Attach II -539-25-508 - Drawings.pdf
PDF 30 MB Posted
- Solicitation number
- 36C25026B0044
About this file
This file is a set of construction drawings for the Correct Imaging Tower Deficiencies project (Project No. 539-25-508) located at the VA Medical Center in Cincinnati, Ohio. The drawings were prepared by the Office of Construction and Facilities Management, U.S. Department of Veterans Affairs, with an issue date of March 24, 2026, and are marked as Construction Documents for a fully sprinklered facility.
The project scope includes demolition of two existing doors and removal of roof surface with preparation for repair, followed by installation of new components including a lead-lined door with specified hardware (Corbin Russwin passage mortis set with pivot hinges and automatic operators), a new asphalt roof, a ductless split system air conditioning unit with 30,000 BTU/hour cooling capacity, and a continuous fiberglass reinforced polymer (FRP) grated walkway system for roof equipment access. The mechanical system installation is all-inclusive and requires power supply with disconnect switch, carpentry work for indoor unit wall mounting and outdoor unit roof curb provision, and plumbing work including condensate pump, drip pan, and sensor installation. General notes emphasize coordination of all dimensions and utility connections prior to installation, compliance with manufacturer requirements and VA specifications, and protection of existing roof equipment and air intakes with charcoal filters to prevent odors from entering the imaging and bed tower during construction. The drawing set includes demolition plan, four new work plan sheets detailing specific installations, and photographic documentation of current conditions and design examples.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25026B0044 0004.docx | DOCX document | |
| RFI - IMS.doc | DOC document | |
| 36C25026B0044 CCI RFI 2.doc | DOC document | |
| 36C25026B0044 CCI RFI 1.doc | DOC document | |
| 36C25026B0044 0003.docx | DOCX document | |
| SignIn sheet.jpg | JPG image | |
| 36C25026B0044 0002.docx | DOCX document | |
| 36C25026B0044 0001.docx | DOCX document | |
| Attach VI - RFI.doc | DOC document | |
| Attach III -539-25-508 Correct Imaging Tower Deficiencies - SOW.docx | DOCX document | |
| 36C25026B0044_1.docx | DOCX document | |
| Attach VI - RFI.doc | DOC document | |
| Attach V - VAAR 852.219-75 VA NOTICE OF LIMITS ON SUBCONTRACTING_CERT OF COMPLIANCE JAN 2023 DEV.docx | DOCX document | |
| Attach IV - 539-25-508 Correct Imaging Tower Deficiencies - SPECS.pdf | ||
| Attach I -Davis Bacon Act WD OH20260082.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
G001
COVER SHEET
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
Correct Imaging Tower Deficiencies
CINCINNATI, OHIO (539)
3/24/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
DRAWING INDEX
SHEET #
G001
AD101
A101 A102 A103 A104 P101 P102
SHEET TITLE
COVER SHEET
DEMOLITION PLAN
NEW WORK PLAN 1
NEW WORK PLAN 2
NEW WORK PLAN 3
NEW WORK PLAN 4
PHOTOS CURRENT COND
PHOTO EXAMPLES
INFECTION CONTROL
GENERAL NOTES
A. PROVIDE TEMPORARY BARRIER WALLS, BASIS OF DESIGN:
STARC SYSTEMS, FOR ACTIVITIES CAUSING DUST AND/OR
DEBRIS, OR AT EXTERIOR LOCATIONS TO PREVENT PEOPLE
OR WEATHER INTRUSION. MAINTAIN 5' CLEAR IN
CORRIDORS LESS THAN 7'6" WIDE, AND 6' CLEAR IN LARGER
CORRIDORS. PROVIDE ACCESS DOORS AS NECESSARY.
UNITED STATES DEPARTMENT OF VETERANS AFFAIRS
V.A. MEDICAL CENTER
3200 Vine St, Cincinnati, OH 45220 Correct Imaging Tower Deficiencies Project # 539-25-508
539-25-508
CT Room #2
A2013
CT Control A2014
Adm.
Equip.
A2016A
CT Room #1
A2016
CT Prep A2017
Toilet A2018
Stair 11 S*3*11
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
AD101
DEMOLITION PLAN
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
Correct Imaging Tower Deficiencies
CINCINNATI, OHIO (539)
3/24/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
GENERAL NOTES
A. EXISTING ROOF METAL DECK.
B. EXISTING PENETRATIONS TO REMAIN. SEE DETIALS FOR FLASHING
CONDITIONS.
C. ROOF DRAINS TO BE PROTECTED THROUGH OUT THE ENTIRE
PROCESS ALLOWING FOR FUNCTIONALITY AND PROTECTED FROM
DEBRIS.
PLAN NOTES
1. REMOVE TWO EXISTING DOORS.
2. REMOVE ROOF SURFACE AND PREP FOR REPAIR.
539-25-508
SCALE | 1/4" = 1' - 0"
DEMO PLAN
CT Room #2
A2013
CT Control A2014
Adm.
Equip.
A2016A
CT Room #1
A2016
CT Prep A2017
Toilet A2018
Stair 11 S*3*11
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
A101
NEW WORK PLAN 1
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
Correct Imaging Tower Deficiencies
CINCINNATI, OHIO (539)
3/24/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
GENERAL NOTES
A. COORDINATE ALL DIMENSIONS, UTILITY CONNECTIONS, AND
EQUIPMENT LOCATIONS PRIOR TO INSTALLATION.
B. ALL NEW MATERIALS SHALL BE INSTALLED PER MANUFACTURER
REQUIREMENTS AND VA SPECIFICATIONS.
C. KEEP ALL EQUIPMENT ON THE ROOF UP AND RUNNING DURING
CONSTRUCTION, AND ENSURE AIR INTAKES ARE PROTECTED
(TYPICALLY CHARCOAL FILTER) SO THAT SMELLS FROM THE WORK
DO NOT TRAVEL INTO THE IMAGING/BED TOWER.
PLAN NOTES
1. INSTALL NEW LEAD-LINED DOOR. (REFERENCE PG 18-14 FOR
REQUIREMENTS)
2. INSTALL NEW ROOF. (IN FAVOR FOR SOMETHING LIKE THE NEW
ASPHALT ROOF WE HAVE TODAY)
3. INSTALL DUCTLESS SPLIT SYSTEM WITH CAPACITY TO COOL AT A
RATE OF UP TO 30K BTU/HR.
4. NEW CONTINUOUS FRP GRATED WALKWAY SYSTEM AT EXISTING
LOCATION. (EX. BELOW THE NEED IS TO SERVICE ALL ROOF
EQUIPMENT USING WALKWAY)
539-25-508
NEW WORK PLAN 1
Stair 11 S*3*11
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
A102
NEW WORK PLAN 2
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
Correct Imaging Tower Deficiencies
CINCINNATI, OHIO (539)
3/24/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
GENERAL NOTES
A. COORDINATE ALL DIMENSIONS, UTILITY CONNECTIONS, AND
EQUIPMENT LOCATIONS PRIOR TO INSTALLATION.
B. ALL NEW MATERIALS SHALL BE INSTALLED PER MANUFACTURER
REQUIREMENTS AND VA SPECIFICATIONS.
C. KEEP ALL EQUIPMENT ON THE ROOF UP AND RUNNING DURING
CONSTRUCTION, AND ENSURE AIR INTAKES ARE PROTECTED
(TYPICALLY CHARCOAL FILTER) SO THAT SMELLS FROM THE WORK
DO NOT TRAVEL INTO THE IMAGING/BED TOWER.
PLAN NOTES
1. NEW CONTINUOUS FRP GRATED WALKWAY SYSTEM AT EXISTING
LOCATION. (EX. BELOW THE NEED IS TO SERVICE ALL ROOF
EQUIPMENT USING WALKWAY)
2. REFERENCE BOTH NOTE C AND V BELOW TO UNDERSTAND HOW
BOTH THE PARAPET AND ROOF CURBS ARE TO BE COMPLETED.
539-25-508
NEW WORK PLAN 2
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
A103
NEW WORK PLAN 3
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
Correct Imaging Tower Deficiencies
CINCINNATI, OHIO (539)
3/24/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
GENERAL NOTES
A. COORDINATE ALL DIMENSIONS, UTILITY CONNECTIONS, AND
EQUIPMENT LOCATIONS PRIOR TO INSTALLATION.
B. ALL NEW MATERIALS SHALL BE INSTALLED PER MANUFACTURER
REQUIREMENTS AND VA SPECIFICATIONS.
C. KEEP ALL EQUIPMENT ON THE ROOF UP AND RUNNING DURING
CONSTRUCTION, AND ENSURE AIR INTAKES ARE PROTECTED
(TYPICALLY CHARCOAL FILTER) SO THAT SMELLS FROM THE WORK
DO NOT TRAVEL INTO THE IMAGING/BED TOWER.
PLAN NOTES
1. INSTALL NEW LEAD-LINED DOOR. (REFERENCE PG 18-14 FOR
REQUIREMENTS)
539-25-508
SCALE | 1/4" = 1' - 0"
NEW WORK PLAN 3
- m: Wood - just indicates that the door should be made of wood.
- t: 15 - indicates that the door is type 15.
- dl: LEAD - indicates it shall be a lead lined door.
- s: S / X - indicates the size of the door shall be “S” or “X”, which is noted in PG 18-4 under “All Div 08 Details”.
- Hardware set is 4Q comes directly from specification section 08 71 00.
- Pivot Set.
- Passage Mortis Set.
- Intermediate Pivots.
- Corbin Russwin Passage.
- Edge Guards, Armor Plate
- Automatic Operator With Hold Open.
- Automatic Flush Bolt.
- Rixson Pivot Hinges
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
A104
NEW WORK PLAN 4
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
Correct Imaging Tower Deficiencies
CINCINNATI, OHIO (539)
3/24/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
GENERAL NOTES
A. COORDINATE ALL DIMENSIONS, UTILITY CONNECTIONS, AND
EQUIPMENT LOCATIONS PRIOR TO INSTALLATION.
B. ALL NEW MATERIALS SHALL BE INSTALLED PER MANUFACTURER
REQUIREMENTS AND VA SPECIFICATIONS.
C. KEEP ALL EQUIPMENT ON THE ROOF UP AND RUNNING DURING
CONSTRUCTION, AND ENSURE AIR INTAKES ARE PROTECTED
(TYPICALLY CHARCOAL FILTER) SO THAT SMELLS FROM THE WORK
DO NOT TRAVEL INTO THE IMAGING/BED TOWER.
PLAN NOTES
1. INSTALL DUCTLESS SPLIT SYSTEM WITH CAPACITY TO COOL AT A
RATE OF UP TO 30K BTU/HR.
2. THE INSTALLATION SHOULD BE ALL-INCLUSIVE TO INCLUDE:
- POWER - NEED A DISCONNECT SWITCH AT THE UNIT.
- CARPENTRY - MOUNTING OF INDOOR UNIT TO THE WALL,
PROVISION OF ROOF CURBS FOR THE OUTDOOR UNIT, LOCATION
SELECTION ON THE ROOF OF THE OUTDOOR UNIT.
- PLUMBING - AS SEEN IN SOME OF OUR NEW TELEDATA ROOMS,
THIS UNIT WILL NEED A CONDENSATE PUMP, A DRIP PAN AND A
SENSOR.
3. THE DATA PROVIDED WILL GIVE A BASIS OF DESIGN.
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
P101
PHOTOS CURRENT COND
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
Correct Imaging Tower Deficiencies
CINCINNATI, OHIO (539)
3/24/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title:
Approved:
VA FORM 08 - 6231
P102
PHOTOS EXAMPLES
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:
321 4 6 7 8 9 10
Correct Imaging Tower Deficiencies
CINCINNATI, OHIO (539)
3/24/2026 LH
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLEREDCHIEF OF ENGINEERING
ZACH SCHMIDT
| Sheets and Views |
| 539-25-508 - Drawings-COVER SHEET |
| 539-25-508 - Drawings-DEMO PLAN |
| 539-25-508 - Drawings-NEW WORK PLAN 1 |
| 539-25-508 - Drawings-NEW WORK PLAN 2 |
| 539-25-508 - Drawings-NEW WORK PLAN 3 |
| 539-25-508 - Drawings-NEW WORK PLAN 4 |
| 539-25-508 - Drawings-PHOTOS CURRENT COND |
| 539-25-508 - Drawings-PHOTOS EXAMPLES |
File details come from the government source that posted it. Updated .