ATTACH_3_BID_SCHEDULE_GCI_Pollyanna__2.pdf

PDF 50 KB Posted

Attached to
GCI Pollyanna #2 Acid Mine Drainage Remediation Pr
Solicitation number
140S0326R0001
Issued by

About this file

This is a pricing template for the Pollyanna #2 GCI 4105 AMD Project located in Latimer County, Gowen, Oklahoma. The document outlines 18 line items for construction and environmental remediation work with estimated quantities and unit pricing requirements.

The project scope includes mobilization, clearing and grubbing (3 acres), pond dewatering (2 each), earthwork (8,000 cubic yards), 8-inch HDPE pipe installation (140 linear feet), flow spreaders and seep steps, limestone aggregate (3,700 tons), dosing siphon concrete vault, 10-inch dosing siphon, settling pond appurtenances, wetland seeding and planting (260 units), agricultural lime (3 tons), fertilizer components including nitrogen (120 lbs), phosphorus (240 lbs), and potassium (240 lbs), seeding (3 acres), 5-wire fencing (700 linear feet), and removal of structures (10 each). All unit prices are currently blank with $0.00 placeholders. The template calculates a total base bid and adds 7 percent, resulting in a total estimated cost field, all presently showing $0.00. The document appears to be a blank pricing template awaiting contractor cost proposals for this environmental remediation and construction project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Estimated Actual Number Quantity Quantity

1 Mobilization LSUM 1 2 Clearing and Grubbing ACRE 3 3 Pond Dewatering EACH 2 4 Earth Work CY 8,000 5 8" HDPE Pipe with Fitting LF 140 6 Flow Spreaders & Seep Steps LSUM 1 7 Limestone AASHTO #3 TON 3,700 8 Dosing Siphon Concrete Vault LSUM 1 9 10" Dosing Siphon LSUM 1

10 Settling Pond Appurtences LSUM 1 11 Wetland Seeding and Planting UP 260 12 Agricultural Lime TON 3 13 Nitrogen LBS 120 14 Phosphorus LBS 240 15 Potassium LBS 240 16 Seeding ACRE 3 17 Fencing (5-wire) LF 700 18 Removal of Structures EACH 10

TOTAL BASE BID $0.00

7% of BASE BID $0.00

TOTAL ESTIMATED COST $0.00

Pollyanna #2 GCI 4105 AMD Project Latimer County Gowen, OK

Item Description Unit Unit Price

$0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Price

Sheet1

File details come from the government source that posted it. Updated .