Attachment 0007 - Appendix F - Non-Hazardous Construction and Demolition Debris Submittal Form.pdf
PDF 14 KB Posted
- Attached to
- Repair by Replacement Lighting Building 299 Federal contract opportunity
- Solicitation number
- W519TC-25-R-A017
About this file
The document is a Non-Hazardous Construction and Demolition Debris Submittal Form, designed to track and report waste materials from a construction or demolition project. The form is divided into two phases: Phase I (C&D Plan Data) and Phase II (C&D Report Data), and categorizes materials into three main sections - Civil, Architectural, and Electrical/Mechanical. It provides a comprehensive tracking mechanism for various material types, including asphalt, concrete, steel, wood, electrical components, and mechanical equipment, with columns for estimated weight, percentage to be landfilled, recycled, or diverted, and actual disposal/recycling results. The form is intended to help contractors document and manage waste streams during construction projects, supporting environmental sustainability efforts by providing detailed tracking of material disposal methods.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Estimated Weight Estimated Percent to be Landfilled
Estimated Percent to be Recycled
Estimated Percent to be Diverted TOTAL Weight Weight landfilled Landfill Weight recycled Recycler Weight
Diverted Diversion Weight tickets received
(pounds) (%) (%) (%) (pounds) (pounds) (vendor/ company name) (pounds) (vendor/ company name) (pounds) (vendor/ company name) Y or N
CIVIL
Asphalt Concrete Gravel Soil Structural Steel Structural Wood Other Wood Other Steel/Metal Top Soil Sub Soil Trees Crushed Stone/Base
ARCHITECTURAL
Aluminum Brick Carpet Ceiling Tile
CMU
Copper Doors Drywall Glass Insulation Materials Iron Metal Studs Misc Metal Paper Plastic Roofing Materials Sheet Metal Stone Vinyl Base Vinyl Flooring Windows Wood Studs
ELECTRICAL
Ballasts Light Fixtures Transformers Wire Conduit
MECHANICAL
Cast Iron Pipe Copper Pipe Steel Pipe HVAC Equipment White Goods Plumbing Fixtures
RPZ/DCD
Insulation
PHASE II:C&D Report Data
Material
Non-Hazardous Construction and Demolition Debris Submittal Project Title:
Project Number:
Contractor Name:
Contracting Officer's Representative:
PHASE I:C&D Plan Data
File details come from the government source that posted it. Updated .