Attach 6_Price Schedule_UB Suite Carson STO.docx
DOCX document 43 KB Posted
- Solicitation number
- W9124J-22-R-0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach 4_IDIQ Labor Rates_ERMA23.xlsx | XLSX spreadsheet | |
| Attach 7_PPQ ERMA23.docx | DOCX document | |
| Attach 1_PWS_Base IDIQ_ERMA23_DRAFT_30Nov2022.docx | DOCX document | |
| Attach 5_Price Schedule_SB Suite Irwin STO.docx | DOCX document | |
| Attach 3_PWS UB Suite_Carson STO_v2.docx | DOCX document | |
| Attach 2_PWS SB Suite_Irwin STO_v3.docx | DOCX document | |
| Attach 8_QA Draft RTOP Template.docx | DOCX document | |
| RFP_W9124J-22-R-0005_ERMA23 IDIQ_DRAFT 7.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UB Suite – Carson Price Schedule/CLIN Structure
Price Schedule/CLIN Structure Sample Task for Unrestricted Business (UB) Suite Environmental Remediation Services Fort Carson, CO
Instructions: Offerors shall return pricing information in MS Excel as unlocked/unprotected copy. Amounts shall be in whole dollars only.
IAW PWS section 1.5, POP shall not exceed 60 months from award of Task Order (TO), inclusive of any exercised options.
| CLIN |
| Completion Date |
| Projected POP |
Quantity & Unit
Unit Price Contractor Total Proposed Price
CLIN 0001: PMP
(Base Period) 30 days from award of TO for Draft PMP
30 days from COR comments on the Draft PMP for Final PMP.
Overall completed 12 months from award of TO.
| 12 Mo: 9/1/2023 – 8/31/2024 |
| 1 Job |
| NA |
| $ |
CLIN 0002: LTM (Base Period)
FTC-023, SWMU 89 only
| Completed 14 months from award of TO. |
| 14 Mo: 9/1/2023 – 12/31/2024 |
| 1 Job |
| NA |
| $ |
CLIN 0003: CMI(O) (Base Period)
FTC-023, SWMU 109 only
| Completed 14 months from award of TO. |
| 14 Mo: 9/1/2023 – 12/31/2024 |
| 1 Job |
| NA |
| $ |
CLIN 0004: (Base Period) Pilot Study, New Remedy; E-Redox
FTC-023, SWMU 109 only
| Completed 18 months from award of TO. |
| 18 Mo: 9/1/2023 – 4/30/2025 |
| 1 Job |
| NA |
| $ |
CLIN 0005: (Option) New E-Redox Remedy Implementation Post Pilot Study
FTC-023, SWMU 109 only Completed 18 months from exercising of option
Performance shall start upon completion of Pilot Study, CLIN 0004, if necessary.
| 18 Mo: 9/1/2023 – 4/30/2025 |
| 1 Job |
| NA |
| $ |
CLIN 0006: IMP(O) (Base Period)
CC-106, PCMS Fuel Point
Completed 11 months from award of TO.
| 11 Mo: 9/1/2023 – 7/31/2024 |
| 1 Job |
| NA |
| $ |
CLIN 0007: OPS Risk-Based Closure Process (Option)
CC-106, PCMS Fuel Point Completed 24 months from exercising of option
Performance shall start once DLA has completed construction of the new AST Fuel Point and removed the existing USTs – Government currently estimates this to be mid CY2024
24 Mo: 10/1/2024 – 9/30/2026
| 1 Job |
| NA |
| $ |
CLIN 0008: GAC Unit (Base Period)
Annual Maintenance
Completed 11 months from award of TO
| 11 Mo: 9/1/2023 – 7/31/2024 |
| 1 Job |
| NA |
| $ |
CLIN 0009: GAC Unit (PFAS Removal) (Option)
PFAS Prove-Out & Annual PFAS-related Maintenance
Completed 11 months from exercising of option.
Option may be exercised at award.
| 11 Mo: 9/1/2023 – 7/31/2024 |
| 1 Job |
| NA |
| $ |
CLIN 0010: UFP-QAPP & RI (Base Period)
FTC-PFAS, Site-Wide PFAS
Completed 48 months from award of TO.
| 48 Mo: 9/1/2023 – 8/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0011 (Option): Add AOPI to RI in Base CLIN 0010 if supplemental data deems necessary
FTC-PFAS, Site-Wide PFAS (AOPI – Golf Course)
Completed 36 months from exercising of option.
Shall be performed in conjunction with Base CLIN 0010.
Performance shall start upon completion of supplemental data gathering/reporting.
| 36 Mo: 9/1/2024 – 8/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0012 (Option): Add AOPI to RI in Base CLIN 0010 if supplemental data deems necessary
FTC-PFAS, Site-Wide PFAS (AOPI – B1982) Completed 36 months from exercising of option.
Shall be performed in conjunction with Base CLIN 0010.
Performance shall start upon completion of supplemental data gathering/reporting.
| 36 Mo: 9/1/2024 – 8/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0013: FS (Option) FTC-PFAS, Site-Wide PFAS Completed 24 months from exercising of option.
Performance shall start upon substantial completion of Base CLIN 0010
| 24 Mo: 9/1/2026 – 8/31/2028 |
| 1 Job |
| NA |
| $ |
CLIN 0014: PP & DD (Option) FTC-PFAS, Site-Wide PFAS Completed 12 months from exercising of option.
Performance shall start upon substantial completion of Optional CLIN 0013
| 12 Mo: 9/1/2027 – 8/31/2028 |
| 1 Job |
| NA |
| $ |
CLIN 0015: RFI (Base Period) Former Buildings 220/221
| Completed 24 months from award of TO. |
| 24 Mo: 9/1/2023 – 8/31/2025 |
| 1 Job |
| NA |
| $ |
CLIN 0016: Dig-and-Haul 100 yd3 Soil (Option)
Former Buildings 220/221
Completed 12 months from exercising of option.
Performance shall be in conjunction with RFI Base CLIN 0015
| 12 Mo: 9/1/2024 – 8/31/2025 |
| 1 Job |
| NA |
| $ |
CLIN 0017: CMS (Option)
Former Buildings 220/221
Completed 18 months from exercising of option.
Performance shall start upon completion of RFI Base CLIN 0015
| 18 Mo: 9/1/2025 – 3/30/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0018: LTM (Option)
9 Landfills; FTC-006 [LFs 2/3], FTC-008 [LF 4], FTC-009 [LF 5], FTC-011 [LF 7], FTC-012 [LF 8], FTC-013 [LF 9], FTC-026 [LF 14], CC-SW001 [LF 1], CC-SW170 [LF 170]
Completed 11 months from exercising of option.
Performance shall start upon completion of existing contract.
| 11 Mo: 12/1/2025 – 10/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 0019: CMI(O) (Option)
FTC-020 [SWMU 13]
Completed 11 months from exercising of option.
Performance shall start upon completion of existing contract.
| 11 Mo: 12/1/2025 – 10/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 0020: CMI(O) – Construct Building over GWTS (Option)
FTC-020 [SWMU 13]
Completed 24 months from exercising of option.
Option may be exercised at award.
| 24 Mo: 9/1/2023 – 8/31/2025 |
| 1 Job |
| NA |
| $ |
CLIN 0021: Plume Delineation (Base Period)
FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site Completed 29 months from award of TO.
Performance shall start upon completion of existing contract.
| 29 Mo: 12/1/2025 – 4/31/2028 |
| 1 Job |
| NA |
| $ |
CLIN 0022: CMI(O) (Option)
FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site
Completed 11 months from exercising of option.
Performance shall start upon completion of existing contract.
| 11 Mo: 12/1/2025 – 10/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 0023: CMI(O) – Construct Building over GWTS (Option)
FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site Completed 24 months from exercising of option.
Option may be exercised at TO award.
| 24 Mo: 9/1/2023 – 8/31/2025 |
| 1 Job |
| NA |
| $ |
CLIN 0024: CMI(O) (Option)
FTC-070 [SWMU 164], FTC-093 [SWMU 168], CC-SW169 [SWMU 169]
Completed 11 months after exercising option.
Performance shall start after completion of existing contract.
| 11 Mo: 12/1/2025 – 10/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 0025: Interim Remedial Action (Option)
FTC-070 [SWMU 164]
Completed 24 months from exercising of option.
Performance shall start upon anticipated approval of CDPHE
| 24 Mo: 5/1/2025 – 4/30/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0026: Interim Remedial Action (Option)
FTC-093 [SWMU 168]
Completed 24 months from exercising of option.
Performance shall start upon anticipated approval of CDPHE.
| 24 Mo: 5/1/2025 – 4/30/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0027: Interim Remedial Action (Option)
CC-SW169 [SWMU 169]
Completed 24 months from exercising of option.
Performance shall start upon anticipated approval of CDPHE.
| 24 Mo: 5/1/2025 – 4/30/2027 |
| 1 Job |
| NA |
| $ |
CLIN 0028: CMI(O) (Option)
FTC-083 [SWMU 167]
Completed 11 months from exercising of option.
Performance shall start upon completion of existing contract
| 11 Mo: 12/1/2025 – 10/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 0029: Interim Remedial Action (Option)
FTC-083 [SWMU 167]
| Completed 36 months from exercising of option. |
| 36 Mo: 5/1/2025 – 4/30/2028 |
| 1 Job |
| NA |
| $ |
CLIN 0030: Monitoring Well Abandonment (Option)
Monitoring Well Abandonment (up to 50 wells).
Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of MW abandonment.
Option may be exercised up to 50 times.
| TBD |
| 50 Each |
| $ |
| $ |
CLIN 0031: Permanent Monitoring Well Installation (Option)
(up to 10 wells)
Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of permanent MW installation.
Option may be exercised up to 10 times.
| TBD |
| 10 Each |
| $ |
| $ |
CLIN 0032: Temporary Monitoring Well Installation & Abandonment (Option)
(up to 10 wells)
Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of temporary MW installation.
Option may be exercised up to 10 times.
| TBD |
| 10 Each |
| $ |
| $ |
CLIN 0033: Permanent Monitoring Well Repairs (Above Ground) (Option)
Above ground portion, permanent monitoring well repair (up to 15 MWs)
Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of above-ground MW repair.
Option may be exercised up to 15 times.
| TBD |
| 15 Each |
| $ |
| $ |
CLIN 0034: Permanent Monitoring Well Repairs (Below Ground) (Option)
Below ground portion, permanent monitoring well repair (up to 15 MWs)
Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of below-ground MW repair.
Option may be exercised up to 15 times.
| TBD |
| 15 Each |
| $ |
| $ |
CLIN 0035: Groundwater Sampling/Analysis (Option)
(up to 40 times)
Each option shall be completed 12 months from exercising of option..
Performance for each option shall start upon first need of groundwater sampling/analysis.
Option may be exercised up to 40 times.
| TBD |
| 40 Each |
| $ |
| $ |
CLIN 0036: Soil (sub-surface) Sampling/Analysis (Option)
(up to 25 times) Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of sub-surface soil sampling/analysis.
Option may be exercised up to 25 times.
| TBD |
| 25 Each |
| $ |
| $ |
CLIN 0037: Soil (surface) Sampling/Analysis (Option)
(up to 25 times) Each option shall be completed 12 months from exercising of option.
Performance for each option shall start upon first need of surface soil sampling/analysis.
Option may be exercised up to 25 times.
| TBD |
| 25 Each |
| $ |
| $ |
CLIN 0038 (Option): Update Risk Module VI
Update Risk Module VI (Risk-Based Evaluation Procedures Manual, Methodology for Identifying NFA at SWMUs)
Completed 18 months from exercising of option.
Performance shall start upon first need of update
| TBD |
| 1 Job |
| NA |
| $ |
CLIN 0039 (Option): Update the Field and Laboratory Procedures Manual (FLPM)
Completed 12 months from exercising of option.
Performance shall start upon first need of update
| TBD |
| 1 Job |
| NA |
| $ |
CLIN 1002: LTM (Option)
FTC-023, SWMU 89 only
| Completed 18 months from exercising of option. |
| 18 Mo: 5/1/2024 – 10/31/2025 |
| 1 Job |
| NA |
| $ |
CLIN 2002: LTM (Option)
FTC-023, SWMU 89 only
| Completed 18 months from exercising of option. |
| 18 Mo: 5/1/2025 – 10/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 3002: LTM (Option)
FTC-023, SWMU 89 only
| Completed 18 months from exercising of option. |
| 18 Mo: 5/1/2026 – 10/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 4002: LTM (Option)
FTC-023, SWMU 89 only
| Completed 18 months from exercising of option. |
| 18 Mo: 3/1/2027 – 8/31/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1003: CMI(O) (Option)
FTC-023, SWMU 109 only
| Completed 18 months from exercising of option. |
| 18 Mo: 5/1/2024 – 10/31/2025 |
| 1 Job |
| NA |
| $ |
CLIN 2003: CMI(O) (Option)
FTC-023, SWMU 109 only
| Completed 18 months from exercising of option. |
| 18 Mo: 5/1/2025 – 10/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 3003: CMI(O) (Option)
FTC-023, SWMU 109 only
| Completed 18 months from exercising of option. |
| 18 Mo: 5/1/2026 – 10/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 4003: CMI(O) (Option)
FTC-023, SWMU 109 only
| Completed 18 months from exercising of option. |
| 18 Mo: 3/1/2027 – 8/31/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1006: IMP(O) (Option)
CC-106, PCMS Fuel Point
| Completed 15 months from exercising of option. |
| 15 Mo: 5/1/2024 – 7/31/2025 |
| 1 Job |
| NA |
| $ |
CLIN 2006: IMP(O) (Option) CC-106, PCMS Fuel Point
| Completed 15 months from exercising of option. |
| 15 Mo: 5/1/2025 – 7/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 3006: IMP(O) (Option) CC-106, PCMS Fuel Point
| Completed 15 months from exercising of option. |
| 15 Mo: 5/1/2026 – 7/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 4006: IMP(O) (Option) CC-106, PCMS Fuel Point
| Completed 15 months from exercising of option. |
| 15 Mo: 5/1/2027 – 7/31/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1008: GAC Unit (Option) Annual Maintenance
| Completed 15 months from exercising of option. |
| 15 Mo: 5/1/2024 – 7/31/2025 |
| 1 Job |
| NA |
| $ |
CLIN 2008: GAC Unit (Option) Annual Maintenance
| Completed 15 months from exercising of option. |
| 15 Mo: 5/1/2025 – 7/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 3008: GAC Unit (Option) Annual Maintenance
| Completed 15 months from Option award |
| 15 Mo: 5/1/2026 – 7/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 4008: GAC Unit (Option) Annual Maintenance
| Completed 15 months from exercising of option. |
| 15 Mo: 5/1/2027 – 7/31/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1009: GAC Unit PFAS (Option) Annual GAC (PFAS) Maintenance
| Completed 15 months from exercising of option. |
| 15 Mo: 5/1/2024 – 7/31/2025 |
| 1 Job |
| NA |
| $ |
CLIN 2009: GAC Unit (PFAS) (Option) Annual GAC (PFAS) Maintenance
| Completed 15 months from exercising of option. |
| 15 Mo: 5/1/2025 – 7/31/2026 |
| 1 Job |
| NA |
| $ |
CLIN 3009: GAC Unit (PFAS) (Option) Annual GAC (PFAS) Maintenance
| Completed 15 months from exercising of option. |
| 15 Mo: 5/1/2026 – 7/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 4009: GAC Unit (PFAS) (Option) Annual GAC (PFAS) Maintenance
| Completed 15 months from exercising of option. |
| 15 Mo: 5/1/2027 – 7/31/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1016: Dig-and-Haul 100 yd3 Soil (Option)
Former Buildings 220/221
Completed 12 months from exercising option.
Completed in conjunction with RFI Base CLIN 0015.
| 12 Mo: 10/1/2024 – 9/30/2025 |
| 1 Job |
| NA |
| $ |
CLIN 2016: Dig-and-Haul 100 yd3 Soil (Option)
Former Buildings 220/221
Completed 12 months from exercising option.
Completed in conjunction with RFI Base CLIN 0015
| 12 Mo: 10/1/2024 – 9/30/2025 |
| 1 Job |
| NA |
| $ |
CLIN 3016: Dig-and-Haul 100 yd3 Soil (Option)
Former Buildings 220/221
Completed 12 months from exercising option.
Completed in conjunction with RFI Base CLIN 0015.
| 12 Mo: 10/1/2024 – 9/30/2025 |
| 1 Job |
| NA |
| $ |
CLIN 1018: LTM (Option)
9 Landfills; FTC-006 [LFs 2/3], FTC-008 [LF 4], FTC-009 [LF 5], FTC-011 [LF 7], FTC-012 [LF 8], FTC-013 [LF 9], FTC-026 [LF 14], CC-SW001 [LF 1], CC-SW170 [LF 170]
| Completed 18 months from exercising of option. |
| 18 Mo: 5/1/2026 – 10/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 2018: LTM (Option)
9 Landfills; FTC-006 [LFs 2/3], FTC-008 [LF 4], FTC-009 [LF 5], FTC-011 [LF 7], FTC-012 [LF 8], FTC-013 [LF 9], FTC-026 [LF 14], CC-SW001 [LF 1], CC-SW170 [LF 170]
| Completed 18 months from exercising of option. |
| 18 Mo: 3/1/2027 – 8/30/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1019: CMI(O) (Option)
FTC-020 [SWMU 13]
| Completed 18 months from exercising of option. |
| 18 Mo: 5/1/2026 – 10/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 2019: CMI(O) (Option)
FTC-020 [SWMU 13]
| Completed 18 months from exercising of option. |
| 18 Mo: 3/1/2027 – 8/30/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1022: CMI(O) (Option) FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site
| Completed 18 months from exercising of option. |
| 18 Mo: 5/1/2026 – 10/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 2022: CMI(O) (Option) FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site
| Completed 18 months from exercising of option. |
| 18 Mo: 3/1/2027 – 8/30/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1024: CMI(O) (Option)
FTC-070 [SWMU 164], FTC-093 [SWMU 168], CC-SW169 [SWMU 169]
| Completed 18 months from exercising of option. |
| 18 Mo: 5/1/2026 – 10/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 2024: CMI(O) (Option)
FTC-070 [SWMU 164], FTC-093 [SWMU 168], CC-SW169 [SWMU 169]
| Completed 18 months from exercising of option. |
| 18 Mo: 3/1/2027 – 8/30/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1028: CMI(O) (Option)
FTC-083 [SWMU 167]
| Completed 18 months from exercising of option. |
| 18 Mo: 5/1/2026 – 10/31/2027 |
| 1 Job |
| NA |
| $ |
CLIN 2028: CMI(O) (Option)
FTC-083 [SWMU 167]
| Completed 18 months from exercising of option. |
| 18 Mo: 3/1/2027 – 8/30/2028 |
| 1 Job |
| NA |
| $ |
CLIN 1038: Update Risk Module VI (Option)
Update Risk Module VI (Risk-Based Evaluation Procedures Manual, Methodology for Identifying NFA at SWMUs)
Completed 18 months from exercising of option.
Performance shall start upon second need of update.
| TBD |
| 1 Job |
| NA |
| $ |
Base Period Total Price:
Options Total Price:
Base Plus Option Periods (Total Value):
File details come from the government source that posted it. Updated .