Attachment 0004 - Appendix C - Submittal Register.pdf

PDF 81 KB Posted

Attached to
Repair by Replacement Lighting Building 299 Federal contract opportunity
Solicitation number
W519TC-25-R-A017
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

The Submittal Register is a comprehensive document for the Repair by Replacement of Normal and Emergency Lighting in Building 299 at the Rock Island Arsenal. The register details required submittals across multiple specification sections, including preconstruction submittals, quality control documents, test reports, operation and maintenance data, and closeout documentation. Key submittal categories include baseline construction schedules, accident prevention plans, contractor quality control plans, warranty management plans, shop drawings, product data, test reports, and certificates for various electrical and lighting system components such as luminaires, transformers, UPS systems, circuit breakers, and lighting controls.

The document outlines specific submission requirements for technical documentation, with most submittals classified as "G" (Government review), covering areas like electrical systems installation, performance testing, design data, manufacturer's instructions, and end-user training plans. Notable technical submissions include ANSI/IES testing reports (LM-79, LM-80, TM-21, TM-30), shop drawings for luminaires and lighting control systems, verification tests for occupancy sensors and photosensors, and operation and maintenance data for electrical and lighting systems. The submittal register is part of solicitation PR 2024-1269 for the Army Contracting Command - Rock Island Arsenal project.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

PR 2024-1269

Bldg 299 Repair By Replacement Normal - Emergency Lighting

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GBaseline Construction Schedule

SD-07 Certificates

1.4Monthly Updates

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.6 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3LHE Inspection Reports

SD-07 Certificates

1.5.1.3Crane Operators/Riggers

1.7Activity Hazard Analysis (AHA)

1.8.1Hot Work Permit

01 45 00 SD-01 Preconstruction Submittals

1.5.2 GContractor Quality Control (CQC)

Plan

01 78 00 SD-03 Product Data

1.8.1Warranty Management Plan

1.6Spare Parts Data

SD-08 Manufacturer’s Instructions

1.8.1Instructions

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES

Bldg 299 Repair By Replacement Normal - Emergency Lighting

01 78 00 3.5 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

3.4As-Built Record of Equipment and Materials

1.8.1Warranted Equipment and

Materials

3.7.1 GInterim DD FORM 1354

3.7.2List Of Installed Building

Equipment Items For DD Form

01 78 23 SD-10 Operation and Maintenance

Data

3.1.1 GOperation And Maintenance

Manual, Final Submittal

SD-11 Closeout Submittals

1.4.5.6 GRecord Drawings And Utility

Systems

02 84 16 SD-07 Certificates

1.8.1 GQualifications of CIH

1.8.1 GTraining Certification

1.8.2 GPCB and Lamp Removal Work

Plan

1.8.3 GPCB and Lamp Disposal Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

Bldg 299 Repair By Replacement Normal - Emergency Lighting

02 84 16 SD-11 Closeout Submittals

3.4.2 GTransporter Certification

3.4.2.1Certificate of Disposal and/or recycling

05 40 00 SD-03 Product Data

2.1Studs, Joists

2.1 SRecycled Content of Steel

Products

07 21 16 SD-03 Product Data

2.1 GBlanket Insulation

2.1.1 SRecycled Content for Insulation

Materials

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.3 GFrames

SD-03 Product Data

2.1 GDoors

2.3 GFrames

09 29 00 SD-03 Product Data

2.1.1Abuse Resistant Gypsum Board

Accessories

26 20 00 SD-02 Shop Drawings

2.11 GPanelboards

2.13 GTransformers

SD-03 Product Data

2.10 GReceptacles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

Bldg 299 Repair By Replacement Normal - Emergency Lighting

26 20 00 2.11.3 GCircuit Breakers

2.9 GSwitches

2.13 GTransformers

2.12 GEnclosed Circuit Breakers

SD-06 Test Reports

3.4.1 GTransformer Tests

SD-09 Manufacturer’s Field

Reports

2.20.1Transformer Factory Tests

SD-10 Operation and Maintenance

Data

1.5.1 GElectrical Systems

26 33 53 SD-02 Shop Drawings

1.5.1 GUPS Drawings

1.5.2 GUPS Installation

SD-03 Product Data

2.1.1 GUPS Module

1.4.2 GSpare Parts

SD-09 Manufacturer’s Field

Reports

3.2.2 GInitial Inspection and Tests

3.2.3 GPerformance Tests

1.5.3 GPerformance Test Plan

1.5.4 GPerformance Test Report

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

Bldg 299 Repair By Replacement Normal - Emergency Lighting

26 33 53 1.4.1 GUPS Operation and Maintenance

SD-11 Closeout Submittals

3.1Installation

26 51 00 SD-02 Shop Drawings

1.5.1 GLuminaire Drawings

1.7.2 GLighting Control System One-Line

Diagram

2.5.1 GSequence of Operation for

Lighting Control System

SD-03 Product Data

2.2 GLuminaires

2.3 GLight Sources

2.4 GLED Drivers

1.6.1 GLuminaire Warranty

1.6.2 GLighting Controls Warranty

2.5.1.1.1 GLighting Control Panel

2.5.2.1 GSwitches

2.5.2.2 GWall Box Dimmers

2.5.2.3 GOccupancy/Vacancy Sensors

2.5.2.4 GPhotosensors

2.5.2.3.6 GPower Packs

2.6.1 GExit Signs

2.6.3 GEmergency Drivers

SD-05 Design Data

1.5.2 GLuminaire Design Data

1.5.7 GPhotometric Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

Bldg 299 Repair By Replacement Normal - Emergency Lighting

26 51 00 SD-06 Test Reports

1.5.3 GANSI/IES LM-79 Test Report

1.5.4 GANSI/IES LM-80 Test Report

1.5.5 GANSI/IES TM-21 Test Report

1.5.6 GANSI/IES TM-30 Test Report

3.2.1.1 GOccupancy/Vacancy Sensor

Verification Test

3.2.1.1 GPhotosensor Verification Test

SD-10 Operation and Maintenance

Data

1.7.1 GLighting System

1.7.2 GLighting Control System

3.3.2.1 GEnd-User Training Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .