Attachment 0003 - ORL EXEC ATCT Equipment List.pdf

PDF 108 KB Posted

Attached to
Orlando Executive Airport Air Traffic Control Tower Slatwall/Consoles Design, Fabrication, Delivery and Installation
Solicitation number
697DCK-25-R-00069
Issued by

About this file

This is an equipment list attachment (Attachment 0003) detailing required items for the Orlando Executive Airport Air Traffic Control Tower slatwall/consoles project.

The document specifies quantities and types of equipment needed, including 5 IVSR TED units, speakers, and POTs; 7 IVSR jackboxes; various TAMR components; monitoring equipment like CruArt monitors and keyboards; communications equipment including admin and crash phones; and numerous slatwall-mounted accessories such as flight strip bays, binder storage, and keyboard trays. The list also includes specialized air traffic control equipment such as light guns, MALS, ILS interlock systems, and various display monitors for ASOS, FDIO, and security systems. A notable specification indicates that 2 TAMR TDM units mounted on articulating arms will not be relocated to the console.

View the file

Other files

File Type Posted
Amendment 0003 - Deletion of Solicitation Clauses Not Consistent with Execuitive Orders.pdf PDF
08.04.23_ORL Cab SS2.png PNG image
08.04.23_ORL Cab SS5.png PNG image
08.04.23_ORL Cab SS4.png PNG image
08.04.23_ORL Cab SS13.png PNG image
08.04.23_ORL Cab SS1.png PNG image
08.04.23_ORL Cab SS10.png PNG image
08.04.23_ORL Cab SS8.png PNG image
08.04.23_ORL Cab SS6.png PNG image
Amendment - 0002 - SIR No 697DCK-23-R-00069 - ORL EXEC ATCT Consoles-Slatwall Replacement.pdf PDF
08.04.23_ORL Cab SS9.png PNG image
08.04.23_ORL Cab SS12 (1).png PNG image
Amendment - 0002 - SIR No 697DCK-23-R-00069 - Q and A - ORL EXEC ATCT Consoles-Slatwall Replacement.pdf PDF
08.04.23_ORL Cab SS7.png PNG image
08.04.23_ORL Cab SS3.png PNG image
08.04.23_ORL Cab SS11.png PNG image
Orlando Executive Airport Air Traffic Control Tower Positions Power Drawing.pdf PDF
Amendment 0001 - 697DCK-25-R-00069 - ORL EXEC ATCT Slatwall Consoles Replacement.pdf PDF
Amendment 0001 - Responses to Questions.pdf PDF
Attachment 0004 - DOL Wage Determination.pdf PDF
Solicitation No. 697DCK-25-R-00069 - ORL EXEC ATCT ConsolesSlatwall Replacement.pdf PDF
Attachment 0002 - ORL EXEC ATCT Drawing Set.pdf PDF
Attachment 0001 - Statement of Work - ORL ATCT Slatwall-Consoles - Design - Fabrication - Delivery - Installation.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORL Equipment List

QTY Equipment

5 IVSR TED

5 IVSR SPEAKER

5 IVSR POT

7 IVSR JACKBOX - Dual Jackboxes at LC and GC 3 IVSR Foot Pedal at LC, GC and FD 1 IVSR Remote Alarm 1 NVR Remote Alarm 3 TAMR Keyboard

2 TAMR DCP

1 TAMR SDM

2 TAMR TAAU

2 PET

1 Field Lighting Panel 3 Clock 2 Light Gun

2 SWS

1 MALS

1 ILS Interlock 1 Window Defogger - Push Button Panel, Monitor and Keyboard 1 LOM Panel

1 RVR

1 AAIU

1 ATIS Control 1 Admin Laser Printer 2 CruArt Monitor 2 CruArt Keyboard

1 ASOS OID

1 ASOS Keyboard 1 FDIO Monitor 1 FDIO Keyboard 2 FDIO Printer 1 NIDS / EIDS Monitor Mount (Future) 1 Security Monitor w/ control panel 3 Flight Strip Bays - Slatwall mount 2 FLIGHT Strip Bay Writing Surface Mount - flight counter 2 Admin Phone 1 Crash Phone 6 Overhead Light Controls/Dimmers 1 NOTAM WHITE BOARD (8.5x11) 1 AWOS Monitor and Keyboard 5 Flight Strip Discard Bin (Slatwall Mounted) 5 Binder Storage (Slatwall Mounted) 5 Pull out keyboard tray Slatwall Mounted) 5 Pen/Pencil Storage (Slatwall Mounted)

Attachment 0003

1 Headset Storage 1 Bookshelf

2 TAMR TDM (Mounted on Articulating Arm - Will not be relocated to console) Notes:

Sheet1

File details come from the government source that posted it. Updated .