Attachement 1 - TDM PWS 11 Aug 26.pdf

PDF 274 KB Posted

Attached to
Time Division Multiplexing (TDM) Phone Switch Removal
Solicitation number
FA461326Q1041
Issued by

About this file

This is a Performance Work Statement (PWS) for the decommissioning, removal, and disposal of a Dial Central Office (DCO) telephone switch system and supporting equipment at F.E. Warren Air Force Base in Wyoming.

The primary objective is to remove and dispose of the Nortel DMS-100 telephone switch located in Building 65, the Remote Cluster Controller (RCC2) in Building 1284, and associated power distribution equipment including battery stacks, inverters, rectifiers, and power distribution centers. The contractor must engineer, plan, remove, palletize, and load equipment according to industry and OEM specifications, then transport removed equipment to the F.E. Warren Logistics office. Specific removal requirements include all Nortel TDM peripheral modules, cabling, ladder racks, power distribution systems, DSX patch panels, three Maintenance Administration Positions (MAPs), spare cards and chassis, and flooring restoration. The contractor must coordinate with Telecommunications Personnel prior to removal to prevent inadvertent collapse of enmeshed systems that must remain active. The Main Distribution Frames and non-Nortel equipment must remain in place. A pre-proposal site survey is recommended but optional, with costs borne by the contractor. The contractor must provide their own disposal means and may receive site scrap or asset credit. A proposed schedule timeline must be submitted within 7 calendar days of contract award. Two key performance objectives are evaluated: (1) performing decommissioning and removal per established standards with periodic surveillance and final walkthrough, and (2) submitting deliverables with no more than one late deliverable. Required deliverables include contract manager information within 3 business days of award and a proposed work schedule within 7 calendar days of award. Performance is to occur at F.E. Warren AFB during normal operating hours (7:30 AM to 4:30 PM MDT, Monday through Friday), excluding holidays and base closures. The government provides utilities (electricity, water, sewage) and no government-furnished property. Extensive requirements address security clearances, REAL ID-compliant identification, base access procedures, physical security, operational security (OPSEC), anti-terrorism training, environmental compliance, hazardous materials handling, safety protocols, contractor personnel qualifications, and Controlled Unclassified Information (CUI) safeguarding per applicable DoD directives and Air Force regulations.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT FOR

90 CS Time Division Multiplexing (TDM) Phone Switch Removal

SERVICES

F.E. Warren Air Force Base, Wyoming

10 August 2026

Table of Contents

1. Description of Services

1.1. System Requirements

1.2. Site Considerations

1.3. Contractor Requirements

2. Services Summary

3. Government Furnished Property and/or Services

3.1. Government Furnished Property

3.2. Government Furnished Services

3.3. Government Property Incidental to the Place of Performance

4. General Information

4.1. Quality Control

4.2. Quality Assurance

4.3. Security Requirements

4.4. Physical Security

4.5. Operational Security (OPSEC)

4.6. Anti-Terrorism

4.7. Location/Hours of Operation

4.8. Conservation of Utilities

4.9. Environmental Controls

4.10. Safety Requirements

4.11. Privatized Utility Systems

4.12. Continuation of Essential DoD Contractor Services During Crisis

4.13. Contractor Personnel

4.14. Records

4.15. Controlled Unclassified Information (CUI)

5. Appendices

APPENDIX A – Publications/Instructions

APPENDIX B – Deliverables

1. Description of Services.

The objective is the Decommission, Removal and Disposal of the Dial Central Office (DCO) telephone switch and remote switch system along with supporting equipment at F.E. Warren AFB. The removal includes the Nortel DMS-100 telephone switch – Building 65, Remote Cluster Controller (RCC2) – Building 1284, supporting equipment (Battery stacks, Inverter(s), Rectifier(s), Power Distribution Center (PDC) and associated equipment/cable).

1.1. System Requirements. A pre-proposal site survey/walk through will be conducted. The cost to attend shall be responsibility of the contractor. Attending the site survey/walk through is at the discretion of the contractor. The site survey/walkthrough is recommended with the designated 90 CS POC due to the type of equipment involved and site conditions.

1.2. Site Considerations. The contractor will be required to provide their own disposal means i.e.

roll off dumpster. A site scrap or asset credit is allowable for this project.

1.3. Contractor Requirements. The contractor shall engineer, plan, remove equipment, palletize equipment, and load equipment for transport according to industry and/or OEM specifications.

Contractor will be responsible to transport the removed equipment to the F. E. Warren Logistics office. Contractor is responsible to perform all necessary efforts in the completion of this project and receive site acceptance. Proposal shall include a description of the removal effort to be performed and cleanup of removed equipment area, equipment elements involved including hardware and associated government wiring connections. Industry standard or OEM procedures and site acceptance are required. Contractor shall provide a proposed schedule timeline for the removal of the equipment within 7 calendar days after contract award. The contractor shall provide all hardware and labor necessary to support this requirement.

1.3.1 Nortel TDM Removal

Bldg 1284 Room 188:

1. All Nortel TDM (Time Division Multiplexing) peripheral modules and associated cabling/termination blocks to the MDF (Main Distribution Frame) to include the alarm panels and termination blocks.

2. All ladder rack installed above the peripheral modules used only for cabling to the Nortel system (If used for other cabling, leave in place).

3. All associated power distribution used to power the Nortel TDM (Battery bank and monitoring systems, Rectifiers, Inverters, and all electrical cabling running to the premise electrical grid).

4. All flooring under the equipment should be returned to serviceable condition or replaced to match the existing tile in the rest of the room.

Bldg 65 Room 100 (or 105, depends on the map you look at):

1. All Nortel TDM peripheral modules/Main processing unit and associated cabling/termination blocks to the MDF to include the alarm panels and termination blocks.

2. All ladder rack installed above the peripheral modules used only for cabling to the Nortel system (If used for other cabling, leave in place).

3. The AVAYA cabinet (Equipment Rack 208) and associated power cabling/communication cabling.

4. The DSX Patch Panels used for trunking from the Nortel TDM system located in rack DSX 000.

5. All associated power distribution used to power the Nortel TDM (Battery bank and monitoring systems, Rectifiers, Inverters, and all electrical cabling running to the premise electrical grid). Most of this is in the basement in separated rooms.

6. Power Distribution Rack located in room 100 specifically for DC power (Rack DCD 00).

7. All 3 MAPs (Maintenance Administration Positions) used for interface/emergency restart.

8. All spare cards/parts/chassis directly associated with the Nortel TDM.

9. All flooring under the equipment should be returned to serviceable condition or replaced to match the existing tile in the rest of the room.

both locations:

1. The MDFs (Main Distribution Frames) and equipment mounted to them that is not directly related to the Nortel TDM system will be left in place.

2. Contractor needs to coordinate with Telecommunications Personnel prior to removal of ANYTHING to ensure we do not inadvertently collapse enmeshed systems that must remain active.

2. Services Summary.

The contractor service delivery requirements are summarized into performance objectives that relate directly to standards of performance required to meet mission essential needs. For the Performance Objective to be met, service delivery must be in substantial compliance with applicable performance standards. The Performance Threshold describes the minimum overall levels of service delivery required for acceptable quality control. Failure to meet these Performance Thresholds means that contractor Quality Control is unacceptable. The following is a list of the key performance objectives that shall be verified as contractually compliant by Government personnel; however, inspection of any contract requirement is authorized.

Performance Objective PWS Para. Performance Threshold Method of Surveillance

SS-1: Perform Decommission, Removal and Disposal of the Dial Central Office (DCO) telephone switch and remote switch system along with supporting equipment and cable

1.1 Services must meet all

Service Removal Standards and Requirements as identified or referenced.

Periodic Surveillance Final walkthrough Customer Feedback

SS-2: Conduct Submit Deliverables

1.2 No more than one (1) late

deliverable

100% inspection

3. Government Furnished Property and/or Services

3.1. Government Furnished Property.

3.1.1. None

3.2. Government Furnished Services.

3.2.1. Utilities. The Government will furnish the electricity, water, and sewage services (as necessary) for the accomplishment of service IAW this PWS.

3.3. Government Property Incidental to the Place of Performance.

3.3.1. None

4. General Information.

4.1. Quality Control.

The contractor is required to control the quality-of-service delivery and offer to the Government for acceptance only services which conform to contract requirements. The overall control of quality must meet the specified performance thresholds for each requirement in the Services Summary.

4.2. Quality Assurance

The Government will evaluate the contractor’s performance by appointing a representative(s) to monitor performance to ensure services are received. The Government representative will evaluate the contractor’s performance through on-site inspections and receipt of customer complaints. The Government will inspect each task as completed. The Government will investigate complaints received from customers. The Government representative shall make final determination of the validity of customer complaint(s) in cases of disagreement with customer(s). Remedies for non-conforming services will be resolved IAW the applicable Inspection/Acceptance clause attached within the contract.

4.2.1. The project manager will inform the contract manager when discrepancies occur and will request corrective action. The project manager will make a notation of the discrepancy on their surveillance checklist with the date and time the discrepancy was noted and will request the contract manager (or authorized representative) to acknowledge the discrepancy.

4.2.2. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the Contracting Officer.

4.2.3. The services to be performed by the contractor during the period of this contract shall (at all times and places) be subject to review by the Contracting Officer or authorized representative(s).

4.3. Security Requirements.

The contractor shall be responsible for all passes issued to their employees under this contract. Applications shall be coordinated by the Contracting Officer or designated representative. At the time of application, Security Forces will conduct a background check on employees. Upon termination of employment or contract completion, the contractor shall be responsible for returning identification cards/base passes to Security Forces within 24 hours.

4.3.1. REAL ID-Compliant Identification.

IAW DoDM 5200.08V3_DAFMAN 31-101V3_DAFGM 2024-01, Installation Perimeter Access Control. Base access and Common Access Cards (CAC) requests will require REAL ID-Compliant identification for Base access and CAC creation. Failure of the vendor to ensure personnel have REAL ID-compliant identification will result in denial of Base access and CAC requests.

4.3.1.1. Contractor Access to department of the Air Force Installations.

• The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

• The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate, and to obtain a vehicle pass.

• During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

• When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with [insert any additional requirements to comply with DAFI 31-101, Integrated Defense, and DODMAN5200.02_DAFMAN 16-1405 , Air Force Personnel Security Program] citing the appropriate paragraphs as applicable.

• Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

• The contractor shall provide an after-hours contact number or after-hours email in the Emergency Mass Notification System (EMNS) for each of their personnel, whose normal place of duty is on a DoD installation or within a DoD facility. The contractor shall comply with any additional requirements in DAFMAN 10-206 for emergency operational reporting. Foreign Nationals may participate and may remove themselves from the Emergency Mass Notification System at any time.

To update information, personnel can access the globe icon on their system desktop screens and choose the “Access Self-Service” option.

• Failure to comply with these requirements may result in withholding of final payment.

4.4. Physical Security.

The contractor shall be responsible for safeguarding all Government property provided for contractor use. At the close of each work period, Government facilities, property, and materials shall be secured.

4.4.1.1. The contractor shall immediately report the occurrences of a lost or duplicate key to the contracting officer.

4.4.1.2. In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon written direction of the contracting officer, rekey or replace the affected lock or locks; however, the government, at its option, may replace the affected lock or locks or perform rekeying. When the replacement of locks or rekeying is performed by the government, the total cost of rekeying or the replacement of the lock or locks shall be https://static.e-publishing.af.mil/production/1/af_a4/publication/dafi31-101/controlled_unclassified_information.pdf https://static.e-publishing.af.mil/production/1/af_a4/publication/dafi31-101/controlled_unclassified_information.pdf https://static.e-publishing.af.mil/production/1/saf_aa/publication/dodman5200.02_dafman16-1405/dodm5200.02_afman16-1405.pdf https://static.e-publishing.af.mil/production/1/saf_aa/publication/dodman5200.02_dafman16-1405/dodm5200.02_afman16-1405.pdf deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the government and the total cost deducted from the monthly payment due the contractor.

4.4.1.3. The contractor shall prohibit the use of keys issued by the government by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor’s employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

4.5. Operational Security (OPSEC).

The contractor shall adhere to the following minimum requirements in support of this requirement:

4.5.1. All contractors, subcontractors, their employees, associates, and consultants who have access to critical information and indicators must comply with the Air Force-sponsored Operations Security (OPSEC) program.

4.5.2. OPSEC is an information-related capability that preserves friendly essential secrecy by using a process to identify, control, and protect critical information and indicators. If critical information and indicators are disclosed, it could allow adversaries or potential adversaries to identify and exploit friendly vulnerabilities leading to increased risk to mission failure or the loss of life. The desired effect of OPSEC is to influence the adversary’s behavior and actions by reducing the adversary’s ability to collect and exploit critical information and indicators about friendly activities.

4.5.3. Responsibilities:

4.5.3.1. Contractors must ensure employees receive OPSEC education that includes an overview of the OPSEC process, the definition of OPSEC, its purpose, what is critical information, the individual’s role in protecting critical information, and the general adversary threat to the AF’s critical information. Additionally, OPSEC education must include updated threat information, changes to critical information and indicators, new procedures and/or OPSEC measures implemented, altered, or deleted by the organization.

4.5.3.2. DoD Contractors with OPSEC requirements or that have access to critical information and indicators shall complete initial and annually-recurring refresher training. Accomplishment of initial OPSEC training must not exceed 90 days from initial assignment to a contract with OPSEC requirements. Access to mission-critical information will not be allowed until OPSEC education has been completed and documented.

4.5.3.3. OPSEC education is a continuous requirement. The host unit OPSEC coordinator must track OPSEC training statistics to include the personnel working on the contract, when each individual received the required initial OPSEC training, and when refresher training is due and/or completed.

4.5.4. Contractor personnel shall not discuss government operations in public or over unprotected or unencrypted communications. Controlled unclassified information (CUI) may only be transmitted as directed in this PWS.

4.5.5. The Contractor shall not post to company websites, publications, newsletters, or other media any images, data, or information that reveal sensitive government operations, personnel, equipment, and/or classified or controlled unclassified information. When in doubt, company press releases related to this contract should be coordinated through the COR or CO, as applicable.

4.5.6. Prior to seeking approval through the F. E. Warren AFB Public Affairs, any information to be released outside of official U.S. Government channels, via any media (to include electronic communications), must be approved through an OPSEC review. All personnel must promptly report OPSEC-related incidents, issues, and concerns to the host-unit OPSEC coordinator.

4.5.7. Contractor shall restrict access to those individuals with a valid need-to-know who are actually providing services under the contract. Further dissemination to other contractors, subcontractors, or other government agencies and private individuals or organizations is prohibited unless authorized in writing.

4.5.8. Because observation of events, operations, physical changes, etc., may reveal National Security information, specific restrictions are needed to preclude unintentional release of this information to unauthorized parties. Unauthorized disclosure and transfer of National Security Information is punishable under 18 USC § 793. Therefore, contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including Social Networking sites) any images, data/information, or observed events that reveal sensitive government operations, personnel, equipment, including, but not limited to:

4.5.8.1. Tactics, techniques, and procedures, production, or work schedules, any visible or concealed modifications, upgrades, additions to vessels, aircraft, or weapons or equipment; increases, change, or decreases in work/deployment frequency or government personnel, vehicle, vessel, or aircraft movements;

specialized equipment orders, deliveries, shipments, etc. Unauthorized disclosures and attempts to solicit this type of information by unauthorized third parties or others not affiliated with this contract shall be reported to the COR or CO, as applicable.

4.5.8.2. Government issued badges, identification shall be removed and/or concealed from plain sight when off base and shall not be left in vehicles or unprotected areas. Badges and passes may not be duplicated, copied, or loaned to others. Lost or stolen identification badges, vehicle passes, etc., will be immediately reported to the COR, CO, and/or Installation Security Office.

4.6. Anti-Terrorism

4.6.1. Notification: If the Contractor (contract employees/subcontractors) identify any suspicious activity, they shall contact the Base Defense Operations Center (BDOC) at 307-773-3501 (On-installation)/Missile Security Control (MSC) at 307-773-2701 (Off-installation) and notify the CO and COR (if appointed) that they contacted the BDOC and/or MSC.

4.6.2. Training. Contractor employees that require routine physical access to a Federally-controlled facility or military installation shall complete Level I antiterrorism awareness training within 30 days of requiring access and annually thereafter and send a copy of their employees’ training certificate(s) to the CO and COR (if assigned). Training is located at Joint Knowledge Online (JKO) website:

https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf

4.7. Location/Hours of Operation.

4.7.1. Location. Place of performance is at FE Warren AFB WY. Telework shall not be permitted for this task order/contract.

4.7.2. Normal Hours of Operation. The contractor shall perform the services required under this contract during the normal operating hours of the site. The average workweek consists of 7:30 AM and 4:30 PM (MDT), Monday through Friday, excluding holidays and base closures. During the planning phase of the project, the Government shall identify any locations that require installation and cutover https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf after normal business hours to avoid unnecessary operational mission impact. Any site work requested by the Contractor to be performed outside of normal duty hours shall be coordinated with the 90 CS Project Manager and Contracting Officer at least 7 working days in advance. The contractor shall accomplish the installation with minimum disruption of daily resident.

4.7.3. Recognized Holidays. The contractor is not required to provide service on the following days, unless otherwise noted:

• New Year's Day (January 1).

• Birthday of Martin Luther King, Jr. (Third Monday in January).

• Washington's Birthday (Third Monday in February).

• Memorial Day (Last Monday in May).

• Juneteenth National Independence Day (June 19).

• Independence Day (July 4).

• Labor Day (First Monday in September).

• Columbus Day (Second Monday in October).

• Veterans Day (November 11).

• Thanksgiving Day (Fourth Thursday in November).

• Christmas Day (December 25).

If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

4.8. Conservation of Utilities.

The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following:

4.8.1. Lights shall be used only in areas where and when work is being performed.

4.8.2. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.

4.8.3. Water faucets or valves shall be turned off after the required use has been accomplished.

4.8.4. Government telephones shall be used only for official Government business.

4.9. Environmental Controls.

4.9.1. Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Interstate, federal, state, and local laws, regulations, and requirements regarding environmental protection, to include Section 01 57 19.05 32, Environmental Protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost because of the change, the contractor shall inform the CO pursuant to notice requirements and negotiate a modification to the contract.

4.9.2. Notification of Environmental Spills. If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to the

F.E. Warren AFB Fire Dept at 911 (landline) or 307-773-2931 (cell phone). The liability for the spill or release of such substance(s) rests solely with the contractor and its agent.

4.9.3. Hazardous Material (HM). If hazardous materials will be used in the execution of this contract, the contractor shall comply with all federal, state and local regulations concerning the use, storage, and reporting of HM in accordance with DAFMAN 32-7002, Environmental Compliance and Pollution Prevention. The contractor shall be required to obtain authorization per the Installation Hazardous Materials Management Program before ordering or purchasing any hazardous product and may not bring a HM onto F.E. Warren AFB property, nor use a HM, until the contractor receives all required authorizations. This authorization process may take up to three weeks. The contractor shall provide the information listed in Attachment 1 of Section 01 57 19.05 32 to request authorization for all hazardous materials proposed for use on FE Warren AFB or the missile field.

4.9.4. Green Procurement Program (GPP). In performance of this contract, contractors shall use Environmental Protection Agency (EPA) designated recycled content products, Information Technology (IT) Energy Star products/appliances, Federal Energy Management Program (FEMP) Designated Energy Efficient Low Stand By Power products/appliances, U.S. Department of Agriculture (USDA) Bio based/Bio preferred products, Environmentally preferable products, Electronic Product Environmental Assessment Tool (EPEAT) registered products, Water Sense or other water efficient products, non- or Low Ozone depleting substances under the Significant New Alternatives Policy (SNAP), non or Low toxic or hazardous constituents (e.g. non- VOC paint) and any other environmentally sustainable product/method, to the greatest extent possible.

4.9.5. Elimination of Use of Class I Ozone Depleting Substances (ODS). Contractors shall not:

4.9.5.1. Provide any service or product with any specification, standard, drawing, or other document that requires the use of a Class I ODS in the test, operation, or maintenance of any system, subsystem, item, component, or process; or

4.9.5.1.1. Provide any specification, standard, drawing, or other document that establishes a test, operation, or maintenance requirement that can only be met by use of a Class I ODS as part of this contract/order.

4.9.5.2. For the purposes of Department of the Air Force policy, the following products that are pure (i.e., they meet the relevant product specification identified in AFI 32-7086[AR2] ) are Class I ODSs:

4.9.5.2.1. Halons: 1011, 1202, 1211, 1301, and 2402;

4.9.5.3. Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503; and

4.9.5.3.1. Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.

4.10. Safety Requirements.

4.10.1. In performing work under this contract, the contractor shall:

4.10.1.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.

4.10.1.2. Record and report promptly (within one hour), to the contracting officer or designated COR, all available facts relating to each instance of damage to Government property or injury to either contractor or Government personnel.

4.10.1.3. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the CO.

4.10.2. Health and Safety on Government Installations. In performing work under this contract on a Government installation, the contractor shall:

4.10.2.1. Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and

4.10.2.1.1. Take such additional immediate precautions as the contracting officer may reasonably require for health and safety purposes.

4.10.2.2. The contracting officer may, by written order, direct Department of the Air Force Occupational Safety and Health (AFOSH) Standards and/or health/safety standards as may be required in the performance of this contract and any adjustments resulting from such direction will be in accordance with the Changes clause of this contract.

4.10.2.3. Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the contracting officer, shall be grounds for termination of this contract in accordance with the Default clause of this contract.

4.10.3. Safety and Health Plan.

The contractor shall submit a safety and Health Plan and corresponding site safety checklist to the CO within 10 business days after contract award or any contract modification that affects personnel safety and health. This requirement includes preparing, implementing, and maintaining a confined space program (if applicable). The contractor’s plan shall include appropriate measures to ensure the contractor reacts promptly to investigate, correct, and track alleged safety and health violations and/or uncontrolled hazards in the contractor work areas.

4.11. Privatized Utility Systems.

4.11.1. The electrical distribution utility system at F.E. Warren Air Force Base has been sold to High West Energy (“System Owner”) as part of the USAF Utilities Privatization (UP) effort. Therefore, the System Owner is the sole provider of these utility services to the installation and should be viewed just like any other local utility Contractor.

4.11.2. Newly installed system infrastructure and modifications of (or connections to) existing system infrastructure identified in the specifications and drawings must be coordinated with the System Owner prior to the contract start date. The System Owner must be integrated into the design, inspection of construction, tie-in to existing utilities, and conveyance of any exterior utilities. The preferred process for connecting facilities is to request that the System Owner install the required connecting facilities, up to a point of demarcation to be identified by the Government, as a connection charge. However, if a connection charge cannot be negotiated, work may be accomplished by the Prime Construction Contractor and later connected to the System Owner’s system, provided that the System Owner’s connection criteria, as set forth in its utility services contract with the Government, are met. Any fees associated with connecting Contractor constructed infrastructure to the System Owner’s system must be negotiated with the System Owner. All work on the system or facilities expected to connect to the system shall comply with the System Owner’s specifications and construction standards.

In no event shall the Contractor cap, connect to, or otherwise touch the System Owner’s infrastructure without the System Owner’s express written permission. This also applies in the event of a utility strike involving the System Owner’s infrastructure.

4.11.3. System Owner Office Hours:

• Monday thru Thursday, 7:30am – 5:00pm MST

4.11.4. If the Contractor requests the System Owner’s efforts outside of the above identified business hours, additional costs may be incurred by the Contractor due to the scheduling of the request.

For a non-emergency, the System Owner may be contacted at:

• Project Manager o 307-365-6458

• HWE Main Office o 6270 CR 212, PO Box 519

Pine Bluffs, WY 82082 o 307-245-3261

For emergencies or utility strikes involving the System Owner’s infrastructure, please follow standard procedures identified on the Dig Permit Request Checklist.

4.12. Continuation of Essential DoD Contractor Services During Crisis.

IAW DFARS 237.7602(a), it is determined that the TDM Removal Service, has NOT been identified as an essential service.

4.13. Contractor Personnel.

4.13.1. Contract Manager: the contractor shall provide a contract manager who shall be responsible for the performance of the services. The name of the contract manager shall be provided to the CO in writing prior to the beginning of the first performance period. The contract manager must be able to read, write, speak, and understand English.

4.13.1.1 The contract manager shall have full authority to act for the contractor on all contract matters relating to daily operations of this contract.

4.13.2. Contractor Employees: the contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

4.13.2.1. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name in English.

4.14. Records. The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this PWS or required by the provisions of a mandatory directive listed in applicable Publications and Forms. If requested by the Government, the contractor shall provide the original record, or a reproducible copy of any such record within five working days of receipt of the request.

4.15. Controlled Unclassified Information (CUI).

4.15.1. Contractors shall follow CUI safeguarding and dissemination controls in accordance with Part 2002 of Title 32, CFR, DoDI 5200.48, Controlled Unclassified Information, and DoDI 5200.48_DAFI 16-1403, Controlled Unclassified Information.

4.15.2. Unlike classified information, an individual or organization generally does not need to demonstrate a need-to-know to access CUI, unless required by a law, regulation, or government- wide policy, but must have a lawful governmental purpose for such access.

4.15.3. Marking Requirements. Contractors shall follow CUI marking requirements in accordance with DoDI

5200.48 and DoDI 5200.48_DAFI 16-1403.

4.15.4. Dissemination. Contractors shall follow CUI dissemination requirements in accordance with DoDI

5200.48 and DoDI 5200.48_DAFI 16-1403.

4.15.5. Storage. Contractors shall follow CUI storage requirements in accordance with DoDI 5200.48 and DoDI 5200.48_DAFI 16-1403. During working hours, steps shall be taken to minimize the risk of access by unauthorized personnel, such as not reading, discussing, or leaving CUI information unattended where unauthorized personnel are present. After working hours, CUI information will be stored in unlocked containers, desks, or cabinets if the government or government-contract building provides security for continuous monitoring of access. If building security is not provided, the information shall be stored in locked desks, file cabinets, bookcases, locked rooms, or similarly secured areas.

4.15.6. Transmission. Contractors shall follow CUI transmission requirements in accordance with DoDI

5200.48 and DoDI 5200.48_DAFI 16-1403. CUI information and material may be transmitted via first class mail, parcel post, or, bulk shipments. When practical, CUI information may be transmitted electronically (e.g., data, website, or e-mail), via approved secure communications systems or systems utilizing other protective measures such as Public Key Infrastructure or transport layer security (e.g., https). Avoid wireless telephone transmission of CUI when other options are available. CUI transmission via facsimile machine is permitted;

however, the sender is responsible for determining whether appropriate protection will be available at the receiving location before transmission (e.g., facsimile machine attended by a person authorized to receive CUI;

facsimile machine located in a controlled government environment). Contractors will remain cognizant of aggregation and compilation of CUI based on the potential to generate classified information pursuant to security classification guidance.

4.15.7. Disposition.

4.15.7.1. Contractors shall follow CUI disposition requirements in accordance with DoDI 5200.48 and DoDI

5200.48_DAFI 16-1403.

4.15.7.2. Record and non-record copies of CUI documents will be disposed of in accordance with Chapter 33 of Title 44, U.S.C. and the DoD Components’ records management directives. When destroying CUI, including in electronic form, agencies must do so in a manner making it unreadable, indecipherable, and irrecoverable. If the law, regulation, or government-wide policy specifies a method of destruction, agencies must use the method prescribed.

4.15.7.3. Record and non-record CUI documents may be destroyed by means approved for destroying classified information or by any other means making it unreadable, indecipherable, and unrecoverable the original information such as those identified in NIST SP 800-88 and in accordance with Section 2002.14 of Title

32, CFR.

4.15.8. Disclosure.

4.15.8.1. Contractors shall follow CUI disclosure requirements in accordance with DoDI 5200.48 and DoDI

5200.48_DAFI 16-1403.

4.15.8.2. Contractor shall immediately notify the Contracting Officer and servicing Information Protection Office of unauthorized disclosure of CUI.

5. Appendices

A. Publications/Instructions

B. Deliverables

APPENDIX A – Publications/Instructions

Publication/Instruction /Name Date Applicable

Paragraph/Chapter PWS Paragraph

Section 01 57 19.05 32, Environmental Protection 04/26 Entire Document

Applicable PWS Para. 4.9.1

DAFMAN 32-7002,

Environmental Compliance and Pollution Prevention

12 Jun 2025 Entire Document Applicable Para 4.9.3

Publication available at:

*http://dtic.mil/whs/directives/corres/pdf/302041p.pdf http://dtic.mil/whs/directives/corres/pdf/302041p.pdf

APPENDIX B – Deliverables

All deliverables must meet professional standards and the requirements set forth in the applicable contractual documents. The Contractor shall be responsible for delivering all specified end items. The end items listed in the table below are outputs, which fall within the scope of this effort and are illustrative of the type of work the Government expects to require.

Deliverable Requirement PWS Paragraph Government PoC

Contract Manager Information Within 3 business days of contract award 4.13.1 Project Manager

Proposed Schedule of Work Within 7 calendar days of contract award 1.3 Project Manager

1. Description of Services.
2. Services Summary.
3. Government Furnished Property and/or Services
3.1. Government Furnished Property.
3.2. Government Furnished Services.
3.3. Government Property Incidental to the Place of Performance.
4. General Information.
4.1. Quality Control.
4.2. Quality Assurance
4.4. Physical Security.
4.5.1. All contractors, subcontractors, their employees, associates, and consultants who have access to critical information and indicators must comply with the Air Force-sponsored Operations Security (OPSEC) program.
4.6. Anti-Terrorism
4.7. Location/Hours of Operation.
4.8. Conservation of Utilities.
4.9. Environmental Controls.
4.10. Safety Requirements.
4.13. Contractor Personnel.
4.15. Controlled Unclassified Information (CUI).
APPENDIX A – Publications/Instructions
APPENDIX B – Deliverables

File details come from the government source that posted it. Updated .