Attachment 0011 - Portal Access Addendum 3.pdf

PDF 201 KB Posted

Attached to
Solicitation for the Overhaul of the Landing Gear, Fixed for the UH-60 Blackhawk
Solicitation number
W58RGZ-24-B-0026
Issued by

About this file

This document is an addendum to the LMP TAV-C Portal End User Access Procedures and AMC OPORD, FRAGO 2, 19-220. It addresses the issue of contractor access to the TAV-C portal, which requires an ECA (External Certification Authority) certificate instead of a full security clearance. The addendum outlines the contractor's responsibilities, which include providing the user's ECA form, a memorandum attesting to the documentation, completion of cybersecurity training, and a signed Acceptable Use Policy (AUP). The LCMC (Life Cycle Management Command) is responsible for appointing a government point of contact, evaluating the contractor's access control procedures, and maintaining records of the accepted certificates. This addendum is intended to provide interim guidance until revisions can be made to the user's guide and related documents.

View the file

Other files

File Type Posted
Amend 0005_Attachment 0002_Document Summary List_Revised 21Jun2024.docx DOCX document
Amend 0005_W58RGZ24B0026_21Jun24.pdf PDF
Amend 0005_Attachment 0014_Q and A Responses_W58RGZ-24-B-0026_21Jun2024.pdf PDF
W58RGZ24B0026_Amend 0003_31May24.pdf PDF
W58RGZ24B0026_Amend 0002_16May24.pdf PDF
Attachment 0012_Sealed Bidding Pricing Template_Revised 16May24.xlsx XLSX spreadsheet
W58RGZ-24-B-0026_0001.pdf PDF
Attachment 0013 - M and O Plan Guidance.pdf PDF
Attachment 0012_Sealed Bidding Pricing Template updated 22June2022.xlsx XLSX spreadsheet
Attachment 0009 - Contractor Repair TAV-C Requirements.docx DOCX document
Attachment 0010 - TAV-C Portal User Access Procedures.pdf PDF
Exhibit C_CDRL A003 MO Process Plan.pdf PDF
Attachment 0002_Document Summary List.docx DOCX document
Attachment 0008 - HQAMC-Level Protest Procedures (October 2015).pdf PDF
Attachment 0001_M and O Packaging Requirements.pdf PDF
Attachment 0005 - Template for Depot Maintenance Production Report.xlsx XLSX spreadsheet
W58RGZ24B0026_Solicitation Issued-02MAY24.pdf PDF
Exhibit A_CDRL A001 GP INVENTORY REPORT.pdf PDF
Attachment 0003 - SF 364.pdf PDF
Exhibit D_CDRL A004 TAMMS-A CDRL (Logistics Product Data).pdf PDF
Exhibit B_CDRL A002 Exhibit G - ROD.pdf PDF
Attachment 0006 - Form 1379.pdf PDF
Attachment 0007 - DD Form 1348-1A Sample.pdf PDF
Attachment 0004 - ROD Guidance.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM TO APPENDIX A, THE LMP TAV-C PORTAL END USER ACCESS

PROCEDURES AND AMC OPORD, FRAGO 2, 19-220

To avoid excessive contract modification costs, it was decided in the development of Total Asset Visibility-Contractor (TAV-C) capability in LMP to require all new relevant contracts or new orders to it to be used rather than modify existing contracts. In a step to make participation in Army support more attractive, the decision was made to use the DoD approved External Certification Authority (ECA) certification in lieu of a full security clearance for TAV-C portal users.

TAV-C completed development and post go-live support period on 23 June 2020 with no contracts being processed. The first contracts are now beginning to be finalized and a problem as been found.

Problem.

Procedures developed for contractors’ access requests mirrored those for Army employees. As currently written, the applications require IA training, a signed Acceptable Use Policy (AUP) statement, and the ECA certificate to be provided with a DD Form 2875 System Authorization Access Request (SAAR). It has been determined the use of the SAAR form is not applicable since the ECA certificate process does not require a security clearance so there is no entry in JPAS for a security manager to validate.

Upon further review, G-2/6 determined the ECA certificate was sufficient for portal users, but the use of the SAAR is inappropriate for requests from ECA certified individuals. In order to have an auditable user access process to LMP, it will be necessary to still have a standard account access process across AMC.

Remediation.

Contractor Responsibility. The application packet shall consist of the 1) user’s ECA form, 2) Memorandum for Record on company letterhead paper signed by the contractor Security Manager or an individual with Company Equity Ownership attesting that all documentation needed to complete the ECA Digital Certificate Forms Packet was witnessed at the time of Notarization. 3) completion of cyber security training as evidenced by copy of training certificate. 4) signed AUP. An electronic copy of all the documents listed in this section shall be provided to the appropriate Government Point of Contact before LMP access can be granted.

The applicant can take the cyber security training at (https://public.cyber.mil/training/.

A blank AUP will be provided and can be manually signed and scanned..

LCMC Responsibility. Appoint a government POC for LMP access and oversight. To ensure validity over time, the requiring activity will evaluate the efficacy of the contractor’s TAV-C portal access control procedures for effectiveness, accuracy and the upkeep of their TAV-C access files. Maintain records of certificates accepted and their expiration date and establish procedures to ensure certificates are maintained as current and valid by the contractor.

AMC DCS G3, Supply Requirements Division is publishing this memorandum as an addendum to the LMP TAV-C Portal User Access Procedures and FRAGO 2, AMC OPORD 19-229 to provide interim guidance until revisions to the user’s guide and other related documents to the established solution can be accomplished per recommendations by the G-2/6 within the LCMC and ACC activities processing these contracts. This addendum can be used to enable the https://public.cyber.mil/training/ completion of pending contracts before year-end and will remain in effect until next release of the portal user access guide. Please insert a copy of this addendum in to the user’s guide.

10/15/2020

X Daniel C. Parker, PhD

DR. DANIEL C. PARKER

Chief, AMC G3 Supply Requirements Division

Signed by: PARKER.DANIEL.C.1171814622

File details come from the government source that posted it. Updated .