Attachment 0004 CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION STATEMENT OF WORK.rtf

RTF text file 62 KB Posted

Attached to
60mm (M204, M235, M236); 81mm (M218, M219, M220, M658); and 120mm (M234A1) Propelling Charges
Solicitation number
W519TC-24-R-0003
Issued by

About this file

This statement of work outlines requirements for configuration change management documentation on a federal contract. The contractor may submit engineering change proposals and requests for variance to modify requirements in the government's technical data package. The contractor must prepare and submit ECPs, NORs, and RFVs according to the contract data requirements list. ECPs are for permanent changes and must include all necessary NORs to fully define the request. RFVs allow for temporary departures and can be submitted pre- or post-production. The submission of an ECP or RFV does not affect delivery schedules as any changes must be negotiated separately. Permanent specification changes also require an ECP and NOR.

Text of this file

ATTACHMENT 0004

STATEMENT OF WORK

CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION

The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, NORs, and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.

ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notices of Revision (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.

Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.

All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within

48 hours of submittal of the ECP.

RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre- production (formerly known as Request for Deviation (RFD)) or post- production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.

Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.

Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).

Other files

File Type Posted
W519TC-24-R-0003 - Amendment 4 - PADDS Print 12.21.2023 .pdf PDF
Attachment 0021 - Surrogate Price Worksheet - Nitrocellulose.xlsx XLSX spreadsheet
W519TC-24-R-0003 Question Log 12.21.23.pdf PDF
W519TC-24-R-0003 AMENDMENT 0003 Questions and Answers - 12.08.23.pdf PDF
W519TC-24-R-0003 AMENDMENT 0003 08 DEC 2023.pdf PDF
W519TC-24-R-0003 AMENDMENT 0002 Questions and Answers - 11.30.2023 v2.pdf PDF
W519TC-24-R-0003 AMENDMENT 0002 30 NOV 2023.pdf PDF
ACV00561H.pdf PDF
W519TC-24-R-0003 AMENDMENT 0002 Questions and Answers - 11.21.2023.pdf PDF
W519TC-24-R-0003 AMENDMENT 0001 31 OCT 2023.pdf PDF
Exhibit D CONTRACT DATA REQUIREMENTS LIST - 81MM M218 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit C CONTRACT DATA REQUIREMENTS LIST - 60MM M236 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit B CONTRACT DATA REQUIREMENTS LIST - 60MM M235 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit G CONTRACT DATA REQUIREMENTS LIST - 81MM M658 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit F CONTRACT DATA REQUIREMENTS LIST - 81MM M220 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit A CONTRACT DATA REQUIREMENTS LIST - 60MM M204 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit H CONTRACT DATA REQUIREMENTS LIST - 120MM M234A1 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit E CONTRACT DATA REQUIREMENTS LIST - 81MM M219 MORTAR PROPELLING CHARGES.pdf PDF
Attachment 0019 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment 0012 GUIDANCE ON DOCUMENTATION OF CONTRACT REQUIREMENTS LIST.pdf PDF
Attachment 0001 PRICE MATRIX.xlsx XLSX spreadsheet
Attachment 0007 DD1694 REQUEST FOR PROPOSAL.docx DOCX document
Attachment 0002 OPSEC REQUIREMENTS STATEMENT OF WORK.docx DOCX document
Attachment 0016 END ITEM COMPONENT LISTING.PDF PDF
Attachment 0010 DD1695-1 NOTICE OF REVISION TABULATED.docx DOCX document
Attachment 0020 COCO SECURITY STATEMENT OF WORK.docx DOCX document
Attachment 0005 DD1692 ENGINEERING CHANGE PROPOSAL.docx DOCX document
Attachment 0006 DD1692C ENGINEERING CHANGE PROPOSAL CONTINUATION PAGE.docx DOCX document
Attachment 0003 OPSEC SECURITY PLAN.pdf PDF
Attachment 0014 RECOMMENDATION FOR CHARGE ESTABLISHMENT AND UNIFORMITY CALCULATIONS.pdf PDF
Solicitation W519TC-24-R-0003.pdf PDF
Attachment 0015 STATEMENT OF WORK FOR INERT PROPELLING CHARGES.pdf PDF
Attachment 0011 DD1695C NOTICE OF REVISION CONTINUATION SHEET.docx DOCX document
Attachment 0013 STATISTICAL PROCESS CONTROL REQUIREMENTS.PDF PDF
Attachment 0017 DRAWING NUMBER LISTING.PDF PDF
Attachment 0008 DD1694C REQUEST FOR PROPOSAL CONTINUATION PAGE.docx DOCX document
Attachment 0018 CONTRACTOR-OWNED AND CONTRACTOR-OPERATED FACILITIES SECURURITY STATEMENT OF WORK.docx DOCX document
Attachment 0009 DD1695 NOTICE OF REVISION.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .