Attachment 0006 - Form 1379.pdf

PDF 601 KB Posted

Attached to
Solicitation for the Overhaul of the Landing Gear, Fixed for the UH-60 Blackhawk
Solicitation number
W58RGZ-24-B-0026
Issued by

About this file

This document is a Request for Depot Engineering Support Form 1379. It is a form used by contractors to request engineering support from the government for issues related to a specific contract.

The form contains details about the contract, including the contract number, the contractor's tracking number, the priority of the request (urgent or routine), and the date of the request. It also includes information about the aircraft system, type, part number, nomenclature, serial number, and related technical publications. The contractor provides a detailed description of the discrepancy or suggested correction, as well as their contact information.

The government disposition section outlines the recommended corrective action, the authorizing signature, and reference numbers for related tracking systems. The form includes instructions for completing the various fields.

View the file

Other files

File Type Posted
Amend 0005_Attachment 0002_Document Summary List_Revised 21Jun2024.docx DOCX document
Amend 0005_W58RGZ24B0026_21Jun24.pdf PDF
Amend 0005_Attachment 0014_Q and A Responses_W58RGZ-24-B-0026_21Jun2024.pdf PDF
W58RGZ24B0026_Amend 0003_31May24.pdf PDF
W58RGZ24B0026_Amend 0002_16May24.pdf PDF
Attachment 0012_Sealed Bidding Pricing Template_Revised 16May24.xlsx XLSX spreadsheet
W58RGZ-24-B-0026_0001.pdf PDF
Attachment 0013 - M and O Plan Guidance.pdf PDF
Attachment 0012_Sealed Bidding Pricing Template updated 22June2022.xlsx XLSX spreadsheet
Attachment 0009 - Contractor Repair TAV-C Requirements.docx DOCX document
Attachment 0010 - TAV-C Portal User Access Procedures.pdf PDF
Exhibit C_CDRL A003 MO Process Plan.pdf PDF
Attachment 0002_Document Summary List.docx DOCX document
Attachment 0008 - HQAMC-Level Protest Procedures (October 2015).pdf PDF
Attachment 0001_M and O Packaging Requirements.pdf PDF
Attachment 0005 - Template for Depot Maintenance Production Report.xlsx XLSX spreadsheet
Attachment 0011 - Portal Access Addendum 3.pdf PDF
W58RGZ24B0026_Solicitation Issued-02MAY24.pdf PDF
Exhibit A_CDRL A001 GP INVENTORY REPORT.pdf PDF
Attachment 0003 - SF 364.pdf PDF
Exhibit D_CDRL A004 TAMMS-A CDRL (Logistics Product Data).pdf PDF
Exhibit B_CDRL A002 Exhibit G - ROD.pdf PDF
Attachment 0007 - DD Form 1348-1A Sample.pdf PDF
Attachment 0004 - ROD Guidance.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR DEPOT ENGINEERING SUPPORT

FCDD-AMR-AM FORM 1379, Page 1 of 3

Contractor Tracking No.

Contract No. Priority of Request

☐Urgent ☐Routine Date of Request

Contractor Address State, Zip

AC System

AC Type

NSN

CSI

☐Yes ☐No Part No.

Nomenclature

Serial No.

Publication No.

Publication Title

Change No.

Pub Date

Page/WP No. Paragraph/Section Figure No. Table No.

Discrepancy/suggested corrections or solutions:

Submitted by Signature Date

Email Address Phone No.

FCDD-AMR-AM FORM 1379, Page 2 of 3

Contractor Tracking No. Contract No.

Government Disposition:

Authorized by

Authorization Signature

Date

Reference TTS Reference MEO(s) Reference PAID

**The Government Disposition contained on this FCDD-AMR-AM FORM 1379 is not to be construed or interpreted as direction to perform tasks, work, or labor which could result in a monetary charge to the U.S. Government. Additionally, the contents of this Government Disposition shall not be used as direction to modify any existing contract between vendors and the U.S. Government. For questions regarding contracts and changes to contracts, consult your contracting officer. The contracting officer is the approving authority for all matters related to contracts.**

FCDD-AMR-AM FORM 1379, Page 3 of 3

INSTRUCTIONS

Contractor Tracking No. The contractor’s internal 1379 tracking number.

Contract No. The contract number issued to the contactor (required field).

Priority of Request. Request urgency.

Date of Request. Engineering support request date.

Contactor. Contractor company name.

Address. Contractor company address.

State, Zip. Contractor company state and zip code.

AC System. Aircraft system.

AC Type. Aircraft type.

NSN. National Stock Number.

CSI. Critical Safety Item.

Part No. Part number if applicable.

Nomenclature. Name of part.

Serial No. Serial number if applicable.

Publication No. Depot Maintenance Work Requirements (DMWR) or Technical Manual (TM) number.

Publication title. Depot Maintenance Work Requirements (DMWR) or Technical Manual (TM) title.

Change No. Depot Maintenance Work Requirements (DMWR) or Technical Manual (TM) change number.

Pub Date. Depot Maintenance Work Requirements (DMWR) or Technical Manual (TM) date.

Page/WP No. The page/work package the discrepancy/suggestion correction location.

Paragraph/Section. The paragraph/section the discrepancy/suggestion correction is location.

Figure No. The figure number of the discrepancy/suggestion correction.

Table No. The table number of the discrepancy/suggestion correction.

Discrepancy/suggested corrections or solutions. Detailed explanation of the issue/problem.

Submitted by. Contractor submitting form.

Signature. Contractor’s signature.

Date. Date signed.

Email Address. Contractor’s email address.

Phone No. Contractor’s phone number.

Government Disposition. Government’s recommend correction/solution to the issue/problem.

Authorized by. Government disposition approver.

Authorizing Signature. Government disposition approver signature.

Date. Government approval date.

Reference TTS. Task Tracking System number.

Reference MEO(s). MEOs pertaining to problem.

Reference PAID. PAID system number.

Contractor Tracking No:
Contract No:
Date of Request:
State Zip:
AC System:
AC Type:
CSI: No
PartNo:
Serial No:
PublicationNo:
Publication Title:
ChangeNo:
PubDate:
PageWP No:
Discrepancysuggested corrections or solutions:
SubmittedBy:
FigureNo:
TableNo:
Date:
EmailAddress:
PhoneNo:
Priority: Routine
Contractor:
Address:
ACSystem:
ACType:
NSN:
Nomenclature:
PublicationTitle:
PageWPNo:
ParagraphSection:
Discrepancy:
DateOfRequest:
StateZip:
SerialNo:
GovernmentDisposition:
AuthorizedBy:
DispositionDate:
ReferenceTTS:
ReferenceMEOs:
ReferencePAID:
FormDate: 27 Apr 2021
ContractorTrackingNo:
ContractNo:

File details come from the government source that posted it. Updated .