Attachment_0007__Revised_Statement_of_Work_0001.pdf
PDF 102 KB Posted
- Attached to
- Replacement HVAC System CBVC ADMIN, Chickamauga Ch Federal contract opportunity
- Solicitation number
- 140P5126Q0016
About this file
Statement of Work for HVAC System Replacement at Chickamauga/Chattanooga National Military Park
This Statement of Work defines requirements for a contractor to remove and replace eighteen existing Mitsubishi mini-split HVAC systems with new, comparable, energy-efficient units at designated facilities within the Chickamauga/Chattanooga National Military Park (CHCH). The contracting agency is the National Park Service (NPS), and the contract is structured as a Firm-Fixed-Price award. The contractor must be NATE (North American Technician Excellence) certified with minimum two years of field experience and recertification every two years; non-NATE certified contractors will face automatic disqualification. Best Value Analysis will be used for contract award. The procurement specifies eighteen new Mitsubishi 230V, 25-amp outdoor condenser units and eighteen Mitsubishi WR series high-wall indoor units, or approved equivalent models, with sizing and capacity to match or exceed existing units being replaced.
Work encompasses equipment procurement and mobilization, removal and EPA-compliant disposal of existing refrigerant and equipment, installation of new systems in original locations with new refrigerant line sets, low-voltage control wiring, digital remote thermostats, and condensate drain lines, plus comprehensive system startup and testing of all eighteen zones in heating and cooling modes. Deliverables include signed commissioning reports, manufacturer warranties and documentation in hard and digital formats, one hour of training for NPS personnel on system operation and troubleshooting, final project record drawings showing component locations, and proof of refrigerant disposal. A site visit is mandatory prior to work commencement, and the contractor must submit an Accident Prevention Plan and Construction Schedule for COR approval. Work shall be performed during normal park administrative hours (7:00 AM–4:00 PM, Monday–Friday) unless otherwise approved by the Contracting Officer's Representative. Special requirements include strict adherence to historic site preservation standards, NPS safety and security guidelines, and daily worksite cleanup and debris removal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5126Q0016_Amd_0002.pdf | ||
| Attachment_0009__Questions_and_Answers_0002.pdf | ||
| Attachment_0008__Revised_Amd_2_Statement_of_Work_0002.pdf | ||
| Sol_140P5126Q0016_Amd_0001.pdf | ||
| Attachment_0006__Revised_Solicitation_Clause_0001.pdf | ||
| Attachment_0001__Solicitation_Clause.pdf | ||
| Attachment_0002__Statement_of_Work.pdf | ||
| Sol_140P5126Q0016.pdf | ||
| Attachment_0004__Price_Schedule.docx | DOCX document | |
| Attachment_0005__Past_Performance.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) for HVAC System Replacement-PMIS 314962A
Project Title: Mitsubishi Mini-Split HVAC System Replacement Location:
Chickamauga/Chattanooga National Military Park (CHCH) Contracting Agency: National Park Service (NPS)
1.0 Introduction and Background
This Statement of Work (SOW) defines the requirements for a contractor to provide all necessary labor, materials, equipment, and supervision to remove and replace existing Mitsubishi mini-split HVAC systems with new, comparable, and energy-efficient units within designated facilities at the Chickamauga/Chattanooga National Military Park.
2.0 Scope of Work
The contractor shall be NATE (North American Technician Excellence) certified which entails at least 2 years field experience, that they recertify every 2 years to stay knowledgeable on new, efficient refrigerant technologies.
More information about NATE under 2.1. The Contractor shall perform a complete, turnkey replacement of the existing HVAC equipment as detailed in Section 3.0. This is a Firm-Fixed-Price contract, and the Contractor is solely responsible for ensuring the new systems are installed, tested, and operational in compliance with all applicable federal, state, and local codes, and the Secretary of the Interior's Standards for Historic Preservation where applicable.
2.1 NATE Certified Technicians are required because many manufacturers only validate warranties if the tech is NATE, Installation results in better energy efficiency and lower utility bills, they follow precise specifications for less callbacks, and they are certified to handle specific chemicals (refrigerants) safely and in compliance with EPA. NATE certified techs ensure the highest quality of work.
2.2 The contractor must be certified NATE by reasons above and disqualified by same reasons above. Non-NATE certified will be automatic disqualification.
2.3 Best Value Analysis will be used for this contract.
3.0 Specific Tasks and Technical Requirements
The Contractor shall execute the following tasks:
3.1 Equipment Procurement and Mobilization
• Procure eighteen (18) new Mitsubishi 230V, 25 amp, condensers outdoor units and eighteen (18) new Mitsubishi WR series mini-splits high-wall indoor units (or approved equivalent models) of appropriate sizing and capacity to match or exceed the performance of the units being replaced.
• Although not mandatory, it is highly recommended that contractors attend the site visit as this is a Historical Building and to better comprehend the project.
• Confirm all equipment is new, currently manufactured, and registered for the full manufacturer’s warranty upon installation.
• Develop and submit a detailed Accident Prevention Plan (APP) and Construction Schedule to the NPS Contracting Officer's Representative (COR) for approval prior to the start of work.
• A site visit is a must.
3.2 Removal and Disposal of Existing Units
• Safely decommission and evacuate refrigerant from eighteen (18) existing outdoor units and eighteen (18) existing indoor units in compliance with EPA regulations, including proper handling of refrigerants.
• Carefully disconnect and remove all associated refrigerant line sets, wiring, and condensate lines.
• Dispose of all removed equipment, components, and construction debris off-site at an approved recycling or disposal facility. The disposal cost shall be included in the fixed price.
3.3 New System Installation
• Install eighteen (18) new Mitsubishi outdoor units in the same general locations as the units being replaced, ensuring proper mounting and vibration isolation.
• Install eighteen (18) new Mitsubishi high-wall indoor units in the exact same interior locations as the units being replaced.
• Install new refrigerant line sets for all new systems. All line sets shall be insulated and protected using new UV-resistant line set covers/raceways to match the aesthetic of the building exterior.
• Install new low-voltage control wiring between all indoor and outdoor units, routed discreetly and protected in raceways.
• Install new digital remote thermostats for each zone, programmed and calibrated for optimal performance.
• Install new, properly sloped condensate drain lines for all indoor units, ensuring compliance with local drainage codes and park aesthetics.
3.4 System Start-up and Testing
• Charge the new systems with the appropriate refrigerant type and quantity.
• Perform a comprehensive system startup and commissioning, including verification of proper electrical power, voltage, and amperage draw.
• Conduct a full operational test of all eighteen (18) zones in both heating and cooling modes to ensure the systems meet manufacturer specifications and are fully functional.
4.0 Deliverables
The Contractor shall provide the following to the COR before final payment:
• A. Final signed Start-up and Commissioning Reports for all eight outdoor units, including refrigerant charge, system pressures, and test results.
• B. Warranties and Manufacturer Documentation (hard copy and digital format), including Operation and Maintenance (O&M) manuals, for all new equipment.
• C. Training for NPS personnel (minimum one hour) on the operation, programming, and basic troubleshooting of the new digital remote thermostats and indoor units.
• D. Final Project Record Drawings (Redlines) showing the final location of all major components and line set routing.
• E. Proof of proper refrigerant disposal.
5.0 Government Furnished Property (GFP)
The Government (NPS) will provide access to the work areas and existing electrical power at the building service panels. No other equipment or materials will be provided by the Government.
6.0 Schedule and Place of Performance
• Place of Performance: Chickamauga/Chattanooga National Military Park, various designated facilities. The specific addresses will be provided in the Notice to Proceed (NTP).
• Period of Performance: The work shall be completed within [Insert Number] calendar days from the issuance of the Notice to Proceed
(NTP).
• Work Hours: Work shall generally be performed during normal park administrative hours (e.g., 7:00 AM – 4:00 PM, Monday through Friday) unless other times are approved in advance by the COR to minimize disruption to park operations and visitors.
7.0 Special Conditions and Requirements
• Historic Site Preservation: The Contractor must exercise extreme caution when working near historic structures, artifacts, and landscape features. Any damage to historic property or cultural resources caused by the Contractor shall be repaired or restored to the original condition at the Contractor’s expense and to the satisfaction of the COR.
• Safety and Security: All Contractor personnel shall adhere to all NPS safety and security guidelines and wear appropriate identification at all times while on park property.
• Cleanliness: The work area shall be cleaned and all debris removed at the end of each workday. The site must be left in a safe, neat, and orderly condition upon completion of the project.
File details come from the government source that posted it. Updated .