ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
JMTC CONCRETE PROJECTS
SECURITY NOTES
SECURITY
Al I controctor errployees. includino subcontroctor efl"Oloyees.
reQuirino access to Arrrry instal lotions. foci I ities. or control led access areas shol I conplete AT Level I awareness training. The COR wi 11 be Pr""OVided O copy of the RIA-JMTC AT Level I awareness training and assuring the training is conpleted.
The contractor sho I I s ion a Memorandum of Record for each contractor errp I oyee and subcontractor erro I oyee to the R IA-JMTC Operations Center prior to o RIA-JMTC electronic keys and access poss be i no issued.
The contractor and al I associated subcontractors errployees sho I I provide o I I i nfor-mot ion reQu ired for bockor-ound checks to meet instol lotion access requirements to be occof'f1)1 ished by the instol lotion Director of Emer-oency Ser-vices.
The cont,.-actor workforce nust COITP I y with a I I pe,.-sona I identity ver"ification r"8Quir"ements <FAR clause 52.204-9.
Pe,.-sonal Identity Ver"ificotion of Cont,.-octo,.- Pe,.-sonnel > as dir"ected by OoD. HODA. and/Or" local pol icy. In oddition to the chanoes other"wise authorized by the chanoe clause of this cont,.-oct. should the Force Pr"otection Condition <FPCON> ot any individual foci I ity or instol lotion chanoe. the Gover"nment may require chonoes In contractor security matters or processes.
Cont,.-octor ond o 1 1 assoc t oted subcont,.-octor erro I oyees sho 1 1 conply with adjudication stondor"ds and pr"ocedur"es usino the
Notional Cr"ime Information Center" inter"stote Identification
Index <NCIC-111> and Ter"r"orist Sc,.-eenino Database <TSOB> (A,.-my Oir"ective 2014-05/AR 190-13>. opp I icable instol lotion.
foci I ity access and local secur"ity policies and pr"ocedur"es
I provided by oovernment rep,.-esentative>. The COR wi 11 pr"ovide guidance to corrplete the Access Contr"OI Records Check request
Form thru the RIA Directorote of Emeroency Services.
Contractor wi 11 acquire and need to return al I issued u.s.
Gover"nment Comnon Access Cor"ds. i nsto I I at ion bodoes. and/or access posses. Use FAR 52-204-9 or PADDS Clouse IF00015 IF00015 at the end of the contract or the lost day of on individuol contractor� erroloyment.
RIA-JMTC electronic keys and access posses ore occountable items and will be returned within 24 hours of no lonoer beino needed. I terns wi I I returned to the COR or p I aced in o droP box at o RIA-JMTC access point.
Contr-octors wno routine I y foi I to retur-n tneSe i terns wi 11 not be issued them in support of any future contract.
The Contractor and al I associated subcontractors shol I brief 011 errployees on the IOCOI iWATCH Pr"OQr"Om. The iWATCH training wi 11 be provided in the RIA-JMTC AT troining.
NOTES
Contr-octor- and 011 associated subcontractor errployees sno11 corrply with adjudication f ��g1f�?�o�?� P
J��=� u
��g IC! i 7f I t
��d N
�!;�� J s� r
J�e!gf �"'86i�ai:
n
TfSD� 7 terstote
�:�� i ��
�gr: �1 e� 6�d
���e���;!
/ Prge� �!g a g� e o��:����t i
�Pr!���ibtr v��� es
1h� n go� oca I r��� ��� v i?: 8Y;�g��ai� grf,!.!�� e
��� ���ef�e ;?ntr-ol Records Check r-equest Form
Contractor wi 11 acquire and need to return al I issued U.S. Government Conmon Access
Cords. insto11otion bodoes. and/or access posses. use FAR 52,204-9 or PAOOS Clouse
IF00015 IF00015 at the end of the contract or the lost day of on individual controctor5#32s erro I oyment.
RIA-JMTC electronic keys and access posses ore accountable items and wi 11 be returned
Pib6:� n i� a h �� �x n
�t
��T�-�=+2 o a��=�:dPoi�i�ms wi 11 r-etur-ned to the COR or
Contr-octors who routinely foi I to retur-n these items wi 11 not be issued them in support of any future contract .
T�: T�������-on
?h� 1 l w�,�� i�6r� i �� b
;f7r r g� t
��v f��� i � r i�! �: !-��� 0iv e �r�7 n r��- 1 oca 1
Ourino FPCONs Char i ie and Delta. services may be discontinued/postponed due to hic;;iher thr-eot. se...-vices wi 11 resume when FPCON level is reduced to level e...-ovo or lower-.
The FPCON descriptions wi 11 be provided in the RJA-JMTC AT troininc;;i.
The COR wi 11 keep the contr-actors informed on the cur-r-ent FPCON or any possible FPCON chonoe, Contractor personnel workino on Rock Island Arsenal ore subject to participation in i�i�66�6;� n w��� p c=Y;
i :rt� r-g�;
a r n���3Ct i�� c
�1ee� e g;
c
��;· R�� r" i�? o�� l.�s��g?
e
�;,I 16�· , · Oepor-tment .
The RAMP proorom is discussed in the RIA-JMTC AT troininc;;i.
LOCATION ON ROCK ISLAND ARSENAL
F=tQCK lSLANO MOL..lNE
ROCK SLAND ARSENAL
PLANT ENGINEERING DIRECTORATE
TARA-I FF
JMTC CONCRETE WORK
SHEET- 1 OF 5
220 BORING PIT CAP
NOTES
1. THE CONTRACTOR WILL USE WATER TO ELIMINATE
OUST DURING ENTIRE CONSTRUCTION.
2. WHEN SAW CUTTING FLOOR AROUND WORK AREA.
REBAR WILL BE PRESENT ANO MUST BE CUT OFF EVEN
WITH SAW CUTS.
3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO
FLOOR OR THE UNDERLYING SOIL CAUSED BY THE
CONSTRUCTION.
4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH
AS BOLTS. CANS. BEAMS, CONDUIT. PLATES, PIPES, WOOD
BLOCKS, CONCRETE ANO REBAR OFF RIA IN ACCORDANCE
WITH LOCAL REGULATIONS.
5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE, IF
EQUIPMENT USED ARE GAS ENGINES.
-CONTRACTOR SHALL HAVE CATALYTIC•
CONVERTER ON ALL DIESEL ENGINES.
6. NEW CONCRETE FOR MACHINE FOUNDATION SHALL BE
A MIN, 5000 PSI.
7. THE CONTRACTOR SHALL CLEANUP THE WORKSITE
AFTER COWLETION OF THE PROJECT.
8. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL.
AFTER CLEANUP IS COMPLETE, LINE FOUNDATION WITH
1/2" RIGID FOAM INSULATION FOR VIBRATION ISOLATION.
JOINT SEALANT SHALL BE BASF SONOLASTIC SL-1 OR EQUAL.
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
JMTC CONCRETE PROJECTS
GENERAL NOTES
11. BARRICADES WILL BE POSITIONED 6' FROM EACH SIDE OF THE WORK AREA.
CONTRACTOR SHALL PROVIDE ANO PLACE THE BARRICADES
12, CONTRACTOR WILL PROVIDE SPOTTER / GROUND MAN
FOR EQUIPMENT / TRUCKS GOING IN ANO OUT OF BLOG,
13. DOUBLE TIED LAYER OF #4 REBAR <112"1, 12" X-W
SPACING, REBAR SHOULD BE A MIN OF 3" AWAY FROM
TOP OR BOTTOM SURFACE ANO HAVE A MINUMUM OF 2 ROOS
IN EACH DIRECTION. DOWELS WILL BE DRILLED A
MINIMUM OF 6" INTO THE VERTICAL FACE OF THE
EXISTING CONCRETE.
14. CONSOLIDATE PLACED CONCRETE USING MECHANICAL VIBRATING
EQUIPMENT WITH HANO RODDING ANO TAMPING SO THAT CONCRETE
IS WORKED AROUND REINFORCING AND OTHER EMBEDDED ITEMS
AND INTO FORMS.
15, FABRICATION AND INSTALLATION OF STRUCTURAL STEEL
SHALL COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL
CONSTRUCTION <AISCI STANDARDS ANO SPECIFICATIONS. ALL
WORK SHALL BE PERFORMED BY COMPETENT, EXPERIENCED,
QUALi F I ED WORK ME NT.
16, ANY DISCREPANCIES IN PLANS, OR BETWEEN PLANS ANO
SPECIFICATIONS. SHALL BE BROUGHT TO THE ATTENTION OF
RIA REPRESENTATIVE JOE CARPENTIER IMMEDIATELY,
17. DRAWING NOT TO SCALE.
9. JACK HAMMERING / REMOVAL WILL BE DONE BETWEEN THE TIMES OF
2:30 PM ANO 11:00 PM OR SATURDAYS •
.POURING OF NEW CONCRETE,FRAMING, TYING OF REBAR
WILL BE DAY SHIFT WORK.
10. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATORS
SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC ANO
WORKABLE CONDITION. SATISFACTORY FOR PLACEMENT IN THE WORK.
THE MAX I MUM HAUL TI ME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS
OR TRUCK AGITATORS SHALL BE ACCORDING TO THE FOLLOWING:
Ccncrete TElfll)eroh.re at Point Haul Time of 0ischcr9e F IC> Hours Mirutes
50-6' 110-17,51 1 JO
65-90 118-32 I - wl thoot retarder 1 0
65-90 I 18-32> - with retorClef 1 30
LOCATION ON ROCK ISLAND ARSENAL
INDEX
SECURITY NOTES •••••••••••••••••••••••••••••• 1
T,.ench Fill Layout Drawing ··•·······•••····3
299 Tr-enct, Fi 11 OEl«I/FLCXJR CUT •••••••••••••• ◄
299 Trencn F 111 ELEV/CCI\IST PLAN, •••••••••••• s
L L
PLANT ENGINEERING DIRECTORATE
TARA-I FF
JMTC CONCRETE WORK
SHEET- 2 OF 5
220 BORING PIT CAP
PIT
PLANT ENGINEERING
220 BORING PIT CAP
LAYOUT DRAWING
A A
PLANT ENGINEERING DIRECTORATE
TARA-I FF
PIT FOUNDATION BUILDING 220
SHEET- 3 OF 5
220 BORING PIT CAP
DEMOLITION PLAN/FLOOR CUT PLAN
CURRENT VIEW C LJ T LINE VIEW
I ,. EXPANSION JOINT I
g -1 a-·-12- · ,-x,s1-,NC-co,-CII ET-E I
I l' 0£EP MACHINE PIT I
1,· l)([P MACHINE PIT I
I 1a•-z<11" tx1sr1NG FOUIC>ATIONI 1,,•-z4• u1sr1NG FOJNOATIONI
1 • EXPANSION JOINT
I a·-1z• cx1sr1NC CONCRETE I
NOTES:
1. l CONCRETE IN EXISTING PIT DOES NOT NEED
TO BE DEMOED BELOW A 12" DEPTH. REMAINED OF
PIT SHALL BE FILLED USING COMPACTED FILL
MATERIAL.
ROCK SLAND ARSENAL
PLANT ENG I NEER I NG O I RECTORATE
TARA-I FF
PIT FOUNOATIDN BUILDING 220
SHEET- 4 OF 5
220 BORING PIT CAP
ELEVATION/CONSTRUCTION PLAN
NOTES:
1. l AREA SURROUNDING FOUNDATION WILL NOT
ALWAYS BE THE SAME ELEVATION. FOUNDATION
MUST MAINTAIN NO GREATER THAN A 1/4" OVER
10' DEVEATION. IF THIS CAN NOT MEET EXISTING
SLAB THE FINAL 12" CAN BE SLOPED TO MEET
EXISTING ELEVATION.
8"-12" EXISTING CONCRETE
REINFORCING BAR NOTES
#4 BAR
6" DOWEL EMBEDMENT
1/2" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT
PRODUCT WILL BE USED IN TOPICAL CRACK
2 EVENLY SPACED LONGITUDINAL BARS
4" DOWN FROM SU ACE OF CONCRETE
j 2, 5. lfOOOBLOClt j
8"-12" EXISTING CONCRETE
CA6 OR EXISTING CONCRETE IF BELOW 12"
PIT FOUNDATION BUILDING 220
SHEET- 5 OF 5
File details come from the government source that posted it. Updated .