ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
JMTC CONCRETE PROJECTS
SECURITY NOTES
SECURITY
Al I contr-octor enployees. includino subcontractor- efll)loyees.
reQuirino access to Arrrrt instol lotions. foci I ities. or control led access areas shol I COtTPlete AT L evel I oworeness troinino. The COR wi 11 be provided O CoPY of the RIA-JMTC AT L evel I awareness troinino and ossurino the troinino is COfl"P I eted.
The contractor sho I I sign o Merrorondum of Record for each contractor errployee and subcontractor errployee to the RIA-JMTC Operations Center prior to o RIA-JMTC electronic keys and access poss being issued.
The contractor and al I associated subcontractors enployees shol I provide ol I information reQuired for bockQr-ot.md checks to meet instol lotion access requirements to be occorrpl ished by the instol lotion Director of Emer-gency Ser-vices.
The contr-octor workforce rrust conp I y with o I I per-sono I identity ver-ificotion requirements <FAR clause 52-204-9.
Per-sono I Identity Ver if i cot ion of Contractor Per-sonne I > os directed by OoO. HODA. ond/or local pol icy. In addition to the chonoes otherwise authorized by the chonoe Clouse of this contract. shou I d the Force Protection Condition < FPCON > ot any individual foci I ity or instol lotion chonoe. the Government may require chonoes in contr-octor security motter-s or processes.
Contractor and o I I assoc i oted subcontractor- ef'll) I oyees sho I I conply with adjudication stondor-as and proceaur-es usino the
Notional Crime Information Center- interstate identification
Inaex CNCIC-111> ond Terrorist Screenino Ootobose ITSOB> <Army Directive 2014-05/AR 190-13 >. opp I icoble instol lotion.
foe i I i ty access ond I oco I security po I i c i es ond procedures I provided by government representative>. The COR wi 11 provide guidance to conplete the Access Control Records Check request
Form thru the RIA Oirectorote of Emeroency Services.
Contractor wi 11 acquire ond need to retur-n ol I issued u.s.
Government Cc:mnon Access Cor-ds. instol lotion bodoes. and/or access posses. use FAR 52-204-9 or PAODS Clouse IF00015 IF00015 at the end of the contract or the lost day of on individual contractor� enoloyment.
RIA-JMTC electronic keys and access posses or-e accountable items and wi 11 be returned within 24 hours of no lonoer beino needed. Items wi 11 returned to tne COR or placed in o dr-op box at a RIA-JMTC access point .
Contractors v.no routinely foi I to return theSe items wi 11 not be issued them in support of any future contract.
The Contractor- and 011 associated subcontractors shal I br-ief 011 enoloyees on the I OCOI iWATCH Pr"OQr"Om, The iWATCH troinino wi 11 be provided in the RIA-JMTC AT troinino.
NOTES
Contractor ond ol I ossocioted subcontractor enoloyees shol I conply with odjudicotion f ����?�?� a�?g., P J�:� u r�g It� l 7Y, t
��d N
�:��� I s� r
��e!�f��i6i�o�:
n r,so� 7terStOte
�:�� i �� r
��T: �T e�
6�tg���e���;!
/ Prge� �!� 0g� e o��:����r i
�Pr-!�;�i�rr v��:
es
¥h� n goA
OCO I
v�?: 8 Y����g� ar� g��
��e
�ef� e
;�trol Records Check request Form
Contractor wi 11 acquire and need to return ol I issued U.S. Government COfffl'Ol""I Access Cords. instol lotion bodoes. and/or access posses, Use FAR 52,204-9 or PADOS Clouse
IF00015 IF00015 at the end of the contract or the lost doy of on individual controctor5#32s eno I oyment.
RIA-JMTC electronic keys and access posses ore accountable items and wi 11 be returned pf���� n i� o h
�� gbx n gt g n
21�-�:+g o o��=�:
d poi�r� ms wi 11 r-eturned to the COR or
Contractors who routine I y fa i I to return these i terns wi I I not be issued them in support of any future contract.
TO:Tg������-on
�h�
:wi¥g�i�6Tgi�� b
;'rir r t g��vf��� I i� r-i�: �:l-��b0
{f
1r-g?nT��-local
���!�?. F�;��f c;� a
�: IT ���u�
�;n s
,�cb�
1e�1 ?: �!����� i
��8
?�e�1 t
G�eg � e
1b��� oher
The FPCON aescriptions wi 11 be proviaed in the RIA-JMTC AT troinino.
The COR wi 11 keep the contractors informed on the current FPCON or ony possible FPCON chonoe.
Contr-octor per-sonnel workino on Rock Island Arsenal or-e subject to participation in
��r�66��� w,�� p c�Y� !f t� r rn�1r�Ctr�!
c
�T!e� g;
c
��=· R�� r i�?o�� i�s���?
e
��I T6;· )
Deportment.
The RAf.P prooram is discussed in the RIA-JMTC AT troinino.
LOCATION ON ROCK ISLAND ARSENAL
JMTC COOCRETE WORK
SHEET- 1 OF 5
208 VTL PAD
NOTES
1. THE CONTRACTOR WILL USE WATER TO ELIMINATE
OUST DURING ENTIRE CONSTRUCTION.
2. WHEN SAW CUTTING FLOOR AROUND WORK AREA,
REBAR WILL BE PRESENT AND MUST BE CUT OFF EVEN
WITH SAW CUTS.
3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO
FLOOR OR THE UNDERLYING SOIL CAUSED BY THE
CONSTRUCTION.
4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH
AS BOLTS, CANS, BEAMS, CONDUIT, PLATES, PIPES, WOOD
BLOCKS, CONCRETE ANO REBAR OFF RIA IN ACCORDANCE
WITH LOCAL REGULATIONS.
5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE. IF
EQUIPMENT USED ARE GAS ENGINES.
-CONTRACTOR SHALL HAVE CATALYTIC•
CONVERTER ON ALL DIESEL ENGINES.
6. NEW CONCRETE FOR MACHINE FOUNOAT ION SHALL BE
A MIN. 5000 PSI.
7. THE CONTRACTOR SHALL CLEANUP THE WORKS I TE
AFTER COMPLETION OF THE PROJECT.
8. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL.
AFTER CLEANUP IS COMPLETE, LINE FOUNDATION WITH
1/2" RIGID FOAM INSULATION FOR VIBRATION ISOLATION.
JOINT SEALANT SHALL BE BASF SONOLASTIC SL-1 OR EQUAL.
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
JMTC CONCRETE PROJECTS
GENERAL NOTES
11. BARRICADES WILL BE POSITIONED 6' FROM EACH SIDE OF THE WORK AREA.
CONTRACTOR SHALL PROVIDE ANO PLACE THE BARRICADES
12. CONTRACTOR WILL PROVIDE SPOTTER / GROUND MAN
FOR EQUIPMENT / TRUCKS GOING IN ANO OUT OF BLOG.
13. DOUBLE TIED LAYER OF #4 REBAR 11/2">, 12" X-W
SPACING. REBAR SHOULD BE A MIN OF 3" AWAY FROM
TOP OR BOTTOM SURFACE ANO HAVE A MINUMUM OF 2 ROOS
IN EACH DIRECTION. DOWELS WILL BE DRILLED A
MINIMUM OF 6" INTO THE VERTICAL FACE OF THE
EXISTING CONCRETE.
14, CONSOLIDATE PLACED CONCRETE USING MECHANICAL VIBRATING
EQUIPMENT WITH HANO RODDING ANO TAMPING SO THAT CONCRETE
IS WORKED AROUND REINFORCING AND OTHER EMBEDDED ITEMS
ANO INTO FORMS.
15. FABRICATION ANO INSTALLATION OF STRUCTURAL STEEL
SHALL COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL
CONSTRUCTION IAISC> STANDARDS ANO SPECIFICATIONS. ALL
WORK SHALL BE PERFORMED BY COMPETENT, EXPERIENCED,
QUALi FI ED WORK ME NT, 16, ANY DISCREPANCIES IN PLANS, OR BETWEEN PLANS AND
SPECIFICATIONS, SHALL BE BROUGHT TO THE ATTENTION OF
RIA REPRESENTATIVE JOE CARPENTIER IMMEDIATELY.
17. DRAWING NOT TO SCALE.
9. JACK HAMMERING / REMOVAL WILL BE DONE BETWEEN THE TIMES OF
2:30 PM ANO 11 :00 PM OR SATURDAYS.
llPOURING OF NEW CONCRETE,FRAMING, TYING OF REBAR
WILL BE DAY SHIFT WORK.
10. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATORS
SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC ANO
WORKABLE CONDITION. SATISFACTORY FOR PLACEMENT IN THE WORK.
THE MAX I MUM HAUL TI ME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS
OR TRUCK AGITATORS SHALL BE ACCORDING TO THE FOLLOWING:
Concrete Tenperoture ot Point Hou I Tine of Oischoroe F ICI
Hou-s Minutes
50-6◄ {10-17.51 1 30
65-90 < 18-321 - withOUt retcrder 1 0
0 · · · · · · ,,..-,,---;,,...,,,_c:::t:=r--t-<---.;,r 0······· 0······ 0······ 0······ 0······ 0······ 0······ 0 ..... · r.t-�'-n.--■..!,..
LOCATION ON ROCK I SL ANO ARSENAL
INDEX
SECURITY NOTES •••••••••••••••••••••••••••••• 1
Trencn F 111 Loyout Or'owing ••••••••••• , ••••• 3
299 Trench Fi I I DEt«I/FLOOR CUT •.••.•. , ••.•.• ◄
299 Trench Fi 11 ELEV/CONST PLAN, ••• , ••••• , •• 5
65-90 {18-321 - with retarder 1 30 ©- ...... u...---::....... ...... -.;��.....;;;,c;,.:lf'--..,::===----------.L...1-----�-"E:,...,.=
PLANT ENC I NEER I NC DI REC TORA TE
TARA-I FF
JMTC CONCRETE WORK
BLD. 208 1ST FLOOR PLAN SHEET- 2 OF 5
208 VTL PAD
208 VTL PAD LAYOUT
DRAWING
□ L]
33882
33801
□ Q 34461 Di □
HSA� .. � ,. I 48., � II:; 111
lflll li!ili .J � i 'fS" II :lj r -
I H 5 "'" "'" � .
� 34462
□ffl��
... ��, 31947 ,� � 34464 � 34325 "
_ _ _ _ 32305 ______________________________ _
□ L]
33882
33801
□ Q 34461 Di □
HSA� .. � I
ia'._£]ft� II:; Iii lflll li!il -�" � ��-� i'fT' II :lj
'c::, 34462
□ffl �� � · ... �Q,_ ' , , --� ....... _ 31947 ,�
34464 � 34325
. ___ 32305 ______________________________ _
K LAN A NAL
PLANT ENGINEERING DIRECTORATE
TARA-I FF
VTL FOUNDATION BUILDING 208
SHEET- 3 OF 5
208 VTL PAD
DEMOLITION PLAN/FLOOR CUT PLAN
CURRENT VIEW
I 1 • EXPANSION JOINT I
I, g I a·-12· EXISTING CIJICRE.TE I
�1 ,.-
. -.�.TI �I ,,-•-24-• .. -... -,
... �.DNI ,.__ ___ _
I 1••-24• EXISTING FCUIDATIIJII
C LJ T LINE VIEW
1,· DEEP IIAD-IIIE PIT I
1" EXPANSION JOINT
I a--12· EXISTING CIJtCRETE I
NOTES:
1.) CONCRETE IN EXISTING PIT DOES NDT NEED
TO BE DEMOED BELOW A 12• DEPTH. REMAINED OF
PIT SHALL BE FILLED USING COMPACTED FILL
MATERIAL.
K LAN A NAL
PLANT ENGINEERING DIRECTORATE
TARA-I FF
YTL FOUNDATION BUILDING 2D8
SHEET- 4 DF 5
208 VTL PAD ELEVATION/
CONSTRUCTION PLAN
NOTES:
1. l AREA SURROUNDING FDUNDATIDN WILL NDT
ALWAYS BE THE SAME ELEVATION. FDUNDATIDN
MUST MAINTAIN NO GREATER THAN A 1/4" DVER
10' DEVEATION. IF THIS CAN NOT MEET EXISTING
SLAB THE FINAL 12" CAN BE SLOPED TO MEET
EXISTING ELEVATION.
8"-12" EXISTING CONCRETE
REINFORCING BAR NOTES:
#4 BAR
6" DOWEL EMBEDMENT
1/2" EXPANSION JOINT MATERIAL - SL-1 DR EQUIVALENT
PRODUCT WILL BE USED IN TOPICAL CRACK
j 2., .. WOIIJBLOCl j
8"-12" EXISTING CONCRETE
CA6 OR EXISTING CONCRETE IF BELOW 12"
VTL FOUNOATION BUILOING 208
SHEET- 5 OF 5