This is a Performance Work Statement (PWS) for Commercial Uninterruptible Power Supply (UPS) Units Maintenance Services issued by the U.S. Army under Solicitation Number PANAPG-26-Q-0UPS, dated 15 September 2026.

The contractor shall provide comprehensive maintenance services for eight government-owned commercial UPS units and associated battery cabinets located at Aberdeen Proving Ground, Maryland. Services include semi-annual preventive maintenance (PM) on UPS electronics (one major PM and one minor PM per unit annually), quarterly battery system PM visits (four per unit annually), on-demand maintenance and repair with a four-hour response time requirement, and scheduled lifecycle component replacements per Section 4.2. All work must comply with OEM specifications and commercial industry standards. The contract utilizes a Firm-Fixed-Price (FFP) structure for base services encompassing routine PM, travel, diagnostics, labor, and standard consumable materials, plus FFP Not-to-Exceed (FFP-NTE) CLINs capped at $10,000 annually for non-standard repairs and on-demand replacement parts. The place of performance is U.S. Army Aberdeen Test Center, 6943 Colleran Road, Aberdeen Proving Ground, Maryland 21005, with operating hours Monday through Thursday 0700–1630 hours EST and alternating Fridays 0700–1500 hours EST. The Period of Performance is one 12-month Base Period with four consecutive 12-month Option Periods (60 months total). Contractor personnel must be fully trained and qualified in servicing the specific OEM brands and models listed (Liebert, APC, Eaton, and Mitsubishi), maintain appropriate PPE compliance per OSHA standards, and obtain security clearance to access Aberdeen Proving Ground per Army Regulation 190-13. Quality assurance metrics require 100% completion of scheduled PMs on schedule, 100% adherence to four-hour on-demand response times, timely component replacements per the lifecycle schedule, and detailed service reports submitted within five business days of each visit with battery maintenance reports including raw data and trend graphs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Commercial Uninterruptible Power Supply (UPS) Units

Maintenance Services

Solicitation Number: PANAPG-26-Q-0UPS Date: 15 September 2026

1.0 General Information & Scope

1.1 Mission Objective & Scope - The U.S. Army requires uninterrupted power for its Data Centers to ensure continuous operation of mission-critical IT infrastructure. The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items necessary to perform comprehensive preventive maintenance (PM), on-demand maintenance and repairs, and scheduled lifecycle component replacements for eight (8) Government-owned commercial UPS units, including their associated battery cabinets, located at Aberdeen Proving Ground (APG), MD.

1.2 Contract Structure & Pricing Rules - Firm-Fixed-Price (FFP) Base Services: FFP pricing must encompass all routine semi-annual UPS electronics PM, quarterly battery system PM, travel, diagnostic labor, and standard consumable materials.

FFP Not-to-Exceed (FFP-NTE) Parts: Non-standard repairs, on-demand replacement parts, and materials outside of scheduled PM are authorized and funded under FFP-NTE CLINs (capped at $10,000.00 annually). No cost-reimbursable metrics are utilized.

Inventory Scope: All eight (8) units in the Section 4.1 Master Inventory are subject to ongoing PM and the lifecycle replacements in Section 4.2.

1.3 Logistics & Administration - Place of Performance: U.S. Army Aberdeen Test Center (ATC), 6943 Colleran Road, APG, Maryland 21005.

Period of Performance (PoP): One (1) 12-month Base Period with four (4) consecutive 12-month Option Periods (60 months total).

Operating Hours: 0700 to 1630 hours EST, Monday through Thursday;

alternating Fridays 0700 to 1500 EST. Closed opposite Fridays and Federal Holidays (5 U.S.C. 6103).

Information Security: Per the Defense Imagery Management Operations Center (available at www.dimoc.mil), no contract-related details, locations, or photos shall be used in marketing materials or websites without CO approval.

Safety Protocols: Personnel must wear appropriate PPE at industrial/test sites in accordance with OSHA standards (available at www.osha.gov). Non-compliance is cause for immediate site removal.

2.0 Specific Performance Tasks

2.1 Scheduled Preventive Maintenance (PM)

2.1.1 UPS Electronics PM (Semi-Annual) - The Contractor shall perform two

(2) PM visits per unit per year (Annually one (1) major PM and one (1) minor – minor PM offset by six (6) months from major PM) following OEM specifications in accordance with commercial industry standards. Schedule to be agreed to by Government and Contractor prior to contract award.

2.1.1.1 Major PM: Includes all Minor PM tasks plus terminal torque testing, meter calibration, internal bypass load testing, operational bypass validation, and diagnostic wave-form analysis.

2.1.1.2 Minor PM: Visual checks, thermal imaging, status diagnostics, internal cleaning, environmental analysis, and parameter checks.

2.1.2 Battery System PM (Quarterly) - The Contractor shall perform four (4) dedicated battery PM visits per unit per year (every three (3) months). Two (2) of these visits shall be scheduled concurrently with the semi-annual UPS Electronics PM. The remaining two (2) visits will be offset from the semi-annual PM visit by three (3) months. Schedule to be agreed to by Government and Contractor prior to contract award.

Required Tasks: Visual cell checks for leaks, swelling, or corrosion;

logging of cell voltage, internal resistance/conductance, and ambient temperature; terminal cleaning and retorquing; and a cumulative health trend analysis to identify failing jars.

2.2 Scheduled Lifecycle Component Replacement - The Contractor shall perform full battery string and capacitor assembly replacements based on the schedule in Section 4.2.

Parts Standard: All parts must be new, unused OEM-standard components.

Form, Fit, and Function Equivalency: If original parts are documented as obsolete or commercially unavailable, the Contractor may utilize high-quality aftermarket or refurbished parts in accordance with federal procurement regulations and with prior technical approval from the Contracting Officer's Representative (COR).

Modular Capacitor Swaps: For modular systems, where capacitors are integrated directly into proprietary power modules, the Contractor shall price and execute capacitor replacements as complete power module swaps per the manufacturer’s specifications in accordance with federal procurement regulations.

2.3 On-Demand Maintenance and Repair - The Contractor shall provide a qualified technician on-site at the specified ATC location within four (4) hours of receiving an on-demand maintenance and repair support service request.

Legacy Parts Exception: If documented legacy parts unavailability or obsolescence causes delays in final repair resolution, the Contractor will not be penalized for extended timelines, provided the Contractor immediately notifies the Contracting Officer and COR with a written supplier Estimated Time of Arrival (ETA).

2.4 Beyond Economic Repair (BER) Threshold - A unit is considered BER if critical parts are permanently unavailable, or if the estimated repair cost exceeds 65% of its current market replacement value. Upon determining a unit is BER, the Contractor shall immediately halt repair efforts and notify the COR.

2.5 Service Reports - The Contractor shall submit a detailed written service report to the COR within five (5) business days of any PM or on-demand maintenance and repair visit. Battery maintenance reports must include tabular raw data and trend graphs for individual cell voltage and impedance / conductance.

3.0 Quality Assurance Surveillance Plan (QASP) - The Government will monitor Contractor performance using the following surveillance metrics:

Performance Objective Performance Standard Acceptable Quality

Level (AQL) Method of Surveillance

1. Scheduled Preventative Maintenance

All UPS electronics receive semi-annual PM;

all battery systems receive quarterly PM.

100% of scheduled PMs are completed and reported on schedule.

Government review of submitted service reports.

2. On-demand Maintenance & Repair

Qualified technician arrives on-site within four

(4) hours of on-demand request.

100% adherence to the 4-hour response time.

Government verification of arrival times.

3. Component Replacement

Batteries and capacitors / modules are replaced per Section 4.2 schedule.

100% of components are replaced within the specified timeframe.

Government review of service reports.

4. Reporting Detailed service report provided within five (5) business days of visit.

100% of reports are received on time and contain required logs / graphs.

COR tracking and receipt logging.

4.0 Equipment Inventory & Replacement Schedule

4.1 Master Equipment Inventory Table

Unit Manu-facturer

Model Line Capacity Model

Number Serial Number

Associated Batteries Location

1 Liebert EXM 200 kVA 47SA200UA

C01TDY

M25E00

48 jars of type

12HX505-FR

Bldg. 400, Room 130B

2 Liebert NPower 80 kVA NPOWER 37-8801 40 jars of type

12HX205-FR

Bldg. 400, Room 128A

3 APC SmartUP S 30 kVA SUVTPF30

KB4F

PS08113

41021

16 trays of 8 jars each

Bldg. 400 Room 128

4 Eaton 9390IT 40 kVA

9390IT-40 EF204C

AB03

12 trays of 10 jars each, type

ES7-12

Bldg. 350, Foyer

5 Eaton 9390 50 kVA 9390-80 model 50

ED033C

BB04

32 jars of type

HX205FR

Bldg. 436, Room 116

6 Liebert NXb 30 kVA NXb 30 38-4103 24 jars of type

12HX330

Bldg. 606, utility room

7 Mitsubishi 50 kVA 2033A 141931 30 jars of type

12HX300-FR

Bldg. 400, Room 140A

8 Eaton 9390 40 kVA 9390-40 EG353C

AC05

32 jars of type

12HX205-FR

Bldg. 1099, Room 108

4.2 Scheduled Component Replacement Lifecycle

Relevant Unit Component Type Capacity Replacement Target Date Location

Eaton 9390IT (Unit 4) AC & DC Capacitors 40 kVA Within 30 days of award Bldg.

Eaton 9390 (Unit 5) AC & DC Capacitors 50 kVA Within 30 days of award Bldg.

Eaton 9390 (Unit 8) AC & DC Capacitors 40 kVA Within 30 days of award Bldg.

APC

SmartUPS

Capacitor Assemblies (if possible; they may be integrated in other modules)

30 kVA Within 30 days of award

Bldg.

Mitsubishi 2033A (Unit 7) AC & DC Capacitors 50 kVA November

Bldg.

Eaton 9390 (Unit 8) Battery String (32 Jars) 40 kVA February

Bldg.

Eaton 9390IT (Unit 4)

Battery String (12 trays of 10 jarseach) 40 kVA May 2028 Bldg.

APC Smart- UPS (Unit 3)

Battery String (16 trays of 8 jars each) 30 kVA June 2028 Bldg.

Liebert NXb (Unit 6) Battery String (24 jars) 30 kVA April 2029 Bldg.

Mitsubishi 2033A (Unit 7) Battery String (30 jars) 50 kVA December

Bldg.

Liebert EXM (Unit 1) Battery String (48 jars) 200 kVA March 2030 Bldg.

Liebert NPower (Unit 2)

Battery String (40 jars) 80 kVA July 2030 Bldg.

Eaton 9390 (Unit 5) Battery String (32 jars) 50 kVA July 2030 Bldg.

Liebert NXb (Unit 6) AC & DC Capacitors 30 kVA December

Bldg.

Eaton 9390IT (Unit 4)

Battery String (12 trays of 10 jars) 40 kVA May 2031 Bldg.

APC Smart- UPS (Unit 3)

Battery String (16 trays of 8 jars) 30 kVA June 2031 Bldg.

Liebert NPower (Unit 2)

AC & DC Capacitors 80 kVA August 2031 Bldg.

5.0 Qualifications, OEM Authorization and Security

5.1 Technician Certifications & OEM Authorization - The Contractor shall provide a workforce with the demonstrated expertise required to maintain the specific equipment listed. Technicians must be fully trained and qualified in accordance with commercial industry standards, with experience in servicing the specified OEM brands and models of UPS equipment, related ancillary equipment, and batteries.

5.2 Workplace Access & Security - All contractor personnel requiring access to Aberdeen Proving Ground must be able to gain physical installation access in accordance with Army Regulation 190-13 and comply with all APG-specific security policies. All necessary details may be found on the APG webpage in the Visitor Information section, https://home.army.mil/apg/about/visitor-information.

Separate access into the Army Aberdeen Test Center (ATC) restricted areas is obtained after visitor vetting at the ATC Visitor Center. Details will be provided in the awarded contract at time of award.

File details come from the government source that posted it. Updated .