Attachment 0001 - Exhibit A Contract Data Requirements Lists (CDRLs).pdf

PDF 111 KB Posted

Attached to
Corrosion Prevention and Engineering Services
Solicitation number
W912CH24R0175
Issued by

About this file

This is a Contract Data Requirements List (CDRL) form DD 1423 detailing nine deliverables (A001-A009) for a Corrosion Engineering Services contract. The CDRLs specify the format, frequency, and requirements for various reports and materials the contractor must provide to the Army's Combat Capabilities Development Command Ground Vehicle Systems Center (DEVCOM GVSC).

The required deliverables include: monthly progress and status reports (A001), quarterly technical reports in PowerPoint format (A002), final technical reports (A003), corrosion survey reports with detailed analysis of equipment conditions (A004), survey dashboard data reports with metrics and graphics (A005), presentation materials (A006), presentation handouts (A007), instructional videos in .wmv or .mp4 format for milTube (A008), and technical manuals/bulletins (A009). All deliverables must be submitted electronically to the specified government representatives, with most requiring both draft and final versions. The contract line item is 7000, and distribution statement C applies to all deliverables. The forms were prepared by Charles A. Machi on 9/12/2024 and approved by Michelle L. Davis on 21 OCT 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

pg. 1

DD FORM 1423

CONTRACT DATA REQUIREMENT LIST, PREVIOUS EDITION MAY BE USED Form Approval

OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.

Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 7000

B. EXHIBIT: A

C. CATEGORY: TDP ____ TM ____ OTHER MISC

D. SYSTEM/ITEM: Corrosion Engineering Services

E. CONTRACT/PR NO.: TBA

F. CONTRACTOR: TBD

1. DATA ITEM NO: A001

2. TITLE: Contractor's Progress, Status, and Management Report

3. SUBTITLE: Monthly Progress Report

4. AUTHORITY: DI-MGMT-80227

5. CONTRACT REFERENCE: C.4.1, C.4.8

6. REQUIRING OFFICE: FCDD-GVS-ES

7. DD250 REQ: LT

8. APP CODE: N/A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: MONTHLY

11. AS OF DATE: See Blk 16

12. DATE OF FIRST SUBMISSION: See Blk 16

13. DATE OF SUBS. SUBMISSION: See Blk 16

14. DISTRIBUTION:

A. ADDRESSEE: Charles Machi charles.a.machi.civ@army.mil, Kelly Germano kelly.l.germano.civ@army.mil

B. COPIES:

DRAFT: 1

FINAL: 1

REG REPRO:

15. TOTAL COPIES:

16. REMARKS: The contractor shall provide the first report 30 calendar days after contract award; monthly thereafter; due 15 calendar days after the period covered. Reports, delivered electronically, in contractor format, to include information related to research, testing, cost studies, meetings and demonstrations (multiple task order reports can be combined within one document). The report shall include accomplishments during the reporting period and planned activities for the next reporting period.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY: Charles A Machi

H: DATE: 9/12/2024

pg. 2

I: APPROVED BY: //signed// Michelle L. Davis

J: DATE: 21 OCT 2024

pg. 3

OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 7000

B. EXHIBIT: A

C. CATEGORY: TDP ____ TM ____ OTHER MISC

D. SYSTEM/ITEM: Corrosion Engineering Services

E. CONTRACT/PR NO.: TBA

F. CONTRACTOR: TBD

1. DATA ITEM NO: A002

2. TITLE: Quarterly Technical Report

3. SUBTITLE: Technical Report - Study/Services (PowerPoint)

4. AUTHORITY: DID DI-MISC-80508B (T)

5. CONTRACT REFERENCE: C.4.2

6. REQUIRING OFFICE: FCDD-GVS-ES

7. DD250 REQ: LT

8. APP CODE: N/A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: QTRLY

11. AS OF DATE: See Blk 16

12. DATE OF FIRST SUBMISSION: See Blk 16

13. DATE OF SUBS. SUBMISSION: See Blk 16

14. DISTRIBUTION:

A. ADDRESSEE: Charles Machi charles.a.machi.civ@army.mil, Kelly Germano kelly.l.germano.civ@army.mil

B. COPIES:

DRAFT: 1

FINAL: 1

REG REPRO:

15. TOTAL COPIES:

16. REMARKS: The contractor shall provide Corrosion Project Reports due each Quarter, to be delivered electronically for each required Corrosion Project task order. Reports will be provided in the contractor's format unless otherwise agreed upon (PowerPoint) which includes an updated milestone schedule, list of completed activities, planned activities for the next quarter, overall status and details of any issues IAW the applicable work directive and DID DI-MISC-80508B (T) (Technical Report - Study/Services).

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY: Charles A Machi

pg. 4

pg. 5

OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 7000

B. EXHIBIT: A

C. CATEGORY: TDP ____ TM ____ OTHER MISC

D. SYSTEM/ITEM: Corrosion Engineering Services

E. CONTRACT/PR NO.: TBA

F. CONTRACTOR: TBD

1. DATA ITEM NO: A003

2. TITLE: Final Technical Report

3. SUBTITLE: Technical Report - Study/Services

4. AUTHORITY: DID DI-MISC-80508B (T)

5. CONTRACT REFERENCE: C.2.2.2, C.2.2.3, C.2.2.4.1, C.2.2.4.2, C.2.2.5.1,

C.2.2.5.2, C.2.3.1, C.2.3.2, C.2.4.2, C.2.4.3, C.2.4.4, C.4.3

6. REQUIRING OFFICE: FCDD-GVS-ES

7. DD250 REQ: LT

8. APP CODE: N/A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: ASREQ

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: See Blk 16

13. DATE OF SUBS. SUBMISSION: See Blk 16

14. DISTRIBUTION:

A. ADDRESSEE: Charles Machi charles.a.machi.civ@army.mil, Kelly Germano kelly.l.germano.civ@army.mil

B. COPIES:

DRAFT: 1

FINAL: 1

REG REPRO:

15. TOTAL COPIES:

16. REMARKS: The contractor shall provide a final report electronically in contractor’s format, draft due 30 calendar days prior to the end of the task order, final due within 15 calendar days of the end of the task order. This report shall summarize all activities performed by the contractor, include pertinent conclusions/recommendations and include any technical documents, data, analysis developed in support of the identified task areas and/or evaluations performed as part of the task order. The final report shall be delivered in a searchable, electronic format. The Contractor shall provide a report(s) IAW the applicable task order and DID DI-MISC-80508B (T) (Technical Report - Study/Services).

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

pg. 6

H: DATE: 9/12/2024

pg. 7

OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 7000

B. EXHIBIT: A

C. CATEGORY: TDP ____ TM ____ OTHER MISC

D. SYSTEM/ITEM: Corrosion Engineering Services

E. CONTRACT/PR NO.: TBA

F. CONTRACTOR: TBD

1. DATA ITEM NO: A004

2. TITLE: Survey Report

3. SUBTITLE: Survey Report - Command Corrosion Prevention and Control Surveys

4. AUTHORITY: DID DI-MISC-80508B (T)

5. CONTRACT REFERENCE: C.2.2.1, C.4.4

6. REQUIRING OFFICE: FCDD-GVS-ES

7. DD250 REQ: LT

8. APP CODE: N/A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: ASREQ

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: See Blk 16

13. DATE OF SUBS. SUBMISSION: See Blk 16

14. DISTRIBUTION:

A. ADDRESSEE: Charles Machi charles.a.machi.civ@army.mil, Kelly Germano kelly.l.germano.civ@army.mil

B. COPIES:

DRAFT: 1

FINAL: 1

REG REPRO:

15. TOTAL COPIES:

16. REMARKS: The contractor shall provide a report electronically in contractor’s format including graphs and photographs, - draft due 70 business days after the end of each survey, final due within 10 business days following receipt of government comments. This report shall summarize all activities performed by the contractor, include pertinent conclusions/recommendations and include any technical documents, data, analysis developed in support of the identified task areas and/or evaluations performed as part of the task order.

The report shall include:

- Scope – A summary of the TACOM CPC survey, emphasizing the requirements listed in Army Regulation (AR) 750-59 (Corrosion Prevention and Control for Army Materiel).

pg. 8

- Introduction – An overview of the activities performed during the specific TACOM CPC survey.

- Recommendations – Specific recommendations for the Installation/Command/Unit and/or Maintenance Facilities, and other Army stakeholders to reduce corrosion on their equipment. Recommendations are developed considering all elements of the doctrine, organization, training, materiel, leadership and education, personnel, facilities, and policy (DOTMLPF-P) framework.

- Field Engagements – Summaries of field engagements with Soldiers, Maintenance Leaders, Command Staff, and others during the survey; the in-brief and out-brief; the corrosion maintenance demonstrations; the corrosion maintenance and corrosion maintenance reporting discussions; Units visited and recommendations specific to each Unit; and the meetings held.

- Corrosion Survey Data – Summaries of the survey activities performed, the number of assets surveyed, the number of assets rated as ‘CIC/Spot Paint’, ‘Part Replacement’, ‘Repaint’, ‘Metal Work’, or ‘Needs Classification’, and the equipment platform specific corrosion observations, coating issues, cleanliness, and other observations and type of recommended maintenance for correction.

- Equipment Platform-Specific Corrosion Observations – Additional details on selected Army ground equipment platforms that includes summaries of the asset ratings by NSN/Nomenclature (as available), leading parts by corrosion observations, general courses of action for consideration on parts where Stage 3 or Stage 4 corrosion is observed, and possible solutions to the most prevalent coating issue(s) observed.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY: Charles A Machi

H: DATE: 9/12/2024

pg. 9

OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 7000

B. EXHIBIT: A

C. CATEGORY: TDP ____ TM ____ OTHER MISC

D. SYSTEM/ITEM: Corrosion Engineering Services

E. CONTRACT/PR NO.: TBA

F. CONTRACTOR: TBD

1. DATA ITEM NO: A005

2. TITLE: Survey Dashboard and Outbrief

3. SUBTITLE: Technical Report - Survey Dashboard and Outbrief

4. AUTHORITY: DID DI-MISC-80508B (T)

5. CONTRACT REFERENCE: C.2.2.1, C.4.4

6. REQUIRING OFFICE: FCDD-GVS-ES

7. DD250 REQ: LT

8. APP CODE: N/A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: ASREQ

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: See Blk 16

13. DATE OF SUBS. SUBMISSION: See Blk 16

14. DISTRIBUTION:

A. ADDRESSEE: Charles Machi charles.a.machi.civ@army.mil, Kelly Germano kelly.l.germano.civ@army.mil

B. COPIES:

DRAFT: 1

FINAL: 1

REG REPRO:

15. TOTAL COPIES:

16. REMARKS: The contractor shall provide a Survey Dashboard data report in conjunction with the outbrief on the final day of each survey, which will include:

- Discussion items with operators/maintainers

- End items surveyed per installation

- Graphic presentation of numbers of vehicle type surveyed

- Maintenance requirements for vehicles inspected (number and type)

- Maintenance requirements for vehicles inspected percentage and type)

- Assets requiring metal work - unit/NSN/PdM Type/Serial Number/Bumper Number/Age

- Graphic representation of Common Part observations and stage of corrosion.

- Graphic representation of General Part observations and stage of corrosion.

- Photographs of badly corroded examples found during survey

pg. 10

- Evaluation of Assets requested by units during survey

- Overall Observations and Recommendations

- Near term CPC correction opportunities

- Field level CPC tools, consumables and technical documentation

- Concluding remarks - observations and longer term recommendations.

and a spreadsheet.

- Asset List - listing each NSN, VIN, Bumper Number, recommended maintenance with macros to sort by asset type, unit and maintenance needed.

- Summary Graph - with macros to show graphically by PdM Type, Unit, Maintenance Needed and age or any combination e.g., 16 years of FMTV belonging to 1st TC needing CIC/spot paint.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY: Charles A Machi

H: DATE: 9/12/2024

pg. 11

OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 7000

B. EXHIBIT: A

C. CATEGORY: TDP ____ TM ____ OTHER Document D. SYSTEM/ITEM: Corrosion Engineering Services

E. CONTRACT/PR NO.: TBA

F. CONTRACTOR: TBD

1. DATA ITEM NO: A006

2. TITLE: Presentation Material

3. SUBTITLE: General Briefing Materials

4. AUTHORITY: DI-ADMN-81373)

5. CONTRACT REFERENCE: C.2.2.6.1, C.2.2.6.2, C.2.2.6.3, C.2.2.6.4, C.4.5

6. REQUIRING OFFICE: FCDD-GVS-ES

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: ASREQ

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Blk 16

13. DATE OF SUBS. SUBMISSION: See Blk 16

14. DISTRIBUTION:

A. ADDRESSEE: Charles Machi charles.a.machi.civ@army.mil, Kelly Germano kelly.l.germano.civ@army.mil

B. COPIES:

DRAFT: 1

FINAL: 1

REG REPRO:

15. TOTAL COPIES:

16. REMARKS: The contractor shall provide: 1. PowerPoint presentations for US Army TACOM use, including acquisition and logistics uses.

2. PowerPoint presentations for CPC procedure demonstrations for the users/operators of ground vehicles and equipment on the general maintenance practices for corrosion prevention and control.

3. PowerPoint presentations for Chemical Agent Resistant Coating (CARC) Quality Assurance (QA) Technical Assistance.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY: Charles A Machi

pg. 12

pg. 13

OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 7000

B. EXHIBIT: A

C. CATEGORY: TDP ____ TM ____ OTHER MISC

D. SYSTEM/ITEM: Corrosion Engineering Services

E. CONTRACT/PR NO.: TBA

F. CONTRACTOR: TBD

1. DATA ITEM NO: A007

2. TITLE: Presentation Handouts

3. SUBTITLE: Physical Handout Materials

4. AUTHORITY: DI-ADMN-81373

5. CONTRACT REFERENCE: C.2.2.6.1, C.2.2.6.2, C.2.2.6.3, C.2.2.6.4, C.4.5

6. REQUIRING OFFICE: FCDD-GVS-ES

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: ASREQ

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: See Blk 16

13. DATE OF SUBS. SUBMISSION: See Blk 16

14. DISTRIBUTION:

A. ADDRESSEE: Charles Machi charles.a.machi.civ@army.mil, Kelly Germano kelly.l.germano.civ@army.mil

B. COPIES:

DRAFT: 1

FINAL: 1

REG REPRO:

15. TOTAL COPIES:

16. REMARKS: The contractor shall provide: 1. Physical materials (e.g.

Handouts) for US Army TACOM use, including acquisition and logistics uses.

2. Physical materials (e.g. Handouts) for CPC procedure demonstrations for the users/operators of ground vehicles and equipment on the general maintenance practices for corrosion prevention and control .

3. Physical materials (e.g. Handouts) for Chemical Agent Resistant Coating (CARC) Quality Assurance (QA) Technical Assistance.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY: Charles A Machi

pg. 14

pg. 15

OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 7000

B. EXHIBIT: A

C. CATEGORY: TDP ____ TM ____ OTHER MISC

D. SYSTEM/ITEM: Corrosion Engineering Services

E. CONTRACT/PR NO.: TBA

F. CONTRACTOR: TBD

1. DATA ITEM NO: A008

2. TITLE: Instructional Videos

3. SUBTITLE: Instructional and Programmatic Videos

4. AUTHORITY: DI-ADMN-81373

5. CONTRACT REFERENCE: C.4.6

6. REQUIRING OFFICE: FCDD-GVS-ES

7. DD250 REQ: LT

8. APP CODE: A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: ASREQ

11. AS OF DATE: See Blk 16

12. DATE OF FIRST SUBMISSION: See Blk 16

13. DATE OF SUBS. SUBMISSION: See Blk 16

14. DISTRIBUTION:

A. ADDRESSEE: Charles Machi charles.a.machi.civ@army.mil, Kelly Germano kelly.l.germano.civ@army.mil

B. COPIES:

DRAFT: 1

FINAL: 1

REG REPRO:

15. TOTAL COPIES:

16. REMARKS: The contractor shall provide: 1. A video explaining and demonstrating the procedures in a format suitable for upload on milTube.

2. Video clips will be provided in .wmv or .mp4 format.

3. Submit draft 6 weeks before end of period of performance. The Government has 30 calendar days after receipt of the QRG videos to evaluate for accuracy and completeness. The contractor shall provide any required updates or modifications.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY: Charles A Machi

pg. 16

pg. 17

OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.: 7000

B. EXHIBIT: A

C. CATEGORY: TDP ____ TM ____ OTHER MISC

D. SYSTEM/ITEM: Corrosion Engineering Services

E. CONTRACT/PR NO.: TBA

F. CONTRACTOR: TBD

1. DATA ITEM NO: A009

2. TITLE: Technical Manual/Technical Bulletin (TM/TB)

3. SUBTITLE: Publication - Technical Manuals

4. AUTHORITY: DI-TMSS-81670A

5. CONTRACT REFERENCE: C.2.3.3, C.4.7

6. REQUIRING OFFICE: FCDD-GVS-ES

7. DD250 REQ: LT

8. APP CODE: N/A

9. DIST. STATEMENT REQ: C

10. FREQUENCY: ASREQ

11. AS OF DATE:

12. DATE OF FIRST SUBMISSION: See Blk 16

13. DATE OF SUBS. SUBMISSION: See Blk 16

14. DISTRIBUTION:

A. ADDRESSEE: Charles Machi charles.a.machi.civ@army.mil, Kelly Germano kelly.l.germano.civ@army.mil

B. COPIES:

DRAFT: 1

FINAL: 1

REG REPRO:

15. TOTAL COPIES:

16. REMARKS: The contractor shall provide a technical manual/bulletin (TM/TB) electronically in the contractor’s format, draft and final versions due according to the schedule set in the task order. This TM/TB shall be developed to cover all topics and subjects required by the task order. The TM/TB shall be developed such that it conforms to any Validation/Verification reviews as required by the task order. The final TM/TB shall be delivered in a searchable, electronic format. The Contractor shall provide the TM/TB in accordance with the applicable task order and MIL-STD-40051-2D [Preparation of Digital Technical Information For Page-Based Technical Manuals (TMs)].

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE: