Attach 6_Price Schedule_UB Suite Carson STO.docx

DOCX document 43 KB Posted

Attached to
Environmental Remediation (ERMA23 IDIQ DRAFT RFP)
Solicitation number
W9124J-22-R-0005
Issued by

View the file

Other files

File Type Posted
Attach 4_IDIQ Labor Rates_ERMA23.xlsx XLSX spreadsheet
Attach 7_PPQ ERMA23.docx DOCX document
Attach 1_PWS_Base IDIQ_ERMA23_DRAFT_30Nov2022.docx DOCX document
Attach 5_Price Schedule_SB Suite Irwin STO.docx DOCX document
Attach 3_PWS UB Suite_Carson STO_v2.docx DOCX document
Attach 2_PWS SB Suite_Irwin STO_v3.docx DOCX document
Attach 8_QA Draft RTOP Template.docx DOCX document
RFP_W9124J-22-R-0005_ERMA23 IDIQ_DRAFT 7.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UB Suite – Carson Price Schedule/CLIN Structure

Price Schedule/CLIN Structure Sample Task for Unrestricted Business (UB) Suite Environmental Remediation Services Fort Carson, CO

Instructions: Offerors shall return pricing information in MS Excel as unlocked/unprotected copy. Amounts shall be in whole dollars only.

IAW PWS section 1.5, POP shall not exceed 60 months from award of Task Order (TO), inclusive of any exercised options.

CLIN
Completion Date
Projected POP

Quantity & Unit

Unit Price Contractor Total Proposed Price

CLIN 0001: PMP

(Base Period) 30 days from award of TO for Draft PMP

30 days from COR comments on the Draft PMP for Final PMP.

Overall completed 12 months from award of TO.

12 Mo: 9/1/2023 – 8/31/2024
1 Job
NA
$

CLIN 0002: LTM (Base Period)

FTC-023, SWMU 89 only

Completed 14 months from award of TO.
14 Mo: 9/1/2023 – 12/31/2024
1 Job
NA
$

CLIN 0003: CMI(O) (Base Period)

FTC-023, SWMU 109 only

Completed 14 months from award of TO.
14 Mo: 9/1/2023 – 12/31/2024
1 Job
NA
$

CLIN 0004: (Base Period) Pilot Study, New Remedy; E-Redox

FTC-023, SWMU 109 only

Completed 18 months from award of TO.
18 Mo: 9/1/2023 – 4/30/2025
1 Job
NA
$

CLIN 0005: (Option) New E-Redox Remedy Implementation Post Pilot Study

FTC-023, SWMU 109 only Completed 18 months from exercising of option

Performance shall start upon completion of Pilot Study, CLIN 0004, if necessary.

18 Mo: 9/1/2023 – 4/30/2025
1 Job
NA
$

CLIN 0006: IMP(O) (Base Period)

CC-106, PCMS Fuel Point

Completed 11 months from award of TO.

11 Mo: 9/1/2023 – 7/31/2024
1 Job
NA
$

CLIN 0007: OPS Risk-Based Closure Process (Option)

CC-106, PCMS Fuel Point Completed 24 months from exercising of option

Performance shall start once DLA has completed construction of the new AST Fuel Point and removed the existing USTs – Government currently estimates this to be mid CY2024

24 Mo: 10/1/2024 – 9/30/2026

1 Job
NA
$

CLIN 0008: GAC Unit (Base Period)

Annual Maintenance

Completed 11 months from award of TO

11 Mo: 9/1/2023 – 7/31/2024
1 Job
NA
$

CLIN 0009: GAC Unit (PFAS Removal) (Option)

PFAS Prove-Out & Annual PFAS-related Maintenance

Completed 11 months from exercising of option.

Option may be exercised at award.

11 Mo: 9/1/2023 – 7/31/2024
1 Job
NA
$

CLIN 0010: UFP-QAPP & RI (Base Period)

FTC-PFAS, Site-Wide PFAS

Completed 48 months from award of TO.

48 Mo: 9/1/2023 – 8/31/2027
1 Job
NA
$

CLIN 0011 (Option): Add AOPI to RI in Base CLIN 0010 if supplemental data deems necessary

FTC-PFAS, Site-Wide PFAS (AOPI – Golf Course)

Completed 36 months from exercising of option.

Shall be performed in conjunction with Base CLIN 0010.

Performance shall start upon completion of supplemental data gathering/reporting.

36 Mo: 9/1/2024 – 8/31/2027
1 Job
NA
$

CLIN 0012 (Option): Add AOPI to RI in Base CLIN 0010 if supplemental data deems necessary

FTC-PFAS, Site-Wide PFAS (AOPI – B1982) Completed 36 months from exercising of option.

Shall be performed in conjunction with Base CLIN 0010.

Performance shall start upon completion of supplemental data gathering/reporting.

36 Mo: 9/1/2024 – 8/31/2027
1 Job
NA
$

CLIN 0013: FS (Option) FTC-PFAS, Site-Wide PFAS Completed 24 months from exercising of option.

Performance shall start upon substantial completion of Base CLIN 0010

24 Mo: 9/1/2026 – 8/31/2028
1 Job
NA
$

CLIN 0014: PP & DD (Option) FTC-PFAS, Site-Wide PFAS Completed 12 months from exercising of option.

Performance shall start upon substantial completion of Optional CLIN 0013

12 Mo: 9/1/2027 – 8/31/2028
1 Job
NA
$

CLIN 0015: RFI (Base Period) Former Buildings 220/221

Completed 24 months from award of TO.
24 Mo: 9/1/2023 – 8/31/2025
1 Job
NA
$

CLIN 0016: Dig-and-Haul 100 yd3 Soil (Option)

Former Buildings 220/221

Completed 12 months from exercising of option.

Performance shall be in conjunction with RFI Base CLIN 0015

12 Mo: 9/1/2024 – 8/31/2025
1 Job
NA
$

CLIN 0017: CMS (Option)

Former Buildings 220/221

Completed 18 months from exercising of option.

Performance shall start upon completion of RFI Base CLIN 0015

18 Mo: 9/1/2025 – 3/30/2027
1 Job
NA
$

CLIN 0018: LTM (Option)

9 Landfills; FTC-006 [LFs 2/3], FTC-008 [LF 4], FTC-009 [LF 5], FTC-011 [LF 7], FTC-012 [LF 8], FTC-013 [LF 9], FTC-026 [LF 14], CC-SW001 [LF 1], CC-SW170 [LF 170]

Completed 11 months from exercising of option.

Performance shall start upon completion of existing contract.

11 Mo: 12/1/2025 – 10/31/2026
1 Job
NA
$

CLIN 0019: CMI(O) (Option)

FTC-020 [SWMU 13]

Completed 11 months from exercising of option.

Performance shall start upon completion of existing contract.

11 Mo: 12/1/2025 – 10/31/2026
1 Job
NA
$

CLIN 0020: CMI(O) – Construct Building over GWTS (Option)

FTC-020 [SWMU 13]

Completed 24 months from exercising of option.

Option may be exercised at award.

24 Mo: 9/1/2023 – 8/31/2025
1 Job
NA
$

CLIN 0021: Plume Delineation (Base Period)

FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site Completed 29 months from award of TO.

Performance shall start upon completion of existing contract.

29 Mo: 12/1/2025 – 4/31/2028
1 Job
NA
$

CLIN 0022: CMI(O) (Option)

FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site

Completed 11 months from exercising of option.

Performance shall start upon completion of existing contract.

11 Mo: 12/1/2025 – 10/31/2026
1 Job
NA
$

CLIN 0023: CMI(O) – Construct Building over GWTS (Option)

FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site Completed 24 months from exercising of option.

Option may be exercised at TO award.

24 Mo: 9/1/2023 – 8/31/2025
1 Job
NA
$

CLIN 0024: CMI(O) (Option)

FTC-070 [SWMU 164], FTC-093 [SWMU 168], CC-SW169 [SWMU 169]

Completed 11 months after exercising option.

Performance shall start after completion of existing contract.

11 Mo: 12/1/2025 – 10/31/2026
1 Job
NA
$

CLIN 0025: Interim Remedial Action (Option)

FTC-070 [SWMU 164]

Completed 24 months from exercising of option.

Performance shall start upon anticipated approval of CDPHE

24 Mo: 5/1/2025 – 4/30/2027
1 Job
NA
$

CLIN 0026: Interim Remedial Action (Option)

FTC-093 [SWMU 168]

Completed 24 months from exercising of option.

Performance shall start upon anticipated approval of CDPHE.

24 Mo: 5/1/2025 – 4/30/2027
1 Job
NA
$

CLIN 0027: Interim Remedial Action (Option)

CC-SW169 [SWMU 169]

Completed 24 months from exercising of option.

Performance shall start upon anticipated approval of CDPHE.

24 Mo: 5/1/2025 – 4/30/2027
1 Job
NA
$

CLIN 0028: CMI(O) (Option)

FTC-083 [SWMU 167]

Completed 11 months from exercising of option.

Performance shall start upon completion of existing contract

11 Mo: 12/1/2025 – 10/31/2026
1 Job
NA
$

CLIN 0029: Interim Remedial Action (Option)

FTC-083 [SWMU 167]

Completed 36 months from exercising of option.
36 Mo: 5/1/2025 – 4/30/2028
1 Job
NA
$

CLIN 0030: Monitoring Well Abandonment (Option)

Monitoring Well Abandonment (up to 50 wells).

Each option shall be completed 12 months from exercising of option.

Performance for each option shall start upon first need of MW abandonment.

Option may be exercised up to 50 times.

TBD
50 Each
$
$

CLIN 0031: Permanent Monitoring Well Installation (Option)

(up to 10 wells)

Each option shall be completed 12 months from exercising of option.

Performance for each option shall start upon first need of permanent MW installation.

Option may be exercised up to 10 times.

TBD
10 Each
$
$

CLIN 0032: Temporary Monitoring Well Installation & Abandonment (Option)

(up to 10 wells)

Each option shall be completed 12 months from exercising of option.

Performance for each option shall start upon first need of temporary MW installation.

Option may be exercised up to 10 times.

TBD
10 Each
$
$

CLIN 0033: Permanent Monitoring Well Repairs (Above Ground) (Option)

Above ground portion, permanent monitoring well repair (up to 15 MWs)

Each option shall be completed 12 months from exercising of option.

Performance for each option shall start upon first need of above-ground MW repair.

Option may be exercised up to 15 times.

TBD
15 Each
$
$

CLIN 0034: Permanent Monitoring Well Repairs (Below Ground) (Option)

Below ground portion, permanent monitoring well repair (up to 15 MWs)

Each option shall be completed 12 months from exercising of option.

Performance for each option shall start upon first need of below-ground MW repair.

Option may be exercised up to 15 times.

TBD
15 Each
$
$

CLIN 0035: Groundwater Sampling/Analysis (Option)

(up to 40 times)

Each option shall be completed 12 months from exercising of option..

Performance for each option shall start upon first need of groundwater sampling/analysis.

Option may be exercised up to 40 times.

TBD
40 Each
$
$

CLIN 0036: Soil (sub-surface) Sampling/Analysis (Option)

(up to 25 times) Each option shall be completed 12 months from exercising of option.

Performance for each option shall start upon first need of sub-surface soil sampling/analysis.

Option may be exercised up to 25 times.

TBD
25 Each
$
$

CLIN 0037: Soil (surface) Sampling/Analysis (Option)

(up to 25 times) Each option shall be completed 12 months from exercising of option.

Performance for each option shall start upon first need of surface soil sampling/analysis.

Option may be exercised up to 25 times.

TBD
25 Each
$
$

CLIN 0038 (Option): Update Risk Module VI

Update Risk Module VI (Risk-Based Evaluation Procedures Manual, Methodology for Identifying NFA at SWMUs)

Completed 18 months from exercising of option.

Performance shall start upon first need of update

TBD
1 Job
NA
$

CLIN 0039 (Option): Update the Field and Laboratory Procedures Manual (FLPM)

Completed 12 months from exercising of option.

Performance shall start upon first need of update

TBD
1 Job
NA
$

CLIN 1002: LTM (Option)

FTC-023, SWMU 89 only

Completed 18 months from exercising of option.
18 Mo: 5/1/2024 – 10/31/2025
1 Job
NA
$

CLIN 2002: LTM (Option)

FTC-023, SWMU 89 only

Completed 18 months from exercising of option.
18 Mo: 5/1/2025 – 10/31/2026
1 Job
NA
$

CLIN 3002: LTM (Option)

FTC-023, SWMU 89 only

Completed 18 months from exercising of option.
18 Mo: 5/1/2026 – 10/31/2027
1 Job
NA
$

CLIN 4002: LTM (Option)

FTC-023, SWMU 89 only

Completed 18 months from exercising of option.
18 Mo: 3/1/2027 – 8/31/2028
1 Job
NA
$

CLIN 1003: CMI(O) (Option)

FTC-023, SWMU 109 only

Completed 18 months from exercising of option.
18 Mo: 5/1/2024 – 10/31/2025
1 Job
NA
$

CLIN 2003: CMI(O) (Option)

FTC-023, SWMU 109 only

Completed 18 months from exercising of option.
18 Mo: 5/1/2025 – 10/31/2026
1 Job
NA
$

CLIN 3003: CMI(O) (Option)

FTC-023, SWMU 109 only

Completed 18 months from exercising of option.
18 Mo: 5/1/2026 – 10/31/2027
1 Job
NA
$

CLIN 4003: CMI(O) (Option)

FTC-023, SWMU 109 only

Completed 18 months from exercising of option.
18 Mo: 3/1/2027 – 8/31/2028
1 Job
NA
$

CLIN 1006: IMP(O) (Option)

CC-106, PCMS Fuel Point

Completed 15 months from exercising of option.
15 Mo: 5/1/2024 – 7/31/2025
1 Job
NA
$

CLIN 2006: IMP(O) (Option) CC-106, PCMS Fuel Point

Completed 15 months from exercising of option.
15 Mo: 5/1/2025 – 7/31/2026
1 Job
NA
$

CLIN 3006: IMP(O) (Option) CC-106, PCMS Fuel Point

Completed 15 months from exercising of option.
15 Mo: 5/1/2026 – 7/31/2027
1 Job
NA
$

CLIN 4006: IMP(O) (Option) CC-106, PCMS Fuel Point

Completed 15 months from exercising of option.
15 Mo: 5/1/2027 – 7/31/2028
1 Job
NA
$

CLIN 1008: GAC Unit (Option) Annual Maintenance

Completed 15 months from exercising of option.
15 Mo: 5/1/2024 – 7/31/2025
1 Job
NA
$

CLIN 2008: GAC Unit (Option) Annual Maintenance

Completed 15 months from exercising of option.
15 Mo: 5/1/2025 – 7/31/2026
1 Job
NA
$

CLIN 3008: GAC Unit (Option) Annual Maintenance

Completed 15 months from Option award
15 Mo: 5/1/2026 – 7/31/2027
1 Job
NA
$

CLIN 4008: GAC Unit (Option) Annual Maintenance

Completed 15 months from exercising of option.
15 Mo: 5/1/2027 – 7/31/2028
1 Job
NA
$

CLIN 1009: GAC Unit PFAS (Option) Annual GAC (PFAS) Maintenance

Completed 15 months from exercising of option.
15 Mo: 5/1/2024 – 7/31/2025
1 Job
NA
$

CLIN 2009: GAC Unit (PFAS) (Option) Annual GAC (PFAS) Maintenance

Completed 15 months from exercising of option.
15 Mo: 5/1/2025 – 7/31/2026
1 Job
NA
$

CLIN 3009: GAC Unit (PFAS) (Option) Annual GAC (PFAS) Maintenance

Completed 15 months from exercising of option.
15 Mo: 5/1/2026 – 7/31/2027
1 Job
NA
$

CLIN 4009: GAC Unit (PFAS) (Option) Annual GAC (PFAS) Maintenance

Completed 15 months from exercising of option.
15 Mo: 5/1/2027 – 7/31/2028
1 Job
NA
$

CLIN 1016: Dig-and-Haul 100 yd3 Soil (Option)

Former Buildings 220/221

Completed 12 months from exercising option.

Completed in conjunction with RFI Base CLIN 0015.

12 Mo: 10/1/2024 – 9/30/2025
1 Job
NA
$

CLIN 2016: Dig-and-Haul 100 yd3 Soil (Option)

Former Buildings 220/221

Completed 12 months from exercising option.

Completed in conjunction with RFI Base CLIN 0015

12 Mo: 10/1/2024 – 9/30/2025
1 Job
NA
$

CLIN 3016: Dig-and-Haul 100 yd3 Soil (Option)

Former Buildings 220/221

Completed 12 months from exercising option.

Completed in conjunction with RFI Base CLIN 0015.

12 Mo: 10/1/2024 – 9/30/2025
1 Job
NA
$

CLIN 1018: LTM (Option)

9 Landfills; FTC-006 [LFs 2/3], FTC-008 [LF 4], FTC-009 [LF 5], FTC-011 [LF 7], FTC-012 [LF 8], FTC-013 [LF 9], FTC-026 [LF 14], CC-SW001 [LF 1], CC-SW170 [LF 170]

Completed 18 months from exercising of option.
18 Mo: 5/1/2026 – 10/31/2027
1 Job
NA
$

CLIN 2018: LTM (Option)

9 Landfills; FTC-006 [LFs 2/3], FTC-008 [LF 4], FTC-009 [LF 5], FTC-011 [LF 7], FTC-012 [LF 8], FTC-013 [LF 9], FTC-026 [LF 14], CC-SW001 [LF 1], CC-SW170 [LF 170]

Completed 18 months from exercising of option.
18 Mo: 3/1/2027 – 8/30/2028
1 Job
NA
$

CLIN 1019: CMI(O) (Option)

FTC-020 [SWMU 13]

Completed 18 months from exercising of option.
18 Mo: 5/1/2026 – 10/31/2027
1 Job
NA
$

CLIN 2019: CMI(O) (Option)

FTC-020 [SWMU 13]

Completed 18 months from exercising of option.
18 Mo: 3/1/2027 – 8/30/2028
1 Job
NA
$

CLIN 1022: CMI(O) (Option) FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site

Completed 18 months from exercising of option.
18 Mo: 5/1/2026 – 10/31/2027
1 Job
NA
$

CLIN 2022: CMI(O) (Option) FTC-058 [SWMU 16], FTC-033 [SWMU 53] – Managed as 1 site

Completed 18 months from exercising of option.
18 Mo: 3/1/2027 – 8/30/2028
1 Job
NA
$

CLIN 1024: CMI(O) (Option)

FTC-070 [SWMU 164], FTC-093 [SWMU 168], CC-SW169 [SWMU 169]

Completed 18 months from exercising of option.
18 Mo: 5/1/2026 – 10/31/2027
1 Job
NA
$

CLIN 2024: CMI(O) (Option)

FTC-070 [SWMU 164], FTC-093 [SWMU 168], CC-SW169 [SWMU 169]

Completed 18 months from exercising of option.
18 Mo: 3/1/2027 – 8/30/2028
1 Job
NA
$

CLIN 1028: CMI(O) (Option)

FTC-083 [SWMU 167]

Completed 18 months from exercising of option.
18 Mo: 5/1/2026 – 10/31/2027
1 Job
NA
$

CLIN 2028: CMI(O) (Option)

FTC-083 [SWMU 167]

Completed 18 months from exercising of option.
18 Mo: 3/1/2027 – 8/30/2028
1 Job
NA
$

CLIN 1038: Update Risk Module VI (Option)

Update Risk Module VI (Risk-Based Evaluation Procedures Manual, Methodology for Identifying NFA at SWMUs)

Completed 18 months from exercising of option.

Performance shall start upon second need of update.

TBD
1 Job
NA
$

Base Period Total Price:

Options Total Price:

Base Plus Option Periods (Total Value):