ATTACH I - J-0200000-08 APP KTR Cklst.pdf
PDF 408 KB Posted
- Attached to
- BASE WIDE REFUSE & RECYCLING SERVICES
- Solicitation number
- N4008522R2584
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5 - J-1503030-13a Refuse Units Tally Sheet.xls | XLS spreadsheet | |
| 4 -J-1503030-08 Recyclable Containers SLF.xlsx | XLSX spreadsheet | |
| 7 - FORM--CCCPD.pdf | ||
| 22R2584_AMD0004.pdf | ||
| 6 - ELIN Schedule A_rev09092022.xlsx | XLSX spreadsheet | |
| 22R2584_AMD0003.pdf | ||
| Amended J-1503030-08 Recyclable SLF.xlsx | XLSX spreadsheet | |
| AMD 0002_22R2584.pdf | ||
| Amended ELINs.xlsx | XLSX spreadsheet | |
| REFUSE SITE VISIT LOG.pdf | ||
| ISWM PPIs.xlsx | XLSX spreadsheet | |
| 22R2584-AMD0001.pdf | ||
| ATTACH N - J-1503030-11 Area Map.pdf | ||
| ATTACH K - J-1503030-07 Refuse MSW CSLF.xlsx | XLSX spreadsheet | |
| ATTACH M - J-1503030-10 Container Map.pdf | ||
| ATTACH H - J-0200000-05_CSIR.pdf | ||
| ATTACH J - J-0200000-10_ELINs.xlsx | XLSX spreadsheet | |
| ATTACH 1 - PPIs.xlsx | XLSX spreadsheet | |
| N4008522R2584.pdf | ||
| ATTACH L - J-1503030-08 Recyclable SLF.xlsx | XLSX spreadsheet |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CESO Form A-02 MAR 15
Form A-02 U.S. Army Corps of Engineers
Accident Prevention Plan Checklist
Date of Inspection
Location (Plant or Facility) Contract Number
Contractor Name Project Name
Inspector Name (Print) Inspector Signature
This checklist serves as a guide only, it does not replace or eliminate the need to comply with the requirements set forth in Engineering Manual 385-1-1, Safety and Health Requirements Manual, dated 30 Nov 2014. The references included in this checklist correspond to the applicable sections of EM 385-1-1.
Item Description Yes No N/A Remarks (Any NO or N/A item)
a. Signature sheet
1. Includes the name, title, signature, telephone number, and qualifications of the Plan Preparer (Qualified person, i.e. corporate safety staff person, QC)
2. Includes the name, title, signature, telephone number, and qualifications of the Plan Approver (e.g. owner, company president, regional vice president) (HTRW activities require approval of a Certified Industrial Hygienist, a Certified Safety Professional may approve the plan for operations involving UST removal where contaminants are known to be petroleum, oils, or lubricants).
3. Includes the name(s), title(s), signature(s), telephone number(s), and qualifications for Plan Concurrence (provide concurrence of other applicable corporate and project personnel (contractor)) (e.g. Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional, project QC.)
b. Background information
1. Includes the Contractor Name.
2. Includes the Contract Number.
3. Includes the Project Name.
4a. Includes the Brief Project Description.
4b. Includes a Discription of the Work to be Performed.
4c. Includes the Location of the Project (map).
4d. Includes the Equipment to be Used.
4e. Includes the Anticipated High Risk Activities.
5. Includes the Major Phases of Work Anticipated.
(Within these major phases of work identified, activities [includes Definable features of Work (DFOWs) and tasks] to be performed that will require an AHA shall be specifically highlighted. This information can then be used by QC, QA and Safety personnel to track AHA submittals. The AHAs for these activities, tasks of DFOWs are NOT submitted at this time (AHAs created/submitted at this time would not be activity-specific as they are intended to be). > See Sections 01.A.14 and 01.A.15.)
ATTACH I - J-0200000-08 APP KTR CKLIST
U.S. Army Corps of Engineers
Accident Prevention Plan Checklist (cont’d)
Date of Inspection
Item Description Yes No N/A Remarks (Any NO or N/A item)
c. Statement of Safety and Health Policy.
1. Provide a copy of current corporate/company Safety and Health Policy Statement, detailing commitment to providing a safe and healthful workplace for all employees. (In addition to the corporate policy statement, a copy of the corporate safety program may provide a portion of the information required by the accident prevention plan.)
2. Includes Contractor’s written safety program goals.
3. Includes Contractor’s written safety program objectives.
4. Includes the Contractor Accident Experience (Copy of OSHA 300 Forms, or equivalent documentation).
d. Responsibilities and Lines of Authority.
1. Includes statement of the employer’s ultimate responsibility for the implementation of his SOH program for his own employees, all sub-contractors and all others on the worksite (includes the strict enforcement of the program).
2. Includes the identification and accountability of personnel responsible for safety and health at both the corporate and project level – including their resumes. Qualifications shall be in accordance with Section 01.A.17. (Only official OSHA 30-Hour cards will be accepted or, if equivalent training is provided, appropriate instructor qualifications.)
3. Includes equivalent training to the OSHA 30-Hour classes is being presented as qualification, the training shall cover, as a minimum, the areas discussed in Appendix A, Section 3.d.3.(a-d).
4. Includes the names of Competent (CP) and/or Qualified Person(s) (QP) and proof of competency/qualification to meet specific OSHA CP/QP requirements. (Must include copies of proof of CP/QP).
5. Includes requirements and details of the employer’s Risk Management Process. (USACE uses the Activity Hazard Analysis (AHA) as part of a total risk management process. Contractors and other individual employer’s may use the AHAs or their own version [Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools]. These documents are considered equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA.)
6. Includes requirements for initial activity-specific AHAs to be submitted and accepted at preparatory meetings, prior to work being performed;
7. Includes requirements that no work by the Contractor shall be performed unless a designated Competent Person/SSHO is present on the job site.
8. Includes policies and procedures regarding non-compliance with safety requirements (to include disciplinary actions for violation of safety requirements).
9. Lines of authority.
10. Includes written company procedures for holding managers and supervisors accountable for safety.
Item Description Yes No N/A Remarks (Any NO or N/A item)
e. Subcontractors and Suppliers.
1. Includes the list of subcontractors and suppliers.
(If not known at the time of initial APP submittal, the contractor shall include the following statement in their initial APP: “The subcontractors for the following DFOWs/activities are not known at this time, but additional information will be submitted to the APP for acceptance prior to the start of any activities listed”)
2. Includes safety responsibilities of subcontractors and suppliers.
f. Training
1. Includes requirements for new hire SOH orientation training at the time of initial hire of each new employee.
2. Includes requirements for mandatory training and certifications that are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, diver, vehicle operator, HAZWOPER training and certification, PPE) and any requirements for periodic retraining / recertification.
3. Includes procedures for periodic safety and health training for supervisors and employees.
4. Includes the requirements for emergency response training.
g. Safety and Health Inspections
1. Includes specific assignment of responsibilities for a minimum daily jobsite SOH inspection during periods of work activity.
1a. Includes the name(s) of individual(s) responsible for conducting safety inspections. (e.g., PM, safety professional, QC, supervisors, employees)
1b. Includes proof of inspector's training / qualifications.
1c. Indicates when inspections will be conducted.
1d. Indicates procedures for documentation. (Furnished sample forms upon which inspections will be recorded.)
1e. Indicates deficiency tracking system and follow-up procedures.
2. Includes any external inspections / certifications which may be required. (e.g., US Coast Guard)
h. Mishap Reporting and Investigation
1. The plan identifies how, when, and who shall complete the Exposure data (man-hours worked).
2a. The plan identifies how, when, and who shall complete mishap investigations, reports, and logs. (The contractor shall report, thoroughly investigate, and analyze all mishaps occurring incidentally to an operation, project or facility for which this manual is applicable.)
2b. The plan identifies how, when, and who shall make immediate notification of major mishaps. (Mishaps shall be reported as soon as possible but not more than 24 hours afterwards to the KO/COR.)
2c. Includes how, when, and who will provide notice to the KO/COR when corrective actions are completed. (Implement corrective actions as soon as reasonably possible.)
Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable safety and occupational health risks and associated compliance plans. Using the EM 385-1-1 as a guide, plans, programs, procedures (assessments and evaluations), may include but not be limited to:
(1)Include a project-specific compliance plan, as applicable to the work being performed, and as identified below. The plans shall incorporate project-wide procedures to control hazards to which the employees of all project employers may be exposed.
(2) These procedures shall be coordinated with all project employers and shall include project-specific, project-wide emergency response and evacuation procedures, PPE requirements, recordkeeping and reporting requirements, and training requirements.
(3) The plans shall be prepared prior to the start of any work activities on the job site (as much as the information can be known at that point in time). The plans shall be updated throughout the life of the project to include changes in personnel, equipment, conditions, etc. Additional revisions shall be incorporated as necessary to reflect changing site conditions, construction methods, personnel roles and responsibilities and construction schedules.
(4) No activity (DFOW) shall be started on site until the APP is revised and submitted to the GDA for acceptance, with the site-specific plans, programs and procedures required to complete the project.
Item Description Yes No N/A Remarks (Any NO or N/A item)
i. Plans (Programs, Procedures, Assessments, and Evaluations) required by the Safety Manual
1. Fatigue Management Plan (01.A.20)
2. Emergency Plans (01.E):
(a) Procedures & Test (01.E.01)
(b) Spill Plans (01.E.01, 06.A.02)
(c) Fire Fighting Plan (01.E.01; 19.A)
(d) Posting of Emergency Telephone Numbers (01.E.05)
(e) Man overboard/abandon ship (19.A.04)
(f) Plan for prevention of alcohol and drug abuse (01.C.02 & Specs)
3. Site Sanitation/Housekeeping Plan (02.B)
4. Medical Support Agreement. Outline on-site medical support and off-site medical arrangements including rescue and medical duties for those employees who are to perform them, and the name(s) of on-site Contractor personnel trained in first aid and CPR. A minimum of two employees shall be certified in CPR and first-aid per shift/site (03.A.01, 03.A.03)
5. Blood-borne Pathogen Program (03.A.05)
6. Exposure Control Plan (03.A.05)
7. Automatic External Defibrillator (AED) Program (03.B.04)
8. Site Layout Plan (04.A)
9. Access/Haul Road Plan (04.B)
10. Hearing Conservation Program (05.C)
11. Respiratory Protection Plan (05.G)
12. Health Hazard Control Program (06.A)
13. Hazard Communication Program (06.B.01)
14. Process Safety Management Plan (06.B.04)
15. Lead Compliance Plan (06.C.02 & Specifications)
16. Asbestos Abatement Plan (06.C.03 & Specifications)
Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans, programs, procedures (assessments and evaluations), may include but not be limited to:
Item Description Yes No N/A Remarks (Any NO or N/A item)
i. Plans (Programs, Procedures) continued.
17. Radiation Safety Program (06.F)
18. Abrasive Blasting Plan (06.I)
19. Heat Stress Monitoring Plan (HSMP) (06.J.02)
20. Cold Stress Monitoring Plan (CSMP) (06.J.04)
21. Indoor Air Quality Management Plan (06.L)
22. Mold Remediation Plan (06.L.04)
23. Chromium (VI) Exposure Evaluation (06.M)
24. Crystalline Silica Assessment (06.N.02)
25. Lighting Plan for Night Operations (07.A.06)
26. Traffic Control Plan (08.C.05)
27. Fire Prevention Plan (09.A.01)
28. Wild Land Fire Management Plan (09.L)
29. Arc Flash Hazard Analysis (11.B)
30. Assured Equipment Grounding Control Program (AEGCP), (11.D.05, Appendix E)
31. Hazardous Energy Control Program and Procedures (12.A.01)
32. Standard Pre-Lift Plan – LHE (16.A.03)
33. Critical Lift Plan – LHE (16.H)
34. Naval Architectural Analysis – LHE (Floating) (16.L)
35. Floating Plant Inspection and Certification (19.A.01)
36. Severe Weather Plan for Marine Activities (19.A.03)
37. Emergency Plan for Marine Activities (19.A.04)
38. Man Overboard/Abandon Ship Procedures (19.A.04)
39. Float Plan for Launches, Motorboats, Skiffs (19.F.04)
40. Fall Protection and Prevention Plan (21.D)
41. Demolition/Renovation Plan (to include engineering survey) (23.A)
42. Rope Access Work Plan (24.H)
43. Excavation/Trenching Plan (25.A.01)
44. Fire Prevention and Protection Plan for Underground Construction (26.D.01)
45. Compressed Air Work Plan for Underground Construction (26.I.01)
46. Erection and Removal Plan for Formwork and Shoring (27.C)
47. Precast Concrete Plan (27.D)
Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational risks and compliance plans. Using the EM 385-1-1 as a guide, plans, programs, procedures (assessments and evaluations), may include but not be limited to:
Item Description Yes No N/A Remarks (Any NO or N/A item)
i. Plans (Programs, Procedures) continued.
48. Lift-slab Plans (27.E)
49. Masonry Bracing Plan (27.F.01)
50. Steel Erection Plan (28.B)
51. Explosives Safety Site Plan (ESSP) (29.A)
52. Blasting Plan (29.A; 26.J)
53. Dive Operations Plan (30.A.14, 30.A.16)
54. Safe Practices Manual for Diving Activities (30.A.15)
55. Emergency Management Plan for Diving (30.A.18)
56. Tree Felling/Maintenance Program (31.A.01)
57. Aircraft/Airfield Construction Safety & Phasing Plan (CSPP) (32.A.02)
58. Aircraft/Airfield Safety Plan Compliance Document (SPCD) (32.A.02)
59. Site Safety and Health Plan (HTRW) (33.B)
60. Confined Space Entry Procedures (34.A.05)
61. Confined Space Program (34.A.06)
j. Risk Management Processes (AHAs). Detailed project-specific hazards and controls shall be provided by Activity Hazard Analysis for each activity (DFOW). No work will begin on an activity (DFOW) until the initial AHA has been accepted by the GDA addressing the project-specific hazards. (01.A.14 & 01.A.15) Note: USACE uses the Activity Hazard Analysis (AHA) as part of a total risk management process. Contractors and other individual employer’s may use the AHAs or their own version [Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools].
These documents are considered equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA.
Remarks:
Other Remarks:
| Location Plant or Facility: |
| Contract Number: |
| Contractor Name: |
| Project Name: |
| Inspector Name Print: |
| Inspector Signature: |
| 2 Inc udes the name title s gnature telephone number and qual f cat ons of the P an Approver eg owner company pres dent regional v ce pres dent HTRW act v t es require approval of a Cert f ed Industr al Hygien st a Cert f ed Safety Profess onal may approve the plan for operat ons nvolv ng UST removal where contam nants are known to be petroleum oi s or ubr cants: |
| 2 Inc udes Contractor s wr tten safety program goals_4: |
| 3 Inc udes Contractor s wr tten safety program object ves_4: |
| 4 Inc udes the Contractor Acc dent Exper ence Copy of OSHA 300 Forms or equivalent documentat on: |
| 2 Inc udes the ident f cat on and accountabi ty of personnel respons ble for safety and health at both the corporate and project evel nc uding the r resumes Qual f cat ons shal be in accordance w th Sect on 01A17 Only official OSHA 30Hour cards w be accepted or f equ valent training is prov ded appropr ate instructor qual f cat ons_4: |
| 3 Inc udes equivalent training to the OSHA 30Hour classes s being presented as qual f cat on the training shal cover as a m nimum the areas discussed in Appendix A Sect on 3d3ad: |
| 4 Inc udes the names of Competent CP andor Qual f ed Persons QP and proof of competencyqual f cat on to meet spec f c OSHA CPQP requirements Must nc ude copies of proof of CPQP_4: |
| 5 Inc udes requirements and detai s of the employer s R sk Management Process USACE uses the Act vity Hazard Ana ysis AHA as part of a total r sk management process Contractors and other ndiv dual employer s may use the AHAs or their own vers on Job Safety Analyses JSAs Job Hazard Analyses JHAs or s m ar R sk Management assessment tools These documents are cons dered equivalent to and acceptable subst tutes for the USACE s AHA prov ded the data col ected is the same as that required by the AHA_4: |
| 6 Inc udes requirements for nit al act v tyspec f c AHAs to be subm tted and accepted at preparatory meet ngs pr or to work being performed: |
| 7 Inc udes requirements that no work by the Contractor shal be performed unless a des gnated Competent PersonSSHO s present on the job s te: |
| 8 Inc udes pol c es and procedures regarding noncompl ance w th safety requirements to inc ude disc pl nary act ons for v olat on of safety requirements: |
| 9 Lines of author ty_4: |
| 10 Inc udes wr tten company procedures for holding managers and superv sors accountable for safety: |
| 2 Inc udes safety respons bi t es of subcontractors and suppl ers_4: |
| 2 Inc udes requirements for mandatory training and cert f cat ons that are appl cable to this project eg explos ve actuated tools conf ned space entry crane operator diver vehic e operator HAZWOPER training and cert f cat on PPE and any requirements for per odic retraining recert f cat on_4: |
| 3 Inc udes procedures for per odic safety and health training for superv sors and employees: |
| 4 Inc udes the requirements for emergency response training: |
| 1a Inc udes the names of ndiv duals respons ble for conduct ng safety nspect ons eg PM safety profess onal QC supervisors employees: |
| 1b Inc udes proof of nspector s training qual f cat ons_4: |
| 1c Indicates when nspect ons w be conducted_4: |
| 1d Indicates procedures for documentat on Furnished sample forms upon which inspect ons w be recorded: |
| 1e Indicates def c ency track ng system and fol owup procedures_4: |
| 2 Inc udes any external nspect ons cert f cat ons wh ch may be required eg US Coast Guard: |
| 18 Abras ve B ast ng P an 06I_4: |
| 19 Heat Stress Monitor ng P an HSMP 06J02_4: |
| 20 Cold Stress Monitor ng P an CSMP 06J04_4: |
| 21 Indoor A r Qual ty Management P an 06L_4: |
| 22 Mold Remediat on P an 06L04_4: |
| 23 Chrom um VI Exposure Evaluat on 06M_4: |
| 24 Crystal ne S ca Assessment 06N02_4: |
| 25 Light ng P an for N ght Operat ons 07A06_4: |
| 26 Traff c Control P an 08C05_4: |
| 27 F re Prevent on P an 09A01_4: |
| 28 W d Land F re Management P an 09L_4: |
| 29 Arc F ash Hazard Analys s 11B_4: |
| 30 Assured Equ pment Grounding Control Program AEGCP 11D05 Appendix E: |
| 31 Hazardous Energy Control Program and Procedures 12A01_4: |
| 32 Standard PreLift Plan LHE 16A03_4: |
| 33 Critical Lift Plan LHE 16H_4: |
| 34 Naval Architectural Analys s LHE F oat ng 16L_4: |
| 35 F oat ng P ant Inspect on and Cert f cat on 19A01_4: |
| 36 Severe Weather P an for Mar ne Act v t es 19A03_4: |
| 37 Emergency P an for Mar ne Act v t es 19A04_4: |
| 38 Man OverboardAbandon Ship Procedures 19A04_4: |
| 39 F oat P an for Launches Motorboats Sk ffs 19F04_4: |
| 40 Fal Protect on and Prevent on P an 21D_4: |
| 41 DemolitionRenovat on P an to inc ude engineer ng survey 23A: |
| 42 Rope Access Work P an 24H_4: |
| 43 Excavat onTrenching P an 25A01_4: |
| 44 Fire Prevent on and Protect on P an for Underground Construct on 26D01: |
| 45 Compressed A r Work Plan for Underground Construct on 26I01: |
| 46 Erect on and Removal P an for Formwork and Shor ng 27C_4: |
| 47 Precast Concrete P an 27D_4: |
| 49 Masonry Brac ng P an 27F01_4: |
| 50 Steel Erect on P an 28B_4: |
| 51 Explos ves Safety S te P an ESSP 29A_4: |
| 52 B ast ng P an 29A 26J_4: |
| 53 D ve Operat ons P an 30A14 30A16_4: |
| 54 Safe Pract ces Manual for D v ng Act v t es 30A15_4: |
| 55 Emergency Management P an for D v ng 30A18_4: |
| 56 Tree Fel ngMaintenance Program 31A01_4: |
| 57 AircraftAirfield Construct on Safety Phas ng P an CSPP 32A02: |
| 58 A rcraftA rfie d Safety P an Compl ance Document SPCD 32A02: |
| 59 Site Safety and Health P an HTRW 33B_4: |
| 60 Conf ned Space Entry Procedures 34A05_4: |
| 61 Conf ned Space Program 34A06_4: |
| Row14_4: |
| Remarks: |
| Other Remarks: |
| Date of Inspection: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Text11: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text36: |
| Text37: |
| Check Box38: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box39: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box40: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box41: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box42: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box43: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box44: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box45: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box46: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box47: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box48: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box49: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box50: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box51: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 6: |
| 0: Off |
| 1: Off |
| 2: Off |
| 7: |
| 0: Off |
| 1: Off |
| 2: Off |
| 8: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box52: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box53: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box54: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 6: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box55: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box57: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box58: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 6: |
| 0: Off |
| 1: Off |
| 2: Off |
| 7: |
| 0: Off |
| 1: Off |
| 2: Off |
| 8: |
| 0: Off |
| 1: Off |
| 2: Off |
| 9: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box59: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box60: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 6: |
| 0: Off |
| 1: Off |
| 2: Off |
| 7: |
| 0: Off |
| 1: Off |
| 2: Off |
| 8: |
| 0: Off |
| 1: Off |
| 2: Off |
| 9: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box61: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box62: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box63: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box64: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box65: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 6: |
| 0: Off |
| 1: Off |
| 2: Off |
| 7: |
| 0: Off |
| 1: Off |
| 2: Off |
| 8: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box66: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box67: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box69: |
| 0: Off |
| 1: Off |
| 2: Off |
| Text70: |
| Text71: |
| Text72: |
| Text73: |
| Text74: |
| Text75: |
| Text76: |
| Text77: |
| Text78: |
| Text79: |
| Text80: |
| Text81: |
| Text82: |
| Text83: |
| Text84: |
| Text85: |
| Text86: |
| Text87: |
| Text88: |
| Text89: |
| Check Box90: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box91: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box92: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box93: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box94: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box95: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box96: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box97: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box98: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box99: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 6: |
| 0: Off |
| 1: Off |
| 2: Off |
| 7: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box100: |
| 0: Off |
| 1: Off |
| 2: Off |
File details come from the government source that posted it. Updated .