Attach 5_Price Schedule_SB Suite Irwin STO.docx
DOCX document 36 KB Posted
- Solicitation number
- W9124J-22-R-0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach 4_IDIQ Labor Rates_ERMA23.xlsx | XLSX spreadsheet | |
| Attach 3_PWS UB Suite_Carson STO_v2.docx | DOCX document | |
| Attach 2_PWS SB Suite_Irwin STO_v3.docx | DOCX document | |
| Attach 7_PPQ ERMA23.docx | DOCX document | |
| Attach 6_Price Schedule_UB Suite Carson STO.docx | DOCX document | |
| Attach 1_PWS_Base IDIQ_ERMA23_DRAFT_30Nov2022.docx | DOCX document | |
| Attach 8_QA Draft RTOP Template.docx | DOCX document | |
| RFP_W9124J-22-R-0005_ERMA23 IDIQ_DRAFT 7.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SB Suite – Irwin Price Schedule/CLIN Structure
Price Schedule/CLIN Structure Sample Task for Small Business (SB) Suite Environmental Remediation Services Fort Irwin, CA
Instructions: Offerors shall return pricing information in MS Excel as unlocked/unprotected copy. Amounts shall be in whole dollars only.
IAW PWS section 1.5, POP shall not exceed 60 months, inclusive of any exercised options.
| CLIN Description |
| Completion Date |
| Projected POP |
| Contractor Proposed Price |
CLIN 0001 (Base Period) Project Management Plan to include UFP-QAPP(s)
Planning/Development/ Execution of Kick-Off Meeting; Monthly Project Meetings, PMP, UFP-QAPP, Health & Safety Plan, Project Schedule, SSWPs/SSWPA
Draft planning documents due within 30 calendar days of Task Order award.
Final documents due within 30 calendar days of receipt of COR comments on the draft. Annual updates.
| 1 Sept 2023 – 30 Nov 2023 |
| $ |
CLIN 0002 (Base Period) Supplemental Site Inspection (SSI): On- Installation PFAS for the following AOPIs:
· Active Recreational Ball Fields
· Bulk POL Contaminant Basins
· Fire Hose Pressure Testing Area
· Fire Station 2 (Bldg P6101)
· Former Fire Station
· FTIR Helipad
· RUFMA Drainage Basins
· RUFMA Former Fire Training Area
· RUFMA Wash-Rack
· J Stand Fire Truck Pump Flush Area
· NASA Goldstone Former Microwave Test Facility
Complete Supplemental Sampling and Final SSI Report.
| 18 months from the award of Task Order |
| 01 Sept 2023 – 31 Mar 2024 |
| $ |
CLIN 0003 (Base Period) Remedial Investigation (RI): On- Installation PFAS for the following AOPIs:
· AFFF Storage Shed (Bldg P358)
· Bulk POL Tanker Fire Response
· DES Training Complex
· Fire Station 1 (Bldg P400) and Former AFFF Storage (Building P411)
· BLAAF – Fire Extinguisher Training Area
· BLAAF - Helipad
· FTIR-20 Former Fire Training Area
Complete RI Fieldwork and Final RI Report
| 24 months from award of Task Order |
| 01 Sept 2023 – 31 Aug 2025 |
| $ |
CLIN 0004 (Base Period) Remedial Investigation (RI): Off Installation PFAS for the following sites:
· East Drainage Basin
· Fire Station
· Helipad – South End
· North Drainage Basin
Complete RI Fieldwork and Final RI Report
| 24 months from award of Task Order |
| 01 Sept 2023 – 31 Aug 2025 |
| $ |
CLIN 0005 (Base Period) Remedial Investigation (RI): Active/ Inactive Landfill for the following site:
FTIR-01/CCFTIR-01
Complete RI Fieldwork and Final RI Report
| 24 months from award of Task Order |
| 01 Sept 2023 – 31 Aug 2025 |
| $ |
CLIN 0006 (Base Period) Long Term Monitoring (LTM): FTIR-02/04
Complete annual LTM requirements and annual report.
| 12 months from award of Task Order |
| 01 Sept 2023 – 31 Aug 2024 |
| $ |
Options
| CLIN Description |
| Completion Date |
| Projected POP |
| Quantity & Unit |
| Unit Price |
| Contractor Proposed Price |
CLIN 0007 (Option) Shallow monitoring well installation without mobilization.
Three (3) monitoring wells installed in accordance with PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| TBD |
| 10 Each |
| $ |
| $ |
CLIN 0008 (Option) Shallow monitoring well installation with mobilization.
Three (3) monitoring wells installed in accordance with PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| TBD |
| 10 Each |
| $ |
| $ |
CLIN 0009 (Option) Deep monitoring well installation with mobilization.
Three (3) monitoring wells installed in accordance with PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3 Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| TBD |
| 10 Each |
| $ |
| $ |
CLIN 0010 (Option) Soil boring for subsurface soil investigation without mobilization.
Two (2) soil borings in accordance with PWS 5.1.2.1, 5.1.2.2, and/or 5.1.2.3
Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| TBD |
| 10 Each |
| $ |
| $ |
CLIN 0011 (Option) Soil boring for subsurface soil investigation with mobilization.
Two (2) soil borings in accordance with 5.1.2.1, 5.1.2.2, and/or 5.1.2.3
Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| TBD |
| 10 Each |
| $ |
| $ |
CLIN 0012 (Option) Fence, landfill cap repair, erosion repair, and soil stability repair in accordance with 5.1.2.4 The contractor shall achieve minor site maintenance no later than three (3) months after exercising option. Minor site maintenance includes, but is not limited to, minor erosion repair, animal burrowings repair, sign replacement, lock replacement, fence replacement/repair, tortoise-proof fabric replacement, vegetation and/or sediment clearing from drainage. Contractor shall perform such repairs equal to two 10-hour days.
Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| TBD |
| 10 Each |
| $ |
| $ |
CLIN 0013 (Option) Monitoring well repair in accordance with 5.1.2.1, 5.1.2.2, and/or 5.1.2.3
Repairs include surface completion replacement of steel monument standpipe, concrete foundation, and bollards; replacing submersible low-flow pumps and tubing, and repainting/labeling the well head and bollards.
Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| TBD |
| 10 Each |
| $ |
| $ |
CLIN 0014 (Option) Gas well repair in accordance with 5.1.2.3.
Soil gas well repairs shall include surface completion replacement of steel monument standpipe, concrete foundation, and billards; replacing soil gas well caps and O-ring seals; and installing new sampling tubing within the well casing and replacing the well cap setup.
Completed 12 months from exercising of option.
Option may be exercised up to 10 times.
| TBD |
| 10 Each |
| $ |
| $ |
CLIN Description
Completion Date
Projected POP
Contractor Proposed Price
CLIN 0015 (Option) Settlement survey for FTIR-02 and FTIR-04.
IAW the RA report, Remedial Action Plan, Fort Irwin Abandoned Landfills (Montgomery Watson, June 1997).
| Completed 12 months from exercising of option. |
| TBD |
| $ |
CLIN 1005 (Option) Feasibility Study/ Proposed Plan/ Decision Document for the following site:
Active/ Inactive Landfill. FTIR-01/CCFTIR-01
| Completed 18 months from exercising of option. |
| To be exercised upon regulatory acceptance of Final RI Report for FTIR-01/CCFTIR-01 |
| $ |
CLIN 1006 (Option) Long Term Monitoring (LTM): FTIR-02/04 Complete annual LTM requirements and annual report
Completed 12 months from exercising of option.
Performance shall start upon completion of CLIN 0006.
| 01 Sept 2024 – 31 Aug 2025 |
| $ |
CLIN 2006
Long Term Monitoring (LTM): FTIR-02/04
Complete annual LTM requirements and annual report
Completed 12 months from exercising of option.
Performance shall start upon completion of CLIN 1006.
| 01 Sept 2025 – 31 Aug 2026 |
| $ |
CLIN 3006
Long Term Monitoring (LTM): FTIR-02/04
Complete annual LTM requirements and annual report
Completed 12 months from exercising of option.
Performance shall start upon completion of CLIN 2006
| 01 Sept 2026 – 31 Aug 2027 |
| $ |
CLIN 4006
Long Term Monitoring (LTM): FTIR-02/04
Complete annual LTM requirements and annual report Completed 12 months from exercising of option.
Performance shall start upon completion of CLIN 3006.
| 01 Sept 2027 – 31 Aug 2028 |
| $ |
Page 1 of 6 Proposed CLINs Structure Fort Rucker Proposed CLINs Structure