Pollyanna #2 GCI 4105 AMD Project Pricing Template

This document is a pricing template for the Pollyanna #2 GCI 4105 AMD (Asset Management Division) Project located in Latimer County, Gowen, Oklahoma. The template is structured as a bid schedule requiring contractors to provide unit prices and extended prices for 19 line items encompassing site preparation, water management infrastructure, and environmental restoration work.

The project scope includes mobilization (calculated at 7% of the base bid), clearing and grubbing of 3 acres, pond dewatering for 2 locations, 8,000 cubic yards of earthwork, 140 linear feet of 8-inch HDPE pipe, limestone material (3,700 tons of AASHTO #3), dosing siphon equipment and concrete vault installation, settling pond appurtenances, wetland seeding and planting of 660 units, agricultural amendments (3 tons of agricultural lime, 120 lbs nitrogen, 240 lbs phosphorus, 240 lbs potassium), seeding of 3 acres, 700 linear feet of 5-wire fencing, removal of 10 structures, and 98 cubic yards of compost for wetland development at 1-foot thickness. The pricing template requires bidders to complete unit prices for each line item, with the total base bid amount then increased by 7% for mobilization to calculate the total estimated cost.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Estimated Number Quantity

1 Mobilization LSUM 1 7% Base Bid 2 Clearing and Grubbing ACRE 3 3 Pond Dewatering EACH 2 4 Earth Work CY 8,000 5 8" HDPE Pipe LF 140 6 Flow Spreaders & Seep Steps LSUM 1 7 Limestone AASHTO #3 TON 3,700 8 Dosing Siphon Concrete Vault LSUM 1 9 10" Dosing Siphon LSUM 1

10 Settling Pond Appurtences LSUM 1 11 Wetland Seeding and Planting UP 660 12 Agricultural Lime TON 3 13 Nitrogen LBS 120 14 Phosphorus LBS 240 15 Potassium LBS 240 16 Seeding ACRE 3 17 Fencing (5-wire) LF 700 18 Removal of Structures EACH 10 19 Compost for Wetland (1 ft thick) CY 98

TOTAL BASE BID

7% of BASE BID

TOTAL ESTIMATED COST

Pollyanna #2 GCI 4105 AMD Project Latimer County Gowen, OK

Item Description Unit Unit Price Price

Sheet1