ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
JMTC CONCRETE PROJECTS
SECURITY NOTES
SECURITY
Al I contractor e"1)1oyees, includino subcontractor- errployees, reQuiring access to Ar-rrry instol lotions, foci I ities, Or' control led access areas shol I corrplete AT Level I oworeness tr-oining. The COR wl 11 be pr"ovlded a copy of the RIA-JMTC AT Level I oworeness training and ossurino the troinino is corrp I eted.
The contr-octor sho I I s ion o MefTIOr"'ondum of Record for each contractor enpl oyee and subcontractor enp I oyee to the RI A-JMTC Oper-otions Center pr-ior- to o RIA-JMTC electr-onic keys and access poss being issued.
The contractor and 011 associated subcontractors efll)loyees shol I provide 011 information reQuired for background checks to meet instol lotion access requir-ements to be occorrpl ished by the instol lotion Director of Emeroency Services.
The contractor workforce nust co,rp I y with o I I persona I identity verification reQuirements IFAR Clouse 52.204-9.
Personal Identity Verification of Contractor Personnel> os directed by ooo. HODA. and/or IOCOI pol icy. In addition to the changes otherwise authorized by the chonoe c I ouse of this contract. should the Force Protection Condition IFPCON> ot any individual foci I ity or instol lotion chonoe, the Government may reouire chonoes in contractor security matters or processes.
Contractor ond o I I assoc i oted subcontractor 8"1> I oyees sho I I corrply with adj udication stondords and procedures usino the Notional Crime Information Center interstate identification
Index lNCIC-1111 and Terrorist Screenino Ootobose <TSOBI (Army Directive 2014-05/AR 190-131. opp I icoble instol lotion.
foci I ity access ond local security policies ond procedures (provided by government representotive >. The COR wi 11 provide gu i donce to corrpl ete the Access Control Records Check reouest
Form thru the RI A Di rectorote of Emergency Services.
Contractor will ocQuire and need to return all issued u.s.
Government Corrrnon Access Cords. instol lotlon badges. and/or access posses. Use FAR 52.204-9 or PADDS Clouse IF00015 IF00015 at the end of the contract or the lost day of on individual contractor� errp I oyment.
RIA-JMTC electronic keys ond access posses ore accountable items and wi 11 be returned within 24 hours of no longer being needed. I terns wi I I returned to the COR or p I aced in o drop box at o RIA-JMTC access point.
Contractors who routinely foi I to return theSe items wi 11 not be issued them in support of ony future contract.
The Contractor and 011 associated subcontractors shol I brief 011 errployees on the IOCOI iWATCH program. The iWATCH troinino wi 11 be provided in the RJA-JMTC AT training.
NOTES
Contractor and o I I ossoc i oted subcontractor e"1) I oyees sha I I co,rp I y with odj ud i cot ion
!���1��?�a�?g,, P
1�:� u r�� ,t!l 7Y, t
��d N
�:;�� l s� r
J�e!�r�i6i�o;:
n r,sDJ 7 terState
�!�� i �� r
�gr: �1 e� 6�d
���e�G�;!
l Prge� �!� g!
e o��:����t i
�Pr!���i�ir v�1�85ih�ngo� oco I f��� ��� v
J?: 8Y;����ot� �rf��� e
��� ����f�e;�trol Records Check reQuest Form
Contractor wi 11 acouire ond need to return al I issued u.s. Government Corrrnon Access Cords. instol lotion badges. and/or access posses. Use FAR 52.204-9 or PAOOS Clouse
IF00015 IF00015 at the end of the contract or the lost day of on individual controctor5#32s errp I oyment.
RJA-JMTC electronic keys and access posses ore accountable items and wi 11 be returned pf���� n i� h
��� �bx n
�t
��1�-�:f8 g 0��=�:
d Poi�t� ms wi 11 returned to the COR or
Contractors who routinely foi I to return these items wi 11 not be issued them in support of any future contract.
The Contractor and 011 associated subcontractors shol I brief 011 errployees on the local iWATCH program. The iWATCH training wi 11 be provided in the RIA-JMTC AT training.
During FPCONs Char i ie and Delta. services may be discontinued/postponed due to higher threat. Services wi 11 resume when FPCON level is reduced to level Bravo or lower.
The FPCON descriptions wi 11 be provided in the RIA-JMTC AT training.
The COR wi 11 keep the contractors informed on the current FPCON or any possible FPCON change.
Contractor personnel working on Rock Island Arsenal ore subj ect to participation in b�t�66��� w�f� P c��y;
i
:r t� r r n���3Ct Y�!
c
� 1ee� e g;
c
��:· R�� r l �? o�� l�s��g?
e
�� 11�;-
Deportment.
The RAMP program is discussed in the RIA-JMTC AT training.
LOCATION ON ROCK ISLAND ARSENAL
K LA NAL
PLANT ENGINEERING DIRECTORATE
TARA-I FF
JMTC CONCRETE WORK
SHEET- 1 OF 5
208 - TOOL CRIB PAD
NOTES
1. THE CONTRACTOR WILL USE WATER TO ELIMINATE
OUST DURING ENTIRE CONSTRUCTION.
2. WHEN SAW CUTTING FLOOR AROUND WORK AREA,
REBAR WILL BE PRESENT ANO MUST BE CUT OFF EVEN
WITH SAW CUTS.
3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO
FLOOR OR THE UNDERLYING SOIL CAUSED BY THE
CONSTRUCT ION.
4. THE CONTRACTOR SHALL REMOVE ALL OEBR IS SUCH
AS BOLTS, CANS, BEAMS, CONDUIT, PLATES, PIPES, WOOD
BLOCKS, CONCRETE ANO REBAR OFF RIA IN ACCORDANCE
WITH LOCAL REGULATIONS.
5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE. IF
EQUIPMENT USED ARE GAS ENGINES.
-CONTRACTOR SHALL HAVE CATALYTIC•
CONVERTER ON ALL DIESEL ENGINES.
6. NEW CONCRETE FOR MACHINE FOUNDATION SHALL BE
A MIN. 5000 PSI.
7. THE CONTRACTOR SHALL CLEANUP THE WORKS I TE
AFTER COMPLETION OF THE PROJECT.
8. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL.
AFTER CLEANUP IS COMPLETE, LINE FOUNDATION WITH
1/2" RIGID FOAM INSULATION FOR VIBRATION ISOLATION.
JOINT SEALANT SHALL BE BASF 50NOLASTIC SL-1 OR EQUAL.
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
JMTC CONCRETE PROJECTS
GENERAL NOTES
11. BARRICADES WILL BE POSITIONED 6' FROM EACH SIDE OF THE WORK AREA,
CONTRACTOR SHALL PROV I OE ANO PLACE THE BARR I CAOES
12. CONTRACTOR WILL PROVIDE SPOTTER / GROUND MAN
FOR EQUIPMENT / TRUCKS GOING IN ANO OUT OF BLOG.
13. DOUBLE TIED LAYER OF #<4 REBAR (1/2"), 12" X-W
SPACING. REBAR SHOULD BE A MIN OF 3• AWAY FROM
TOP OR BOTTOM SURFACE ANO HAVE A MINUMUM OF 2 ROOS
IN EACH DIRECTION, DOWELS WILL BE DRILLED A
MINIMUM OF 6" INTO THE VERTICAL FACE OF THE
EXISTING CONCRETE,
14, CONSOLI DATE PLACED CONCRETE US I NG ME CHAN I CAL VI BRAT I NG
EQUIPMENT WITH HANO RODDING ANO TAMPING SO THAT CONCRETE
IS WORKED AROUND RE I NFORC I NG ANO OTHER EMBEDDED ITEMS
ANO INTO FORMS.
15. FABRICATION ANO INSTALLATION OF STRUCTURAL STEEL
SHALL COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL
CONSTRUCTION IAISCI STANDARDS ANO SPECIFICATIONS. ALL
WORK SHALL BE PERFORMED BY COMPETENT, EXPER I ENCEO,
QUALi F I ED WORKMENT.
16. ANY DISCREPANCIES IN PLANS, OR BETWEEN PLANS ANO
SPECIFICATIONS, SHALL BE BROUGHT TO THE ATTENTION OF
RIA REPRESENTATIVE JOE CARPENTIER IMMEDIATELY.
17. DRAWING NOT TO SCALE.
LOCATION ON ROCK I SL ANO ARSENAL
INDEX
SECURITY NOTES •••••••••••••••••••••••••••••• 1
Trench FIii Layout Drawing ••••••••••••••••• 3
299 Trencn F' I I I DEMO/FLOOR CUT •••••••••••••• 4
9. JACK HAMMERING / REMOVAL WILL BE DONE BETWEEN THE TIMES OF
2:30 PM ANO 11 :00 PM OR SATURDAYS.
<ll@ @ C:J�<!> <ll <!> e:> ® ® ®@ ® ® @'i!!®@@@@@@@@@@ @�®®@@@@@@ e e @�@ e e 299 Tl"'ench FI 11 ELEV/CONST PLAN,,,,,,,,,,,, ,S aPOURING OF NEW CONCRETE,FRAMING, TYING OF REBAR
WILL BE DAY SHIFT WORK.
10. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATORS
SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC ANO
WORKABLE CONDITION. SATISFACTORY FOR PLACEMENT IN THE WORK.
THE MAXIMUM HAUL TIME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS
OR TRUCK AGITATORS SHALL BE ACCORDING TO THE FOLLOWING:
Concrete TenperotU"e at Point HCRJI Time of Olscna-ge F IC) Ho.rs Minutes
50-64 110-17.51 1 30
65-90 (18-321 - without retarder 1 0
65-90 118-321 - with retcrCler' 1 30
I I ,, ,, BLD. 208 1ST FLOOR PLAN
LA A AL
PLANT ENGINEERING DIRECTORATE
TARA-I FF
JMTC CONCRETE WORK
SHEET- 2 OF 5
208 - TOOL CRIB PAD
PLANT ENGINEERING
208 - TOOL CRIB PAD
LAYOUT DRAWING
0 ---· 0 0 32305 0 _________________________ o ---------
0 -··-· 0 0 32305 0 _________________________ o ---------
132659 I D�B I 132659 I D�B I
PLANT ENGINEERING DIRECTORATE
TARA-I FF
TOO.. CRIB PAD FOR 2D8
SHEET- 3 OF 5
208 - TOOL CRIB PAD
DEMOLITION PLAN/FLOOR CUT PLAN
CURRENT VIEW CUT LINE VIEW
I 12• DEEP MACHINE PIT I
1 • EXPANSION JOINT
I 2.s· WOOOBLOCK I
I •·-12· EXISTING CONCRETE I
I 12• DEEP MACHINE PIT I
1 • EXPANSION JOINT
j 2.r wooDBLoc1 j
L L
PLANT ENGINEERING DIRECTORATE
TARA-I FF
TOOL CRIB PAD FOR 2OB
SHEET- 4 OF 5
ISLAND ARSENAL ROCK
JMTC
208 TOOL CRIB PAD
ELEVATION/CONSTRUCTION PLAN
NOTES:
1. l AREA SURROUNDING FOUNDATION WILL NOT
ALWAYS BE THE SAME ELEVATION. FOUNDATION
MUST MAINTAIN NO GREATER THAN A 1/4" OVER
10' OEVEATION. IF THIS CAN NOT MEET EXISTING
SLAB THE FINAL 12" CAN BE SLOPED TO MEET
EXISTING ELEVATION.
REINFORCING BAR NOTES:
#4 BAR
6" DOWEL EMBEDMENT
1/2" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT
PRODUCT WILL BE USED IN TOPICAL CRACK
j 2.s· GJJBLDcitj
8"-12" EXISTING CONCRETE
CA6 OR EXISTING CONCRETE IF BELOW 12•
LA A AL
PLANT ENGINEERING DIRECTORATE
TARA-I FF
TOOL CRIB PAO FOR 208
SHEET- 5 OF 5