Attach A SOW Eng Svcs Final .pdf
PDF 327 KB Posted
- Solicitation number
- 19AQMM26R0034
About this file
This is a Statement of Work for engineering and support services for the Department of State's Bureau of Diplomatic Security. The effort is structured as an Indefinite Delivery, Indefinite Quantity (IDIQ) contract organized into five task groups covering research, development, testing, and evaluation activities.
The five task groups encompass: (1) Automotive Testing—including armored vehicle performance testing, Advanced Driver Assistance Systems (ADAS) testing, and runflat system testing; (2) Cybersecurity Testing—identifying vulnerabilities in onboard vehicle electronic systems; (3) Ballistic and Material Testing—conducting research and development on armor materials, forced entry and ballistic resistance testing, and material characterization; (4) Anti-Ram Design and Testing—developing and evaluating anti-ram perimeter barrier systems; and (5) Blast Design, Testing, and General Consulting—designing blast mitigation systems, conducting blast testing, and providing subject matter expertise. The contractor must provide all necessary equipment and facilities for awarded groups, maintain SECRET-level security clearance capability, and deliver detailed test plans, test reports, R&D project summaries, and modeling/simulation reports as specified. Key personnel must possess a bachelor's degree in a relevant field and minimum eight years of experience. All contracted activities must be conducted at contractor-provided facilities. Deliverables include weekly status meetings, monthly reports, test incident reports, and comprehensive documentation of all testing activities and results. The contractor is responsible for all material costs, which must be included in proposal pricing, with no separate payment for materials unless specifically authorized in individual task orders.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD 001 Attach 1 Instruction_Track Changes.docx | DOCX document | |
| AMD 001 SOW_Eng Svcs Final_Track Changes.docx | DOCX document | |
| AMD 001 SOW_Eng Svcs Final .pdf | ||
| AMD 001 Attach C - CDRLs_EngSvcs.pdf | ||
| RFP 19AQMM26R0034 AMD 001 Eng Svcs.pdf | ||
| AMD 001 Attach B Pricing Worksheet.xlsx | XLSX spreadsheet | |
| AMD 001 Attach 1 Instruction.pdf | ||
| AMD 001 Questions and Answers.xlsx | XLSX spreadsheet | |
| AMD 001 DD254.pdf | ||
| Attach C - CDRLs_EngSvcs.pdf | ||
| 19AQMM26R0034.pdf | ||
| Attach B Pricing Worksheet_EngSvcs.xlsx | XLSX spreadsheet | |
| ATTACH 1 RFP Instruction.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP # 19AQMM26R0034
Attachment A Statement of Work
Engineering Services for Physical Security Programs (PSP) and Defensive Equipment and
Armored Vehicles (DEAV)
1. Purpose
The Department of State, Bureau of Diplomatic Security, Countermeasures Directorate, Office of Physical Security Programs is seeking an industry partner or partners to provide engineering and support services for both the Physical Security Division (PSD) and Defensive Equipment and Armored Vehicles
(DEAV).
Services include:
• Automotive Testing o Conduct Automotive Performance Testing on Armored
Vehicles to evaluate performance and reliability.
o Conduct Research, Testing and Characterization of
Advanced Driver Assistance Systems (ADAS) to evaluate performance on armored vehicles.
o Perform Runflat Testing for Armored Vehicles to evaluate runflat performance of selected systems.
• Cybersecurity Testing o Conduct Research and Testing on Automotive Electronics to identify cybersecurity risks and mitigation strategies.
• Ballistic and Material Testing o Conduct Research and Development on armor materials and armored vehicles to evaluate protection capability against designated ballistic threats.
o Conduct Forced Entry and Ballistic Resistance Testing on components, systems, and construction commodities to evaluate protection levels.
o Perform Material Characterization and Evaluation services on building materials in the form of mechanical, impact, and accelerated life testing.
• Anti-Ram Engineering and Test o Conduct Anti-Ram Engineering and Design to improve current or develop new barrier systems.
o Conduct Anti-Ram Testing Services to evaluate anti-ram perimeter barrier systems.
• Blast and Security Engineering and Test o Perform Blast Mitigation Design to improve current or develop new blast mitigation systems.
o Perform Blast Testing Services to ensure designs meet designated specifications.
o Provide General Physical Security Consulting Services in the form of Subject Matter Expertise and other support services as needed.
2. Introduction
The Bureau of Diplomatic Security (DS) provides security for U.S. personnel overseas and foreign dignitaries visiting the U.S. The Physical Security Division, Office of Physical Security Programs (PSP), Countermeasures Directorate, Bureau of Diplomatic Security (DS), is responsible for developing and implementing physical security policies, standards, and programs to protect U.S. diplomatic facilities and personnel worldwide. The Defensive Equipment and Armored Vehicle Division (DEAV) of the Office of Physical Security programs purchases armored sedans, SUVs, and vans for both the Department of State (the Department), other federal agencies and departments.
Both offices have significant need for Research, Development, Testing, and Evaluation (RDTE) efforts to constantly improve the protection capabilities of both armored vehicles and hardened structures.
3. Objective
The intent of this effort to issue an Indefinite delivery, indefinite quantity (IDIQ) type Contract which allows for an indefinite quantity of services to perform the necessary RDTE tasks to maintain the Department of State’s security and protection capabilities.
4. Organizational Background
As the law enforcement and security arm of the U.S. Department of State, DS is responsible for providing a safe and secure environment for the conduct of U.S. foreign policy. DS is the most widely represented U.S. law enforcement and security organization in the world and protects people, property, and information at 275 State Department posts around the globe. Every U.S.
diplomatic mission in the world operates under a security program designed and maintained by Diplomatic Security. To achieve its mission, DS is a leader in detecting and mitigating terrorist threats to U.S. lives and facilities, mounting international investigations, and developing innovations in security training, cyber security, and physical security engineering.
The DS Countermeasures Directorate (DS/C) manages the development and implementation of all physical and technical countermeasure security standards and policies that apply to U.S. Department of State facilities domestically and overseas; securely transports classified diplomatic materials across international borders; and provides defensive equipment to protect the lives of U.S. government personnel, classified information, and property.
The Office of Physical Security Programs (PSP) directs the development of Overseas Security Policy Board (OSPB) security standards and Department policies and procedures associated with the physical security, construction security, transit security, secure procurement, defensive equipment, and armored vehicle programs at U.S. missions. PSP provides oversight into the implementation of these programs abroad to ensure compliance with the OSPB standards.
PSD manages the Department's forced entry and ballistic resistance, blast mitigation, perimeter protection, and special projects programs. PSD represents the Department to international and U.S. Government interagency committees involved in developing uniform security standards for physical security testing and modeling, material characterizations, and construction codes.
DEAV manages the Department's domestic and overseas special protective equipment (SPE) and AV program. DEAV represents the Department to international and U.S. Government interagency committees involved in developing uniform security standards for defensive equipment and armored vehicles.
5. Scope
The scope of this requirement encompasses: engineering and support services for the Department of State, Bureau of Diplomatic Security, Countermeasures Directorate, Office of Physical Security Programs. This includes services for Defensive Equipment and Armored Vehicle Division and Physical Security
Division.
6. Tasks
6.1. Group 1 (Task #1): Automotive Testing
6.1.1. Subtask #1.1: Armored Vehicle Performance Testing. Conduct Research Development Test and Evaluation (RDTE) of automotive performance and reliability of armored vehicles. Design and implement a detailed test plan to capture the automotive performance of armored vehicle first article or production systems and subsystems. Perform automotive performance and endurance testing on armored vehicle first articles and subsystems as described in the most recent version of the Department of State Armored Vehicle Specification and NHTSA FMVSS regulations. Document automotive testing results in a detailed test report and identify improvements for tested systems. Inspections and testing under this task include but are not limited to:
• Initial inspection and periodic inspections for conformance to Department of State Armored Vehicle Specification.
• Vehicle Physical Characteristics such as vehicle dimensions, weight, and center of gravity measurement.
• Braking performance.
• Speed and acceleration testing.
• Steering and handling testing, including double-lane change and slalom maneuvers.
• Endurance testing shall be performed according to the following breakdown, for a total of 5k-10k miles as decided by the COR, or through an accelerated durability test modeled after the same parameters.
Table 1. Endurance Testing Breakdown
Terrain Type Average Speed (mph)
Percent of Total
Average
RMS
Highway 50-65 35% 0.05-0.09
Paved Roads in Traffic/Congesti on 25-40 35% 0.05-0.09
Gravel 15-30 15% 0.17-0.25
Unimproved/Dir t 15-30 15% 0.85-1.8
Deliverable #1.1A: Detailed Test Plan (CDRL A004) The Contractor shall be responsible for creating a Detailed Test Plan (DTP) (CDRL A004) to ensure the vehicle meets requirements in the most recent revision of the Department of State Armored Vehicle Specification. The Detailed Test Plan shall be designed to fully capture the performance characteristics of each vehicle through conduct of standard automotive performance tests. The DTP shall identify clear pass/fail criteria for each test. The DTP must be approved by the contracting officer’s representative (COR).
Deliverable #1.1B: Test Incident Reports (CDRL A008) The Contractor shall generate Test Incident Reports (TIRs) documenting noteworthy findings or equipment failures throughout test conduct. TIRs shall be verbally reviewed during the weekly status meetings. The contractor shall assume that 30 to 40 TIRs will be documented for each first article tested.
Deliverable #1.1C: Test Report (CDRL A005) The Contractor shall generate and provide a test report summarizing all findings and results of the automotive and endurance testing. The report must include both narrative descriptions and tabular data detailing all testing performed and the outcome of each test.
6.1.2. Subtask #1.2: Armored Vehicle Advanced Driver Assistance
Systems Testing. Conduct testing, investigation, and characterization of Advanced Driver Assistance Systems (ADAS) on armored vehicles, with focus on Level 1 and Level 2 ADAS systems such as adaptive cruise control, lane keeping assistance, and collision intervention.
Design and implement a detailed test plan to investigate performance and potential improvements for the ADAS, including the rapid disabling of ADAS systems as needed in emergency situations. Document test results in a detailed test report and identify improvements for tested systems.
Deliverable #1.2A: Detailed Test Plan (CDRL A004) The Contractor shall be responsible for creating a Detailed Test Plan
(DTP) (CDRL A004) outlining the steps and methodologies for testing ADAS systems. While the Contractor shall be responsible for developing the DTP, it must be approved by the contracting officer’s representative (COR).
Deliverable #1.2B: Test Report (CDRL A005) The Contractor shall generate and provide a test report summarizing all findings and results of the testing. The report must include both narrative descriptions and tabular data detailing all testing performed and the outcome of each test.
6.1.3. Subtask #1.3: Runflat Testing for Armored Vehicles. Conduct
RDTE on runflat systems including runflat inserts and runflat tires.
Perform testing in accordance with U.S. and International testing protocols including but not limited to SAE (J 2014-2022) and FINABEL. Assemble tire/wheel/runflat systems and install runflat tires.
Document test procedure in a detailed test plan and document results in a test report including all test activities, including runflat installation best practices, test procedure, test methodology, deviations from the test plan, and a detailed overview of testing that includes descriptions, photos, and video.
Deliverable #1.3A: Detailed Test Plan (CDRL A004) The DTP shall define the setups, procedures, and support for the runflat testing. The DTP shall comprehensively explain the methodology to evaluate the performance of the selected runflat systems.
Deliverable #1.3B: Test Report (CDRL A005) The Contractor shall generate and deliver a report (CDRL A005) that comprehensively describes the results of testing on the selected run flat options. The report must include both tabular and narrative descriptions detailing the amount and type of damage sustained by the tested components and all failure modes experienced. Photographs and videos of representative portions of test conduct shall be included.
6.2. Group 2 (Task #2): Cybersecurity Testing
6.2.1. Subtask #2.1: Armored Vehicle Cybersecurity Testing. Conduct Research, Development, Testing, and Evaluation (RDTE) of cybersecurity on armored vehicles. Design and implement a detailed test plan to identify vulnerabilities of onboard Original Equipment
Manufacturer (OEM) electronics systems in AVs, including Controller Area Network (CAN) systems, control modules, infotainment units, and key fobs. Perform software, hardware, and communication system exploitations on armored vehicle first articles and subsystems.
Document test results in a detailed test report and recommend improvements and best practices to mitigate cybersecurity risks.
Deliverable #2.1A: Detailed Test Plan (CDRL A004) The Contractor shall be responsible for creating a Detailed Test Plan (DTP) (CDRL A004) outlining the steps and methodologies that the Contractor intends to use to attempt exploitation of onboard vehicle electronic systems. The Detailed Test Plan shall be designed to capture the cybersecurity characteristics of OEM electronics present in AVs.
The DTP shall identify clear pass/fail criteria for each test. While the Contractor shall be responsible for developing the DTP, it must be approved by the contracting officer’s representative (COR).
Deliverable #2.1B: Test Report (CDRL A005) The Contractor shall provide a test report summarizing all findings and results of the testing. The report must include both narrative descriptions and tabular data detailing all testing performed and the outcome of each test.
6.3. Group 3 (Task #3): Ballistic and Material Testing
6.3.1. Task #3.1: Armored Vehicle Protection Research and Development.
Conduct RDTE on OEM and aftermarket automotive components.
Conduct RDTE on armor materials, components, and armored vehicle systems. Conduct RDTE on corrosion protection coatings and systems, as well as methods of increasing service life for opaque armor, transparent armor, and automotive components. Conduct small arms ballistic and blast testing in accordance with U.S. and international testing protocols including but not limited to National Institutes of Justice (NIJ) ballistic standards, Underwriters Laboratory (UL) ballistic standards, ASTM standards, and NATO Standardization Agreement (STANAG) procedures. Perform technical analysis of alternate armor materials to reduce weight and maintain or improve threat protection.
Design and fabricate test fixtures. Destroy (as required) and dispose of tested systems and components. Document results in a detailed test report including specific attacks on weak areas. RDTE under this task includes but is not limited to:
• Conduct research and analysis of automotive upgrades intended to support the additional weight of civilian armored vehicles with a focus on improved tires, wheels, brakes, suspension, and power output to ensure adequate automotive capabilities and vehicle handling required to perform vehicle escape and evade maneuvers.
• Conduct test and evaluation of automotive upgrades at the component and full-system levels. Test vehicles used by the Contractor shall be representative of Department AVs in size and weight.
• RDTE of armor system integration into vehicle platforms including:
o Proper welding, bonding, and fastening of armor into vehicles.
o Use of proper overlaps with armor interfaces such as transparent armor (TA) and doors.
o Integration of lightweight composite systems.
o Validation of armor integration through analysis of structural integrity for blast protection.
• Corrosion and Environmental Factors o Provide engineering analyses on environmental factors affecting longevity of vehicles and opaque and transparent armor.
• Ballistics and Blast o Conduct small arms ballistic and blast simulation modeling of armor materials and systems.
o Conduct small arms ballistic testing and blast testing of armor materials and systems. Conduct analysis of small arms ballistic and blast effects on armor material and systems.
o Conduct testing and technical analysis of alternatives to currently fielded opaque and transparent armor systems.
Deliverable #3.1A: R&D Project Summary (CDRL A009) Provide R&D Project Summaries for a variety of areas as required, identifying research goals, technical approach(es), and comparisons with current technology.
Deliverable 3.1#B: Modeling and Simulation Report (CDRL A010)
The Contractor shall conduct analysis of selected ballistic and/or blast mitigation systems per DOS requests using Finite Element Simulation and provide a detailed report including both tabular and narrative descriptions.
6.3.2. Subtask #3.2: Conduct Forced Entry and Ballistic Resistance
Testing on components, systems, and construction commodities to evaluate protection levels. Conduct RDTE for Forced Entry (FE) / Ballistic Resistant (BR) systems, components, construction commodities, and full-scale structures. Conduct FE and BR testing in accordance with U.S. and international testing protocols including but not limited to the Department of State SD-STD-01.01 FE/BR standard, National Institutes of Justice (NIJ) ballistic standards, Underwriters Laboratory (UL) ballistic standards, ASTM standards, and NATO Standardization Agreement (STANAG) procedures. Testing must be conducted by firms on the Department of State (DOS) list of approved labs to conduct SD-STD-01.01 forced entry and ballistic resistance (FE/BR) certification testing.
Deliverable #3.2A: Detailed Test Plan (CDRL A004) The DTP shall define the setups, procedures, and support for FE/BR testing. The DTP shall include the methodology to evaluate the performance of the selected systems. The Contractor shall submit the DTP for COR approval.
Deliverable #3.2B: Test Report (CDRL A005) The Contractor shall deliver a Test Report (CDRL A005) with the results of testing on the Forced Entry and/or Ballistic Resistant materials. The report shall include both tabular results and narrative descriptions. The report shall include test descriptions, photos and videos, and descriptions of the layup condition posttest.
6.3.3. Subtask #3.3: Perform Material Characterization and Evaluation
Services on building materials in the form of mechanical, impact, and accelerated life testing. Perform testing and evaluation of materials and components used in building structures and armored vehicles. Materials include but are not limited to metals, masonry, polymers, glass, adhesives, and seals. Conduct material testing and evaluation including mechanical, thermal, chemical, corrosive, aging, and weathering properties or effects. Conduct mechanical testing including basic quasi-static testing as well as testing at high load rates corresponding to blast, ballistic, or impact events. Provide engineering analyses for a variety of areas, including but not limited to:
• Chemical, thermal, aging, and weathering testing aimed at evaluation of the reduction in mitigation effectiveness for a given load event.
• Evaluate the effectiveness of components joined together via adhesive bond as in the case of laminated glass or components joined by fasteners.
Deliverable #3.3A: R&D Project Summary (CDRL A009) identifying research goals, technical approach(es), and comparisons
6.4. Group 4 (Task 4): Anti-Ram Design and Test
6.4.1. Subtask #4.1: Conduct Anti-Ram Engineering and Design to improve current or develop new barrier systems. Conduct RDTE relating to anti-ram vehicle barriers. Conduct design, engineering analysis, modeling and simulation, and analytic predictions to support development of new vehicle barrier systems. Conduct post-test analytic evaluation of test results and identify modifications and refinements to systems.
Deliverable #4.1A: Modeling and Simulation Report (CDRL A010) The Contractor shall conduct analysis of selected anti-ram barriers per DOS requests using Finite Element Simulation and provide a detailed report including both tabular and narrative descriptions.
Deliverable #4.1B: Test Report (CDRL A005) The Contractor shall conduct analysis of test results and provide recommendations for modifications to the selected system(s) through Finite Element Simulation and provide a detailed report including both tabular and narrative descriptions.
6.4.2. Subtask #4.2: Conduct Anti-Ram Testing Services to evaluate the effectiveness of various anti-ram perimeter barrier systems. Conduct vehicle anti-ram testing and evaluation of perimeter barrier systems designed to deter and delay physical attack. Conduct testing to ASTM 2656-23 or latest version. Install anti-ram systems for test and dispose of spent barriers.
Deliverable #4.2A: Detailed Test Plan (CDRL A004) The DTP shall define the setups, procedures, and support to be utilized for the anti-ram testing. The DTP shall comprehensively explain the methodology to evaluate the performance of the selected systems. While the Contractor shall be responsible for developing the DTP it must be approved by the COR.
Deliverable #4.2B: Test Report (CDRL A005) The Contractor shall generate and deliver a report (CDRL A005) that comprehensively describes the results of testing on the selected anti-ram options. The report must include both tabular and narrative descriptions detailing the amount and type of damage sustained by the tested components and all failure modes experienced. Photographs and videos of representative portions of test conduct shall be included.
6.5. Group 5 (Task 5): Blast Design, Testing, and General Consulting
6.5.1. Subtask #5.1: Perform Blast Mitigation Design to improve current or develop new blast mitigation systems. Develop, design, analyze and evaluate blast mitigation systems. Develop detailed drawings for blast mitigation systems to be used for fabrication of test articles or on-site mitigation systems. Analyze and evaluate systems using modeling and simulation such as simplified computer modeling (e.g., SDOF – single degree of freedom method), finite element modeling (FEA) for structural predictions, and computational fluid dynamics (CFD) modeling for blast loading. Develop open-air blast and shock tube test plans in accordance with the latest versions of the Blast Testing SOP for DS/PSP/PSD and ASTM F3664. Perform post-blast-test forensics and evaluations with an aim toward system or device improvements and refinements. Provide evaluation and analysis of developed blast mitigation designs, products and construction materials including but not limited to: Rectangular and Irregular Shaped Windows, Facades, Novel Building Materials, Test Front Housing, Subframes, Window Embeds, and any other materials determined by DoS.
Deliverable #5.1A: R&D Project Summary (CDRL A009) with current technology.
Deliverable #5.1B: Modeling and Simulation Report (CDRL A010) The Contractor shall conduct analysis of selected blast mitigation systems per DOS requests using Finite Element Simulation and provide a detailed report including both tabular and narrative descriptions.
Deliverable #5.1C: Detailed Test Plan (CDRL A004) The DTP shall define the setups, procedures, and support to be utilized for blast-mitigation testing, both open air and shock tube-based. The DTP shall comprehensively explain the methodology to evaluate the performance of the selected systems. While the Contractor shall be responsible for developing the DTP it must be approved by the COR.
Deliverable #5.1D: Test Evaluation (CDRL A005) The Contractor shall conduct post-blast forensics and analysis of test results to provide recommendations for modifications to the selected system(s) through Finite Element Simulation and provide a detailed report including both tabular and narrative descriptions.
6.5.2. Subtask #5.2: Perform Blast Testing Services to ensure designs meet or exceed designated specifications. Conduct research, testing, and evaluation of blast effects and blast mitigation systems. Design and develop infrastructure to support testing including a reaction structure, shock tube, and/or blast simulator to meet performance requirements.
Develop, fabricate, and install test articles. Conduct shock tube and open-air blast testing. Collect blast pressure data, impulse data, deflection data, and high-speed video. Conduct blast testing in accordance with ASTM F3664 and document results in a test report.
Deliverable #5.2A: Detailed Test Plan (CDRL A004) The DTP shall define the setups, procedures, and support to be utilized for blast-mitigation testing, both open air and shock tube-based. The DTP shall comprehensively explain the methodology to evaluate the performance of the selected systems. While the Contractor shall be responsible for developing the DTP it must be approved by the COR.
Deliverable #5.2B: Test Report (CDRL A005) The Contractor shall generate and deliver a report (CDRL A005) that comprehensively describes the results of testing on the blast-mitigating materials. The report must include both tabular and narrative descriptions. Reports will include test descriptions, recorded gauge data, processed gauge data, high resolution photos and videos, and documented descriptions of layup and witness panel condition posttest. All final reports, photos, and full testing videos shall be delivered at the completion of all samples testing.
6.5.3. Subtask #5.3: Provide General Physical Security Consulting
Services in the form of Subject Matter Expertise and other support Services as needed. Conduct concept and product development, drafting, modeling, simulation, software development, testing support, evaluation, forensic investigation, and report generation. Provide engineering analyses for a variety of areas as required, including but not limited to:
• Cataloguing and summarizing the results of design, analysis, and testing of location-specific physical security mitigation strategies and/or otherwise developed by DS in the context of physical security applications.
• Processing data, summarizing, and adapting results to design guidance and standards.
• Support, quality control, and enhancement for DOS developed analytical tools/applications.
Deliverable #5.3A: R&D Project Summary (CDRL A009)
7. Milestones and Deliverables
In addition to the specific, task-based deliverables enumerated in Section 6, the Contractor shall provide the following deliverables and milestones:
Programmatic
Milestone Meeting
Frequency Applicable Groups
Due Date
Kickoff Meeting Once ALL Within 30 calendar days of contract award
Weekly Status Meetings
Weekly ALL The first weekly status meeting shall be conducted on an agreed upon date after the Kickoff Meeting.
Subsequent meetings will occur weekly at the same day and time.
Test Readiness Review
Once ALL Must be conducted a minimum of 15 days prior to test conduct
Test Results Review
Once ALL Must be conducted within 20 days of test completion
Deliverables Mode of Delivery
Applicable Groups
Due Date
Presentation Material
(CDRL A001)
Via Email to the appropriate recipients, to be provided upon Task Order.
ALL The business day prior to weekly reviews.
3 Business days prior to milestone meetings:
• Kickoff Meeting
• Test Readiness Review
• Test Results Review
Meeting Minutes
(CDRL A002)
Via Email to the appropriate recipients, to be provided upon Task Order.
ALL No later than 3 business days after the following meetings:
• Kickoff Meeting
• Weekly Status Meeting
• Test Readiness Review
• Test Results Review mailto:ds_av_cap@state.gov
Monthly Status Reports
(CDRL A003)
Via Email to the appropriate recipients, to be provided upon Task Order.
ALL The first Monthly Report must be submitted on the last business day of the first complete calendar month after contract award.
Subsequent Monthly reports must be submitted 3 business days prior to the monthly status meetings.
Dates for monthly status meetings will be proposed by the Contractor.
Detailed Test Plan (CDRL A004)
Via Email to the appropriate recipients, to be provided upon Task Order.
ALL Draft due within 30 days of contract award.
Test Report
(CDRL A005)
Via Email to the appropriate recipients, to be provided upon Task Order.
ALL Draft due 20 business days after the end of the testing period
Program Management Plan (CDRL A006)
Via Email to the appropriate recipients, to be provided upon Task Order.
ALL 3 Days prior to the Kickoff Meeting.
Failure Summary Report (CDRL A007)
Via Email to the appropriate recipients, to be provided upon Task Order.
Group 1 10 days after the end of the testing period.
mailto:ds_av_cap@state.gov mailto:ds_av_cap@state.gov mailto:ds_av_cap@state.gov
Test Incident Reports
(CDRL A008)
Via Email to the appropriate recipients, to be provided upon Task Order.
Group 1 Weekly from receipt of test article to completion of test conduct.
Evaluation and Analysis Report (CDRL A009)
Via Email to the appropriate recipients, to be provided upon Task Order.
Groups 3, To be determined by the Contractor and COR upon issuance of individual Task Orders.
Modeling and Simulation Report
(CDRL A010)
Via Email to the appropriate recipients, to be provided upon Task Order.
Groups 3, 4, 5
To be determined by the Contractor and COR upon issuance of individual Task Orders.
8. Constraints
The Contactor must have access to all necessary equipment and facilities for all awarded Groups (Tasks).
NOTE: Certain tasks encompassed by this effort will be classified as SECRET.
As a result, the contractor(s), regardless of the Groups (Tasks) awarded, must have the ability to receive, store and process information at the SECRET classification level.
9. Government-Furnished Data and Data Rights/Intellectual Property
Government Furnished Data and the results of this contract are the property of the U.S. Government and includes all information provided by the Government and the information gathered during this contract. Information provided by the Government and the results of this contract are considered proprietary, are not to be used for projects other than the subject project and are not to be shared with other entities. The contents of this project, including but not limited to instructions, templates, software, information, conclusions, and other “material” are the property of the U.S. Government and may not be used outside of this mailto:ds_av_cap@state.gov agreement without express permission of the Contracting Officer (CO). The Contractor may not sell or modify the information, material, or reproduce, display, publicly perform, distribute, or otherwise use the material in any way for any public or commercial purpose. By contracting with the U.S. Government, the vendor does not acquire any right, title or interest in any of this information or conclusions.
10. Government-Furnished Equipment
All materials provided by the Government during the course of this contract shall remain the property of the Government and shall be returned immediately or disposed of as instructed by the Government upon completion of the contract or as otherwise requested by the COR or CO.
11. Key Personnel
The Key Personnel shall be determined at the Task Order level and shall provide expert leadership and technical guidance to ensure successful contract performance and mission accomplishment.
The Key Personnel shall perform services during the entire Task Order Period of Performance, with potential option periods as specified in the contract.
The Key Personnel /are considered essential to contract performance. The Contractor shall not remove or replace Key Personnel without prior written approval from the Contracting Officer. Any proposed replacement must possess qualifications equal to or exceeding those of the original Key Personnel.
a. The Key Personnel shall:
1. Serve as the primary point of contact between the Contractor and the Contracting Officer's Representative (COR)
2. Provide strategic direction and oversight for all contract activities
3. Ensure all deliverables meet quality standards and are submitted on schedule
4. Coordinate and supervise contractor staff assigned to the project
5. Identify and resolve technical, operational, and administrative challenges
6. Maintain regular communication with government stakeholders
7. Ensure compliance with all contract terms, conditions, and applicable regulations
b. Specific Duties
1. Management and Coordination:
2. Develop and maintain project plans, schedules, and resource allocations
3. Conduct regular team meetings and status reviews
4. Manage subcontractor relationships and performance
c. Technical Oversight:
1. Review and approve all technical deliverables before submission
2. Provide subject matter expertise in accordance with the work to be performed under the Task Order Statement of Work.
3. Ensure work products align with government standards and requirements
d. Reporting and Communication:
1. Prepare and deliver monthly progress reports
2. Attend all required meetings with government personnel
3. Provide timely notification of issues, risks, or changes affecting performance
e. Minimum Qualifications
1. Education:
a. Bachelor's degree or higher in a field relevant to the work to be performed under the Task Order Statement of Work or equivalent experience.
2. Experience:
a. Minimum 8years of experience in a field relevant to the work to be performed under the Task Order Statement of Work.
b. Demonstrated experience managing similar contracts or projects
c. Proven track record of successful government contract performance
3. Skills and Competencies:
a. Strong leadership and team management abilities
b. Excellent written and oral communication skills
c. Proficiency in skills and/or tools relevant to the work to be performed under the Task Order Statement of Work.
d. Active security clearance at Secret or higher or ability to obtain.
f. Deliverables
1. The Key Personnel shall be responsible for ensuring delivery of:
2. Monthly progress reports
3. Deliverables as listed in the Contract Deliverables Requirements List (CDRLs)
4. Quality assurance documentation
5. Final project reports and closeout materials
12. Materials
a. Contractor-Provided Materials
1. Contractor Responsibility: The Contractor shall provide all materials, supplies, and equipment necessary to perform this contract.
2. Pricing Requirement: The Contractor shall include all material costs in its proposal price. No additional payment will be made for materials unless a task order specifically authorizes separate pricing.
3. Quality Standards: All materials must meet applicable quality and safety standards.
b. Government-Furnished Materials: The Government will provide materials, equipment, or facilities only when specifically identified in individual task orders.
The Contractor shall furnish all other required resources.
13. Place of Performance All contracted activities shall be conducted at Contractor-provided facilities.
| 1. Purpose |
| 2. Introduction |
| 3. Objective |
| 4. Organizational Background |
| 5. Scope |
| 6. Tasks |
| 6.1.1. Subtask #1.1: Armored Vehicle Performance Testing. Conduct Research Development Test and Evaluation (RDTE) of automotive performance and reliability of armored vehicles. Design and implement a detailed test plan to capture the automotive perf... |
| 6.1.2. Subtask #1.2: Armored Vehicle Advanced Driver Assistance Systems Testing. Conduct testing, investigation, and characterization of Advanced Driver Assistance Systems (ADAS) on armored vehicles, with focus on Level 1 and Level 2 ADAS systems suc... |
| Deliverable #1.2A: Detailed Test Plan (CDRL A004) |
| The Contractor shall be responsible for creating a Detailed Test Plan (DTP) (CDRL A004) outlining the steps and methodologies for testing ADAS systems. While the Contractor shall be responsible for developing the DTP, it must be approved by the contr... |
| Deliverable #1.2B: Test Report (CDRL A005) |
| The Contractor shall generate and provide a test report summarizing all findings and results of the testing. The report must include both narrative descriptions and tabular data detailing all testing performed and the outcome of each test. |
| 6.1.3. Subtask #1.3: Runflat Testing for Armored Vehicles. Conduct RDTE on runflat systems including runflat inserts and runflat tires. Perform testing in accordance with U.S. and International testing protocols including but not limited to SAE (J 2... |
| Deliverable #1.3A: Detailed Test Plan (CDRL A004) |
| The DTP shall define the setups, procedures, and support for the runflat testing. The DTP shall comprehensively explain the methodology to evaluate the performance of the selected runflat systems. |
| Deliverable #1.3B: Test Report (CDRL A005) |
| The Contractor shall generate and deliver a report (CDRL A005) that comprehensively describes the results of testing on the selected run flat options. The report must include both tabular and narrative descriptions detailing the amount and type of da... |
| 6.2. Group 2 (Task #2): Cybersecurity Testing |
| 6.2.1. Subtask #2.1: Armored Vehicle Cybersecurity Testing. Conduct Research, Development, Testing, and Evaluation (RDTE) of cybersecurity on armored vehicles. Design and implement a detailed test plan to identify vulnerabilities of onboard Original... |
| 6.3. Group 3 (Task #3): Ballistic and Material Testing |
| 6.3.1. Task #3.1: Armored Vehicle Protection Research and Development. Conduct RDTE on OEM and aftermarket automotive components. Conduct RDTE on armor materials, components, and armored vehicle systems. Conduct RDTE on corrosion protection coating... |
| 6.3.2. Subtask #3.2: Conduct Forced Entry and Ballistic Resistance Testing on components, systems, and construction commodities to evaluate protection levels. Conduct RDTE for Forced Entry (FE) / Ballistic Resistant (BR) systems, components, construc... |
| Deliverable #3.2A: Detailed Test Plan (CDRL A004) |
| The DTP shall define the setups, procedures, and support for FE/BR testing. The DTP shall include the methodology to evaluate the performance of the selected systems. The Contractor shall submit the DTP for COR approval. |
| Deliverable #3.2B: Test Report (CDRL A005) |
| The Contractor shall deliver a Test Report (CDRL A005) with the results of testing on the Forced Entry and/or Ballistic Resistant materials. The report shall include both tabular results and narrative descriptions. The report shall include test desc... |
| 6.3.3. Subtask #3.3: Perform Material Characterization and Evaluation Services on building materials in the form of mechanical, impact, and accelerated life testing. Perform testing and evaluation of materials and components used in building structur... |
| Chemical, thermal, aging, and weathering testing aimed at evaluation of the reduction in mitigation effectiveness for a given load event. |
| Evaluate the effectiveness of components joined together via adhesive bond as in the case of laminated glass or components joined by fasteners. |
| Deliverable #3.3A: R&D Project Summary (CDRL A009) |
| Provide R&D Project Summaries for a variety of areas as required, identifying research goals, technical approach(es), and comparisons with current technology. |
| 6.4. Group 4 (Task 4): Anti-Ram Design and Test |
| 6.4.1. Subtask #4.1: Conduct Anti-Ram Engineering and Design to improve current or develop new barrier systems. Conduct RDTE relating to anti-ram vehicle barriers. Conduct design, engineering analysis, modeling and simulation, and analytic predictio... |
| 6.4.2. Subtask #4.2: Conduct Anti-Ram Testing Services to evaluate the effectiveness of various anti-ram perimeter barrier systems. Conduct vehicle anti-ram testing and evaluation of perimeter barrier systems designed to deter and delay physical atta... |
| 6.5. Group 5 (Task 5): Blast Design, Testing, and General Consulting |
| 6.5.1. Subtask #5.1: Perform Blast Mitigation Design to improve current or develop new blast mitigation systems. Develop, design, analyze and evaluate blast mitigation systems. Develop detailed drawings for blast mitigation systems to be used for fa... |
| 6.5.2. Subtask #5.2: Perform Blast Testing Services to ensure designs meet or exceed designated specifications. Conduct research, testing, and evaluation of blast effects and blast mitigation systems. Design and develop infrastructure to support tes... |
| 6.5.3. Subtask #5.3: Provide General Physical Security Consulting Services in the form of Subject Matter Expertise and other support Services as needed. Conduct concept and product development, drafting, modeling, simulation, software development, te... |
| 7. Milestones and Deliverables |
| 8. Constraints |
| 9. Government-Furnished Data and Data Rights/Intellectual Property |
| 10. Government-Furnished Equipment |
| 11. Key Personnel |
| The Key Personnel shall be determined at the Task Order level and shall provide expert leadership and technical guidance to ensure successful contract performance and mission accomplishment. |
| The Key Personnel shall perform services during the entire Task Order Period of Performance, with potential option periods as specified in the contract. |
| The Key Personnel /are considered essential to contract performance. The Contractor shall not remove or replace Key Personnel without prior written approval from the Contracting Officer. Any proposed replacement must possess qualifications equal to o... |
| a. The Key Personnel shall: |
| 1. Serve as the primary point of contact between the Contractor and the Contracting Officer's Representative (COR) |
| 2. Provide strategic direction and oversight for all contract activities |
| 3. Ensure all deliverables meet quality standards and are submitted on schedule |
| 4. Coordinate and supervise contractor staff assigned to the project |
| 5. Identify and resolve technical, operational, and administrative challenges |
| 6. Maintain regular communication with government stakeholders |
| 7. Ensure compliance with all contract terms, conditions, and applicable regulations |
| b. Specific Duties |
| 1. Management and Coordination: |
| 2. Develop and maintain project plans, schedules, and resource allocations |
| 3. Conduct regular team meetings and status reviews |
| 4. Manage subcontractor relationships and performance |
| c. Technical Oversight: |
| 1. Review and approve all technical deliverables before submission |
| 2. Provide subject matter expertise in accordance with the work to be performed under the Task Order Statement of Work. |
| 3. Ensure work products align with government standards and requirements |
| d. Reporting and Communication: |
| 1. Prepare and deliver monthly progress reports |
| 2. Attend all required meetings with government personnel |
| 3. Provide timely notification of issues, risks, or changes affecting performance |
| e. Minimum Qualifications |
| f. Deliverables |
| 12. Materials |
| 13. Place of Performance |
File details come from the government source that posted it. Updated .