This document outlines statistical process control requirements for propelling charges used in 60mm, 81mm and 120mm munitions. The contractor must apply statistical process control techniques and create control charts for specific characteristics, including weight of propellant, gross weight of the propelling charge, and tabbing process. Control limits and chart types are defined for critical characteristics and other characteristics from the minimum to below minimum and from the maximum to above maximum. The contractor must also describe their process control procedures, monitoring and charting of applicable parameters in their bid.

The related solicitation is for 60mm propelling charges in drawings M204, M235 and M236; 81mm propelling charges in drawings M218, M219, M220 and M658; and 120mm propelling charges in drawing M234A1. The solicitation was issued by the Department of the Army Materiel Command Contracting Command located at Rock Island Arsenal.

View the file

Other files

File Type Posted
W519TC-24-R-0003 - Amendment 4 - PADDS Print 12.21.2023 .pdf PDF
Attachment 0021 - Surrogate Price Worksheet - Nitrocellulose.xlsx XLSX spreadsheet
W519TC-24-R-0003 Question Log 12.21.23.pdf PDF
W519TC-24-R-0003 AMENDMENT 0003 Questions and Answers - 12.08.23.pdf PDF
W519TC-24-R-0003 AMENDMENT 0003 08 DEC 2023.pdf PDF
W519TC-24-R-0003 AMENDMENT 0002 Questions and Answers - 11.30.2023 v2.pdf PDF
W519TC-24-R-0003 AMENDMENT 0002 30 NOV 2023.pdf PDF
ACV00561H.pdf PDF
W519TC-24-R-0003 AMENDMENT 0002 Questions and Answers - 11.21.2023.pdf PDF
W519TC-24-R-0003 AMENDMENT 0001 31 OCT 2023.pdf PDF
Exhibit D CONTRACT DATA REQUIREMENTS LIST - 81MM M218 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit C CONTRACT DATA REQUIREMENTS LIST - 60MM M236 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit B CONTRACT DATA REQUIREMENTS LIST - 60MM M235 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit G CONTRACT DATA REQUIREMENTS LIST - 81MM M658 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit F CONTRACT DATA REQUIREMENTS LIST - 81MM M220 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit A CONTRACT DATA REQUIREMENTS LIST - 60MM M204 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit H CONTRACT DATA REQUIREMENTS LIST - 120MM M234A1 MORTAR PROPELLING CHARGES.pdf PDF
Exhibit E CONTRACT DATA REQUIREMENTS LIST - 81MM M219 MORTAR PROPELLING CHARGES.pdf PDF
Attachment 0019 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment 0012 GUIDANCE ON DOCUMENTATION OF CONTRACT REQUIREMENTS LIST.pdf PDF
Attachment 0001 PRICE MATRIX.xlsx XLSX spreadsheet
Attachment 0004 CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION STATEMENT OF WORK.rtf RTF text file
Attachment 0007 DD1694 REQUEST FOR PROPOSAL.docx DOCX document
Attachment 0002 OPSEC REQUIREMENTS STATEMENT OF WORK.docx DOCX document
Attachment 0016 END ITEM COMPONENT LISTING.PDF PDF
Attachment 0010 DD1695-1 NOTICE OF REVISION TABULATED.docx DOCX document
Attachment 0020 COCO SECURITY STATEMENT OF WORK.docx DOCX document
Attachment 0005 DD1692 ENGINEERING CHANGE PROPOSAL.docx DOCX document
Attachment 0006 DD1692C ENGINEERING CHANGE PROPOSAL CONTINUATION PAGE.docx DOCX document
Attachment 0003 OPSEC SECURITY PLAN.pdf PDF
Attachment 0014 RECOMMENDATION FOR CHARGE ESTABLISHMENT AND UNIFORMITY CALCULATIONS.pdf PDF
Solicitation W519TC-24-R-0003.pdf PDF
Attachment 0015 STATEMENT OF WORK FOR INERT PROPELLING CHARGES.pdf PDF
Attachment 0011 DD1695C NOTICE OF REVISION CONTINUATION SHEET.docx DOCX document
Attachment 0017 DRAWING NUMBER LISTING.PDF PDF
Attachment 0008 DD1694C REQUEST FOR PROPOSAL CONTINUATION PAGE.docx DOCX document
Attachment 0018 CONTRACTOR-OWNED AND CONTRACTOR-OPERATED FACILITIES SECURURITY STATEMENT OF WORK.docx DOCX document
Attachment 0009 DD1695 NOTICE OF REVISION.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rock Island Statistical Process Control (SPC) Requirements

The contractor shall consider the below SPC requirements as well as any additional SPC when establishing his bid for this solicitation. At a minimum the following characteristics shall be subjected to the application of SPC techniques as identified:

Paragraph

4.4.2.1 Examination or Test

Type of Charting

Critical 1 Weight of propellant in excess of 3 grains below min or above max. X Bar R Critical 2 Gross weight of propelling charge, min. X Bar R

101 Weight of propellant from min. to and including 3 grains below min. X Bar R 102 Weight of propellant from max to and including 3 grains above max. X Bar R 103 Gross weight of propelling charge, max. X Bar R

Note 1* Tabbing process

Note 1: The contractor to provide a description of the process control procedures including the monitoring and charting of applicable parameters.

Revised 27 FEB 2017

60MM Drawing # 9312698/12982841/13008610 Characteristics for SPC Control Charting – MIL-DTL-32276

Attachment 0013 when establishing his bid for this solicitation. At a minimum the following characteristics shall be subjected to the application of SPC techniques as identified:

Paragraph 4.4.2.1

Examination or Test

Type of Charting

Critical 1 Weight of propellant in excess of 10 grains below min or above max. X Bar R Critical 2 Gross weight of propelling charge, min. X Bar R

101 Weight of propellant from min. to and including 10 grains below min.

X Bar R

102 Weight of propellant from max. to and including 10 grains above max.

X Bar R

103 Gross weight of propellant charge, max. X Bar R Note 1* Tabbing process

Note 1: The contractor to provide a description of the process control procedures including the monitoring and charting of applicable parameters.

Revised 27 FEB 2017

81MM Drawing # 9300234/9378134/9381510 Characteristics for SPC Control Charting – MIL-DTL-70545A when establishing his bid for this solicitation. At a minimum the following characteristics shall be subjected to the application of SPC techniques as identified:

Paragraph 4.4.2.1

Examination or Test

Type of Charting

Critical 1 Weight of propellant in excess of 3.0 grams below min. X Bar R Critical 2 Gross weight of propelling charge, 3.3 grams below min X Bar R

101 Weight of propellant from min. to and including 3.0 grams below min.

X Bar R

102 Weight of propellant, max. X Bar R 105 Gross weight of propelling charge X Bar R

Note 1* Tabbing process

Note 1: The contractor to provide a description of the process control procedures including the monitoring and charting of applicable parameters.

Revised 27 FEB 2017

120MM Drawing # 12577282/12977375/13038372 Characteristics for SPC Control Charting – DTL12977282