Attach 5 - CSP_SAC.pdf
PDF 318 KB Posted
- Solicitation number
- N0042120R0099
About this file
This document contains a Contract Surveillance Plan (CSP) and associated Surveillance Activity Checklist (SAC) for security support services provided to the Naval Air Warfare Center Aircraft Division. The scope of work includes a range of security services such as acquisition security, information security, personnel security, industrial security, and physical security. The five-year contract will have a cost-plus-fixed-fee arrangement and require services to maintain daily administrative functions and the full range of security operations. The CSP establishes methods for government surveillance of contractor performance, including a SAC for monthly assessments of quality, schedule, cost control, regulatory compliance, and management. Areas of focus for surveillance include accuracy of reports, adherence to schedule, cost forecasting and control, regulatory compliance, and management of subcontracts and resources. Ratings will use a CPARS scale of exceptional, very good, satisfactory, marginal, and unsatisfactory.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions Part 3.docx | DOCX document | |
| Amendment 0003.docx | DOCX document | |
| Questions Part 3.docx | DOCX document | |
| Questions Part 2.docx | DOCX document | |
| N0042120R0099 Amend 2.docx | DOCX document | |
| N0042120R00990001.pdf | ||
| Questions Part 1.docx | DOCX document | |
| Attachment P6_ Sample Task 3 IPSS.docx | DOCX document | |
| Attach 2 - OCI List.docx | DOCX document | |
| Attachment P4_ Sample Task 1 Acqsec.docx | DOCX document | |
| Attach 3- DD254 (for bidding purposes only).pdf | ||
| RFP N0042120R0099.docx | DOCX document | |
| Attach P1 - Past Performance Information Form.pdf | ||
| Attach P3- Cost Summary Spreadsheet.xls | XLS spreadsheet | |
| Attachment P5_ Sample Task 2 Cyber.docx | DOCX document | |
| Attachment_P7_Composite_Labor_Rate_Fee_Worksheet.xlsx | XLSX spreadsheet | |
| Attach 1 - Cybersecurity Plan (CS) Plan.docx | DOCX document | |
| Attach 4 - Data Item Form.docx | DOCX document | |
| Exhibit A-CDRLs A001-A010.pdf | ||
| Attach P2 - CPAQ.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-20-R-0099
Contract Surveillance Plan (CSP) for the Naval Air Warfare
Center Aircraft Division (NAWCAD) Security Support Services
1. Purpose
This Contract Surveillance Plan (CSP) and the attached Surveillance Activity Checklist (SAC) is a Government developed and applied document used to ensure that systematic quality assurance methods are used in the administration of the Statement of Work (SOW). The intent is to ensure that the Contractor performs in accordance with the SOW and that the Government receives the quality of services called for in the contract and resulting task orders.
The contract requirement is for the NAWCAD Security Department and the Command Operations
Group, which provide people, skills, knowledge, and expertise required to provide control measures for protecting classified and controlled unclassified information for a major acquisition
Program. Services and products provided will reduce risks, improve performance, quality, timeliness and efficiency of Security operations throughout the Organization including the Naval
Air Warfare Center Aircraft Division (NAWCAD) and the Naval Air Systems Command
(NAVAIR).
The scope of this effort is for services in maintaining daily administrative and full range of Security operations. Support services required include administrative functions, application of traditional security disciplines which include Acquisition Security (AQSEC), Information Security, International Programs Security (Foreign Disclosure and Foreign National Visits), Personnel
Security, Industrial Security, Operations Security (OPSEC), Physical Security/Force
Protection/Anti-Terrorism/Emergency Management, Communications Security (COMSEC), as well as Research Technology Protection, Anti-Tamper & Cyber Security Support services.
The effort will be a non-performance based Indefinite Delivery Indefinite Quantity (IDIQ) contract with Cost-Plus-Fixed-Fee (CPFF). The period of performance consists of a five (5) year ordering period.
A properly executed CSP and attached SAC will assist the Government in achieving the objectives of this procurement and clearly define performance expectations.
2. Authority
Authority for issuance of this CSP and attached SAC is provided in the contract under Section E
- Inspection and Acceptance of the contract, which provides for inspection and acceptance of the services and documentation called for in the contract and resulting task orders, to be executed by the Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the SAC. The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract and individual task orders. The SAC is put in place to provide Government surveillance oversight of the Contractor’s efforts to ensure that they are timely, effective, and are delivering the results as specified in the contract and resulting task orders.
4. Government Resources
The following definitions for Government resources are applicable to this SAC:
Contracting Officer – A person duly appointed with the authority to enter into (Procuring
Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determinations and findings on behalf of the Government. The PCO for this contract is AIR-2.5.1.8. The ACO will be designated in the resulting contract. Contracting
Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer’s Representative (COR)/Alternative Contracting Officer’s
Reprsentative (ACOR) – An individual appointed in writing by the PCO to act as their authorized representative to assist in administration of the contract and resulting task orders. The limitations of authority are contained in a written letter of appointment.
5. Responsibilities
The following Government resources shall have responsibility for the implementation of this
SAC:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The
Contracting Officer is ultimately responsible for the final determination of the adequacy of the
Contractor’s performance.
COR/ACOR – The COR/ACOR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the
Government’s behalf. Any changes that the Contractor deems may affect contract and task order price, terms, or conditions shall be referred to the Contracting Officer for action. The COR/ACOR will be appointed at the contract level, meaning the COR/ACOR will be responsible for technical administration and government surveillance of all resulting task orders.
6. Methods of Surveillance
a. Contractor Performance Assessment Reporting System (CPARS) – The market place for financial support services is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS ratings for this contract and resulting task orders. For this procurement, the Government will address the quality of product or service, schedule, cost control, regulatory compliance, management and other important areas. As this information may affect future source selections throughout the Department of Defense (DoD), the Government assessment will be used appropriately as an additional performance oversight and communication tool.
b. SAC - Enclosure (1) lists methods of surveillance that will be used by the COR/ACOR in the technical administration of the SOW tasks performed by the Contractor.
c. Observation, Feedback and Review – Unscheduled observation of products and services provided by the Contractor on site and recurring review of the Contractor submitted reports and documentation identified in the CDRL(s) will be performed by the COR/ACOR. Feedback from the Comptroller Department will be collected and used by the COR/ACOR to document surveillance of performance.
7. Surveillance
The SAC, Enclosure (1), will be provided by the COR/ACOR to the Contractor on a Monthly basis, as feedback on the performance of their management and quality control actions for the services and products provided under this contract and resulting task orders. Enclosure (1) will also be used to document the monthly surveillance reporting requirement via the Contracting
Officer Representative Tracking (CORT) Tool.
8. Documentation
In addition to providing monthly reports to the Contracting Officer, the COR/ACOR will maintain a complete Quality Assurance file in CORT. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the original copies of the SACs. All such records will be maintained for the life of the contract. The COR/ACOR shall forward a hard copy of these records to the
Contracting Officer at termination or completion of the contract and task orders.
9. Enclosures
Enclosure (1) – Surveillance Activity Checklist (SAC)
N00421-20-R-0099
Enclosure (1)
Surveillance Activity Checklist
All SOW/CDRL tasks, including SOW/CDRL sub-tasks, will be assessed focusing on the following for the contract and any resulting task order:
Quality of Product or Service – Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess accuracy of reports/data and how successfully the Contractor meets program quality.
Schedule – Assess the Contractor’s adherence to the required delivery schedule by assessing the
Contractor’s efforts during the assessment period that contribute to or effect the schedule variance.
Also address significance of scheduled events, discuss causes, and assess the effectiveness of
Contractor corrective actions.
Cost Control – Assess the Contractor’s effectiveness in forecasting, managing, and controlling costs.
Assess the Contractor’s ability to perform within the total estimated cost; cost growth or under run and applicable causes. Assess any innovative approaches implemented by the Contractor that resulted in cost savings. In addition, assess the extent to which the Contractor demonstrates as sense of cost responsibility, through the efficient use of resources in each work effort.
Regulatory Compliance – Assess compliance with all terms and conditions in the contract relating to applicable regulations and codes. Consider aspects of performance such as compliance with financial, environmental (i.e. Clean Air Act, Clear Water Act), safety and labor regulations, as well as any other reporting requirements in the contract terms and conditions.
Management – Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small business participation goals. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activities needed to execute the contract and resulting task orders. Discuss the extent to which the Contractor identifies and applies resources required to meet schedule requirements, assigns responsibility for tasks/actions required, and communicates appropriate information to affected program elements in a timely manner.
Assess the Contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the individual task orders.
Other Areas – Assess additional evaluation areas unique to the individual task order or that cannot be captured elsewhere.
Monthly Surveillance:
The COR will perform a monthly assessment of Quality, Schedule, Cost Control, Business Relations, Management of Key Personnel and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed below.
Exceptional - Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task/sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
Metrics – Exceptional:
Quality: Fully meets all quality expectations and requirements more than 95% of the time; and corrective action was acceptable and effective.
Schedule: Meets all schedule/delivery due dates more than 95% of the time and corrective action taken for past due items was appropriate and effective.
Cost Control: Cost is within 5% of forecast based on most recent changes approved by the
Government.
Regulatory Compliance: The Contractor meets all of the Government’s expectation for compliance of regulations and codes related to financial, environmental, safety and labor as well as any reporting requirements as specified in the contract terms and conditions more than
95% of the time; and corrective action was acceptable and effective.
Management: Management of subcontracts, coordination of activities, applies resources required to meet schedule and contract requirements; assignment of responsibility for asks/actions; risk mitigation plans; and communication meet expectations and are performed in a timely manner 95% of the time.
Other: Meets requirements more than 95% of the time.
Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task/sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
Metrics – Very Good:
Quality: Fully meets all quality expectations and requirements more than 90% of the time; and corrective action was acceptable and effective.
Schedule: Meets all schedule/delivery due dates more than 90% of the time and corrective action taken for past due items was appropriate and effective.
Cost Control: Cost is within 10% of forecast based on most recent changes approved by the
Government and explanation of cost deviation was acceptable.
Regulatory Compliance: The Contractor meets or exceeds some of the Government’s expectation for compliance of all regulations and codes related to financial, environmental, safety and labor as well as any reporting requirements as specified in the contract terms and conditions more than 90% of the time; and corrective action was acceptable and effective.
Management: Management of subcontracts, coordination of activity and applies resources required to meet schedule and contract requirements; assignment of responsibility for tasks/actions; risk mitigation plans; and communication meet expectations and are performed in a timely manner more than 90% of the time and the Contractor is making necessary adjustments to meet government expectation.
Other: Meets requirements more than 90% of the time and is taking appropriate corrective action to improve performance.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task/sub-task contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
Metrics – Satisfactory:
Quality: Fully meets all quality expectations and requirements more than 80% of the time; and corrective action proposed/taken is appropriate.
Schedule: Meets all schedule/delivery due dates more than 80% of the time and time corrective action taken for past due items was appropriate and effective.
Cost Control: Cost is within 15% of forecast based on most recent changes approved by the
Government and explanation of cost deviation is acceptable; and proposed cost mitigation is acceptable.
Regulatory Compliance: The Contractor meets the Government’s expectation for compliance of all regulations and codes related to financial, environmental, safety and labor as well as any reporting requirements as specified in the contract terms and conditions more than 80% of the time; and corrective action was satisfactory.
Management: Management of subcontracts, coordination of activity and applies resources required to meet schedule and contract requirements; assignment of responsibility for tasks/actions; risk mitigation plans; and communication meet expectations and are performed in a timely manner more than 80% of the time and the Contractor is making necessary adjustments to meet government expectation.
Other: Meets requirements more than 80% of the time and the Contractor is taking appropriate corrective action to improve performance.
Marginal - Performance does not meet some contractual requirements. The contractual performance of the task/sub-task being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.
Metrics – Marginal:
Quality: Meets quality expectations and requirements less than 70% of the time; and corrective action proposed/taken is often not appropriate.
Schedule: Meets schedule/delivery due dates less than 70% of the time and corrective action taken for past due items was often not appropriate and ineffective.
Cost Control: Cost was not within 20% of forecast based on most recent changes approved by the Government or explanation of cost deviation was not acceptable; or proposed cost mitigation was not acceptable.
Regulatory Compliance: The Contractor meets the Government’s expectation for compliance of all regulations and codes related to financial, environmental, safety and labor as well as any reporting requirements as specified in the contract terms and conditions less than 70% of the time; and corrective action has not yet been taken or actions were marginal or not fully implemented.
Management: Management of subcontracts, coordination of activity and application of resources to meet schedule and contract requirements; or assignment of responsibility for tasks/actions; risk mitigation plans and communication meet expectations less than 70% of the timeand the Contractor is not making necessary adjustments to meet government expectation.
Unsatisfactory - Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task/sub-task contains a serious problem(s) for which the Contractor’s actions appear or were ineffective.
Metrics – Unsatisfactory
Quality: Meets quality expectations and requirements less than 60% of the time; and corrective action proposed/taken is not appropriate or ineffective. Contractor is unlikely to meet quality expectations in the near future.
Schedule: Does not meet all schedule/delivery due dates less than 60% of the time or corrective action taken for past due items was not appropriate or ineffective. Contractor is responsible for the failure to meet schedule and is likely to continue to fall behind schedule.
Cost Control: Cost was more than 20% of forecast based on most recent changes approved by the Government or explanation of cost deviation was not acceptable; or proposed cost mitigation was not acceptable or ineffective. The Contractor had the opportunity to control and failed to do so and is unlikely reduce cost or maintain the current cost deficit.
Regulatory Compliance: The Contractor meets the Government’s expectation for compliance of all regulations and codes related to financial, environmental, safety and labor as well as any reporting requirements as specified in the contract terms and conditions less than 60% of the time; and corrective action was ineffective, not yet taken or unlikely to meet compliance or reporting requirements in the near future.
Management: Management of subcontracts, coordination of activity and application of resources to meet schedule and contract requirements; or assignment of responsibility for tasks/actions; or risk mitigation plans; or communication to meet expectations are not performed in a timely manner less than 60% of the time or is not making necessary adjustments to meet government expectation. The Contractor is unlikely to establish control in the near future.
Other: Meets requirements less than 60% of the time or is not taking appropriate corrective action to improve performance. The Contractor is unlikely to meet requirements in the near future.
SURVEILLANCE ACTIVITY CHECKLIST
MONTHLY
The COR/ACOR will perform a Monthly assessment of Quality, Schedule, Cost Control, Regulatory
Compliance, Management and Other Areas to the PCO for approval via CORT and a Monthly summary to the Contractor utilizing the CPARS evaluation rating definitions listed above.
PERFORMANCE STANDARDS – TASKS
Description
Surveillance
Method /
Measure
Date
Planned
Date
Completed Quality Schedule
Cost
Control
Regulatory
Compliance Mgmt Other
Acquisition Security
(ACQSEC) Support
Services, SOW para 3.3.1
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
SharePoint Site Collection
Support Services, SOW para 3.3.2
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
Cybersecurity Support
Services, SOW para 3.3.3
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
Anti-Tamper(AT) Support
Services, SOWpara 3.3.4
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
International Programs
Securityy Support
(Foreign Disclosure and
Foreign Visits) Support
Services, SOWpara 3.3.5
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
Information Security
Support Services, SOW para 3.3.6.
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
Personnel Security
Support Services, SOW para 3.3.7.
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
Industrial Security
Support Services, SOW para 3.3.7.
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
Operations Security
(OPSEC) Support
Services, SOW para 3.3.9.
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
Physical Security/Force
Protection/Anti-
Terrorism/Emergency
Management Support
Services, SOW para
3.3.10.
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
Communications Security
(COMSEC) Support
Services, SOW para
3.3.11.
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
Security Project/Program management Support
Services, SOW para
3.3.12.
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
System Security
Engineering Support
Services, SOW para
3.3.13.
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
Administrative Support
Services, SOW para
3.3.14.
Surveillance by
COR/ACOR,
and customer
Feedback
TBD
PERFORMANCE STANDARDS – DATA
Description
Surveillance
Method /
Measure
Date
Planned
Date
Completed Quality Schedule
Cost
Control
Regulatory
Compliance Mgmt Other
Monthly
Progress and
Financial Status
Report Refer to
SOW
paragraph
3.1.3.1 CDRL
A001
100%
Inspection by
COR/ACOR
and customer feedback
TBD
Transition Out
Plan, refer to
SOW
paragraph
3.1.8.
CDRL A002
100%
Inspection by
COR/ACOR
and customer feedback
Operations
Security
(OPSEC) Plan, refer to SOW paragraph
3.2.5. CDRL
A003
100%
Inspection by
COR/ACOR
and customer feedback
Cybersecurity
Implementation
Plan, refer to
SOW
paragraph
3.2.8.1.
CDRL A004
100%
Inspection by
COR/ACOR
and customer feedback
TBD
Technical and
Management
Work Plan, refer to SOW paragraph
3.3.1, 3.3.2, and 3.3.4 thru
3.3.14.
CDRL A005
100%
Inspection by
COR/ACOR
and customer feedback
TBD
Training Data
Products, refer to SOW paragraph
3.3.1, 3.3.2, and 3.3.5 thru
3.3.14.
CDRL A006
100%
Inspection by
COR/ACOR
and customer
Security
Classification
Guide, refer to
SOW
paragraph 3.3.1 and 3.3.6.
CDRL A007
100%
Inspection by
COR/ACOR
and customer
Supply Chain
Risk
Management, Refer to SOW paragraph 3.3.1 and 3.3.13.
CDRL A008
100%
Inspection by
COR/ACOR
and customer feedback
TBD
Operations
Security
(OPSEC) Plan, refer to SOW paragraph 3.3.1 and 3.3.9.
CDRL A009
100%
Inspection by
COR/ACOR
and customer feedback
TBD
Cybersecurity
Documentation, refer to SOW paragraph
3.3.3.
CDRL A010
100%
Inspection by
COR/ACOR
and customer feedback
TBD
SAC Monthly Summary of Ratings
For the period of: ________
Quality Schedule
Number of Exceptional ____ Number of Exceptional ____
Number of Very Good ____ Number of Very Good ____
Number of Satisfactory ____ Number of Satisfactory ____
Number of Marginal ____ Number of Marginal ____
Number of Unsatisfactory ____ Number of Unsatisfactory ____
Cost Control Regulatory Compliance
Number of Exceptional ____ Number of Exceptional ____
Number of Very Good ____ Number of Very Good ____
Number of Satisfactory ____ Number of Satisfactory ____
Number of Marginal ____ Number of Marginal ____
Number of Unsatisfactory ____ Number of Unsatisfactory ____
Management Other Areas
Number of Exceptional ____ Number of Exceptional ____
Number of Very Good ____ Number of Very Good ____
Number of Satisfactory ____ Number of Satisfactory ____
Number of Marginal ____ Number of Marginal ____
Number of Unsatisfactory ____ Number of Unsatisfactory ____
SAC QUARTERLY SUMMARY
OF RATINGS
FOR THE PERIOD OF: _______________
The COR/ACOR will perform an Quarterly summary of overall contract performance utilizing the
CPARS evaluation rating definitions listed above and the quarterly SAC summary of ratings.
Description Surveillance Method
/Measure
Date
Planned
Date
Completed
Summary
Rating /
Results
Quality Review of Quarterly
Ratings
Schedule Review of Quarterly
Cost Control Review of Quarterly
Regulatory
Compliance
Review of Quarterly
Management Review of Quarterly
Other Areas Review of Quarterly
File details come from the government source that posted it. Updated .