST. WIRING SMALLER THAN #12 AWG SHALL

NOT BE USED FOR ANY INSTALLATIONS.

33. THE CONTRACTOR SHALL CIRCUIT PANELBOARDS EXACTLY AS INDICATED IN THE PANEL SCHEDULES. IF ANY DEVIATIONS ARE NECESSARY, THE ENGINEER SHALL BE NOTIFIED. TYPED DIRECTORY CARDS SHALL BE PROVIDED AT EACH PANELBOARD INDICATING LOAD SERVED AND FINAL ROOM NUMBERS PER THE NEC. WHEN EXISTING DIRECTORIES ARE REPLACED FOR RENOVATION WORK, EXISTING LOAD

INFORMATION SHALL BE DIRECTLY TRANSFERRED TO THE NEW DIRECTORY CARDS.

34. NEUTRAL CONDUCTORS SHALL ONLY BE SHARED WHEN INDICATED ON THE DRAWINGS. WHERE

NEUTRALS ARE INDICATED TO BE SHARED, THE NEUTRAL SHALL BE A MINIMUM OF #10 AWG.

35. THE CONTRACTOR SHALL REMOVE ALL UNUSED AND ABANDONED WIRING AND CABLING FROM THE CEILING PLENUM THAT ISN'T LABELED FOR FUTURE USE, AS REQUIRED BY THE NEC. THIS SHALL INCLUDE BUT IS NOT LIMITED TO FIRE ALARM, POWER, SECURITY, CONTROLS, DATA, TELEPHONE, A/V, ETC.

36. ALL BRANCH CIRCUIT CONDUCTORS AND FEEDER CIRCUITS 100A OR SMALLER SHALL BE COPPER.

FEEDER CIRCUITS SERVING LOADS LARGER THAN 100A MAY BE EITHER COPPER OR ALUMINUM,

HOWEVER THE DESIGN IS BASED AROUND COPPER AND THE CONTRACTOR WILL BE RESPONSIBLE FOR ACCOUNTING FOR INCREASED WIRE SIZE, CONDUIT SIZE, AND SPACE TAKEN BY THE LARGER CONDUIT IF

ALUMINUM IS USED. HOWEVER, BRANCH CIRCUITS FEEDING MOTORS SHALL ALWAYS BE COPPER

REGARDLESS. CONDUCTORS #10 AWG AND SMALLER SHALL BE SOLID, AND CONDUCTORS #8 AWG AND

LARGER SHALL BE STRANDED. CONDUCTORS SHALL BE CODE TYPE THW, THHN, THWN, OR XHHW

UNLESS OTHERWISE REQUIRED BY THE NEC. CONDUCTORS SHALL BE MARKED WITH INSULATION CODE, VOLTAGE RATING, AWG SIZE, AND MANUFACTURER AND INCLUDE A CONTINUOUS COLOR CODING FROM PANEL TO LOAD SERVED. WHERE CONTINUOUS MARKINGS ARE NOT AVAILABLE, USE COLOR CODED TAPE AT EACH TERMINATION. #8 AWG AND SMALLER CONDUCTORS SHALL BE SPLICED WITH SPRING

CONNECTORS. #6 AWG AND LARGER SHALL BE SPLICED WITH BARREL CONNECTORS REQUIRING

COMPRESSION ON EACH END.

37. ALL EMERGENCY EGRESS, STANDBY LIGHTING, AND EXIT LIGHTING SHALL HAVE A BATTERY BALLAST WITH RUN TIME MEETING OR EXCEEDING 90 MINUTES. THE BATTERY BALLAST SHALL NOT BE CAPABLE OF BEING DISCONNECTED. REGARDLESS OF MODEL NUMBER SPECIFIED, LIGHT FIXTURES SPECIFIED

WITH BACKUP BATTERY BALLASTS SHALL HAVE THE TEST BUTTON INTEGRALLY MOUNTED WHERE

POSSIBLE. WHERE FIXTURES ARE NOT AVAILABLE WITH INTEGRALLY MOUNTED TEST BUTTONS, THE TEST BUTTONS SHALL BE LOCATED IN A DISCRETE LOCATION AS DETERMINED BY THE ARCHITECT, UP TO

50' AWAY FROM THE FIXTURE.

38. NEW LIGHTS AND LAMPS SHALL MATCH EXISTING BUILDING STANDARD, INCLUDING LAMP TEMPERATURE COLOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING BUILDING STANDARDS PRIOR TO PURCHASE. THE CONTRACTOR SHALL PROVIDE THE PROPER FIXTURE TYPE FOR THE CEILING OR WALL TYPE WHICH THE FIXTURE IS TO BE INSTALLED IN INCLUDING TRIM, MOUNTING ACCESSORIES ETC.

REGARDLESS OF THE MODEL NUMBERS IN THE LIGHT FIXTURE SCHEDULE, THE CORRECT MOUNTING TYPE SHALL BE PROVIDED. THE CONTRACTOR SHALL REFER TO INTERIOR DESIGNER, ARCHITECTURAL, LANDSCAPE, OR OTHER CONSULTANT PLANS FOR ADDITIONAL INFORMATION AND REQUIREMENTS;

WHERE THERE IS A DISCREPANCY BETWEEN ELECTRICAL PLANS AND OTHER CONSULTANT PLANS, THE OTHER CONSULTANT PLANS SHALL TAKE PRIORITY EXCEPT FOR VOLTAGE AND WATTAGE OF FIXTURES.

FIXTURE TYPES IN THE LIGHT FIXTURE SCHEDULE ARE TO ESTABLISH A TYPE, NOT A METHOD OF MOUNTING. FLUORESCENT FIXTURES THAT UTILIZE DOUBLE-ENDED LAMPS AND CONTAIN BALLASTS THAT CAN BE SERVICED IN PLACE SHALL HAVE A DISCONNECTING MEANS, UNLESS THE FIXTURE IS USED FOR EMERGENCY LIGHTING. ALL BALLASTS SHALL BE ELECTRONIC, LESS THAN 20% THD, CREST FACTOR OF 1.7 FOR FLUORESCENTS AND 1.8 FOR METAL HALIDES, HIGH POWER FACTOR, AND RATED FOR THE TYPE OF LAMP IT OPERATES. MANUFACTURERS SHALL BE GE, ADVANCE, MAGNETEK, MOTOROLA, LUTRON, OR OTHER APPROVED EQUAL. LIGHT FIXTURES, BALLASTS, TRANSFORMERS, DRIVERS, ETC LOCATED IN A WET OR DAMP LOCATION SHALL BE LISTED FOR SAID USE. LIGHT FIXTURES INSTALLED IN AREAS HAVING EXPOSED FOOD OR FOOD PREPARATION AREAS OR KITCHENS SHALL BE PROPERLY

LENSED AND HAVE SHATTER PROOF LAMPS.

39. ALL LIGHT FIXTURES SHALL BE SUPPORTED FROM THE BUILDING STRUCTURAL SYSTEM BY SUPPORT WIRES, INDEPENDENT OF CEILING GRID SYSTEMS. TROFFER TYPE FIXTURES SHALL BE SUPPORTED BY WIRES AT ALL FOUR CORNERS. RECESSED DOWNLIGHTS SHALL BE SUPPORTED VIA HANGER BARS SUPPORTED BY WIRES AT ALL FOUR CORNERS. SUPPORT MEANS SHALL BE IN ACCORDANCE WITH

LOCAL SEISMIC REQUIREMENTS.

40. THE EQUIPMENT GROUNDING SYSTEM SHALL CONSIST OF AN ELECTRICALLY CONTINUOUS METALLIC CONDUIT SYSTEM TOGETHER WITH INSULATED EQUIPMENT GROUNDING CONDUCTORS. EVERY ITEM SERVED BY THE ELECTRICAL SYSTEM SHALL BE PROPERLY GROUNDED IN ACCORDANCE WITH NEC ARTICLE 250. THIS SHALL INCLUDE RACEWAYS, JUNCTION/OUTLET BOXES, MACHINE FRAMES, ETC. ALL

BRANCH CIRCUITS AND FEEDERS SHALL HAVE A GREEN INSULATED EQUIPMENT GROUNDING

CONDUCTOR OR GROUND ELECTRODE SIZED IN ACCORDANCE WITH THE NEC. PROVIDE BONDING

JUMPERS FOR ALL NON-CURRENT CARRYING CONDUCTORS OF DIFFERENT SYSTEMS TO ENSURE NO VOLTAGE POTENTIAL. METAL GAS PIPING SHALL ONLY BE GROUNDED AT EQUIPMENT HOUSING BOTH ELECTRICAL CIRCUITS AND UTILIZING GAS VIA THE EQUIPMENT GROUND ROUTED WITH THE CIRCUIT. ALL

GROUND WIRES SHALL BE COPPER.

41. WHERE LIGHTNING PROTECTION SYSTEMS EXIST, OBJECTS INSTALLED ON ROOFTOPS AND EXTERIOR OF

BUILDINGS SHALL BE PROPERLY BONDED PER NFPA 780.

42. SUBMITTALS SHALL BE SUBMITTED ELECTRONICALLY, IN PDF FORMAT. THE CONTRACTOR SHALL ALLOW FOR A TOTAL OF 10 BUSINESS DAYS FOR REVIEW BY THE ENGINEER. SUBMITTALS SHALL INCLUDE PANELBOARDS, TRANSFORMERS, DISCONNECTS, WIRING DEVICES, UPS'S, LIGHT FIXTURES, TVSS, AND FIRE ALARM SYSTEM. SUBMITTALS SHALL ONLY INCLUDE DATA RELEVANT TO THIS PROJECT; DATA SHEETS INDICATING SEVERAL PRODUCTS SHALL HAVE THE RELEVANT PRODUCTS HIGH-LITED OR CLEARLY IDENTIFIED. SIMILAR EQUIPMENT SHALL BE SUBMITTED IN ONE COMPLETE SUBMITTAL

PACKAGE (I.E. ALL PANELBOARDS, ALL LIGHTING FIXTURES, ETC.).

43. PROVIDE PAD LOCKING HARDWARE ON CIRCUIT BREAKERS FOR EQUIPMENT WHICH IS HARDWIRED

WITHOUT A LOCAL DISCONNECTING MEANS THAT ARE NOT WITHIN SIGHT OF THE PANELBOARD.

44. MATCH EXISTING RECEPTACLE AND LIGHT SWITCH MANUFACTURER AND STYLE UNLESS OTHERWISE NOTED ON THE PLANS. IF NO STANDARD EXISTS, PROVIDE RECEPTACLES SIMILAR TO PASS & SEYMOUR #CR20 SERIES AND LIGHT SWITCHES SIMILAR TO PASS & SEYMOUR #20AC1 SERIES. COVER PLATES SHALL BE AS SPECIFIED BY THE ARCHITECT OR BRUSHED STAINLESS STEEL. CONFIRM ALL DEVICE

COLORS WITH THE ARCHITECT.

ELECTRICAL NOTES

45. DUPLEX OUTLETS SHALL BE NEMA 5-20R WHEN THEY ARE THE ONLY LOAD ON A CIRCUIT.

46. WALL MOUNTED OCCUPANCY SENSORS SHALL BE PASSIVE INFRARED, MANUAL-ON, AUTO-OFF SIMILAR TO WATT STOPPER PW-100-W. CEILING MOUNTED OCCUPANCY SENSORS FOR CORRIDORS SHALL BE LONG RANGE PASSIVE INFRARED SIMILAR TO WATT STOPPER CX-100-1. CEILING MOUNTED OCCUPANCY

SENSORS FOR CONFERENCE ROOMS, LOBBIES, AND OTHER SIMILAR AREAS SHALL BE DUAL

TECHNOLOGY PASSIVE INFRARED AND ULTRASONIC SIMILAR TO WATT STOPPER DT-300. DEVICES SHALL BE MOUNTED SUCH THAT THE SENSORS HAVE FULL COVERAGE OF THE INTENDED AREAS AND PER THE

MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL ACCESSORIES NECESSARY FOR A FULLY

FUNCTIONING SYSTEM, INCLUDING POWER PACKS, CONTROL AND POWER WIRING, BACKBOXES, ETC.

POWER PACKS FOR CEILING MOUNTED SENSORS SHALL BE PROVIDED, SIMILAR TO WATT STOPPER

BZ-150. SENSORS SHALL BE WATT STOPPER, HUBBEL, COOPER, OR LUTRON PROVIDED IT IS

EQUIVALENT OR EXCEEDS THE REQUIREMENTS LISTED HEREIN. THE CONTRACTOR SHALL FULLY

COMMISSION THE OCCUPANCY SENSORS SYSTEM TO CONFIRM IT IS FUNCTIONING AS INTENDED.

47. MAGNETIC MOTOR STARTERS SHALL MATCH THE CHARACTERISTICS OF THE MOTOR IT CONTROLS AND

BE CAPABLE OF CYCLING AT THE FREQUENCY DETERMINED BY THE CONTROL DEVICES. MOTOR

STARTERS SHALL BE PROVIDED FOR ALL MOTORS NOT HAVING INTEGRALLY MOUNTED STARTERS. ALL INTERNAL WIRING SHALL BE COPPER. THE HORSEPOWER RATING OF EACH STARTER SHALL NOT BE

LESS THAN THE MOTOR IT CONTROLS. ENCLOSURES SHALL BE NEMA 1 RATED (UNLESS NOTED

OTHERWISE) AND CAPABLE OF BEING PADLOCKED IN THE OFF POSITION. COILS SHALL BE RATED AT 120V AC CONTROL VOLTAGE. A CONTROL POWER TRANSFORMER WITH PRIMARY FUSES AND ONE FUSE ON THE SECONDARY SIDE. COORDINATED OVERLOAD PROTECTION SHALL BE PROVIDED IN ALL THREE PHASES FOR THREE PHASES APPLICATIONS, AND ALL SINGLE PHASE CONTROLLERS SHALL HAVE OVERLOAD PROTECTION IN UNGROUNDED PHASES. EACH CONTROLLER SHALL HAVE A PILOT LIGHT AND TRIP FREE SWITCH. EACH CONTROLLER SHALL HAVE TWO EXTRA INTERLOCK CONTACTS WHICH CAN BE

EITHER NORMALLY OPEN OR NORMALLY CLOSED. PROVISIONS FOR REMOTE CONTROL FUNCTION

OPERATED BY THE ATC OR FIRE ALARM CONTRACTOR SHALL BE INCLUDED. PROVIDE FUSED SWITCH COMBINATION STARTERS WHEN REQUIRED BY MANUFACTURER OR LOCAL INSPECTING AUTHORITY.

48. TRANSFORMERS SHALL BE DRY TYPE, 60 HERTZ, 480V 3 PHASE DELTA TO 120/208V 3 PHASE, 4 WIRE GROUNDED WYE. TEMPERATURE CLASSIFICATION SYSTEM SHALL BE A MINIMUM OF 155°C INSULATION SYSTEM. WINDING TEMPERATURE RISE SHALL NOT EXCEED 150°C IN A 40°C AMBIENT. TRANSFORMERS SHALL HAVE FOUR 2-1/2% FULL LOAD TAPS BELOW RATED VOLTAGE AND TWO 2-1/2% FULL LOAD TAPS

ABOVE RATED VOLTAGE. INTERNAL VIBRATION ISOLATION MOUNTS SHALL BE PROVIDED.

49. PANELBOARDS SHALL HAVE COPPER FULL SIZE PHASE BUSSES, NEUTRAL BUSSES, AND BOLTED ON COPPER GROUNDING BUS WITH MAIN LUGS. BUS BAR CONNECTIONS SHALL BE COLUMN CONSECUTIVE PHASE-SEQUENCE TYPE. BUS BARS SHALL BE DRILLED AND EQUIPPED FOR BOLT-ON MOLDED CASE CIRCUIT BREAKERS. SHORT CIRCUIT BRACING AND BREAKER INTERRUPTING CAPACITY SHALL BE AS INDICATED ON THE PANEL SCHEDULES, BUT SHALL NOT BE BELOW 10,000 A.I.C. FOR 120/208V PANELS AND 14,000 A.I.C. FOR 277/480V PANELS. PANEL CONSTRUCTION SHALL BE HINGED DOOR IN DOOR COVERS WITH MASTER-KEYED DOOR LOCKS, GALVANIZED SHEET STEEL CABINETS WITH MULTIPLE KNOCKOUTS, WIRING GUTTERS, AND SPACE FOR A TYPED CIRCUIT DIRECTORY. MAIN BREAKERS OR MAIN LUGS ONLY SHALL BE PROVIDED AS INDICATED IN THE PANEL SCHEDULES. PANELS SHALL BE

PROVIDED WITH FEED THRU LUGS UNLESS OTHERWISE NOTED.

50. TVSS SHALL BE INSTALLED IN EACH MAIN DISTRIBUTION PANEL. EACH MODE SHALL BE INDIVIDUALLY FUSED. PROVIDE A LOAD SIDE CIRCUIT BREAKER TO DISCONNECT THE TVSS IN THE EVENT OF FAILURE.

THE TVSS SHALL PROVIDE 200 kA PER PHASE; THE PEAK SURGE CURRENT RATING SHALL BE THE ARITHMETIC SUM OF THE RATINGS OF THE INDIVIDUAL MOVS IN A GIVEN MODE. PHYSICAL WIRING

LENGTH SHALL NOT EXCEED 6" FROM THE PROTECTED BUS TO THE TVSS.

51. MOLDED CASE CIRCUIT BREAKERS SHALL BE THERMAL MAGNETIC AND AMBIENT COMPENSATED INVERSE TIME-DELAY OVERLOAD AND INSTANTANEOUS SHORT CIRCUIT PROTECTED, FULL SIZE, BOLT- ON, WITH A QUICK-MAKE, QUICK-BREAK OVER-CENTER SWITCHING MECHANISM THAT IS MECHANICALLY

TRIP-FREE FROM THE HANDLE SUCH THAT THE CONTACTS CAN NOT BE CLOSED AGAINST SHORT

CIRCUITS. CONTACTS SHALL BE NON-WELDING SILVER ALLOY. TRIPPING DUE TO OVERLOAD OR SHORT CIRCUIT SHALL BE INDICATED BY THE BREAKER RESTING AT A MID POINT BETWEEN THE ON AND OFF POSITIONS. AMPERE AND FAULT CURRENT RATINGS SHALL BE CLEARLY VISIBLE. BREAKERS SHALL BE LISTED FOR USE WITH 75°C AND 90°C CONDUCTORS. MULTI-POLE BREAKERS SHALL BE OF THE COMMON

TRIP TYPE HAVING A SINGLE HANDLE. WHERE NEUTRALS ARE SHARED AMONG CIRCUITS, THE

CONTRACTOR SHALL PROVIDE MULTI-POLE BREAKERS TO SIMULTANEOUSLY DISCONNECT ALL CIRCUITS IN THE EVENT OF ONE TRIPPING; IN THIS CASE SINGLE POLE BREAKERS MAY BE CONNECTED BY A

COMMON TRIP HANDLE.

52. ALL FUSES SHALL BE DUAL-ELEMENT RK5 FOR MOTORS AND DUAL-ELEMENT RK1 FOR ALL OTHER CONNECTIONS AS MANUFACTURED BY BUSSMAN OR LITTLE FUSE. FUSE VOLTAGE RATING SHALL BE 250

VOLT FOR 120/208 VOLT SYSTEM AND 600 VOLT FOR 277/480 VOLT SYSTEM.

53. DISCONNECT SWITCHES SHALL BE HEAVY DUTY TYPE, HIGH I2T RATED, APPROVED FOR SERVICE ENTRANCE APPLICATIONS. DISCONNECT SWITCHES SPECIFIED FOR 208 VOLT CIRCUITS SHALL BE RATED AT 240 VOLT, AND DISCONNECT SWITCHES SPECIFIED AT 480 VOLT SHALL BE RATED AT 600 VOLT. ALL

DISCONNECTS SHALL BE QUICK-MAKE, QUICK-BREAK TYPE AND HAVE PROVISIONS FOR

ACCOMMODATING R TYPE FUSES. SWITCHES IN EXTERIOR LOCATIONS SHALL BE NEMA TYPE 4X UNLESS OTHERWISE NOTED, AND INDOOR SWITCHES EXPOSED TO WET OR DAMP CONDITIONS SHALL BE NEMA TYPE 3R. SWITCHES SHALL HAVE PROVISIONS FOR PADLOCKING. SWITCHES SHALL BE PREVENTED FROM OPENING WHILE SWITCH IS ON. FUSED DISCONNECTS SHALL BE PROVIDED WHEN REQUIRED BY

THE MANUFACTURER OR BY THE LOCAL INSPECTING AUTHORITY.

54. PROVIDE A 15A 120 VOLT CIRCUITS FOR ALL SMOKE AND COMBINATION FIRE/SMOKE DAMPERS AND

ASSOCIATED SMOKE DETECTOR FOR ALL SMOKE DAMPERS AS SHOWN AND REQUIRED ON THE

MECHANICAL DRAWINGS. UPON ACTIVATION, SMOKE DETECTOR SHALL SIGNAL FOR DAMPER TO CLOSE.

SYSTEM SHALL BE TIED INTO THE BUILDING FIRE ALARM SYSTEM.

55. PROVIDE PHOTOELECTRIC TWIST IN TYPE SMOKE DETECTORS WITH ACCESS DOORS IN ALL FANS AND AHU'S SERVING A COMMON PLENUM OF 2000 CFM OR ABOVE. ALL SMOKE DETECTORS SHALL BE BY ONE MANUFACTURER, AND SHALL COMPLY WITH UL 268A. LOCATE THE SMOKE DETECTORS IN THE SUPPLY AIR DUCT FOR INSTALLATIONS IN COMPLIANCE WITH THE INTERNATIONAL BUILDING CODE. THE DETECTORS SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR & INSTALLED IN THE DUCT BY THE MECHANICAL CONTRACTOR. ELECTRICAL CONNECTION SHALL BE BY ELECTRICAL CONTRACTOR. UPON SMOKE DETECTION, ALL ASSOCIATED AIR MOVING EQUIPMENT SERVING A COMMON PLENUM WILL BE SHUT DOWN. TIE FIRE ALARM DEVICES INTO EXISTING FIRE ALARM SYSTEM (IF APPLICABLE).

56. ALL 15 AND 20A, 120V RECEPTACLES LOCATED IN WITHIN 6' OF SINKS, IN EXTERIOR LOCATIONS, IN AREAS EXPOSED TO WET CONDITIONS SHALL BE GFI TYPE, WITH SELF-TEST FUNCTION. PROVIDE GFI-TYPE CIRCUIT BREAKER IF RECEPTACLE IS NOT IN A READILY ACCESSIBLE LOCATION OR IF A SIMPLEX

RECEPTACLE IS REQUIRED.

57. E.C. SHALL BE RESPONSIBLE FOR PROVIDING A JUNCTION BOX AND DIRECT ELECTRICAL CONNECTION TO EACH HVAC CONDENSATE PUMP AS NEEDED PER MECHANICAL DRAWINGS OR FIELD CONDITIONS.

PROVIDE 2#12, 1#12G, IN 1/2"C FROM NEAREST 120V G.P. RECEPTACLE CIRCUIT.

58. THE ELECTRICAL CONTRACTOR OR LOW VOLTAGE CONTRACTOR SHALL PROVE A TWO-WAY RADIO COMMUNICATION ENHANCEMENT SYSTEM FOR FIRE DEPARTMENT COMMUNICATIONS WHICH COMPLIES WITH THE INTERNATIONAL FIRE PREVENTION CODE AND NFPA 72 UNLESS DEEMED AS NOT REQUIRED BY THE AHJ. IF THE SYSTEM IS REQUIRED, THE CONTRACTOR SHALL COORDINATE POWER REQUIREMENTS

WITH THE ELECTRICAL ENGINEER.

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 1-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:1

:3

A

M

ELECTRICAL COVER SHEET

EJ-001

11/21/2022 RGD RGD

ELECTRICAL SHEET INDEX

EJ-001 ELECTRICAL COVER SHEET

ED-101 ELECTRICAL DEMOLITION PLAN

EP-101 ELECTRICAL POWER PLAN

EL-101 ELECTRICAL LIGHTING PLAN

EK-101 ELECTRICAL PANEL SCHEDULES

EK-201 ELECTRICAL RISER & DETAILS

NO. DESCRIPTION DATE

bob.davenport Date 01/03/2024

J

ELECTRICAL ROOM

BOILER

ROOM

RESTROOM

OPERATORS OFFICE

STORAGE

GRAPHIC

CONTROL

ROOM

DCBA

3.1

MPZ

RPP

LPP1

LPP2

MCC-6 IN ROOM C-33

BOILER #2

SG-2

BOILER #1

SG-4

BOILER #3

SG-5

EXISTING DIESEL

PUMP

FACP

(D)

(E)

(D)

(D)

(D)

(D)

(D) (D)

(D)

(D)

(E)

(E)

A

(E)

(D)

10 11

EXISTING DIESEL PUMP

STARTER/DISCONNECT

(D)

EXISTING BOILER #3

CONTROL

PANEL/DISCONNECT

EXISTING BOILER #1

CONTROL

PANEL/DISCONNECT

EXISTING BOILER #2

CONTROL PANEL

(D)

(E)

(E)

EXISTING

MINI-SPLIT

UNIT

(D)

EXISTING BOILER #2

DISCONNECT

EXISTING DEAERATOR

CONTROL

PANEL/DISCONNECT

PHASE - 1

PHASE - 1

PHASE - 4

PHASE - 4

PHASE - 1

PHASE - 2

PHASE - 3

(E) 19

(D)

EXISTING TEMPORARY

BOILER DISCONNECT

PHASE - 2

PHASE - 2

(D)

DEMOLITION GENERAL NOTES

1. THE CONTRACTOR SHALL REMOVE ALL UNUSED AND ABANDONED WIRING AND CABLING FROM THE CEILING PLENUM THAT ISN'T LABELED FOR FUTURE USE, AS REQUIRED BY THE NEC. THIS SHALL INCLUDE BUT IS NOT LIMITED TO FIRE ALARM, POWER, SECURITY, CONTROLS, DATA, TELEPHONE, A/V, ETC.

2. CIRCUITS MADE SPARE SHALL BE UPDATED ON PANEL SCHEDULES. DIRECTORY CARDS SHALL BE REPLACED WITH NEW TYPED DIRECTORIES, INCLUDING ALL NEW LOADS IN ADDITION TO SPARES. HAND-

MARKED NOTES WILL NOT BE ACCEPTED.

3. CARE SHALL BE TAKEN TO RELOCATE ALL EXISTING EQUIPMENT THAT IS BEING MOVED BUT REMAINING AFTER COMPLETION OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE TO KEEP ALL EXISTING TO REMAIN OR RELOCATED EQUIPMENT AT THE SAME LEVEL OF FUNCTIONALITY FROM THE ACCEPTANCE OF THE CONTRACT TO FINAL COMPLETION. ANY DAMAGE OR LOSS OF FUNCTIONALITY SHALL BE

REMEDIED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER.

4. EQUIPMENT INDICATED TO BE REMOVED AND NOT RE-USED SHALL REMAIN THE PROPERTY OF THE

OWNER AND RETURNED OR STORED AS DIRECTED.

5. CONDUITS AND RACEWAY SYSTEMS MAY BE ABANDONED WHERE CONCEALED HOWEVER SHALL BE REMOVED WHERE EXPOSED. REMOVED OUTLETS SHALL BE PROVIDED WITH BLANK COVERS, COLOR

PER THE ARCHITECTS DIRECTION.

6. EXISTING RACEWAYS AND WIRING ARE ALLOWED TO BE RE-USED PROVIDED THEY MEET THE

SPECIFICATIONS FOR THE NEW SYSTEM(S).

7. ALL OUTAGES SHALL BE COORDINATED WITH THE OWNER. THE CONTRACTOR SHALL PLAN AHEAD TO

MINIMIZE ALL OUTAGES.

8. CIRCUITS SHALL STAY FUNCTIONAL WHERE DEVICES/FIXTURES ARE BEING DEMOLISHED THAT SHARE A COMMON CIRCUIT WITH DEVICES/FIXTURES THAT ARE TO REMAIN. WIRING SHALL BE REMOVED AS FAR

AS POSSIBLE WHILE MAINTAINING EXISTING TO REMAIN OPERATION.

9. THE CONTRACTORS SHALL REMOVE ALL EXISTING ELECTRICAL EQUIPMENT NOT REUSED OR NOT

NECESSARY FOR THE COMPLETION OF THIS PROJECT.

ELECTRICAL

CLOSET

DEMOLITION LEGEND

(D) - EXISTING TO BE DEMOLISHED

(E) - EXISTING TO REMAIN

ELECTRICAL PHASING NARRATIVE

GENERAL NOTE - THE FOLLOWING NARRATIVE INCLUDES PHASING OF ELECTRICAL WORK ASSOCIATED WITH DEMOLITION AND NEW INSTALLATION. THE ITEMS LISTED BELOW ARE TO SHOW THE PHASING INTENT ONLY.

CONTRACTOR SHALL COORDINATE BETWEEN ALL TRADES AND OWNER.

PHASE - 1

• IDENTIFICATION, VERIFICATION AND REMOVAL OF ALL ABANDONED/NOT-IN-USE BRANCH CIRCUITS FROM EXISTING PANELS "LPP1", "LPP2", "MPZ" AND "RPP". EXISTING ELECTRICAL PANELS SHALL REMAIN

OPERATIONAL TILL PHASE - 3B.

• INSTALLATION OF NEW PANELBOARDS "LPP1", "RPP" AND ASSOCIATED TRANSFORMER IN NEW

ELECTRICAL ROOM.

• ELECTRICAL WORK ASSOCIATED WITH MINI-SPLIT A/C UNIT REPLACEMENT.

• ELECTRICAL WORK ASSOCIATED WITH NEW ELECTRICAL ROOM POWER, LIGHTING AND FIRE ALARM.

• INSTALLATION OF NEW SHOWER LIGHTING.

• ELECTRICAL WORK ASSOCIATED WITH ELECTRIC WATER HEATERS EWH-2 AND EWH-3.

• ALL GENERAL BRANCH CIRCUITS SHALL BE TRANSITIONED ONE-BY-ONE TO THE NEW ELECTRICAL ROOM

PANELS AT THE END OF PHASE - 1.

PHASE - 2

• ELECTRICAL WORK ASSOCIATED WITH BOILER #2 REPLACEMENT.

• ELECTRICAL WORK ASSOCIATED WITH NEW BOILER #2 ECONOMIZER.

• ELECTRICAL WORK ASSOCIATED WITH NEW FUEL POLISHER AND DIESEL PUMP REPLACEMENT.

PHASE - 3

• ELECTRICAL WORK ASSOCIATED WITH BOILER #3 FEEDER REPLACEMENT. BOILER REFED FROM NEW

ELECTRICAL ROOM.

• ELECTRICAL WORK ASSOCIATED WITH NEW BOILER #3 ECONOMIZER.

PHASE - 4

• ELECTRICAL WORK ASSOCIATED WITH BOILER #1 FEEDER REPLACEMENT. BOILER REFED FROM NEW

ELECTRICAL ROOM.

• ELECTRICAL WORK ASSOCIATED WITH NEW BOILER #1 ECONOMIZER.

• EXISTING DEAERATOR CIRCUIT TO BE TRANSITIONED TO NEW ELECTRICAL ROOM PANEL AT THE END OF

PHASE - 3B.

• OLD ELECTRICAL ROOM DECOMMISSIONED AT THE END OF PHASE - 3B.

• ELECTRICAL WORK ASSOCIATED WITH NEW WATER TREATMENT LAB AT THE END OF PHASE - 3B.

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 1-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:1

:3

A

M

ELECTRICAL DEMOLITION

PLAN

ED-101

11/21/2022 Checker Author

KEYNOTE LEGEND

1 EXISTING DISCONNECT SWITCH IS ABANDONED. ELECTRICAL CONTRACTOR SHALL

REMOVE DISCONNECT SWITCH AND ALL ASSOCIATED WIRES AND CONDUIT BACK

TO SOURCE.

2 EXISTING MOTOR CONTROL CENTER MCC6 IS LOCATED APPROXIMATELY 250FT

FROM BOILER ROOM ELECTRICAL CLOSET IN PLAN SOUTH DIRECTION IN ROOM

C-33. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY.

3 BOILER #2 TO BE DEMOLISHED. ELECTRICAL CONTRACTOR SHALL REMOVE ALL

DISCONNECT SWITCH AND ALL ASSOCIATED ELECTRICAL COMPONENTS

INCLUDING WIRES AND CONDUIT BACK TO SOURCE. REFER TO THE PHASING PLAN

FOR MORE DETAILS.

4 ELECTRICAL CONTRACTOR SHALL IDENTIFY, VERIFY AND REMOVE ALL

ABANDONED/NOT-IN-USE BRANCH CIRCUITS FROM PANELS LPP1, LPP2, MPZ AND

RPP. REMOVE ALL ASSOCIATED ELECTRICAL COMPONENTS INCLUDING WIRES

AND CONDUIT BACK TO SOURCE.

5 EXISTING JUNCTION BOX IS ABANDONED. ELECTRICAL CONTRACTOR SHALL

VERIFY AND REMOVE ALL ASSOCIATED WIRES AND CONDUIT BACK TO SOURCE.

6 EXISTING DIESEL PUMP TO BE REPLACED. ELECTRICAL CONTRACTOR SHALL

REMOVE STARTER AND ALL ASSOCIATED WIRES AND CONDUIT BACK TO SOURCE.

MAINTAIN EXISTING CONNECTION TO EXISTING DIESEL FUEL PUMPS WHEN

TEMPORARILY RELOCATED TO ALLOW NEW PUMPS TO BE INSTALLED. PROVIDE

FINAL CONNECTION TO NEW DIESEL FUEL PUMPS WHEN INSTALLATION IS

COMPLETE, COORDINATE WITH PLUMBING CONTRACTOR.

7 ELECTRICAL CONTRACTOR SHALL REMOVE ELECTRICAL CLOSET LIGHT FIXTURE

AND ASSOCIATED SWITCH. MAINTAIN WIRES AND CONDUIT FOR REUSE.

8 EXISTING MINI-SPLIT UNIT IS BEING REPLACED. ELECTRICAL CONTRACTOR SHALL

REMOVE EXISTING LOCAL DISCONNECT AND ALL ASSOCIATED WIRES AND

CONDUIT BACK TO SOURCE.

9 EXISTING LAUNDRY PANEL "A" IS LOCATED APPROXIMATELY 100FT FROM BOILER

ROOM ELECTRICAL CLOSET IN PLAN SOUTHWEST DIRECTION. CURRENT LOCATION

ON PLANS SHOWN FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY.

10 RELOCATE EXISTING RECEPTACLE FED FROM PANEL RPP CIRCUIT #11. EXTEND

WIRES AND CONDUIT AS REQUIRED. SEE SHEET EP-101 FOR NEW LOCATION.

11 RELOCATE EXISTING RECEPTACLE FED FROM PANEL MP CIRCUIT #15. EXTEND

WIRES AND CONDUIT AS REQUIRED. SEE SHEET EP-101 FOR NEW LOCATION.

12 EXISTING UPS CONTROLS BOX TO BE RELOCATED. EXTEND WIRES AND CONDUIT

AS REQUIRED. SEE SHEET EP-101 FOR NEW LOCATION.

13 PROVIDE A 100A, 3 POLE SQUARE D BREAKER TYPE EDB24100 IN PANEL LPP2.

PROVIDE A TEMPORARY 100AMP FEEDER FROM LPP2 TO PANEL LPP1 TO ALLOW

THE REMOVAL AND RELOCATION OF LPP1 FEEDER FROM MCC-6. PANE LPP2 TO BE

REMOVED AFTER ALL BRANCH CIRCUITS HAVE BEEN RELOCATED TO THE NEW

LPP1 PANEL AND THE FEEDER FOR LP2 AND ALL ASSOCIATED CONDUIT IS TO BE

REMOVED BACK TO MCC-6 AND ALL WALL PENETRATION SEALED TO MATCH

EXISTING.

14 ELECTRICAL CONTRACTOR SHALL REMOVE EXISTING PANEL RPP AND ALL

ASSOCIATED CONDUITS AFTER ALL BRANCH CIRCUITS HAVE BEEN RELOCATED TO

NEW PANEL RPP.

15 ELECTRICAL CONTRACTOR SHALL REMOVE EXISTING PANEL MPZ AND ALL

ASSOCIATED CONDUITS AFTER ALL BRANCH CIRCUITS HAVE BEEN RELOCATED TO

NEW PANEL RPP.

16 REPLACE EXISTING FEEDER FROM MCC-6 WITH TEMPORARY 100AMP FEEDER

FROM PANEL LPP2. RELOCATE EXISTING FEEDER, SEE SHEET EP-101. REMOVE

PANEL LPP1 AFTER ALL BRANCH CIRCUITS HAVE BEEN RELOCATED TO NEW

PANEL LPP1.

17 EXISTING BOILER #3 IS FED FROM EXISTING PANEL LPP2 CIRCUIT #8,10,12.

ELECTRICAL CONTRACTOR SHALL RELOCATE CIRCUIT TO NEW PANEL LPP1,

EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.

18 EXISTING BOILER #1 IS FED FROM EXISTING PANEL LPP2 CIRCUIT #2,4,6.

ELECTRICAL CONTRACTOR SHALL RELOCATE CIRCUIT TO NEW PANEL LPP1,

EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.

19 EXISTING DEAERATOR IS FED FROM EXISTING PANEL LPP2 CIRCUIT #1,3,5.

ELECTRICAL CONTRACTOR SHALL RELOCATE CIRCUIT TO NEW PANEL LPP1,

EXTEND CONDUIT AND CONDUCTORS AS REQUIRED.

20 DISCONNECT FEEDER FROM EXISTING PANEL LPP1 AND RELOCATE TO NEW PANEL

LPP1, SEE SHEET E-101. REMOVE FEEDER FROM LPP2 AFTER ALL BRANCH

CIRCUITS HAVE BEEN RELOCATED AND REMOVE CONDUIT AND CONDUCTORS

BACK TO MCC-6.

21 EXISTING TROUGH THAT HAS MOST OF THE EXISTING BRANCH CIRCUITS FOR THE

BOILER PLANT PASSING THROUGH IT FROM THE EXISTING PANELS. THE TROUGH

IS TO REMAIN AND THE BRANCH CIRCUITS EXTENDED TO THE NEW PANELS.

PROVIDE TROUGH WITH NEW COVER PLATES AS THE EXISTING ONES ARE

MISSING.

22 DISCONNECT EXISTING AIR COMPRESSOR, REMOVE EXISTING CONDUIT AND

DISCONNECT LOCATED OUTSIDE BACK TO SOURCE PANEL.

1/4" = 1'-0"

ELECTRICAL DEMOLITION POWER PLAN

1/4" = 1'-0"

ELECTRICAL DEMOLITION LIGHTING PLAN

GENERAL ELECTRICAL NOTES

1 FOR ALL RELOCATED EQUIPMENT, CONTRACTOR SHALL EXTEND WIRES AND

CONDUIT AS REQUIRED UNLESS NOTED OTHERWISE. MATCH EXISTING WIRE AND

CONDUIT SIZES.

2 DEMOLITION AND NEW WORK SHALL BE IN ACCORDANCE WITH THE PHASING

NARRATIVE.

NO. DESCRIPTION DATE

bob.davenport

T u b e

R e m o v a l

R e a r

R e a r

S w in g

D o o r

R e a r d o o r c le a ra n c e to s id e

M in im u m ro o m le n g th fo r fr o n t tu b e re m o v a l

F ro n t

T u b e

R e m o v a l

M a x im u m

C le a ra n c e

B u rn e r

P a s s

V e n t

S ta c k

DCBA

3.1

WATER

SAMPLING

ROOM

ELECTRICAL

ROOM

BOILER

ROOM

RESTROOM

OPERATORS OFFICE

STORAGE

T u b e

R e m o v a l

R e a r

R e a r

S w in g

D o o r

R e a r d o o r c le a ra n c e to s id e

M in im u m ro o m le n g th fo r fr o n t tu b e re m o v a l

F ro n t

T u b e

R e m o v a l

M a x im u m

C le a ra n c e

B u rn e r

P a s s

V e n t

S ta c k

DCBA

3.1

WATER

SAMPLING

ROOM

ELECTRICAL

ROOM

BOILER

ROOM

RESTROOM

OPERATORS OFFICE

STORAGE

J

J

J

J

J

DIESEL

PUMP

BOILER #2

SG-2

BOILER #1

SG-4

BOILER #3

SG-5

(E)

(E)

ECONOMIZERECONOMIZER

ECONOMIZER

FACP

(E)

LPP1

RPP

T-RPP

GFI

GFI

RPP - 24

FUEL OIL

FILTRATION -

POLISHER

NEMA 3R

30AS

NF

RPP - 25,27

LPP1 - 1,3,5

LPP1 - 7,9,11

LPP1 - 13,15,17

EXISTING BOILER #3

CONTROL

PANEL/DISCONNECT

EXISTING BOILER #1

CONTROL

PANEL/DISCONNECT

EXISTING DEAERATOR

CONTROL

PANEL/DISCONNECT

WATER TREATMENT

LAB

NEW ELECTRICAL

ROOM

RPP - 28

RPP - 29

LPP1 - 10

LPP1 - 8

LPP1 - 12

LPP1 - 16,18,20

DIESEL PUMP

CONTROL PANEL

W/DISCONNECT

E P

O

RPP - 31

RPP - 33

RPP - 35

BOILER #2 CONTROL

PANEL/DISCONNECT

EWH-3

EWH-2

EWH-1

PHASE - 2

PHASE - 2

PHASE - 1

PHASE - 1

PHASE - 3B

PHASE - 3

PHASE - 4

PHASE - 4

48"

AFF

E P

O

PHASE - 2

LPP1 - 24,26,28

LPP1 # 2,4,6

MCC-6 IN ROOM C-33

LPP1 - 14

EWH-4

PHASE - 2

PHASE - 2

RPP - 19,21

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 1-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:1

:3

A

M

ELECTRICAL POWER PLAN

EP-101

11/21/2022 Checker Author

1/4" = 1'-0"

ELECTRICAL POWER PLAN

GENERAL ELECTRICAL NOTES

1 FOR ALL RELOCATED EQUIPMENT, CONTRACTOR SHALL EXTEND WIRES AND

CONDUIT AS REQUIRED UNLESS NOTED OTHERWISE. MATCH EXISTING WIRE AND

CONDUIT SIZES.

2 DEMOLITION AND NEW WORK SHALL BE IN ACCORDANCE WITH THE PHASING

NARRATIVE.

KEYNOTE LEGEND

1 ELECTRICAL CONTRACTOR TO INSTALL NEW STEAM BOILER AND ALL ASSOCIATED

ELECTRICAL COMPONENTS. REFER TO MANUFACTURER'S SHOP DRAWINGS FOR

MORE INFORMATION.

2 RELOCATED RECEPTACLES AND ALL ASSOCIATED WIRES AND CONDUIT. REFER TO

SHEET ED-101 FOR EXISTING LOCATION.

4 RELOCATED UPS CONTROLS BOX. EXTEND WIRES AND CONDUIT AS REQUIRED.

SEE SHEET ED-101 FOR EXISTING LOCATION.

5 EXISTING EMERGENCY POWER OFF SWITCH FOR BOILERS, INTEGRATE NEW

BOILER #2 EPO CONTACT INTO EXISTING EPO CIRCUIT FOR EXISTING BOILERS.

6 ECONOMIZER CONTROL PANEL SHOWN FOR REFERENCE ONLY. ELECTRICAL

CONTRACTOR SHALL COORDINATE EXACT LOCATION WITH THE MECHANICAL

CONTRACTOR.

7 EXTEND EXISTING BOILER CIRCUIT FROM EXISTING LPP2 TO NEW LPP1, EXTEND

CONDUIT AND WIRE AS REQUIRED.

8 PROVIDE NEW CONDUIT AND CONDUCTORS FOR BOILER #2 CIRCUIT.

9 MOUNT XFMR ON TOP OF ELECTRICAL CLOSET. PROVIDE NEMA 3R ENCLOSURE

10 PROVIDE SINGLE POLE SWITCH AS MEANS OF DISCONNECT FOR INDICATED

EQUIPMENT.

12 PROVIDE TWO 2" CONDUITS FROM PANEL RPP THROUGH CONCRETE LID TO A 12" X

12" X 3' TROUGH FOR ALL BRANCH CIRCUITS. EXTEND EXISTING CIRCUITS FROM

EXISTING TROUGH TO PANEL RPP THROUGH NEW TROUGH.

13 PROVIDE 30AMP/600V/NEMA 3R NON-FUSIBLE DISCONNECT FOR TEMPORARY

BOILER CONNECTION.

14 EXTEND EXISTING DEAERATOR CIRCUIT FROM EXISTING LPP2 TO NEW LPP1,

EXTEND CONDUIT AND WIRE AS REQUIRED.

15 RELOCATED FEEDER FOR NEW LPP1 FROM MCC-6.

17 PROVIDE NEW CONDUIT, CIRCUIT AND DISCONNECT. PROVIDE FINAL CONNECTION

TO NEW AIR COMPRESSOR.

18 MAINTAIN EXISTING CONNECTION TO EXISTING DIESEL FUEL PUMPS WHEN

TEMPORARILY RELOCATED TO ALLOW NEW PUMPS TO BE INSTALLED. PROVIDE

FINAL CONNECTION TO NEW DIESEL FUEL PUMPS WHEN INSTALLATION IS

COMPLETE, COORDINATE WITH PLUMBING CONTRACTOR.

NO. DESCRIPTION DATE

bob.davenport

EF-1(N)

WATER TREATMENT

LAB

A

EXHAUST

FAN SWITCH

LIGHT

SWITCH

A

B

ELECTRICAL ROOM

RPP - 26

TOILET

SHOWER

EF-2(N)

(TYPICAL ALL SHADED LIGHT FIXTURES)

(E)

(E)

(E) (E)

(E)(E)

(E) (E) (E)

(E)

(E)(E)(E)

(E) (E)

EF-01(EX)

EF-04(EX)

EF-03(EX)

EF-02(EX)

RPP - 22

TYPE DESCRIPTION MANUFACTURER CATALOG NUMBER VOLT LAMP COLOR LAMP TYPE DIM TYPE WATTS MOUNTING NOTES

A 4FT VAPORTITE LED METALUX BAA-4VT3-LD5-4-G-UNV-L840-CD1-U UNV 4000K LED 0-10V 32W SURFACE

B 2FT VAPORTITE LED METALUX BAA-2VT3-LD5-3-G-UNV-L840-CD1-U UNV 4000K LED 0-10V 24W SURFACE

FIXTURE SCHEDULE NOTES

LIGHTING FIXTURE SCHEDULE

FOR QUESTIONS PERTAINING TO THIS FIXTURE SCHEDULE PLEASE CONTACT RYAN HUFF @ LIGHTING DYNAMICS- 772-285-7169 ; RH@LIGHTINGDYNAMICS.COM

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 1-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:1

:3

A

M

ELECTRICAL LIGHTING PLAN

EL-101

11/21/2022 Checker Author

1/4" = 1'-0"

ELECTRICAL LIGHTING PLAN

GENERAL ELECTRICAL NOTES

1 FOR ALL RELOCATED EQUIPMENT, CONTRACTOR SHALL EXTEND WIRES AND

CONDUIT AS REQUIRED UNLESS NOTED OTHERWISE. MATCH EXISTING WIRE AND

CONDUIT SIZES.

2 DEMOLITION AND NEW WORK SHALL BE IN ACCORDANCE WITH THE PHASING

NARRATIVE.

KEYNOTE LEGEND

1 CONNECT NEW LIGHT FIXTURE AND EXHAUST FAN TO INDICATED CIRCUIT.

PROVIDE NEW CONTROLS AS INDICATED.

2 PROVIDE UL 924 LISTED EMERGENCY BATTERY BACK-UP INVERTERS IN EACH OF

THE INDICATED EXISTING 4' LIGHT FIXTURES. PROVIDE CONSTANT HOT FROM

EXISTING LIGHTING CIRCUIT AHEAD OF LOCAL SWITCHING.

NO. DESCRIPTION DATE

bob.davenport

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CD-FINAL (100% CD) SUBMITTAL 1-03-2024

CD-FINAL (100% CD)

SUBMITTAL

10 CALLE CASIA - ADM. BLDG.

SUITE 4M456

672-20-602

FULLY SPRINKLERED

REPLACE BOILER #2 AND

CORRECT BOILER PLAN

DEFICIENCIES

/3

/2

:1

:3

A

M

ELECTRICAL PANEL

SCHEDULES

EK-101

11/21/2022 Checker Author

Note: ** INDICATES NEW LOAD ALL OTHER LOADS ARE EXISTING THAT HAVE BEEN REOCATED TO NEW PANEL.

Receptacle 0.54 100.00% 0.54

Other 0.50 100.00% 0.50

Motor 1.60 125.00% 2.00 Total Estimated Demand Current: 44 A

Lighting 0.19…