Attachement F Exhibit B_7-9-26 -1 Pages.pdf

PDF 630 KB Posted

Attached to
Y1DA--656-26-201 Replace Carpet FY26 NRM 36C263-26-AP-2448
Solicitation number
36C26326B0032
Issued by

About this file

This is an architectural floor plan for Building #28 basement that identifies asbestos-containing materials (ACM) and sample locations within the facility. The plan documents multiple categories of ACM present in the basement, including asbestos-containing fire doors, pipe insulation in ceiling penetrations, mastic under floor tiles and carpet, debris in dirt crawlspace, and floor tile and mastic combinations under various flooring materials. The legend indicates sample locations marked as positive samples (showing confirmed asbestos presence) and general sample locations throughout the basement areas.

The floor plan uses color coding and hatching patterns to highlight specific ACM locations across the basement layout, with designated sample point identifiers (2020-00 series and BS-20 through BS-22) marked at various positions. The plan was prepared by Trine Environmental, Inc. and is dated September 2020 for a facility located in St. Cloud, Minnesota. This document serves as a reference guide for asbestos abatement, remediation, or management activities, providing precise visual identification of contaminated areas requiring attention or containment.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

-ASBESTOS-CONTAINING FIRE DOOR

-ASBESTOS-CONTAINING PIPE INSULATION IN CEILING PENETRATIONS

-ASBESTOS-CONTAINING MASTIC UNDER 12"X12" FLOOR TILE

-ASBESTOS-CONTAINING MASTIC UNDER CARPET AND FLOOR TILE

-ASBESTOS-CONTAINING DEBRIS IN DIRT CRAWLSPACE

-ASBESTOS-CONTAINING MASTIC UNDER FLOOR FILLER AND CARPET

-ASBESTOS-CONTAINING FLOOR TILE AND MASTIC UNDER CARPET

N

S

W E

LEGEND

BUILDING #28 - BASEMENT FLOOR PLAN

-POSITIVE SAMPLE LOCATION

-SAMPLE LOCATION

BS-20

BS-21

BS-22

B28B {20241201} St. Cloud VA Medical Center - Asbestos Reinspection Report - Sept. 2024.pdf
B28B Chart St. Cloud VA Medical Center - Asbestos Reinspection Report - Sept. 2024 (2).pdf

File details come from the government source that posted it. Updated .