ATTACH_4_-_Construction_Schedule.docx
DOCX document 21 KB Posted
- Solicitation number
- 140S0326R0001
About this file
This is a construction schedule attachment for the GCI Pollyanna #2 Acid Mine Drainage Remediation Project, a Department of the Interior Office of Surface Mining Reclamation and Enforcement solicitation (140S0326R0001). The schedule outlines a 15-day construction timeline for implementing acid mine drainage remediation infrastructure at the Pollyanna #2 site.
The construction activities include mobilization, site clearing and grubbing, pond dewatering, and installation of water treatment components such as HDPE 8-inch collection pipe, concrete flow spreaders, seep steps, and high calcium limestone (AASHTO #3) dosing systems. The work also encompasses construction of a concrete vault for a 10-inch dosing siphon and a settling/oxidation pond with appurtenances including two 4-inch outlet pipes, two 2.5/3-inch orifice plates, and baffle curtains. The schedule includes 50 feet of 6-foot-tall wetland seeding and planting, permanent erosion control fencing installation, and equipment removal. The document appears to be an incomplete template allowing contractors to add additional pages as needed for detailed scheduling and phasing of construction activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date:
| Feature |
| Item |
| Day: |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| Pollyanna 2 |
| Mobilization |
Clearing and Grubbing
Pond Dewatering
Earth Fill / Dirt Work
HDPE 8” Collection Pipe
Concrete for Flow Spreader(s), Seep Step, and Installment
High Calcium Limestone (AASHTO #3)
Dosing Siphon Concrete Vault
10” Dosing Siphon
Settling/Oxy Pond Appurtenances: Two 4-inch Outlet Pipes, two 2.5/3-inch Orifice Plates, & Baffle Curtains 6: 50ft long x 3ft tall
Wetland Seeding and Planting
Permanent Erosion Control
Fencing (5-wire)
Removal of Equipment and Associated Tanks
Earth Fill / Dirt Work
HDPE 8” Collection Pipe
Concrete for Flow Spreader(s), Seep Step, and Installment
Add more pages as seem fit
File details come from the government source that posted it. Updated .