Attachment 0015 STATEMENT OF WORK FOR INERT PROPELLING CHARGES.pdf

PDF 139 KB Posted

Attached to
60mm (M204, M235, M236); 81mm (M218, M219, M220, M658); and 120mm (M234A1) Propelling Charges
Solicitation number
W519TC-24-R-0003
Issued by

About this file

This statement of work outlines requirements for inert 60mm, 81mm, and 120mm propelling charges. The US Government seeks to procure inert end item charges composed of inert container assemblies, closure tabs, and inert simulant propellant loaded to nominal weights. The inert charges must be assembled per specifications but free of energetic materials and labeled as inert. Drawings and specifications are referenced for component details. Delivery locations and contact information are provided for shipments as quantities are requested under the LAP Propelling Charge IDIQ contract.

View the file

Other files

File Type Posted
W519TC-24-R-0003 - Amendment 4 - PADDS Print 12.21.2023 .pdf PDF
Attachment 0021 - Surrogate Price Worksheet - Nitrocellulose.xlsx XLSX spreadsheet
W519TC-24-R-0003 Question Log 12.21.23.pdf PDF
W519TC-24-R-0003 AMENDMENT 0003 Questions and Answers - 12.08.23.pdf PDF
W519TC-24-R-0003 AMENDMENT 0003 08 DEC 2023.pdf PDF
W519TC-24-R-0003 AMENDMENT 0002 Questions and Answers - 11.30.2023 v2.pdf PDF
W519TC-24-R-0003 AMENDMENT 0002 30 NOV 2023.pdf PDF
ACV00561H.pdf PDF
W519TC-24-R-0003 AMENDMENT 0002 Questions and Answers - 11.21.2023.pdf PDF
W519TC-24-R-0003 AMENDMENT 0001 31 OCT 2023.pdf PDF
Exhibit D CONTRACT DATA REQUIREMENTS LIST - 81MM M218 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit C CONTRACT DATA REQUIREMENTS LIST - 60MM M236 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit B CONTRACT DATA REQUIREMENTS LIST - 60MM M235 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit G CONTRACT DATA REQUIREMENTS LIST - 81MM M658 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit F CONTRACT DATA REQUIREMENTS LIST - 81MM M220 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit A CONTRACT DATA REQUIREMENTS LIST - 60MM M204 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit H CONTRACT DATA REQUIREMENTS LIST - 120MM M234A1 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit E CONTRACT DATA REQUIREMENTS LIST - 81MM M219 MORTAR PROPELLING CHARGES.pdf PDF
Attachment 0019 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment 0012 GUIDANCE ON DOCUMENTATION OF CONTRACT REQUIREMENTS LIST.pdf PDF
Attachment 0001 PRICE MATRIX.xlsx XLSX spreadsheet
Attachment 0004 CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION STATEMENT OF WORK.rtf RTF text file
Attachment 0007 DD1694 REQUEST FOR PROPOSAL.docx DOCX document
Attachment 0002 OPSEC REQUIREMENTS STATEMENT OF WORK.docx DOCX document
Attachment 0016 END ITEM COMPONENT LISTING.PDF PDF
Attachment 0010 DD1695-1 NOTICE OF REVISION TABULATED.docx DOCX document
Attachment 0020 COCO SECURITY STATEMENT OF WORK.docx DOCX document
Attachment 0005 DD1692 ENGINEERING CHANGE PROPOSAL.docx DOCX document
Attachment 0006 DD1692C ENGINEERING CHANGE PROPOSAL CONTINUATION PAGE.docx DOCX document
Attachment 0003 OPSEC SECURITY PLAN.pdf PDF
Attachment 0014 RECOMMENDATION FOR CHARGE ESTABLISHMENT AND UNIFORMITY CALCULATIONS.pdf PDF
Solicitation W519TC-24-R-0003.pdf PDF
Attachment 0011 DD1695C NOTICE OF REVISION CONTINUATION SHEET.docx DOCX document
Attachment 0013 STATISTICAL PROCESS CONTROL REQUIREMENTS.PDF PDF
Attachment 0017 DRAWING NUMBER LISTING.PDF PDF
Attachment 0008 DD1694C REQUEST FOR PROPOSAL CONTINUATION PAGE.docx DOCX document
Attachment 0018 CONTRACTOR-OWNED AND CONTRACTOR-OPERATED FACILITIES SECURURITY STATEMENT OF WORK.docx DOCX document
Attachment 0009 DD1695 NOTICE OF REVISION.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK FOR

INERT 60MM, 81MM, and 120MM PROPELLING CHARGES

1. OBJECTIVE

The objective of this Inert 60mm, 81mm, and 120mm Propelling Charge Statement of Work is to enable the USG to purchase INERT propelling charges in support of the ongoing Load, Assemble and Pack (LAP) IDIQ contracts being awarded. A deliverable under the LAP IDIQ contracts will be INERT end item charges as part of CLINs XXXX, XXXX, XXXX, and XXXX.

2. BACKGROUND

The USG requires inert 60mm, 81mm, and 120mm mortar propelling charges for use in inert propelling charge models that will be built as a requirement under the Propelling Charge IDIQ contract being awarded.

3. APPLICABLE DOCUMENTS

3.1 DRAWINGS

Drawings for the following components TDP’s are applicable for this SOW. The Drawing Numbers for the necessary required components are as follows:

Caliber Propelling Charge Drawing Number 60mm M204,M235,M236 9312698,12982841,13008610 81mm M218,M219,M220 9300234,9378134,9381510 120mm M234A1 13038372

3.2 MILITARY SPECIFICATIONS AND STANDARDS

MIL-DTL-32276 – CHARGE PROPELLING, M204/M235/M236 LOADING,

ASSEMBLING, AND PACKING, FOR THE 60MM PROPELLING CHARGE

MIL-DTL-70545A - CHARGE PROPELLING, M218/M219/M220 LOADING,

ASSEMBLING, AND PACKING, FOR THE 81MM PROPELLING CHARGE

DTL12977282 – CHARGE PROPELLING, M233/M234/M234A1 LOADING,

ASSEMBLING, AND PACKING, FOR THE 120MM PROPELLING CHARGE

MIL-DTL-32274 – CHARGE PROPELLING, 60/81/120mm, PARTS AND

CONTAINER ASSEMBLY

Attachment 0015

03 April 2023

4. REQUIREMENTS

The quantity and delivery schedule for the inert propelling charges will be provided to the contractor upon award of the LAP Propelling Charge IDIQ contract by the USG. The 60mm, 81mm, and 120mm inert propelling charges are to be composed of the following components: 1 inert container assembly, 1 inert closure tab, and an inert propellant loaded to the nominal charge weight of each propelling charge specification. The 60mm, 81mm, and 120mm inert propelling charges shall be assembled as per their respective specification with the following exceptions: they shall be free of all energetic materials and therefore the final propelling charges are considered inert.

In place of the energetic materials, a simulant should be used for inert propellant in the propelling charges. The materials used for inert parts must be representative of the energetic materials in terms of weight and dimensions, as per their respective specification. Each propelling charge should be labeled with its respective propelling charge nomenclature and be labeled “INERT” along the top half of the propelling charge.

5. GFM:

GFM will not be provided during the performance of this SOW.

6. SHIPPING INSTRUCTIONS:

When quantities of each propelling charge are requested, items shall be shipped to the following address or other address provided at the time of awarding the quantities:

U.S. Army – SFAE-AMO-CAS ATTN: Kevin McDonnell / SFAE-AMO-CAS / Bldg 162 / Picatinny Arsenal Picatinny, NJ 07806-5000

Technical POC for this SOW is Kevin McDonnell, phone 973-724-1400.

File details come from the government source that posted it. Updated .