Attachment 0023 MIL_P_70668.pdf

PDF 1 MB Posted

Attached to
CANISTER, MINE, PRACTICE, M88 Federal contract opportunity
Solicitation number
W15QKN21R0106
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to CANISTER, MINE, PRACTICE, M88, newest first.
File Type Posted
Attachment 0027 - Questions and Government Responses 22 Mar 2022.pdf PDF
W15QKN21R0106-0007.pdf PDF
Attachment 0027 - Questions and Government Responses 18 Mar 2022.pdf PDF
W15QKN21R0106-0006.pdf PDF
Attachment 0027 - Questions and Government Responses 9 Mar 2022.pdf PDF
Attachment 0029 Drawings Distribution A.pdf PDF
W15QKN-21-R-0106 0005.pdf PDF
W15QKN21R0106-0004.pdf PDF
Exhibit A - W15QKN-21-R-0106.pdf PDF
W15QKN21R0106-0003.pdf PDF
W15QKN-21-R-0106 0002.pdf PDF
Attachment 0028 - Process Map.pdf PDF
Attachment 0027 - Questions and Government Responses 18 Feb 2022.pdf PDF
Attachment 0027 - Questions and Government Responses 31 Jan 2022.pdf PDF
W15QKN-21-R-0106 0001.pdf PDF
Exhibit A - W15QKN-21-R-0106.pdf PDF
Attachment 0005 - OPSEC Plan Template.pdf PDF
Attachment 0006 - DD 2345.pdf PDF
Attachment 0022 MIL_P_70668 AMDT 3.pdf PDF
Attachment 0001 - Additional Solicitation and Contract Requirements.pdf PDF
Attachment 0003 - Disclosure of Lobbying.pdf PDF
Attachment 0021 MIL_P_70668 AMDT 2.pdf PDF
W15QKN-21-R-0106.pdf PDF
Attachment 0004 - NIST.SP.800-171r2.pdf PDF
Attachment 0007 - NDA.doc DOC document
Attachment 0008 - Tech Data Questionaire.pdf PDF
Attachment 0009 - Past Performance Questionniare.pdf PDF
Attachment 0011 DoDM 5100.76, April 17, 2012, No Restrictions.pdf PDF
Attachment 0024 CDRL Matrix.xlsx XLSX spreadsheet
Attachment 0002 - Contract Quality Requirements.pdf PDF
Attachment 0010 - DODI 5230.24.pdf PDF
Attachment 0012 How to Read DD 1423.pdf PDF
Attachment 0013 PEO AMMO PUBLIC RELEASE CLEARANCE REVIEW.pdf PDF
Attachment 0020 MIL_P_70668 AMDT 1.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIL-P-70668(AR)

6 October 1987

MILITARY SPECIFICATION

PRESSURE CARTRIDGE ASSEMBLY

LOADING, ASSEMBLING AND PACKING

This specification is approved for use within the U.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense.

1. SCOPE

1.1 scope. This specification contains requirements not normally covered by drawings and provides Quality Assurance provisions for the parts, loading assembling, and packing for the Pressure Cartridge Assembly used in the M87 and M88 Canister Assemblies.

2. APPLICABLE DOCUMENTS

2.1 Government documents.

2.1.1 Specifications and standards. The following

specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited in the solicitation.

SPECIFICATIONS

MILITARY

MIL-P-223 - Propellant, Black Powder

MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification for

STANDARDS

MILITARY

MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes

MIL-STD-129 - Marking for shipment and storage

AMSC N/A FSC 1345

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

MIL-STD-286 -

MIL-STD-652 -

MIL-STD-81O -

MIL-P-70668(AR)

Propellant, Solid, Sampling, Examination and Testing Propellants, Solid, for Cannons, Requirements and Packing Environmental Test Methods

2.1.2 Other Government documents, drawings, and

publications. The following other Government documents form a part of this specification to the extent herein. Unless otherwise specified, the issues shall be those in effect on the date of the solicitation.

DRAWINGS

US ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING

CENTER (ARDEC)

PRODUCT DRAWINGS

9366511 - Pressure Cartridge Assembly

9366635 - Cartridge Case Assembly with Primer

(Copies of specifications, standards, handbooks, drawings, and publications required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting officer.)

2.1.3 Other publications. The following documents form a

part of this specification to the extent specified herein. Unless otherwise specified, the issues of documents which are DOD adopted shall be those listed in the issue of the DoDISS specified in the solicitation. Unless otherwise specified, the issues of documents not listed in the DoDISS shall be the issue of the nongovernment documents which is current on the date of the solicitation.

CODE OF FEDERAL REGULATIONS

49 CFR 173.94 - Hazardous Materials Regulations of the Department of Transportation

(The Department of Transportation Regulations are now a part of the Code of Federal Regulations (1949 Edition and Revisions) available from the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402. Orders for the above publications should cite “49 CFR 173.94, (latest revision).”)

MIL-P-70668 (AR)

2.2 Order of precedence. In the event of a conflict between

the text of this specification and the references cited herein (except for associated detail specifications, specification sheets or MS standards), the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.

3. REQUIREMENTS

3.1 Material. Materials shall be in accordance with

applicable drawings and specifications.

3.1.1 Propellant, M1. The propellant shall comply with

MIL-STD-652 Propellant Ml, Form C, Type I, with grain diameter of .13 ± .01 inch.

3.1.2 Propellant, black powder . The propellant shall comply

with MIL-P-223.

3.2 Pressure cartridge assembly. The cartridge assembly

shall comply with all requirements specified on Drawing 9366511 and with all requirements specified therein.

3.3 Moisture content.

3.3.1 Propellant, M1. The moisture content of the M1

propellant used in loading the cartridge assembly shall not exceed

0.50 percent when tested as specified in 4.5.2.

3.3.2 Propellant, black powder . The moisture content of the

propellant used in loading the cartridge assembly shall not exceed

0.15 percent when tested as specified in 4.5.3.

3.4 Environmental conditions. The cartridge assembly shall

meet the requirements of 3.5 when tested at temperature range of -35°F to +145°F.

3.5 Functioning,.

3.5.1 Impact sensitivity, primer. The primer in the

cartridge case assembly when tested in an impact fixture shall fire when impacted with 27 inch ounces of energy, when tested as specified in 4.5.4.1.

3.5.2 Pressure/time values. (+140°F +5°F). The

cartridge assembly when tested in a closed bomb test fixture as specified in 4.5.4.2 shall demonstrate the following pressure/time values:

a.

b.

c.

d.

e.

3. 5.3

MIL-P-70668(AR)

Maximum Peak Pressure 16K psi

Minimum Pressure at .10 seconds 9.5K psi

Minimum Pressure at .20 seconds 8K psi

Minimum Pressure at .40 seconds 7.2K psi

Maximum Time to Peak Pressure 0.08 seconds

Pressure/time value. (-30°F -5°F). The cartridge assembly when tested in a closed bomb test fixture as specified in 4.5.4.2 shall demonstrate the following pressure/time values:

a. Minimum Peak Pressure 8K psi

b. Minimum Pressure at .10 sec 9.5K psi

c. Minimum Pressure at .20 sec 8K psi

d. Minimum Pressure at .40 sec 7.2K psi

e. Maximum time to peak pressure .05 psi

3.6 First article. This specification makes provision for

first article inspection. Requirements for submission of first article samples by the contractor shall be as specified in the contract.

3.7 Workmanship. All parts and assemblies shall be

fabricated and furnished in a thorough, workmanlike manner. They shall be free of burrs, cracks, chips, sharp edges, unblended radii, surface defects, dirt, grease, hot rolling defects, rust, corrosion products and other foreign matter. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. Surface coatings shall be continuous except for a few light scratches. All required markings shall be neat and sharply defined.

4. QUALITY ASSURANCE PROVISIONS

4.1 Respossibility for inspection and standard quality

assurance provisions. Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification.

4.2 Classification of inspections. The following types of

inspection shall be conducted on this item.

a. First article inspection

b. Quality conformance inspection

4.3 First article inspection.

4.3.1 Submission. The contractor shall submit a first

article sample as designated by the contracting officer for evaluation in accordance with provisions of 4.3.2.

article sample quantities as indicated:

Part Participation Drawing

Propellant, Ml, Form C, Type I Propellant, Black Powder Cartridge Case Assembly Pressure Cartridge Assembly Disc Foam Paper, Filter Wadding

4.3.2 Inspection to be performed.

I specified herein.

MIL-STD-652

MIL-P-223

9366635 9366511 9366605 9366604 9366607 9366606

The first

Quantity

10 gram 10 gram

See MIL-A-48078 and Table

4.3.3 Rejection. See MIL-A-48078.

4.4 Quality conformance ins pection.

4.4.1 Inspe ction lot formation. Inspection lots shall compl

with the lot formation Provisions of MIL-A-48078. In addition, inspection lots of cartridge assemblies shall contain:

a. M1 Propellant from not more than one lot from one manufacturer.

b. Propellant black powder from not more than one lot from one manufacturer.

c. Cartridge case assembly with primer from not more than one lot from one manufacturer.

4.4.2 Examination. See MIL-A-48078.

a. Sampling plans . Unless otherwise specified in the Classification of Defects and Test Tables, sampling plans and procedures for major and minor defects shall be in accordance with MIL-STD-105, Single Sample Inspection Level II, Switching, By A.Q.L.

4.4.3 Testing. Testing is described in the First Article and

Quality Conformance Inspection Tables.

4.4.4 Inspection equipment. The inspection equipment

required to perform the examinations and tests prescribed in this specification is identified either directly or by reference, in the “paragraph reference/inspection method” column of the First Article or Quality Conformance Inspection Tables herein. the contractor shall submit inspection equipment designs to the Government for approval in accordance with the terms of the contract. See Section 6 of MIL-A-48078 and 6.2 herein.

4.5 Methods of inspection.

4.5.1 Materials, components and processes. Compliance with

all requirement by current and continuing examination of— — inspection and test data to determine that all components (parts, subassemblies, and materials) have been inspected and tested and found to comply with their respective drawing and specification- -requirements, and that all specified manufacturing processes have been followed.

4.5.1.1 Visual and mechanical inspection. The visual, manual

and mechanical inspections and tests shall verify compliance with the requirements of Sections 3 and 5 of this specification in accordance with 4.4.2 herein and Table I.

4.5.2 Moisture content of M1 propellant. The moisture

content of M1 propellant shall be determined at the time of loading. The moisture content shall be determined in accordance with MIL-STD-286, Method 101.3.2.

4.5.3 Moisture content of black powder propellant. The

moisture content of black powder propellant shall be determined at the time of loading. The moisture content shall be determined in accordance with MIL-STD-286, Method 101.3.2.

4.5.4 Environmental conditions.

4.5.4.1 High temperature function. Units shall be stabilized

per MIL-STD-81O, Method 501.2 at +140°F +5°F and tested in accordance with 4.5.5.

4.5.4.2 Low temperature function. Units shall be stabilized

per MIL-STD-810, Method 502.2 at -30°F -5°F and tested in accordance with 4.5.5.

4.5.5 Functioning.

4.5.5.1 Impact sensitivity primer. The sample units shall

be mounted in a test fixture. The primer shall be impacted on centerline with a 1.94 ± .02 ounce firing pin with a tip of approximately .100 spherical diameter, impacting at 8.7 fps (14 inch drop) maximum. Statistical data shall be gathered to show

8.7 fps to be greater than the mean velocity plus 4 sigma deviations.

4.5.5.2 Pressure/time values. Sample cartridge assemblies, Dwg . 9366511 shall be selected in accordance with 4.4. The samples shall be assembled to a closed bomb type test fixture and the pressure/time values shown in Figure 1 shall be demonstrated by functioning the pressure cartridge.

5. PACKAGING

5.1 Preservation and packaging.

5.1.1 Level C. The cartridge assemblies shall be prepared

and packed in conformance with Department of Transportation Regulations, a part of the code of Federal Regulations, 49 CFR 173.94.

5.2 Packing.

5.2.1 Level C. The containers shall be packed in conformance

with Department of Transportation Regulations, a part of the code of Federal Regulations, 49 CFR 173.94.

5.3 Markings. The containers shall be marked in conformance

with MIL-STD-129.

6. NOTES

6.1 Ordering data. See MIL-A-48078 (AR).

6.2 Submission of inspection equipment designs for ap

(See MIL-A-58078).

proval.

Submit equipment designs as required, to

Commander: US ARDEC ATTN: AMSMC-QAT-I (D), Picatinny Arsenal, NJ 07806-5000. This address will be specified on the Contract Data Requirements List, DD Form 1423 in the contract. Unless otherwise specified, data item DI-R-1714 will apply.

6.3 Data submissions. Results of all tests performed by the

contractor shall be submitted in accordance with Data Item DI-R-1721 on the DD Form 1423 for the contract. Distribution shall include the following:

Commander

ARDEC

ATTN : AMSMC-QAT-M (D)

Picatinny Arsenal, NJ 07806-5000

6.4 Distribution of ammunition data cards, inspection and

test results. Distribution of ammunition data cards, inspection, and test results shall include Commander: ARDEC, Picatinny Arsenal, NJ 07806-5000, ATTN: AMSMC-QAT-M (D).

6.5 Drawings. Drawings listed in Section 2 of this

specification under the heading US Army Armament Research Development, and Engineering Center (ARDEC) may also include drawings prepared by and identified as, US Array Armament Research and Development Command, Edgewood Arsenal, Frankford Arsenal, Rock Island Arsenal, or Picatinny Arsenal drawings. Technical data originally prepared by these activities is now under the cognizance of ARDEC.

MIL--P-7O668(AR)

6.6 Subject term (key word) listing.

Pressure Cartridge Assembly Cartridge Case Assembly

Custodian:

Army-AR

Preparing activity:

Army-AR

(Project 1345-A477)

File details come from the government source that posted it. Updated .