Attachment 0022 MIL_P_70668 AMDT 3.pdf

PDF 20 KB Posted

Attached to
CANISTER, MINE, PRACTICE, M88 Federal contract opportunity
Solicitation number
W15QKN21R0106
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to CANISTER, MINE, PRACTICE, M88, newest first.
File Type Posted
W15QKN21R0106-0007.pdf PDF
Attachment 0027 - Questions and Government Responses 22 Mar 2022.pdf PDF
Attachment 0027 - Questions and Government Responses 18 Mar 2022.pdf PDF
W15QKN21R0106-0006.pdf PDF
Attachment 0027 - Questions and Government Responses 9 Mar 2022.pdf PDF
Attachment 0029 Drawings Distribution A.pdf PDF
W15QKN-21-R-0106 0005.pdf PDF
W15QKN21R0106-0004.pdf PDF
Exhibit A - W15QKN-21-R-0106.pdf PDF
W15QKN21R0106-0003.pdf PDF
Attachment 0027 - Questions and Government Responses 18 Feb 2022.pdf PDF
W15QKN-21-R-0106 0002.pdf PDF
Attachment 0028 - Process Map.pdf PDF
W15QKN-21-R-0106 0001.pdf PDF
Attachment 0027 - Questions and Government Responses 31 Jan 2022.pdf PDF
W15QKN-21-R-0106.pdf PDF
Attachment 0004 - NIST.SP.800-171r2.pdf PDF
Attachment 0007 - NDA.doc DOC document
Attachment 0008 - Tech Data Questionaire.pdf PDF
Attachment 0009 - Past Performance Questionniare.pdf PDF
Attachment 0011 DoDM 5100.76, April 17, 2012, No Restrictions.pdf PDF
Attachment 0024 CDRL Matrix.xlsx XLSX spreadsheet
Attachment 0001 - Additional Solicitation and Contract Requirements.pdf PDF
Attachment 0003 - Disclosure of Lobbying.pdf PDF
Attachment 0021 MIL_P_70668 AMDT 2.pdf PDF
Attachment 0023 MIL_P_70668.pdf PDF
Attachment 0002 - Contract Quality Requirements.pdf PDF
Attachment 0010 - DODI 5230.24.pdf PDF
Attachment 0012 How to Read DD 1423.pdf PDF
Attachment 0013 PEO AMMO PUBLIC RELEASE CLEARANCE REVIEW.pdf PDF
Attachment 0020 MIL_P_70668 AMDT 1.pdf PDF
Exhibit A - W15QKN-21-R-0106.pdf PDF
Attachment 0005 - OPSEC Plan Template.pdf PDF
Attachment 0006 - DD 2345.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INCH-POUND

MIL-P-70668 (AR)

AMENDMENT 3

12 July 1996

SUPERSEDING

AMENDMENT 2

15 July 1991

MILITARY SPECIFICATION

PRESSURE CARTRIDGE ASSEMBLY LOADING,

ASSEMBLING AND PACKING

This amendment forms a part of MIL-P-70668 (AR), dated 6 October 1987, and is approved for use by the U.S. Army Armament Research, Development and Engineering Center, and is available for use by all Departments and Agencies of the Department of Defense.

2.1.1, Delete “MIL-STD-129 - Marking for shipment and storage.”

2.1.3, Delete in its entirety.

3.5.1, Line 4: Delete “4.5.4.1” and substitute “4.5.5.1”.

3.5.2, Delete in its entirety and substitute the following:

“3.5.2 Velocity. The pressure cartridge (Dwg. 9366511) when assembled to a M88 configuration canister shall produce enough energy in the canister to launch the mines at 60 feet per second exit velocity (min.) (measured on the first mine) at all temperatures when tested in accordance with 4.5.5.2.”

3.5.3, Delete in its entirety and substitute the following:

“3.5.3 Force. The pressure cartridge (9366511) when assembled to a M88 configuration canister shall produce force no greater then 6500 lbs-f (Max.) when tested in accordance with 4.5.5.2.”

AMSC N/A FSC 1345

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Source: https://assist.dla.mil -- Downloaded: 2020-11-10T12:01Z Check the source to verify that this is the current version before use.

AMENDMENT 3

Table I, sheet 2 of 2: Under Cartridge Case Assembly with Primer:

Delete “Primer Sensitivity 25-0-1 3.4.1 4.5.4.1” and substitute “Primer Sensitivity with sealant 25-0-1 3.5.1 4.5.5.1.”

Pressure Cartridge Assembly, Delete in its entirety and substitute the following:

“Pressure Cartridge Assembly 20 (Dwg. 9366511) Examination for defects 20-0-REFER 1/ 3.2 4.4.2.2 Functioning Force/Velocity Hot 10-0-REFER 1/ 3.5.2/3.5.3

4.5.5.2 Cold 10-0-REFER 1/ 3.5.3/3.5.3

4.5.5.2”

Add new note;

1/ Refer to technical agency AMSTA-AR-QAA-B for disposition.

4.4.2, Line 4 to Line 5: Delete “, switching, by A.Q.L.”

4.4.2.1, Delete “Primer sensitivity Improper” and substitute “Primer sensitivity with sealant.”

4.4.2.4, Delete Major 103, 104, 106 and 107.

Add 108 as follows:

“108 Functioning/Force/Velocity Hot 10-0-1 3.5.2/3.5.3 4.5.5.2 Cold 10-0-1 3.5.2/3.5.3 4.5.5.2”

4.5.2, Delete “MIL-STD-286, Method 101.3.2” and substitute “MIL-STD-286B, Method 102.1.3”.

4.5.3, Delete “MIL-STD-286, Method 101.3.2” and substitute “MIL-P-223B, Para. 4.4.3 (Oven Method).

4.5.4.1, Delete in its entirety and substitute:

“4.5.4.1 High temperature function. M88 configuration canisters with pressure cartridges shall be conditioned at 140+5 oF for 4 hours minimum after reaching required temperature and shall be tested in accordance 4.5.5.2.”

4.5.4.2, Delete in its entirety and substitute:

“4.5.4.2 Low temperature function. M88 configuration canister with pressure cartridge shall be conditioned at -30- 5oF for 4 hours minimum after reaching required temperature and shall be tested in accordance with 4.5.5.2.”

4.5.5.2, Delete in its entirety and substitute the following:

“4.5.5.2 Force/Velocity function. The pressure cartridge when assembled into the M88 canister and tested at hot and cold shall meet the requirements of 3.5.2 and 3.5.3.”

Delete page in its entirety.

Delete section 5 in its entirety and substitute the following:

“5. PACKAGING

5.1 Packaging.

5.1.1 Level A. Not applicable.

5.1.2 Level B. Not applicable.

5.1.3 Level C. Level C packaging shall be in accordance

with Dwg. 12902743.

5.2 Packing.

5.2.1 Level A. Not applicable.

5.2.2 Level B. Not applicable.

5.2.3 Level C. Level C packing shall be in accordance with

Dwg. 12902744.

5.3 Marking.

5.3.1 Level A. Not applicable.

5.3.2 Level B. Not applicable.

5.3.3 Level C. Level C marking shall be in accordance with

Dwg. 12902743 and 12902744.

The margins of this amendment are marked with an asterisk or vertical lines to indicate where changes (additions, modifications, corrections, deletions) from the previous amendment were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous amendment.

Custodian: Preparing activity:

Army-AR Army-AR

(Project 1345-0022)

File details come from the government source that posted it. Updated .