Attach II -539-25-508 - Drawings.pdf

PDF 30 MB Posted

Attached to
Y1DA--Project No. 539-25-508 Correct Imaging Tower Deficiencies
Solicitation number
36C25026B0044
Issued by

About this file

This file is a set of construction drawings for the Correct Imaging Tower Deficiencies project (Project No. 539-25-508) located at the VA Medical Center in Cincinnati, Ohio. The drawings were prepared by the Office of Construction and Facilities Management, U.S. Department of Veterans Affairs, with an issue date of March 24, 2026, and are marked as Construction Documents for a fully sprinklered facility.

The project scope includes demolition of two existing doors and removal of roof surface with preparation for repair, followed by installation of new components including a lead-lined door with specified hardware (Corbin Russwin passage mortis set with pivot hinges and automatic operators), a new asphalt roof, a ductless split system air conditioning unit with 30,000 BTU/hour cooling capacity, and a continuous fiberglass reinforced polymer (FRP) grated walkway system for roof equipment access. The mechanical system installation is all-inclusive and requires power supply with disconnect switch, carpentry work for indoor unit wall mounting and outdoor unit roof curb provision, and plumbing work including condensate pump, drip pan, and sensor installation. General notes emphasize coordination of all dimensions and utility connections prior to installation, compliance with manufacturer requirements and VA specifications, and protection of existing roof equipment and air intakes with charcoal filters to prevent odors from entering the imaging and bed tower during construction. The drawing set includes demolition plan, four new work plan sheets detailing specific installations, and photographic documentation of current conditions and design examples.

View the file

Other files

File Type Posted
36C25026B0044 0004.docx DOCX document
RFI - IMS.doc DOC document
36C25026B0044 CCI RFI 2.doc DOC document
36C25026B0044 CCI RFI 1.doc DOC document
36C25026B0044 0003.docx DOCX document
SignIn sheet.jpg JPG image
36C25026B0044 0002.docx DOCX document
36C25026B0044 0001.docx DOCX document
Attach VI - RFI.doc DOC document
Attach III -539-25-508 Correct Imaging Tower Deficiencies - SOW.docx DOCX document
36C25026B0044_1.docx DOCX document
Attach VI - RFI.doc DOC document
Attach V - VAAR 852.219-75 VA NOTICE OF LIMITS ON SUBCONTRACTING_CERT OF COMPLIANCE JAN 2023 DEV.docx DOCX document
Attach IV - 539-25-508 Correct Imaging Tower Deficiencies - SPECS.pdf PDF
Attach I -Davis Bacon Act WD OH20260082.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

G001

COVER SHEET

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

Correct Imaging Tower Deficiencies

CINCINNATI, OHIO (539)

3/24/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

DRAWING INDEX

SHEET #

G001

AD101

A101 A102 A103 A104 P101 P102

SHEET TITLE

COVER SHEET

DEMOLITION PLAN

NEW WORK PLAN 1

NEW WORK PLAN 2

NEW WORK PLAN 3

NEW WORK PLAN 4

PHOTOS CURRENT COND

PHOTO EXAMPLES

INFECTION CONTROL

GENERAL NOTES

A. PROVIDE TEMPORARY BARRIER WALLS, BASIS OF DESIGN:

STARC SYSTEMS, FOR ACTIVITIES CAUSING DUST AND/OR

DEBRIS, OR AT EXTERIOR LOCATIONS TO PREVENT PEOPLE

OR WEATHER INTRUSION. MAINTAIN 5' CLEAR IN

CORRIDORS LESS THAN 7'6" WIDE, AND 6' CLEAR IN LARGER

CORRIDORS. PROVIDE ACCESS DOORS AS NECESSARY.

UNITED STATES DEPARTMENT OF VETERANS AFFAIRS

V.A. MEDICAL CENTER

3200 Vine St, Cincinnati, OH 45220 Correct Imaging Tower Deficiencies Project # 539-25-508

539-25-508

CT Room #2

A2013

CT Control A2014

Adm.

Equip.

A2016A

CT Room #1

A2016

CT Prep A2017

Toilet A2018

Stair 11 S*3*11

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

AD101

DEMOLITION PLAN

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

Correct Imaging Tower Deficiencies

CINCINNATI, OHIO (539)

3/24/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

GENERAL NOTES

A. EXISTING ROOF METAL DECK.

B. EXISTING PENETRATIONS TO REMAIN. SEE DETIALS FOR FLASHING

CONDITIONS.

C. ROOF DRAINS TO BE PROTECTED THROUGH OUT THE ENTIRE

PROCESS ALLOWING FOR FUNCTIONALITY AND PROTECTED FROM

DEBRIS.

PLAN NOTES

1. REMOVE TWO EXISTING DOORS.

2. REMOVE ROOF SURFACE AND PREP FOR REPAIR.

539-25-508

SCALE | 1/4" = 1' - 0"

DEMO PLAN

CT Room #2

A2013

CT Control A2014

Adm.

Equip.

A2016A

CT Room #1

A2016

CT Prep A2017

Toilet A2018

Stair 11 S*3*11

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

A101

NEW WORK PLAN 1

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

Correct Imaging Tower Deficiencies

CINCINNATI, OHIO (539)

3/24/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

GENERAL NOTES

A. COORDINATE ALL DIMENSIONS, UTILITY CONNECTIONS, AND

EQUIPMENT LOCATIONS PRIOR TO INSTALLATION.

B. ALL NEW MATERIALS SHALL BE INSTALLED PER MANUFACTURER

REQUIREMENTS AND VA SPECIFICATIONS.

C. KEEP ALL EQUIPMENT ON THE ROOF UP AND RUNNING DURING

CONSTRUCTION, AND ENSURE AIR INTAKES ARE PROTECTED

(TYPICALLY CHARCOAL FILTER) SO THAT SMELLS FROM THE WORK

DO NOT TRAVEL INTO THE IMAGING/BED TOWER.

PLAN NOTES

1. INSTALL NEW LEAD-LINED DOOR. (REFERENCE PG 18-14 FOR

REQUIREMENTS)

2. INSTALL NEW ROOF. (IN FAVOR FOR SOMETHING LIKE THE NEW

ASPHALT ROOF WE HAVE TODAY)

3. INSTALL DUCTLESS SPLIT SYSTEM WITH CAPACITY TO COOL AT A

RATE OF UP TO 30K BTU/HR.

4. NEW CONTINUOUS FRP GRATED WALKWAY SYSTEM AT EXISTING

LOCATION. (EX. BELOW THE NEED IS TO SERVICE ALL ROOF

EQUIPMENT USING WALKWAY)

539-25-508

NEW WORK PLAN 1

Stair 11 S*3*11

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

A102

NEW WORK PLAN 2

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

Correct Imaging Tower Deficiencies

CINCINNATI, OHIO (539)

3/24/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

GENERAL NOTES

A. COORDINATE ALL DIMENSIONS, UTILITY CONNECTIONS, AND

EQUIPMENT LOCATIONS PRIOR TO INSTALLATION.

B. ALL NEW MATERIALS SHALL BE INSTALLED PER MANUFACTURER

REQUIREMENTS AND VA SPECIFICATIONS.

C. KEEP ALL EQUIPMENT ON THE ROOF UP AND RUNNING DURING

CONSTRUCTION, AND ENSURE AIR INTAKES ARE PROTECTED

(TYPICALLY CHARCOAL FILTER) SO THAT SMELLS FROM THE WORK

DO NOT TRAVEL INTO THE IMAGING/BED TOWER.

PLAN NOTES

1. NEW CONTINUOUS FRP GRATED WALKWAY SYSTEM AT EXISTING

LOCATION. (EX. BELOW THE NEED IS TO SERVICE ALL ROOF

EQUIPMENT USING WALKWAY)

2. REFERENCE BOTH NOTE C AND V BELOW TO UNDERSTAND HOW

BOTH THE PARAPET AND ROOF CURBS ARE TO BE COMPLETED.

539-25-508

NEW WORK PLAN 2

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

A103

NEW WORK PLAN 3

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

Correct Imaging Tower Deficiencies

CINCINNATI, OHIO (539)

3/24/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

GENERAL NOTES

A. COORDINATE ALL DIMENSIONS, UTILITY CONNECTIONS, AND

EQUIPMENT LOCATIONS PRIOR TO INSTALLATION.

B. ALL NEW MATERIALS SHALL BE INSTALLED PER MANUFACTURER

REQUIREMENTS AND VA SPECIFICATIONS.

C. KEEP ALL EQUIPMENT ON THE ROOF UP AND RUNNING DURING

CONSTRUCTION, AND ENSURE AIR INTAKES ARE PROTECTED

(TYPICALLY CHARCOAL FILTER) SO THAT SMELLS FROM THE WORK

DO NOT TRAVEL INTO THE IMAGING/BED TOWER.

PLAN NOTES

1. INSTALL NEW LEAD-LINED DOOR. (REFERENCE PG 18-14 FOR

REQUIREMENTS)

539-25-508

SCALE | 1/4" = 1' - 0"

NEW WORK PLAN 3

- m: Wood - just indicates that the door should be made of wood.

- t: 15 - indicates that the door is type 15.

- dl: LEAD - indicates it shall be a lead lined door.

- s: S / X - indicates the size of the door shall be “S” or “X”, which is noted in PG 18-4 under “All Div 08 Details”.

- Hardware set is 4Q comes directly from specification section 08 71 00.

- Pivot Set.

- Passage Mortis Set.

- Intermediate Pivots.

- Corbin Russwin Passage.

- Edge Guards, Armor Plate

- Automatic Operator With Hold Open.

- Automatic Flush Bolt.

- Rixson Pivot Hinges

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

A104

NEW WORK PLAN 4

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

Correct Imaging Tower Deficiencies

CINCINNATI, OHIO (539)

3/24/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

GENERAL NOTES

A. COORDINATE ALL DIMENSIONS, UTILITY CONNECTIONS, AND

EQUIPMENT LOCATIONS PRIOR TO INSTALLATION.

B. ALL NEW MATERIALS SHALL BE INSTALLED PER MANUFACTURER

REQUIREMENTS AND VA SPECIFICATIONS.

C. KEEP ALL EQUIPMENT ON THE ROOF UP AND RUNNING DURING

CONSTRUCTION, AND ENSURE AIR INTAKES ARE PROTECTED

(TYPICALLY CHARCOAL FILTER) SO THAT SMELLS FROM THE WORK

DO NOT TRAVEL INTO THE IMAGING/BED TOWER.

PLAN NOTES

1. INSTALL DUCTLESS SPLIT SYSTEM WITH CAPACITY TO COOL AT A

RATE OF UP TO 30K BTU/HR.

2. THE INSTALLATION SHOULD BE ALL-INCLUSIVE TO INCLUDE:

- POWER - NEED A DISCONNECT SWITCH AT THE UNIT.

- CARPENTRY - MOUNTING OF INDOOR UNIT TO THE WALL,

PROVISION OF ROOF CURBS FOR THE OUTDOOR UNIT, LOCATION

SELECTION ON THE ROOF OF THE OUTDOOR UNIT.

- PLUMBING - AS SEEN IN SOME OF OUR NEW TELEDATA ROOMS,

THIS UNIT WILL NEED A CONDENSATE PUMP, A DRIP PAN AND A

SENSOR.

3. THE DATA PROVIDED WILL GIVE A BASIS OF DESIGN.

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

P101

PHOTOS CURRENT COND

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

Correct Imaging Tower Deficiencies

CINCINNATI, OHIO (539)

3/24/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title:

Approved:

VA FORM 08 - 6231

P102

PHOTOS EXAMPLES

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:

321 4 6 7 8 9 10

Correct Imaging Tower Deficiencies

CINCINNATI, OHIO (539)

3/24/2026 LH

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLEREDCHIEF OF ENGINEERING

ZACH SCHMIDT

Sheets and Views
539-25-508 - Drawings-COVER SHEET
539-25-508 - Drawings-DEMO PLAN
539-25-508 - Drawings-NEW WORK PLAN 1
539-25-508 - Drawings-NEW WORK PLAN 2
539-25-508 - Drawings-NEW WORK PLAN 3
539-25-508 - Drawings-NEW WORK PLAN 4
539-25-508 - Drawings-PHOTOS CURRENT COND
539-25-508 - Drawings-PHOTOS EXAMPLES

File details come from the government source that posted it. Updated .