Amendment 0001 - 697DCK-25-R-00069 - ORL EXEC ATCT Slatwall Consoles Replacement.pdf

PDF 198 KB Posted

Attached to
Orlando Executive Airport Air Traffic Control Tower Slatwall/Consoles Design, Fabrication, Delivery and Installation
Solicitation number
697DCK-25-R-00069
Issued by

About this file

This is Amendment 0001 to solicitation 697DCK-25-R-00069 issued by the Federal Aviation Administration (FAA) AAQ-500 Regional Acquisitions office in College Park, GA. The amendment incorporates responses to vendor questions and clarifications to the statement of work for the Orlando Executive Airport Air Traffic Control Tower Slatwall/Consoles Design, Fabrication, Delivery and Installation project.

The amendment adds two key documents: 1) Responses to vendor questions regarding the slatwall/consoles project and 2) Power drawing specifications for the control tower positions. The effective date is January 7, 2025 and contractors are required to sign and return one copy of the amendment. The solicitation response deadline was not extended by this amendment. This remains a small business set-aside opportunity for design, fabrication, delivery and installation of modular slat-wall style consoles at the Orlando Executive Airport control tower location.

View the file

Other files

File Type Posted
Amendment 0003 - Deletion of Solicitation Clauses Not Consistent with Execuitive Orders.pdf PDF
08.04.23_ORL Cab SS2.png PNG image
08.04.23_ORL Cab SS5.png PNG image
08.04.23_ORL Cab SS4.png PNG image
08.04.23_ORL Cab SS13.png PNG image
08.04.23_ORL Cab SS1.png PNG image
08.04.23_ORL Cab SS10.png PNG image
08.04.23_ORL Cab SS8.png PNG image
08.04.23_ORL Cab SS6.png PNG image
Amendment - 0002 - SIR No 697DCK-23-R-00069 - ORL EXEC ATCT Consoles-Slatwall Replacement.pdf PDF
08.04.23_ORL Cab SS9.png PNG image
08.04.23_ORL Cab SS12 (1).png PNG image
Amendment - 0002 - SIR No 697DCK-23-R-00069 - Q and A - ORL EXEC ATCT Consoles-Slatwall Replacement.pdf PDF
08.04.23_ORL Cab SS7.png PNG image
08.04.23_ORL Cab SS3.png PNG image
08.04.23_ORL Cab SS11.png PNG image
Orlando Executive Airport Air Traffic Control Tower Positions Power Drawing.pdf PDF
Amendment 0001 - Responses to Questions.pdf PDF
Attachment 0004 - DOL Wage Determination.pdf PDF
Solicitation No. 697DCK-25-R-00069 - ORL EXEC ATCT ConsolesSlatwall Replacement.pdf PDF
Attachment 0003 - ORL EXEC ATCT Equipment List.pdf PDF
Attachment 0002 - ORL EXEC ATCT Drawing Set.pdf PDF
Attachment 0001 - Statement of Work - ORL ATCT Slatwall-Consoles - Design - Fabrication - Delivery - Installation.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, i X s required to sign this document and return

ORDER NO. IN ITEM 10A.

1 2

0001 01/07/2025

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1701 COLUMBIA AVENUE

AAQ-570 - Energy and Specialized Contracts

AAQ510ATL-AFN

COLLEGE PARK GA 30337

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x

697DCK-25-R-00069

1 copies to the issuing office.

01/07/2025

(x)

This amendment is created to incorporated response to questions posted by the vendors and clarifications to the statement of work, The following solicitation documents are hereby incorporated as part of the solicitation:

1) Amendment 0001 - Responses to Questions - Orlando Executive Airport Air Traffic Control

Tower Slatwall/Consoles Design, Fabrication, Delivery and Installation

2) Orlando Executive Airport Air Traffic Control Tower Positions Power Drawing

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Hector De Jesus

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

01/17/2025

LIST OF CHANGES: