About this file

This document contains a pre-award survey checklist for evaluating a contractor's accounting system. The checklist asks 22 questions to determine if the contractor's accounting system complies with Generally Accepted Accounting Principles, properly segregates direct and indirect costs, accumulates costs under general ledger control, and meets other requirements for government contracts as specified in FAR Part 31. The questions address topics such as prior DCAA audits of the system, compliance with CAS requirements, timekeeping and labor distribution processes, identification of costs by contract and cost objectives, and financial reporting capabilities. An affirmative response is required for all questions for the system to be deemed acceptable for cost-type government contracts.

The related federal contract opportunity is a solicitation from the Department of the Army Materiel Command Contracting Command for the Integrated Battle Command System Hardware Low Rate Initial Production/Full Rate Production. Final proposals are due by December 10, 2020 for pre-qualified contractors. The requirement is for production of IBCS hardware end items and associated engineering changes, software and firmware updates, and other efforts to maintain approved configurations during the contract period of performance.

View the file

Other files for this federal contract opportunity

Other files attached to RFP for Integrated Battle Command System (IBCS) LRIP/FRP, newest first.
File Type Posted
Attachment 0019 - Section L - Instructions Conditions and Notices to Offerors - 7DEC2020.docx DOCX document
Attachment 0023 - IBCS LRIP FRP DO 0001 Pricing Template_22Oct2020.xlsx XLSX spreadsheet
Attachment 0003 - GFP LRIP FRP - 3SEP2020.xlsx XLSX spreadsheet
Attachment 0007 - AIAMD Requirements Prioritization 1-n table.docx DOCX document
Attachment 0010 - FMECA.docx DOCX document
Attachment 0010a.16 – R034 Media Converter Power Supply-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.3 – E005 Blower Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.8 – E032 R112 Shelter – Server Stack – 02-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.9 – E033 R112 Shelter – Server Stack – 03-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.1 – E043 Firewall Red-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.4 – E049 BPU-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.7 – E052 SCIM-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.14 – E064 Shelter Router Black – FMECA.xlsx XLSX spreadsheet
Attachment 0010d.2 – E144 RWS Bkup Batteries-FMECA.xlsx XLSX spreadsheet
Attachment 0010d.5 – E152 – Media Converter 05-FMECA.xlsx XLSX spreadsheet
Attachment 0010d.9 - E156 UPS - FMECA.xlsx XLSX spreadsheet
Attachment 0010e.2 – E082 thru E091 Wkstn Laptop-FMECA.xlsx XLSX spreadsheet
Attachment 0010e.4 – E102d thru E111 Vid Extender-FMECA.xlsx XLSX spreadsheet
Attachment 0010e.8 – E146 – Table 2 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 0013 - Training Documentation.docx DOCX document
Attachment 0013e - IBCS-A301-003 Vol IV Slide Package_redacted.pdf PDF
Attachment 0020 - Section M - Evaluation Factors for Award - 23NOV2020.docx DOCX document
Attachment 0022a.1.b - ALH-209032 00 CABLE ASSEMBLY CASS.pdf PDF
Attachment 0022a.1.d - ALH-213030 00 CABLE ASSEMBLY CASS.pdf PDF
Attachment 0022a.1.j - PL-ALH-215333 00 S-280 CASS INSTA.pdf PDF
Attachment 0022a.3 - S280_System Power Analysis_12-5-2017.xlsx XLSX spreadsheet
Attachment 0024 - Quality Assurance Surveilance Plan (QASP) - 24NOV2020.pdf PDF
Attachment 0028 - HWSW Baseline Inventory Template.xlsx XLSX spreadsheet
Attachment 0029 - System Security Plan (SSP) Template.doc DOC document
Attachment 0010g - IBCS - 243-003 HW FMECA Results redacted.pdf PDF
Attachment 0004a - EOC Acceptance Test Procedures_FINAL.docx DOCX document
Attachment 0010d.10 – E157 KVM Switch 2 Shelter-FMECA.xlsx XLSX spreadsheet
Attachment 0010h - SWFMEA Results.xlsx XLSX spreadsheet
Attachment 0010a.10 – R016 thru R025 Media Converter Module-FMECA.xlsx XLSX spreadsheet
W31P4Q-20-R-0015- LRIP FRP - 25NOV2020.pdf PDF
Exhibit B - LRIP FRP TO 0001 DD1423 CDRLs_24NOV2020.pdf PDF
Attachment 0001 - IBCS LRIP FRP Statement of Work - 24NOV2020.docx DOCX document
Attachment 0010a.1 – R001 HRFU-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.2 – R002 BPU-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.6 – R006 TIMING UNIT-FMECA.xlsx XLSX spreadsheet
Attachment 0010a.12 – R030 PFPU SSHD-1—FMECA.xlsx XLSX spreadsheet
Attachment 0010a.14 – R032 Media Converter Module 11-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.1 – E001 28VDC Pwr Supply Shelter Power-FMECA.xlsx XLSX spreadsheet
Attachment 0010b.10 – E034 R112 Shelter – Server Stack – 04-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.6 – E051 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.11 – E061 Isolation Router Red-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.12 – E062 Shelter Router-Red-FMECA.xlsx XLSX spreadsheet
Attachment 0010c.16 – E069 Media Converter 03 - FMECA.xlsx XLSX spreadsheet
Attachment 0010d.1 – E123 TMSS – ECU-FMECA.xlsx XLSX spreadsheet
Attachment 0010d.4 – E151 – Media Converter 04-FMECA.xlsx XLSX spreadsheet
Show all 50

RFP for Integrated Battle Command System (IBCS) LRIP/FRP has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM

Name, Title, and signature of Company Principal (President/VP/Controller, etc) responsible for the design of the Accounting System.

PLEASE ANSWER THE QUESTIONS BELOW:

HAVE YOU READ THE DCAA PUBLICATION DCAAM 7641.90 - "Information for Contractors" ON For each question, check only one box. ALL questions must have explanatory narrative text entered in the boxes. Please provide sufficient detail to describe the process (Including Account Numbers/Process Flow etc.) Each Question must be complete. Do NOT refer to previous answers, (i.e. "See Question 3 Above").

Pre-award Survey of Prospective Contractor Accounting System Checklist

1. Has your organization's Accounting System ever been audited by DCAA?

the DCAA Report number or DCAA POC info.

1.A. If the answer is "Yes" to Question 1 above, when was the audit performed?

1.B. If the answer is "Yes" to Question 1 above, did DCAA determine the Accounting System acceptable for award of prospective contracts?

1.C. If the answer is "Yes" to Question 1 above, have there been any changes to the Accounting System since the DCAA audit?

2.B. Has your organization been notified by DCAA that it is (or may be in) non-compliance with its disclosure statement or CAS?

Pre-award Survey of Prospective Contractor Accounting System Checklist

2. Is your organization subject to CAS (48 CFR Chapter 99)?

(If YES (FULL or MODIFIED), the Offeror MUST attach a copy of their most recent audit reports/documentation regarding all CAS compliance or non-compliance issues to this Modified Pre-Award Survey) 2.A. Has your organization submitted a CASB disclosure statement (CASB DS-1) to DCAA and has it been determined adequate?

2.c. Is any aspect of this proposal inconsistent with your orgnaization's disclosed practices or applicable CAS?

Instruction: If the Contractor is planning on bidding on Cost Type Contracts, the contractor MUST provide explanatory narrative for all of the following questions:

3. Has your organization's Accounting System been audited by an outside Certified Public Accountant/Consultant or other Cognizant Federal Agency other than DCAA?

4. Is your organization's Accounting System currently in full operation?

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

6. Is your organization's Accounting System ready for a DCAA audit?

7. Are the loaded hourly labor rates proposed consistent with your established estimating and accounting principles and procedures and FAR Part 31, Cost Principles? (Answer this Questions "N/A" if you do not have an active proposal)

5. Is your organization's Accounting System in accord with Generally Accepted Accounting Principles (GAAP) Applicable in the Circumstances?

8. Does the Accounting System provide for the proper segregation of Direct Costs from Indirect Costs?

9. Does the Accounting System provide for the identification and accumulation of Direct Costs by contract?

10. Does the Accounting System provide for a logical and consistent method for the allocation of Indirect Costs to intermediate and final cost objectives? (A contract is a final cost objective.)

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

11. Does the Accounting System Provide for the accumulation of costs under general ledger control?

12. Does the Accounting System provide for a timekeeping system that identifies employees' labor by intermediate or final cost objectives?

13. Does the Accounting System provide for a labor distribution system that charges Direct and Indirect labor to the appropriate cost objectives?

14. Does the Accounting System provide for an interim (at least monthly) determination of costs charged to a contract through routine posting of books of account?

15. Does the Accounting System provide for an exclusion of costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions?

16. Does the Accounting System provide for the identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract?

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

17. Does the Accounting System provide for the segregation of preproduction costs from production costs?

18. Does the Accounting System provide financial information required by contract clauses concerning limitation of cost (FAR 52.232.20) or limitation on payments (FAR 52.216-16)?

19. Does the Accounting System provide financial information required to support requests for Progress Payments?

Pre-award Survey of Prospective Contractor Accounting System Checklist

22. Is your organization currently performing on Cost-Type (FAR 16.3) contracts/task orders?

21. Is your organization planning on submitting proposals on Cost-Type (FAR 16.3) contracts/task orders?

20. Is the Accounting System designed, and are the records maintained, in such manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

Pre-award Survey of Prospective Contractor Accounting System Checklist 11.0.0.20130303.1.892433.887364 7142287093 1/06/2016 DCAA/Policy and Plans DCAA Preaward survey of Prospective Contractor Accounting System Checklist Naomi Vaughn Draft Preaward survey of Prospective Contractor Accounting System Checklist

Enter Date as MONTH/DAY/YEAR XX/XX/XXXX:
TextField1:
TextField2:
TextField3:
DateField2:
TextField4:
TextField5:
CheckBox1:
CheckBox2:
CheckBox3:
TextField6:
CheckBox4:
CheckBox5:
TextField7:
CheckBox6:

File details come from the government source that posted it. Updated .