Attach_3_-_Tulageak_Drilling_Report.pdf

PDF 782 KB Posted

Attached to
NPRA LEGACY WELL REMEDIATION - TULAGEAK TEST WELL
Solicitation number
140L0623R0021
Issued by

About this file

This document is a drilling report for the Tulageak Test Well No. 1 located in the National Petroleum Reserve in Alaska. The report provides details on the drilling and testing operations for the well, which was drilled to a total depth of 4,015 feet to test sandstone formations. Operations began in February 1981 and concluded in March 1981, with Husky Oil NPR Operations, Inc. supervising drilling and Brinkerhoff Signal, Inc. operating the drilling rig. The well encountered tight formations and lost circulation. Drill stem tests were conducted and three cores were collected for analysis before the well was plugged and abandoned.

The document includes well location data, drilling reports, mud records, casing information including a 9-5/8" casing run to 2,720 feet, completion reports noting drill stem tests, and core analysis. Appendices provide rig inventory details. The included federal contract opportunity is for remediation of the Tulageak Test Well No. 1 site by the Bureau of Land Management to properly abandon the legacy well.

View the file

Other files

File Type Posted
Sol_140L0623R0021_Amd_0002.pdf PDF
Attach_21_-_Amend_0002_23R0021_SF1449_REV_CONT_PAGES_0002.pdf PDF
Attach_18_-_Amend_0001_Tulageak_Statement_of_Work_0001.pdf PDF
Attach_19_-_Amend_0001_Tulegeak_Q-A_0001.pdf PDF
Attach_20_-_Amend_0001_Tulegeak_Pre_Prop_Conf_Attendees_List_0001.pdf PDF
Sol_140L0623R0021_Amd_0001.pdf PDF
Attach_17_-_Amend_0001_23R0021_SF1449_REV_CONT_PAGES_0001.pdf PDF
Attach_16_-_Brand_Name_JOFOC_SnowDens_Software.pdf PDF
Attach_7_-_West_Dease_2022_Site_Inspection.pdf PDF
Attach_2_-_Tulageak_Statement_of_Work.pdf PDF
Attach_5_-_Tulageak_Legacy_Well_Site_Delineation_and_Sampling_2019_Report.pdf PDF
Attach_15_-_Past_Performance_Questionnaire.docx DOCX document
Attach_6_-_Tulageak_1_Wellbore_Diagram.pdf PDF
Attach_12_-_BLM_Polar_Bear_Interaction_Plan.pdf PDF
Attach_9_-_East_Simpson_1_2022_Site_Inspection.pdf PDF
Attach_13_-_Wage_Determination_SCA_-_NSB_05_16_23.pdf PDF
Sol_140L0623R0021.pdf PDF
Attach_1_-_Contract_Price_Schedule.xlsx XLSX spreadsheet
Attach_11_-_Tulageak_Site_Access_Routes.pdf PDF
Attach_4_-_Tulageak_2022_Site_Inspection.pdf PDF
Attach_8_-_West_Dease_1992_Environmental_Status_Report.pdf PDF
Attach_14_-_Limitation_on_Subcontracting_Worksheet.xlsx XLSX spreadsheet
Attach_10_-_East_Simpson_1992_Environmental_Status_Report.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I

NATIONAL PETROLEUM RESERVE IN ALASKA

HISTORY

OF

DRILLING OPERATIONS

TULAGEAK TEST WELL NO. 1

HUSKY OIL NPR OPERATIONS, INC.

Edited by: S. L. Hewitt & R. G. Brockway

For the

U. S. GEOLOGICAL SURVEY

Office of the National Petroleum Reserve in Alaska Department of the Interior

SEPTEMBER 1982

TABLE OF CONTENTS

INTRODUCTION

DRILLING SUMMARY

GOVERNMENT FORMS AND REPORTS

Notice of Intent to Drill Sundry Notices and Reports

Subsequent Report of Spud Subsequent Report of Running and Cementing

9-5/8" Casing Subsequent Report of Abandon

Well Completion Report

LOCATION DATA

As Staked Location Plat Drill Pad Drawing

DRILLING DATA

Operations History Drilling Time Analysis Drilling Time Curve Drilling Mud Record Bit Record

CASING DATA

Introduction Casing Tally Summary 9-5/8" Casing Casing Tally 9-5/8" Casing .

Casing and Cement Report 9-5/8" Casing

COMPLETION DATA

Wellbore Schematic Abandonment Head Drawing

APPENDIX NO. I - Rig Inventory

LIST OF FIGURES

Figure 1, Well Location Map

1-1

TULAGEAK TEST WELL NO. 1

Tulageak Test Well No. 1 is located in the National Petroleum Reserve in Alaska (Figure 1). The well is located 1,140 feet from the west line and 3,338 feet from the south line of protracted Section 7, Township 21 North, Range 14 West, Umiat Meridian (Latitude: 71°11'21.62" North; Longitude:

155°44'00.82" West). Alaska State Plane Coordinates are: X = 295,272.76; Y = 6,287,738.37, Zone 5. Elevations are: ground level 10 feet and Kelly bushing 27 feet. Rig-up began on February 20, 1981, and the rig released on March 23, 1981.

The well was drilled to a total depth of 4,015 feet. The primary objective of the well was to test the sandstones in the basal portion of the "Pebble Shale" unit. Secondary objectives were the equivalents of the Jurassic Barrow sandstones and the Sag River Sandstone. The Argillite basement was reached at 3,964 feet.

Husky Oil NPR Operations, Inc. supervised and directed the drilling and support operations as prime contractor to the Department of the Interior, U. S. Geological Survey, Office of the National Petroleum Reserve in Alaska. Geological personnel were furnished by Tetra Tech, Inc.

Brinkerhoff Signal, Inc. was the drilling contractor; Brinkerhoff Rig 31, a National T -20, was used to drill the well.

""V'HO~ •

FIGURE 1 - WELL LOCATION MAP - TULAGEAK NO. 1

DRILLING SUMMARY

Field operations at the Tulageak Test Well No. 1 location began on January 26, 1981, with the mobilization of construction crews and equipment required to build the drilling pad and an ice airstrip to accommodate C-130 Hercules aircraft. Construction work was completed on February 11.

The rig move from Walakpa Test Well No. 2 was accomplished with 34 Rolligon loads. Rig move-in operations began on February 16. Rig-up operations began on February 20, and were completed on February 26.

The well was spudded February 26, 1981, at 3:00p.m.

During rig-up, 20" conductor pipe was set at 105' and cemented with 475 sacks of 14.9 ppg Permafrost cement. A 12-1/4" hole was drilled below the 20" conductor pipe to 2730' and the hole conditioned for logs. This interval was drilled with a 3% calcium chloride mud system with a weight of

9.6 to 10.1 ppg. A calcium chloride mud was used to prevent damage to possible hydrocarbon reservoirs which are known to contain swelling clays in the Barrow area (determined from water susceptibility tests on cores from the South Barrow Wells Nos. 12 and 13). The presence of calcium chloride necessitated the running of a dual laterolog rather than a dual induction log. The following logs were run: DLL/GR/SP, FDC/CNL/GR/CAL, BHC-Sonic/GR/TTI, LSS/GR/TTI, and HDT-Dipmeter.

Nineteen sidewall cores were shot with seventeen recovered. Sixty-three joints of 9-5/8", S-95, 53.5 lb./ft. Buttress casing were run to 2720' and cemented with 1,500 sacks of Permafrost cement; slurry weight of returns was 14.6 ppg. The 9-5/8" casing was hung with a National casing hanger, and slips were set with full casing weight. The Hydril was tested to 1,500 psi; the blowout preventer and all other equipment were tested to 3,000 psi. A 13-5/8", 5,000 psi, SRRA arrangement blowout-preventer stack was installed. The casing was tested to 3,000 psi, and a formation leakoff test was run after drilling 10 feet of new hole. The formation was tested to 12.0 ppg equivalent with 9.6 ppg mud in the hole (360 psi surface pressure). There was no leakoff.

An 8-1/2" hole was drilled to 2940' with a mud weight of 9.9 ppg, and Core No. 1 was cut from 2940' to 2982' (38' recovered). Drilling operations resumed. Tight hole was encountered while tripping for a new bit at 3322'. The lower interval of the hole, 2970' to 3322', was tight and required three hours to ream. While tripping for a new bit at 3644', tight hole was encountered at 3376'. The stand was pulled too high in the derrick, and the blocks became wedged against the crown. The blocks were worked loose, and 590 feet of drilling line was cut as a safety precaution. Drilling of the 8-1/2" hole was resumed. Core No. 2 was cut from 3783' to 3816' (33' recovered). Drilling resumed to 3880' where circulation was lost. A lost-circulation material pill was spotted and circulation regained. Drilling resumed to 4005', and Core No. 3 was cut to 4015' (10' recovered).

The core following hole logs was reamed and were run:

prep a rations Temperature made for Survey, logging. The

DLL/SP/GR,

FDC/CNL/GR/CAL, BHC-Sonic/GR, HOT-Oipmeter. Twenty sidewall cores were attempted, and 18 were recovered. The top sidewall core was shot at 2730'; the bottom was shot at 3940'. A second temperature survey was run, and the hole was conditioned for testing.

Drill-Stem Test No. 1 was conducted in the open hole over the interval 3770' to 3825'. A 530' water cushion was used. Surface chokes were 1/4" and 1/8", and the bottom-hole choke was 3/4". All pressures listed below were recorded at 3811' and are the field data. The test is summarized as follows:

Initial Flow Period (30 minutes): Opened with weak blow, increasing to very strong blow in 15 minutes and continuing until shut-in; Initial Hydrostatic Pressure 1,993 psi; Bottom Hole Flowing Pressure from 279 psi when opened to 545 psi at shut-in.

Initial Shut-In (30 minutes): Initial Shut-In Pressure 1,841 psi.

Final Flow Period (120 minutes): Opened with strong decreasing to moderate in one minute, and to weak at shut-in;

Hole Flowing Pressure 545 psi at opening increasing to 684 shut-in.

blow, Bottom psi at

Final Shut-In (240 minutes): Final Shut-In Pressure 1,841 ps1; Final Hydrostatic Pressure 1,993 psi.

Recovery: 4. 59 barrels of slightly water-cut mud.

After running Drill-Stem Test No. 1, a decision was made to plug and abandon the well. Cement plugs were set from 3950' to 3700' with 96 sacks of cement and from 2800' to 2600' with 72 sacks of cement. Both plugs were of Class "G" cement containing 1% CFR-2. The pipe was pulled to 2000' and the mud was displaced with water; the water was then displaced with diesel oil. This was to allow future re-entry into the upper well bore by U. S. Geological Survey personnel to make temperature measurements.

The abandonment marker and head were set and installed; the rig was released March 23, 1981, at 12:00 noon.

Mud and rental equipment were shipped by Hercules C-130 aircraft to Camp Lonely. The rig was flown by Hercules C-130 aircraft to Fairbanks, Alaska, and trucked to Anchorage. This operation was completed on April 5, 1981. During and following the rig move, the rig camp was shipped to the South Barrow Pressure Reducing Station by truck where it was stacked out for future use in connection with the Barrow Gas Field.

Detailed drilling information, in the form of bit records, mud summary, time analysis, and casing and cementing reports, is included in the body of this report.

UNITED STATES

St:IB>ll"t Of TI<IPLICA'rE' (Oth<r !nottu<ll~•• oo ,. ...... , .. , DEPARTMENT OF THE INTERIOR ' u:ooo ou10•o:r1o• oxo nou~ •o.

GEOLOGICAL SURVEY NlA

NOTICE OF J:IIENI TO DRILL DEEPEi"./1 OR PLUG BACK 6. lr "'""~' OLL<>1"!'00 DO TU .. "'"'

... :rrro or ""n N/A DRILL lXI VEEPEN 0 PLUG BACK 0 • o•t:r o~u'"""'" ••at• .. ....... ~ "'"'"" N/A

••• lXI ••• 0 ot•ou: 0 voc.-tru: 0 i. hOW CO ............ Nil tiona ... • •• 071101 ~" "" :. Kowo or on••~• National Petrole~ Reserve 1n Alaska Petroleum Reserve 1n AK (throu~h Husky 011 NPR Operations Inc.) g, ....... ""·

3. oooouo or cuo.o~• Tulageak Test Well No, 2525 c Street Suite 400 Anchorage AK 99503 )0. ''""' "'"

!'0<>!,.. 00 "ll.DCOT

t. I.LIO>TIO~ or ,..,Ll. (ioopoM loOoUoo doulJ ud !o oooordoo« with oor SU.to lt<jU!ru .. ou..•l Wildcat At ourhn

1140' FWL; 3338' FSL 11

••• ouovu

A.t ~101'01<~ p<od

Same {3traight holel Soc 7. T21N, Rl4W, llM H. Dlno•eo IK WII.ZO 0~0 OIOO<"TIO. TOO>< KUO<n' TOWK 00 ....... onreo• ll:·. :::TY 5°1° :.nul 13

25 Mil ' Southeast of Barro"' Alaska AK ... DIOTUCO lOCI .. PoO,..,UD' n. ""· •• ·~· " ...... " U><..r1o• "' •uo...- "":r;~•A'"'-= •••,.u• oo ~u .. ~•~•. ,.,., 20.22~ 1 (J.l .. "' _.,,....,, Or!r. ~an ltoo. If ••r) 2J.Q6Q,QQQ

" otoTA~n ,..,,. .,o.,no I.Oe.<Tto~· .. "'"""'""on-... " """""' <>• c.uu: roo'"' 1'<1 O<oUn ,.. ...... D>!Uo•O. <0MI't.""t11.

...... ~.~ ........... ,.,. tLulo, ,.,., 14 B50 1 4050' Rotarv ,. .._...,., • .,, ISbow -<!>or DF, RT, GR. o&<.) 21. uroM. oon "0U ,., .... T..OT'

Pad: 10' KB: 27' (Estimated) March 5, 1981 PROPO!W C.UlltG .LND CEio!Et."T!NG 1'1<0GR&Iol

01<0 or RDU:

26" 12 U4" 8 1/2"

BOP Program:

20"

9 5/8" 7"

133~ (K-55)

53.51.1 (S-95) 321 (N-80)

100' 2600' 4050'

From From

100' to 1500' 1500' to TD:

12", 3000 psi, SA Diverter Assembly 12", 3000 psi, SRRA BOP Assembly "'ith

Choke Manifold and Kill Line

325 Sx Permafrost to Surface 1725 Sx Permafrost to Surface Caliper Volume + L5% Excess

Class "G"

C"l~l c~~so· ... ~, c·:: :" ''.: =''"·,- ·• psi F£~.

'" aon ""'~" ou"""'' _.,..,,.., ,.... ... ., ' U p..,....;a II to "- or plur loodo rl" 4Uo oo .,._.., preoh«> .. - u4 PrO- .... prod,..,,..

oon. U pro--.. 10 to 41'W or 4 .. pa 4\netlooU!r. rl" J>UII"""t tlato "" ooWurlooo loc:o.tlno ao4 .,,_,_ u4 """' ..n!O&I Oo~ G!n biDWODt .,,..,..,..,. procn,a. II ou . .... ~em-~ Chief of Operations 1 ONPRA ... ,.

(TIIU opo. .. lor f'-...:1 or lltato oll!eo uol .. --,.-,,.,.-;--------:;---.. ~tt:· '· 4r&-4 ... ~~·~:

~:0':: TAC~<::O CONOITIONS

-_,,, _ _,:,-,, ,c,. ~,c'-'r--'sec·-,,,c,""-"'· ''.''t,c,o~Rc_ ~

-~ .. ~ Z<...O<:,Z"'£"'14"''8~1:__

"'S- lnrtruo:tion1 On RcotciH Side

UNITED STATES

DEPARTMENT OF THE INTERIOR

GEOLOGICAL SURVEY

1140' FWL; 3338'

AT TOP PROO. INTERVAL.:

AT TOTAL DEPTH: Same (straight

APPROPRIATE BOX TO

REPORT, OR OTHER DATA

NOTICE OF INTENT TO: SUBSEQUENT REPORT OF:

TEST WATER SHVT-QFF

FRAcnJRE TREAT

SHOOT OR ACIDIZE

REPAII'I WELL

PULL OR ALTER CASING

MULTIPLE COMPt-ETE

CHANGE ZONES

ABANOON•

[J

(other) Subsequent Report of SputJ

NAME

(,.OTE: Mo,..... ..-.ul'" ol ""'ltlllio ......,111..,..., 0, ..,.,.

<honJo on F""" 9-J.~<>J. _

17. DESCRIBE PROPOSED OR COMPlETED OPERATIONS (Clearly state all pe.-tinent details, and g'fve ]lel'tinent d~tes.

tncluding estimeted date of startlns any proposed wor~. If well is d~r&etio.,ally dnlled, gi~e subsurface locations ~nd measured and tr~• vert•cal depth• for all marke.., ~nd zones pertinent to thts worlc.)"

This well was spudded February 26, 1981, at 3:00PM with a 12 l/4" bit. Prior to spud, a 20" conductor was set in a 24" dry drilled hole and cemented to surface with 475 sacks of Permafrost cement at 105' KB.

_Set@ _____ ,.

.. dliTED STATES

DE?ll,RTMENT OF THE INTERIOR

GEOLOGICAL SURVEY

SUNDRY NOTICES AND REPORTS ON WELLS

<0" ~of ~•• 1~; 1 ~~"'' ~~~ P"'I>Ouls to <:lt;H o• t~ ''"""" Ot pt~r boc• lo o dollotont •n•.....,;,_ Uoo ,.,..., 9-lJl....C lot"'""'"""'"''-)

1. oil ,.., well t.:J

AMENDED tlAY 19. 1983

5. LEASE

N/A

6. IF INDIAN, ALLOTTEE OR TRIBE N.l.~IE N/A

7. UNIT AGREEMENT NAME

N/A

8. FAAM OR LEASE NI\ME National Petroleum Reserve in Alaska

9. WELL NO.

.a. NA.'>~E OF OPERATOR National Petroleum Reserve in Tlllageak Test Well No.

Alaska (through Husky Oil !fl'R Operations, Inc..) 10. FIELD OR WILDCAT NAME'"

3. ADDRESS OF OPERATOR Wildcat 2525 C Street, Suite 400, Anchorage, AX 99503 11. SEC .. T., R., M., OP Ell..K. AND SURVEY a.=

4. LOCATION OF WELL (REPORT LOt;AnON CLEARLY. Ste sp~c~ 17 AREA

Sec 7, TllN, Rl4W , UM below.) J-,:;,:;,;,:::,;o-::;:7.c;;;':r,:;'-;="'=---- ~~ ~~:F:;;:0_1/N~:Rv~; 3338 FSL l~0 ;;huN570:: PARISHI13. A7:::a AT TOTAL DEPTH: Same {Strah:ht hole) 14. API NO.

16. CHECK APPROPRIATE BOX TO INDICATE NATURE OF NOTICE. l-:-:---::-::cc::::::::;,-,::c-:c---:.,-.-c~-- REPORT, OR OTHER DATA 15. ELEVATIONS (SHOW OF, KOa, AND WQ

Pad: 10' · KB.27'

NOTICE OF INTD"T TO:

TEST WATER SHUT.Qf"F

I'RACTI.JRE TREAT

SHOOT OR ACIDIZE

REPAIR WELL 0

PULL OR AlTER CASING Q

~~-LN'D"D':.COMPt.ETE DOD ~~:NGC:..ZONES

{other) Subsequent Report

SUBSEQUENT REPORT OF:

(NOTE: R•pott "9nlu a• .,.,~ll•a<• """""'_.., o< tO"

"'"'""I• e• f~..,. 'J-310 of Runoin!Z and Cementing 9 5/8" Casing

17. DESCRIBE PRO?QSEO OR COMPLETED OPERATIONS (Cinrty sUte ~II ~erti.,~nt det•ils, ~"d Rive pertin .. nt dHe:

"'~l~dino: u:<mat~ date of startong any propose<l wor~. II well is dire<;tto.,ally d'111..:1, s•ve subsurlace locations an musur..:l and tr"'e venrcal dllpths lor all markers •nd zonu per::i~ent to this work.)• l.Jrilled 12 t/4" hole to 2730' · Logged '"'ith DLL, FDC/CNL, BHC'/Sonic, LSS, HDT.

(aJ.l logs 2725'-105'). Shot 19 sidewall cores with 17 recovered.

Ran 63 jts 9 S/8" , 53.5 f! S-95 Butt.ress csg. Cemented with 1500 sks Permafrost 14.9 pjlg cement. Good returns throughout. Csg shoe at 2720', F/C at 2632'.

CIP LOO P:-1 2/5/81. Tested choke manifold, blind and pipe rams to 3000 psi; Hvdril to 1500 ?Si. Tested 9 5/8" casino;; to 3000 psi. Drilled to 2740'. Tested format-ion to equivalent 12.0 ppg. mud 060 psi surface pressure with 9.6 ppg mud).

Subsurlllce S.fety Valve: Manu. and Typ• --------------------Set@

SICNEO

Conforms ~o~ith pertinent provisJ.ons of

30 CFR 221.

ml~ Chief of Operationeut

----------- nnt ---------

I'

UNITED STATES 5. LEASC:

DEPARTMENT Of THE INTERIOR NJA GEOLOGICAL SURVEY 6. !I' INDIAN, ALLOTTEE OR TRIBE NAo\1!:

NlA

SUNDRY NOTICES AND REPORTS ON WELLS 7. UNIT AGREEMENT NAME

N/A

(De ~"'' uoo thl• le•m lor "'""f.::Nis 10 doift ot I~ dup.., •• ~luf bs¢~ to • diJt•rono •••-;•. llu '""" t-JJI-< Ot ouch ,.,.,,... .. to.) 8. FARM OR LEASF NAME National

1, oil ••• well Ill well 0 ether Petroleum Reserve in Alaska

9. WEU NO.

2. NAME OF OPERATOR National Petroleum Reserve in Tlllageak Test ~ell No. 1 Alaska (through HuskX Oil NPR Oeerations, lnc.l 10. fiELD OR WILDCAT NAME

3. ADDRESS OF OPERATOR Wildcat

2525 C Street, Suite 400, Anchorage, AX 99503 11. SEC., T., R .. M., OR SLK. AND SURVEY Oi'!

4. LOCATION OF WELL (REPORT LOCATION CLEARLY. Su S1)41Cl!l 17 AR<A be!cw.) s., 7, T21N, Rl4W, UM AT SURFACE: 1140' FWL; 3338' FSL 12. COUNTY OF. PARISHt 13. STATE AT TOP PROD. INTERVAL: North Slope Bnro gh, Alaska AT TOTAL DEPTH: Sa~ (straight hole) 14. API NO. ,. CHECK APPROPRIATE BOX TO INDICATE NATURE Of NOTICE.

REPORT, OR OTHER DATA IS. ELEVATIONS ,SHOW DF,·KCB, _.O.ND WO)

Pad: tO 1

• KR; 27' 'Estl

NOTICE OF INTENT TO: SUBSEQUENT REPORT OF:

TEST WATER SHUT ..OFF 0 0 o<>,.r, :•· C~.~~- ,, rRAC11JRE TREAT 0 0

SHOOT OR ACIOIZE 0 0

REPAIR WELL 0 0 INOT£:: llo- ,...,. ... <rl ft.dlll!ll>i• l<1~~..., . .,, zot1• PULL OR ALTER CASING 0 0 <hsn.~ ~n """" ~JO.l---" ~ ' '-' •

MULTIPLE COMPLETE 0 0

CHANGE ZONES 0 0 ~~-.- ' " ,_ .":

ABANOON• 0 ro " (other)

:. '"' AU,,~

l7. OESCR18E PROPOSED OR COMPLETED OPERATIONS (Ciurty sute all p1rt1nent details, and giue pertin .. M dates.

including estimated dale of sllrrtins any proposed work. If well 1s d>re~ticnaily <!nlled, give subsurface localions 3n<l 'Tleasurl!d and true ue<tical depths lor all markers and zone-s pet"t">ent to this wor!.-.)•

This is a confirming notice to abandon Tulageak Test Well No. 1. This well waa dril led to a depth of 4015', logged, and tested. ~o evidence of hydrocarbon bearing zones was discovered. Verbal approval was received from Jim Weber on March 21, 1981, to abandon Tulageak No. 1. Ran HRT/DLL/GR/SP, BHC/GR/TTI, FDC/CNL/GR/CAL, HDT Dip meter, Sidewall Cores, HRT. A Drill Stem Test was run on the Sag River formation from 3770' to 3825'. Six hundred-twenty feet (4.59 barrels) of slightly water-cut mud was recovered. Set cement plug No. 1, 3950' to 3700', with 96 sacks Class "G",

14.9 ppg cement with 1% CFR-2. Set plug No. 2, 2800' to 2500', with 72 sacks Class "G", 14.9 ppg cement with 14 CFR-2. Displaced top 2000 feet of hole with diesel.

Installed dry hole ~rker. Released rig March 23, 1981, at 12:00 noon.

Subsllrface S..fety Valve: Manu. and Type------------------- Set@.------" lS. I h~::-rtify ~~,:u~~regcln!Jislrue and correct

SICNED~~ ... ._.... ......... Ttfl~ Chief of 0DetatiOPtl.lT(

Conforms with pertinent provisJ.ons of

30 CFR 221.

JSgd.) Kenaflt!l 7. !::L_' -------'--"---"'-'-'- liTLt --~-~--

OATE: ------------. _____ ..,_

Tvm 0-'00

'""'· ...... , BUBMIT IN DUPUCA11:' UNITED STATES

DEPARTMENT OF THE INTERIOR

GEOLOGICAL SURVEY

""""'""' on .... ". ··•··

WELL COMPLETION OR RECOMPLETION REPORT AND LOG"

''· 1'YPt Of wfLL, IL TTl'!: Or COMPLETTON'

:.·.~. 0 0 0 2· •••• "'"''"""' National Petroleum Reserve (through Husky Oil NPR Operations, Inc.)

J. '"""'"' ....... ,..,.

Wildcat in Alaska

2525 C Street, Suite t.OO, Anchorage. AK 99<.01 <. o.oo•~•~s 00 ~•cc <R•P•" '""'""" <l«rl~ ••4 •• ""'"'"""" "'"" ••~ ~'"" ,.,.,.,.,..,..,,.

A.l ourfo« llt.O' FWL; 3338' FSL

.u lOP o•o4 '"''"''' "po"«! !><low

2/26/81 ,. ~ ..... .,..,, foOlS'

N/A room ooo••••«< ~'"lo<l ~",...'" No <1-IIIOU

N/A ~. IT !~OJoO, •<O.O:rUI 00 nJII OoOI

N/A

N/A

b. "'"" ,. cu•• •••• National Petroleum Reserve in AK

•· ••cc •o.

Tulageak Test Well No.

Wildcat II. oro . • .. o .. ><- •• oo.oeo '"" oc un

2G. n•• mcro<< "" "'"" ,..., "'" DL/GR/SP, BHCS/GR/TTI, LSS/GR/TTI, FDC/Cl'L/GR/Cat :•· HOT Dipmeter, Temp. GR/SPIDLL. GR/Cal/CNL. FDC. GR/BHC. HDT-Dipmeter

11'01 "'ILC COOIO

Yes 2' <"'A~I'<G RECORO rl<<pod o!r """0' ..-1 ;, "''"

2,0" . 1331! CK-5Sl lOs-, ... 9 5/8" i 53.5/1 (S-95)' 2720'

N A LINI:R RECOIIO .... 7U !00) I ool'TO" o ""' l""u

• ! ""' P.l<Y C< ~ • ''~" , o•o•' '"'

' 26"

- 12 1/t.''

·, '"''''7'''' ,;:,~.~- !_____lii' s·~·Peunafrost I 1500 S~rmafrost

Tt.'B!I<G IIEC'ORD oco<o• IJ<DI

lo. N A ., .. .,,...~ u:r '""'

___;;me, __ None

:11 PU>OUT10. OICOIO )IA .... Ol, io« •nd "Wmi"J "· N/A ACID. SHOT. FRACTURE. CEio!EI<T SQUEEZE, ETC.

NIA

~" NIA

......... :r """"' .. '"" ooU Or TUT """'

OCT 29 !98!

~ "'"••n<""< "'"''""' u: G[:".-:.;...\~~;,·n

TOOT >1.,00 -

o•>TK 1.T .... L (OOI

Ot.o" ..,.,,..-. C.II~O ru .. tu C<LC<CUIO Oil. nc. OOC. J OIC OUYI'TT•UI

~O·ML< ..... -

" ond •t<ubod lnformoUoo U <om~l•" ood '""""' oo 4«mo<o•d !rom oll '""""'• r«ord.o

,onn.l

TITLE Chief pf Operations. 0:-.PRA O.l.'l'E/ 7 ~ F /

'(Sn lnolrYcliont ond Spano for Addition.,] O.,t., on R~une Sidt)

WELL COMPLETION REPORT

Tulageak Test Well No.

INSTRUCTIONS

Pi!f,fo,.j( Thl• '"'"' I• M•l~o~•l f.,c ~"hnollllol[ ~ co•nplctc and o•orrO<'t wrll ooonjllollnn rojo..rt nnoll"~ nu a111J'l"-'" nr lno•~• ""''~~~"""to rllhor a F"'INal a~~nt·y '" n Sll!l~ •~•IO•"J.

<oe ln·ll•. l""""""t '" nppll•"hl~ ~·o~l~c"l ntool/ur !!tale lnw• nnol re~tolnll"""· ,l.n~ n~,·~••••J' •J•'<"Inl '"·"'"""II""" rnnrori!IU~ the""" ol !lol• fnrm ""''the"'""'""' <>f "''"''"'to> I"' ,.,l,..,l!l.-•1. Jmrtlo· 01 1nr1J· ""olh ·~~nnl on lnrnl. nrrn. nr rr~lunnl J!t<H"<:"!htreo "'"I prnrtke•. rllhrr oro"'""'"" hohnr <>r n·lll he '""""'' br, or mn7 be .. ~tolnr<l hum. lho ''"'"' ~·,.ler•l ""''("' ~lnt•• offi<"• !<N" '""l"""ll""" "" ltruoo n ""'' ~4, nnd 33. ""'""' rognr<liUJ[ "epnrnlr rcJ•>rlo fur ..,parole coHJIJ!lell<>n•.

H ""' fl!•·•l I'''"''" lhr ti"'~ I hi~ """"""'Y "'cunl I" suhoulll.,..l, '""I''"" "f nil rorrrl!ll)" R>"iollo~le l"K' [drlllrrll. ~rolo~l•lo, •nmj>le ood c<>I"O nn~tnl~. all 111""' clr<:trl<, ole.), f.,rt.,l· """""'I "'"'""'n t~•l•, mul tllro•t·ll,nnl Ollr<"CJI<, l!lO<>IIhl be I!U.,doNiloerch>. to the utcnt rc•Jlllr<•d by 81•t•ll~obln ··c<IHol on<l/or Bl"te lnwa ""'' tC~OIInllo,.. All Mlluo•lu"""'" ~l .. whll ... li .. cd "" lh!' r ............ ltou• ~.-..

u • .., 4: If there nr<• no nppii<·O<hl~ Stole '"'tllltemonl<l, lo<"RUono on F~~erol or lndlno land ollnnld he llel!crlbetl In ac-,or<lnnee -..[th F<"<lcrnl t<'qUlrNnrut.o. Cooault \oral Sl•lc ''' l'"'INOI ol!h-o fur •rwdOc h"lr<i<·llnn•.

lhm U: lmllo·nle whl<"lo cle>nlh•n Ia """" n.• N'fcrrooce (Wh•re not nllterwt"" ohnwn) fnr •l•t>llt mcnsurrmont.o ~~Y~n In olher apnee~ on thlo form nn1lln ""7 nllachmonl•.

tt 010n n oad 14: If rhl• ""II I; "'""I'IHI'<l fnr """"'"'" j!r<><lnctlon fr<>m '"'"" lhnn one loolcr.nl "'"" tnoolltltlle '"'"plcU.,n), ''" ~lnl• In llron :n. n11d Ill llcnt 2~ •hniT I he torml!ldu~ h>h•nol. "' l!!lrr~·ol.•. l"r•l•l l••lt"ml.•l nt><l "'"""'") [I( nllfl fnr ou[J thr holrrvnl rrport...,lln l~m 33. Submit a """nrnle r<JMtrt (t••~r~J <to thlo !orm, "''"'I"Rielr lolO!ItlJiool.

f<>r ""'"'' J><lollll"""l ll!lc<>·nl I<> br ••·pnr~I.,[J Jtru>lll<(!(l. ~howln~ the ~thll1l"..nl dRIR t><!fll'""t '" ~u•·h lutrunl.

Ito"' zt: ··.~~. •• t:c"" nl"" · o\Hndo.,l ~"!'I'IN"rntnl ,,.,..,,.,,, for lhl~ wrll "'""'''' oluow I he dell! II• uf on1 Utullli>l<> otn~e r~oucntho~ n•><l the I<O<"ntlOIO <•! Uoe ~"''"ll"ll '"''1.

Ito"' ll: R"lmo!l R '""'""RI" '""'"l•lcllun re1•orl on lbl• f""" toe <!O<"h h•t~r>·nl to be "'"to:ornlrly t•mdm·,.l. (fl<"fl lnolnlrllun (ut lteono :!"lOIId 2{ niH>\"~.)

" St<\IOIAI!Y tW I'OtiO<tll~ 7AtNF:R """" "·'· "" I•OT•'T '""'" '" I"OjiO .. Tf ··~ <"<>•n•To T"fhUf · COUV !.U0'" 3; ...... !, !tOU.I.·OT"'( ...... , IOCI·VP!OO ., .. <tp;<JJ.OUIC _,ARKICR" !"l"fU '"''''"· TIO.T"'· > """'"" > 000. TINO ......... {)C<O. ro.Q .. o>o ••• OUUH. !" .. U"OU, '""

'"'""'"" '"' OOTTOM "'""""''""''""· <"""'""'"· ne.

TOO"

Kingak Shale 2940' 2982' Con! No. I ' >ee !l"baequent pages Gubik Fm SuTface Torok Shale 100'

Sag River ss 3783 3816' CoTe No. ,, '" subsequent pages Torok Bottom- 1925'

"' Beds

Neruokpuk Fm 4005' 4015' Core No. ,, s •• subsequent pages GR/Pebble Shale 2504.

Kingak Shale 2950'

u. BarTow 3542' L. Bancow 36lo0' Sog River ss 3764' Shublik Fm 3796' Neruokpuk Fm 3964'

I -- Ul ............ ,_,.., ,.., .. !Otl-(>""""'" •"·"'

WELL COMPLETION REPORT

Tulageak Test Well No.

CORE NO.

INTERVAL

294o-- 2982' (Cut 42'; Rec 38')

3783*3816' (Cut 33'; Rec 33')

2940-2948'

2949-2980'

3783-3784'

3784-3785'

3785-3786'

3786-3787'

3787-3788'

3788-3789'

3789-3791'

DESCRIPTION

Sh, blk-v dk gy, firm-brit, v carb, some slt, abunt fltg sd grn, shunt fltg cht & qtz peb, occ gvl or cbl size, R- SR, occ pyr strg.

Sh, m gy, firm, sub fis, thn bed, ali mica, tr pyr, sa, lt brn-gy, v f grn, SA- SR, fri, calc &/or dol in part, occ grn ~ica, slty, ely-filled in part, poor fair sort, poor por, bri yel fluor w/good cut. This intv is lightly bioturbated sh, ada, & sltatn.

Sa, m gy, v f-alt, occ grdg altar, tr f grn, SA-SR, mod hd, occ dk gy partings, calc, ely-filled in pt, tr glsu, occ calcite-filled fraca, tr por, al tr oil w/yel fluor.

Sa, m gy, v f-f grn, slty in pt, SA-SR, al fri, occ dk grna, tr flau, al calc, al ely-filled in pt, p por, g-fr artg, spotty brn oil atn w/dull orng fluor.

Sa, brn, (oil stn), v f-f gt!J SA-SR, some slt, fri, al calc, sl ely-filled in pt, p por, fr-g artg, even brn oil atn w/dull orng fluor.

Sa, m gy, w/dk gy arg ptga and/or burrows, v f grn to alt, some f grn, SA-SR, al fri, occ dk grns, tr glau, al tr calc cmt, cly-fille, v poor - tr por, fr srtg, tr dull or fluor, no visible stn.

Sa as in 3786-87', pred dk gy, more arg, occ v thin sh ptga.

Ss, m gy, w/spty brn oil stn, v f-f grn, some slt, SA-SR, sl fri, calc, occ dk grns, tr glau, al ely-filled in pt, p w/aome fr pot, fairly g artg, dull or fluor.

Sa, as in 3788-89', leas oil atn & occ v a arg ptg.

0 • 0 0~ ~ ~ . .

0 >< " 0 • o• • • •• 0 " " ~ ' 0 • 0 0 0 • " 0 0 0 " • ' 0 • ~ ~ ~ ~ " 0 • 0 . 0 0 " > -~ -~ • o• " " ' 0 " • • " " "~ " " 0 0 • " ' ~~ " 0 0 ~0 0 .. --~ • " • " • ' ~ ~· • " 0 ' •• • , ~ • 0 " • • 0 ~ " > • 0 0 0 • ~ ~ • " • • " ~ •• ' • " ~ ' 0 " . " • 0 < 0 " 0 • " > " 0 • > • , " • 0 0 " " ~· 0 . " " ' 0 , 0 ~ 0 > " • • " " • 0 ~ 0 " 0 • ~ 0 0 • • " • " " ~ " 0 " • • .. ~ " " " " • > • 0 " " " 0 " "~ • • • • • > . • 0 • • 0 0 • "" 0 , • ~ 0 ~ • 0 0 0 ' 0 • ' ~ "~ • • • • " • . . " -~ 0 • " " • 0 •• ' ' • • • " " -~ 0 " ~ . " " " " ~ ' " ~ ~~ o• 0 • 0 ~ " 0 ~- • ~ " ~ • 0 •• • ' 0 " • ·~ " ' 0 ' " • ·~ ~ ~ ~ ~ •• • • • • •N " > 0 " "" " • ' -~ " 0 o• • • • > " 0 • ' • ' • • > o. 0 0 " 0

" " 0 " • '" " • ~ 0 " " ' ' • " ' 0~ " 0 . • ~ • . • • • ~ " • 0 • ~ ' • 0 • 0 0 " " ., . • ' " ' • • ~· • 0 ~ o• • z 0 0 ~ • " ' •• • - " " ' • " 0 " • 0 00 " • 0 0 " " , ~· ~ • " " ' • ' " " - ~ - • ' • " • • - 0 ..

-~ •• ' • ' , 0 ~ '" • " 0 0 0 ' 0 " • " 0~ • " • " • 0 0 0 • •• • ~ • • ~ • ~ 0

" N " 0~ ~ " • " N • • • 0 0 • ' u > 0 ~ • .. ~ ~ •• ~ ~ ~ ' " . 0 N " 0

" •• ' ' ' • ' • ~ ~ , 0 • " 0 • 0

" " " 0 0 ~ " " • ~ • "~ 0 ' • • 0 ~ • 0 ~ 0 " 0 ~ " " " 0 ~ •• • ~ ••o " " ~ .. • • " N -• N " 0 N -· " - ~ 0 0 o• -" • ~ , " ~ - 0 0 ~ , ' • ,. "~ • 0 > ~ ' • , , 0 • ' ' " ~~ •• 0

" 0 .. 0 0 " ~ " 0 -~ • .. ~ • . 0 0 • . " • ' • • ,. • " >o 0 ' . ' 0 ' • ' • •o • • • •• • ' "" ·~ • • 0 • " • • ~ .. • .. o- 0 • . • " " • ' • '"" • • " ' 0 ' " , • • ' > • •o • > "~ 0 " • " • • •• 0 .. ' ·~ 0 . "" • 0 0 .. ' • ~· • • " " • • 0 " • • " • 0 • • ~ " • " • "~ • " •• " " •• " " 0 ". " ~ "~ 0 " 0 • • " • " -·~

N ;., ~ • • ~ N " ~ ~ ~ ~ ~ ~ ~ 0 0 0 0 N N N N N N • • • • ~ " " ~ " ~ ~ ~ ~ ~

' ' ' ' ' ' ' ~ ' ' . N " ~ • • ~ N ~ ~ ~ ~ ~ ~ ~ ~ 0 0 0 N N N N N N N • • • ~ ~ ~ ~ " ~ ~ ~ ~ "

~ " 0 3 0 z • " " " " ' z 3

0 • 0 • u H z • " -• ' ~ N 0 - • 0

~ 0 • 0 u eo u

N

WELL COMPLETION REPORT

Tulageak Test Well No.

CORE NO.

' (Cont'd}

J

INTERVAL

'<005-t.OIS' (Cut 10'; Rec 10'}

380'<-3805'

3605-3607'

3807-3808'

3808- )809'

3809-3811'

3811-)816' l,QOS-l,Oil' t.011-'<013' l,OI)-l,OIS'

DESCRIPTION

Ss, m gy, w/v al greenish cast, occ dk gy carb ptgs or burrow & trails, v f-f grn, some slt, calc, fri, occ dk grns, tr glau, f srtg, p por, tr yel fluor.

Ss, m gy, v sl greenish, freq dk gy arg ptgs, v f-f grn, slty grdg to sltst, val calc, mod hd, occ grn glau, f srtg, p to tr par.

Ss, m gy, sli greenish in pt, ace dk gy arg lams, v f-f grn, slty, mod hd, occ-freq dk grns, occ grn glau, p srtg, tr por.

Ss, m gy-gn to dk brn-gy, mottled, v f-f grn, slty, mod hd to sli fri, occ dk gy arg ptgs, frcq glau grns, occ other dk grns, ely-filled, tr por, v p srtg.

Sltst, dk gy-brn w/freq large (up to .S mm) gn glau grns, some v f sd, hd, calc.

Ss, m gy-gn, mod hd, v f-f grn, slty, ely-filled, occ to abunt glau, v sl calc to calc, freq dk gy-brn sh ptgs, tr por, p w/some f srtg.

Phyllite, v dk gy to blk, hd, steep cleavage, prob original bdg surf, occ qtz--or calc--filled fracs, frequent s pyr (1) xls.

Slate, v dk gy, hd, steep cleavage, occ pyr xls.

As In l,OOS-t.Oll'.

w

WELL COMPLETION REPORT

Tulageak ~e9t Well No. 1

Drill Stem Teat No. I waa conducted in the open hole over the interval 3770' to 3825', A 530' water cushion was used. Surface chokes were 1/4" and 1/8" and the bottom hole choke was 3/4", All pressures listed below were recorded at 3811 1 and are the field data. The teat is summarized as followa:

Initial Flow Period (30 minutes): Opened with weak blow, increasing to very stronR blow in 15 minutes and continuing until shut in; Initial Hydrostatic Pressure 1,993 psi; Bottom Hole Flowing Pressure from 279 pai when opened to 545 psi at shut in.

Initial Shut In (30 minutes): Initial Shut In Pressure 1,841 psi.

Final Flow Period (120 minutes): Opened with strong blow, decreasing to moderate in One minute, and to weak at shut in;

Bottom Hole Flowing Pressure 545 psi at opening increasing to 684 psi at shut in.

Final Shut In (240 minutes): Final Shut In Prea9ure 1,841 psi;

Final Hydrostatic Pressure 1,993 psi.

Recovery: 4.59 barrels of sliRhtly water cut mud, I hereby certify that I om properly registered and licensed to practice land surveying in State of Alaska and that this plot represents a location survey made by me or under my supervision, and that all dimensions and other details are correct.

OATE: DEC. 12, 1980

l4

TULAGEAK 7-81

Lat. = Lonq.= y •

X•

71° 11' 21.62"N 155°44

OO.B2"W

6,2.87, 738.37 295,272.76

AS- STAKED LOCATION

FOR

TULAGEAK No. I 1/4 protracted

Umiat Sec. 7, Ak.

Surveyed for:

HUSKY

f§'§!

Surveyed by:

OIL

J...

A I •• I e

.. 1 -l-It'

RESERVE ., .

"l.:l-~11·, !::· J t_ ~ELl.

~~7.51

DRILL PAD

PLAN VIEW

<JROUNO

AESEAVI! PIT

SECTION A- A

CAWP

PAD

JJ

J

TULAGEAK DRILL PAD

DATE AND

FOOTAGE

DRILLED AS

OF 6:00 A.M.

2/16/81

2/17/81

2/18/81

2/19/81

2/20/81

2/21/81

2/22/81

2/23/81

2/24/81

OPERATIONS HISTORY

ACTIVITY

Began moving rig from Walakpa No. 2 to Tulageak.

Six Rolligon loads were moved today.

Continued with rig move.

Continued with rig move. The rig substructure, being moved by Rolligon, is off the ice road and temporarily stuck. Attempts are being made to get it back on the road. Kodiak's truck shop was destroyed by fire yesterday.

Rig move is appr,pximately 80 percent complete. The substructure is back on the road.

Three loads of rig components remain to be moved.

The camp is set and has heat but no water. The sewer plant is not yet operational. Rig-up will begin today, and the camp is expected to be operational today.

Rig move (a total of 34 Rolligon loads) is complete.

All Rolligons left the location at midnight. Set substructure, draw works, dog house, and derrick.

Changed out one mud pump. Camp is completely operational; rig-up is 65% complete.

Set four pump room units, mud tank, boilers, generators, boiler water tank, air heater, mechanics' shop, fuel tank, Howco cement unit, and logging unit.

Hooked up fuel lines and heat ducts. Fired up air heater. Rigged up windwalls.

Strung derrick and miscellaneous Started air heater; hooked up derrick. Set ramp and catwalk.

on Howco and Schlumberger units.

lines; strung lights.

steam lines. Raised

Continued working

Finished firing boilers and repairing steam lines.

Hooked up mud lines. Cut 20" casing. Welded on 20" casing head and tested weld to 200 psi. Set casing at 105'. Started Howco unit and heated water for cementing. Cleaned up yard; stacked mud. Built docks and stacked miscellaneous supplies on same.

2125/81

2/26/81

2127/81 625'

2/28/81 84a'

3/1/81 566'

3/2/81 594'

3/3/81 a·

3/4/81 a·

3/5/81 0'

Cemented 20" conductor with 475 sacks of Permafrost cement; 14.9 ppg slurry. Nippled up 13-3/8", 5,000 psi blowout preventer. Mixed mud; rigged up No. 2 pump. Rig-up is complete.

Completed nippling up blowout preventer stack.

Hooked up accumulator, hydraulic lines, diverter lines, and choke manifold. Completed nippling up No. 2 pump. Repaired water and steam leaks. Picked up kelly; made up swivel; picked up rathole and mousehole. Worked on air compressors. Hooked up standpipe and rotary chain guard. Ran wear bushing.

Picked up bottom-hole assembly.

Total Depth: 730'; Mud Weight: 9.6; Viscosity: 34.

Finished picking up bottom-hole assembly. Repaired arr lines to mud pump. Pressure tested blowout preventers to 200 psi. Drilled cement from 57' to 105'.

Repaired mud pump and lines. Pulled out of hole to unplug bit. Ran in hole; spudded well February 26, 1981. at 3:00 p.m. Surveyed at 503'; broke wireline.

Reran survey. Drilled ahead.

TD: 1570'; MW: 10.1; Vis:

unplugged flow line. Drilled Drilled ahead.

35.

to

Drilled to 995';

1099'; surveyed.

TD: 2136'; MW: 10. 1; Vis: 38. Drilled to 1756';

surveyed. Drilled to 2083'; surveyed. Tripped for new bit. Drilled ahead.

TO: 2730'; MW: 10; Vis:

mud pump. Drilled; repaired

36. Drilled; worked on recorder line. Drilled.

TO: 2730'; MW: 10. 1; Vis: 47. Circulated and conditioned hole for wiper trip. Dropped survey and made wiper trip. Circulated and conditioned mud.

Unplugged flow line; circulated and conditioned mud.

Pulled out of hole, steel-line measuring; no correction.

Rigged up logging unit. Ran in hole and began logging with DLL tool. CPW broke and pulled into casing. Waited on parts.

TO: 2730'; MW: 10.1; Vis: 49. Waited for parts to arr1ve. Ran DLL/GR/SP, FDC/CNL/GR/CAL, BHC-Sonic/GR/TTI, LSS/GR/TTI, and HDT -Dipmeter.

Shot 19 sidewall cores with 17 recovered.

TD: 2730'; MW:

logging unit. Ran bottom. Circulated

10.3; Vis: 44. Rigged down in hole; had eight feet of fill on and conditioned hole for running

3/6/81 0'

3/7/81 0'

3/8/81 217'

3/9/81 148'

3/10/81 227'

9-5/8" casing. Pulled out of hole. Rigged up and ran 63 joints of 9-5/8", 53.5#, Buttress casing. Ran in hole with stab-in tool and rigged up to circulate.

Circulated and conditioned hole for cementing.

TO: 2730'. Circulated while preparing blowout preventers to set casing slips. Cemented 9-5/8" casing with 1,500 sacks Permafrost cement mixed at

14.9 ppg, with 14.6 ppg returns at surface. Preceded cement with 40 barrels water ahead and two barrels water behind. Displaced with 19-1/2 barrels water.

Casing shoe at 2720'; float collar at 2632'; centralizers at 2710', 2673', 2630', 2583', 2497', 2413', 2329', 167', 128' and 86'. Cement was in place at 1:00 p.m.

Pulled out of hole with drill p1pe. Nippled down blowout preventers. Picked up 9-5/8" casing hanger;

set 9-5/8" casing slips with full casing load. Cut off casing; installed packing support; had to grind off one side of packing support ring.

TD: 2730'; MW: 9.0; Vis: 33. Nippled up blowout preventer stack. Tested blowout preventer equipment. Tested choke manifold to 3,000 psi; tested Hydril to 1,500 psi. Had two flange leaks and had to replace seal ring below blowout preventer. Replaced seal gaskets on test plug three times. Installed wear bushing. Picked up 8-1/2" bit; ran in hole.

Strapped in hole; tagged FO at 2627'.

TO: 2947'; MW: 9.6; Vis: 36. Tested casing;

tested upper and lower kelly valves to 3,000 pounds.

Drilled float collar, two shoe joints and float shoe at 2720'; drilled 10 feet of cement below float shoe.

Drilled from 2730' to 2740'. Circulated bottoms up.

Closed pipe rams; pressured up on formation to 12.0 ppg mud weight equivalent (360 psi surface pressure).

Drilled from 2740' to 2940'. Circulated bottoms up.

Dropped survey and pulled out of hole. Picked up core barrel; ran in hole. Circulated and dropped ball.

Cut Core No. 1, 2940' to 2947'.

TO: 3095'; MW: 9.9; Vis: 47. Continued cutting the core, 2947' to 2952'. Worked on mud-pump motor.

Finished cutting Core No. 1 to 2982'. Pulled out of hole with core barrel. Laid down core; stood core barrel in derrick. Recovered 38 feet of core. Ran in hole with bit; washed and reamed 60 feet to bottom.

Drilled to 3095'.

TD: 3322'; MW:

d rapped survey.

9.9;

Pulled

Vis: 45.

out of hole.

Drilled to 3322';

3/11/81 117'

3/12/81 102'

3/13/81 103'

3/14/81 26'

3/15/81 113'

3/16/81 33'

3/17/81 64'

TD: 3439'; MW: 9.9; Vis: 47. Tripped for bit;

washed and reamed from 2970' to 3260'; tight hole.

Surveyed at 3240'. Washed and reamed from 3260' to 3322'. Drilled from 3322' to 3385'. Laid down one joint of 3-1/2" drill pipe and lower kelly valve.

Drilled to 3439'.

TD: 3541'; MW:

dropped survey.

30 feet to bottom.

9.9; Vis: 40.

Tripped for bit;

Drilled ahead.

Drilled to 3505';

washed and reamed

TD: 3644'; MW: 10.0; Vis:

circulated samples. Drilled;

Drilled ahead.

42. Drilled to 3560';

repaired mud pump.

TD: 3670'; MW: 10.1; Vis: 41. Pulled four stands;

tight hole; had 40,000 pounds drag. Picked up kelly;

worked pipe through tight spot at 3376'. Picked up too high and wedged blocks in crown section. Cut and slipped 590 feet of drilling line; finished pulling out of hole. Pulled wear bushing. Tested blowout preventer equipment: Hydril to 1,500 pounds; all other equipment to 3,000 pounds. Reset wear bushing. Safety reamed 30 feet to bottom; had seven feet of fill on bottom. Drilled to 3653'; circulated samples. Drilled to 3660'; circulated samples. Drilled ahead.

TD: 3783'; MW: 9.7; Vis: 37. Drilled to 3747';

circulated samples. Drilled to 3783'; circulated samples. Started losing partial returns; lost 100 barrels mud. Slowed pump down to one-half rate with full returns. Conditioned mud.

TD: 3816'; MW: 9.9; Vis: 43. Circulated and conditioned mud at 3783'; dropped survey. Pulled out of hole, steel-line measuring; no correction. Replaced brake blocks. Picked up core barrel and ran in hole to 3723'; hole tight. Reamed and washed 60 feet to bottom; had eight feet of fill. Circulated bottoms up and dropped ball. Cut Core No. 2, 3783' to 3803'.

Repaired No. 1 mud pump and welded on mud line.

Continued coring to 3816'; pulled out of hole with core.

TD: 3880'; MW: 9.9; Vis: 44. Laid down core and stood core barrel in derrick. Recovered 33 feet of core. Picked up bit and ran in hole to 3780'. Safety reamed 36 feet to bottom; had eight feet of fill on bottom. Drilled to 3880'. Lost 50 barrels of mud at 3880' in five minutes. Shut down pump; pulled 95 feet

3/18/81 100'

3/19/81 26'

3/20/81 9'

3/21/81 0'

,3/22/81 0' up hole. Filled annulus with water. Fluid dropped one foot each two minutes. Mixed 30-barrel lost-circulation material pill at 9.8 ppg with 10 sacks medium Quickseal and 15 sacks fine Nut Plug. Ran bit to bottom; kelly froze up. Rigged up circulating sub and spotted lost-circulation material pill on bottom; pill in place at 4:15 a.m. Had 75% returns while spotting pill. Thawed kelly and standpipe with bit 95 feet off bottom. Ci rcu Ia ted with 100% returns.

TD: 3980'; MW: 9.8; Vis: 41.

and kelly. Drilled to 3900';

Drilled ahead.

Thawed stand pipe circulated samples.

TD: 4006'; MW: 9.8; Vis: 46. Drilled to 4005';

circulated bottoms up. Pulled out of hole to 3950';

reamed from 3950' to 4005'. Circulated while waiting for 40-knot winds to diminish. Dropped survey;

pulled out of hole. Picked up core barrel and ran in hole to 3950'. Reamed from 3950' to 4005'; no fill; hole tight. Began cutting Core No. 3 at 4005'.

TD: 4015'; MW: 9.8; Vis: 45. Cut Core No. 3 to 4015'; pulled out of hole with core. Laid down core and core barrel; recovered 10 feet of core. Ran in hole with bit and reamed core hole. Circulated; pulled out of hole for logs, steel-line measuring; no correction. Rigged up logging unit. Ran Temperature Survey; attempted to run DLL but tool failed.

TD" 4015'; MW: 9.8; Vis: 47. Ran DLL/SP/GR;

FDC/CNL!GR/CAL, BHC-Sonic/GR, and HDT-Dipmeter. Shot 20 sidewall cores; recovered 18.

Ran second Temperature Survey. Ran 1 n hole to 2688'; circulated bottoms up at casing shoe. Finished running in hole; no fill. Circulated and conditioned hole and mud for drill-stem test.

TD: 4015'; MW: 9.8; Vis: 44. Pulled out of hole for drill-stem test; picked up drill-stem test tools.

Ran in hole with tools and a 530-foot water cushion.

Set bottom packer at 3825', center packer at 3770', and top packer at 3761', with 190-foot tail pipe.

Opened tool for 30 minutes with initial 1" blow increasing to 20" blow in 15 minutes in bucket of water. Blow decreased to 4" at end of final flow period. Initial flowing pressure during first period was 279 psi; the final flowing pressure during the first period was 545 psi. The initial shut-in period was 30 minutes with a shut-in pressure of 1,841 psi.

The second (and final) flow period was for 120 minutes with an initial flowing pressure of 545 psi and a final

I I

3/23/81

3/24/81

3/25/81 through 4/2/81 flowing pressure of 684 psi. The final shut-in period was 240 minutes with a shut-in pressure of 1,841 psi.

Initial and final hydrostatic pressures were 1,993 psi.

All pressures were taken from Pressure Gauge No.

7581, located at 3811'. The final flow period began with an immediate 20" blow; it decreased to a 7" blow in one minute and to a 4" blow at end of period. Five hundred thirty feet of water and 620 feet of slightly water-cut mud were recovered. The surface choke used in this test was 1/8"; the bottom choke was 3/4".

Unseated packer and pulled out of hole. Reversed out fluids. Finished pulling out of hole and laying down drill-stem test tools.

TD: 4015'; PBTD: 2600'; MW: 9.6; Vis: 42.

Finished laying down drill-stem test tools; laid down drill collars and jars. Ran in hole with drill pipe;

circulated and conditioned mud. Set Plug No. 1 from 3950' to 3700' with 96 sacks Class "G" cement with 1.% CFR-2; followed with one barrel water and 23 barrels mud; slurry weight 14.9 ppg. Pulled out of hole 18 stands to 2800'; circulated and conditioned mud. Set Plug No. 2 from 2800' to 2600' with 72 sacks Class "G" cement with 1% CFR-2; followed with one barrel water and 16 barrels mud. Pulled out of hole 14 stands; laid down drill pipe. Waited on cement. Ran in hole with drill pipe to 2000'. Circulated and pumped water;

displaced with 2,500 gallons diesel.

TO: 4015'; PBTD: 2600'. Finished displacing mud with diesel from 2000' to surface. laid down 3-1/2" drill p1pe. Nippled down blowout preventers; installed companion flange and head; cleaned mud pits. laid down kelly; rigged down floor, mud pumps, and lines.

Released rig March 23, 1981, at 12:00 noon.

Rigged down and cleaned location. Moved the rig by Hercules aircraft to Fairbanks. Moved the rig camp to the South Barrow Pressure Reducing Station for future use in the Barrow Gas Field.

DRILLING TIME ANALYSIS

TULAGEAK TEST WELL NO. 1

BRINKERHOFF SIGNAL, INC., RIG 31

Spudded 2126/81, Rig released 3/23/81

Total Depth: 4,015 Feet

DRILLING TIME ANALYSIS (HOURS)- HUSKY NPR OPERATIONS, INC.

c 0 ~ ... m z " ~ z z 0 w ~

0 " c > 0 w z w c <(

" ~ 0 u ' r > ... u - u ~ ~ m ~ " ~ z <( ~ ~ ~

' z " ~ ~ .. " 0 w " ~ z ~ <( w z " w m u z " ~ " ~ z u J z w J " ~ u " ... z ... ... ~ r

" - <( > " " ~ " ~ 0 ~ ~ <( ~ ~ <( " w " w 0 <( w r 0 ~ 0 c " 0 " ... 0 " ~ u J u ~ z ... u J ~ u

I '-" 12-18

I '-" I 2-2o. 124 I ,_, I" I ,_, 124

12-" 1, I ,_,. 4 20

I 2-" ' 18

I '-" lw 1 I ' _.

- '" I '"

.1- 20 1k I.

~- l<c I" loc

TULAGEAK TEST WELL NO. 1 Page I of 3

Operations Comments

" ... ~ 6:00 a.m. z w

8 I " "' w u "' ' u ~

<( w 0 ...

m N ~ <(

I w " " " w w ... 3 g " 0 r c ~ ~ c ~ 0

24 Movfnq Rlq

24 Moving Rig

24 Movfno Rio

24 Moving Rfq

Rioafno Uo

Rioainq Uo

Rlggiog Up

Rfoofnq Uo

Cementing 20" Set 20" at 105'

Mixfno Mud

3 Picking Up BHA Soudded Well at 3:00 o.m.

" Dr11lfng

Drfllino

Drilling

I~ Drilling

<O

DRILLING TIME ANALYSIS (HOURS) - HUSKY NPR OPERATIONS, INC.

0 0 => 1-rn z "' ,. z z 0 w ,.

0 "' 0 > 0 z w 0 " w

" "' 0 u ' I - > 1- u ~ rn u z

" => 0 ' z => ~ .. w " 0 - z "' " w z " w rn u z " ~ "' "' z u z w => "' "

1- z -

~ 0 u ~ 1- I -1-

" - " - > " " "' " "' 0 0 "' " "' "' "' " - "' w "' w - - 0 " w I 0 0 0 "' 0 "' 1- 0 "' "' u ~ u ,. z 1- u ~ ~ u

3 3 ,_ 23

3-4 5 4'2 '" B

3-5 5 6 4 9

3-6 12 12

3-7 12 3>, " 2 4

3-8 9.; "" I ' "" 3-9 24

3-10 14' 3 4'- }J-

J-11 19 .. 4 I "

J-12 22 I I

3-13 " '> 7 7>, 3-14 21~ " 3-15 ,, I' 6 ' 5' "' '" 3-16 ]" I 5 I' I>, 3-17 " 7~ 4~

TULAGEAK TEST WELL NO. 1 Page 2 of 3

Operations Comments

" 1- 6:00 a.m. ~ z -w 8 "' w u u ~ '

"' " 1-w 0 rn N ,. " "' w " " w w 1- 3 2 "' 0 I

"' 1- 0 ~ "' 0 3 0 logging Ran Schlumberqer Wireline loqs loqging

Circulatinq Ran 9 5/8" Cas i nq

Nioolinq Up BOP

2 Testinq BOP

Corin_g_ Core No. 1 : 2940' - 2982' I

Drilling

.. POH For New Bit

Drilling

Drilling

3<, RIH With New Bit

Dri 11 i ng

Circulating Core No. 2: 3783' - 3816'

I> Breaking Down Core Bar •I

2 Thawing Standpipe

• 0 o E ~ .... IIi " . • 0

a. '?.

0 w

' 0

0 ' " " " ·.\' SPUD- 3>00 PM· FEBfiUMIY "· 19&1 ' I I

I

I \ T.

I

• ' • 0

3000!--

I ' I i i ' ' I .. 'I '

I .. - I ' ' I

- ' I ' ' I . - --- i· --------- ----- -- - -

--'-f---c --i i ' ' ·- I i I

- i '

\. ' - ---- I -- - -

' I ' ' ---- ----- I . . . . - -

' ' j ' \ -- I ' \ I I - - - - '

-i- . i

I '

- ------ . -- I - . I !

... I

---· I ' i ' ' . I I 'I • ' ' i

1-

' ~00 '"' • 5/B-- !CASING wruit 9

\ i '

Cor~ ·".ol>- \

' . ;\ I '\~PROPOSED

i _'i ---- --

ACrUAL~~ ' \ i ' i ' \ ' I '-- ! I -

' r

' I

~0. 2'

3 -3816' " '

'" !lS.T '" I ~i)'G~ AE!ANOON, RIG RELEASED- NOON- MARCH 23, 196 I --

TULAGEAK TEST WELL No. I 1140' FWL and 3338' FSL, Sec. 7, TZ!N, RI4W, U.M.

HUSKY 01 L NPR Operations Inc.

NATIONAL PETROLEUM RESERVE in ALASKA

DRILLING TIME CURVE

'0

(OI.If'AIH Husky Oil NPR Operations. Inc.

,.~ 11 Tulageak Test Well No, l

DRILLING MUD RECORD

AltCTIC lllULLING SEitVICES

IIAH Alaska coutHY North Slope Borough

CASING PROGRAM, l.Q_r~oh or_l!!Lh, ~r ... h oo..1llJ!_h.

COIHR.o.CToR Brinkerhoff Signal. Inc. LOCAI!OH NPRA SEC~TWP....2...l.I:L_ Jlti(;___li\L r~•k •• "·

SIOCKPOI/H DATE BAIIOIO EHGIH[[R

OAH I OHTII!wEOIT( VIH.OSIIT IYr I GEl~ I pi! flllii.O.IIOH frlTRAlE ANALYSIS !VNfll RUOIH "' loot 1~1 ol Soc API Pv 10 uc/. So.r, 0 ~r >tlltP Col.o Pm PV Cl Co "I ~ OH ""'"'I ~·.

1961 '- •r~ "' ro ... n •••·oAPI< "FJlnJ• /1.11 PP"' '""' .• 110 ~ .,.;..r ztu, _1Q2 _9_,!! JL --~A-- _l ___j_j_§_ t,_Q ___ u__. ____ L ______ )8000 _1_!280 __ _ _] _Q__ .21 ~ _ fl.jo_ _2_._.o_ .li- _,_ 20 _lLU. z_'-Q_i~ ____ ~ ___ J2oQQ 17920 1/4!--! .Q_ 21 _ 28_ ts4o lO_,J Ji _a __ u; ..J!JH 7.Q n_ _ 4 __ _ nooo !1.2.1!! 1/4 19 Q_ .2.!l.

_ill_ 1.120 lD~l .18. __l_Q_ 30 _!_Q_l__Ul 7_,Q_ li.. -- ~ --- 42000 2~gg m lQ Q__ 90

2 2700 10.0 36 8 24 8/15 7.0 26 4 42000 23520 l/4 10 0 90 3 27"30 i0--:-1 -t;J- -f)" Jj Ti721 7--:0 i9: ----- 4 ------ 47000 26320 174 TI 0-89 4 2730- 10-:T 49 -----u;--· 40 t4t2T 7.0-- -19. ----- 4 - 45ooo 2s2oo 174 Ti 0 -89 5- _lVQ. tO::-~ 44-_ ~ll_~- 33 -12/18_ 7 .o· 19- ~~--= L-= ·::__:__ _430Q.0 _24Q80 f!4 .!! ]~ :89 L .ll.lQ. 1~ ____n _ _lQ.._ 20 ___]JJ]_ L_Q_ u_ __ 4 oooo 22400 ill to o 90 7 2730 9.0 33 3 9 lD_ 7.0 14.1!.__ 3 33000 18480 Tr 3 0 97

E -~~!~ 11 ± ~ 1~ - -H ~1~o- ~ :g -~t~ -_ j-- -- ·--- -~7ggg ;~!~g W1-{ g :i !Q_ _331]_ u __!1__ ____u_ 12 .MlQ_ z_,__Q__ lQ_,_ --- L --- ]lOOQ 20720 ill .lQ .Q_ ..2Q ll 3435 _ __2_,__2_ _!J]_ __ 16_.1] 12/25_ Z.,_Q_ .. ~, ___ __L __ 44000 24640 1L!!..l9~ _1Q_ u_ __ JD2 __2__,___2_ ___!Q_ _12_ .111 10~22 L_Q_ !1., 2 __ 40000 22400 ill _!.9 Q_ 90 ll_~l!l...Q_ 42 13 19 9187.0 ~: __ 2- 4200023520ill.19JL_90

_____lL ..Jfibl 10. 1 41 IS 2 9/20 7.0 __]__. ___ t-2 J_l- 38000 11280 ffi J.9 __Q_ 1Q ~_lj __ 3783~~ __ll__ _8 __ __2~ ~_:_Q_ _!!. __ 2 I 35000_19600 I/4___§_Q_ 92

!§__I~ . .2..:.?.1--U--- _ _!l__ 1.! IQL2ll~ !I.: ~-It_ - 44000 24640 1/4 9 0 ~ 17 3880 .?-2 44 16 18 10122 7.0 13. 3 _43000 24080 ffi 9 0 .2.!

18 3977 9.8.__i!_ 13 14 7/12 7.0 14. 3 _ 39000 21840 _!l!._J!~ .fl.

_12___ .!i..QQ2 ____t_,J!_ "-" 18 1+9_______2_l1Q__ 7.0 5. 2 35000 19600 1/41 __ 8 0 92 .lQ___ ~Q1s __ 2_,___!! ____iL_ ___!_6_~ _____B_Lj_B l_,_Q_ ~ _· _ 1... ~~: -~~ ·34ooo 1904Q ill_ ·a- 9i, ll___4015___2__:_!_ 47 17 1 11/211~-~------~---13000_1_84001/4 __ 0'92' ~L 4015 _ _2_,J! ____!t!__ -~~ .U ___l_lil_Q__~ __ {!. . ..• _J __ ____ .125.00 .1§.200 !I.!J _ 0 92

____u_ ___MU_5_ _ ____2__.__§_ _ _il_ __ ll_ 14 ______M_!1__ L_Q_ ..J!_, __ 1_ _ ___ 2700Jl j_?OOO.lL4 __]_ 0- ·93 f--- --- --··- ----1-1·- -----·-

---·-+-- === -= =1-1=1=1= ·--1---1·--=i==-- - -- -

TOTAL D{PTH 4015 "·

REMAR~S AHO Tllf.O.T,.EIH

Lost circulation; reduced mud w

§IB

_., __ , ___ , __ ,. __ tJs --L I , Ill II 1=1--=t=:H - -···-·

'"""'~' "'"'"'""" ~- • - -- ~-- -- COUMTY - I"'"

flusky Oil NPR OperationsL Inc Brin!<-~:r:!!_off DrillinP: Company North Slope Borough! Alaska

BIT RECORD

""' "'" "" '" !'"""'"'' .... , I"'""" "HP

National Petroleum Reserve Tulageak T. W. No. l 7 ZIN 14W I

TOOl OR<i I OROW

::·~--- - --- --- ---- ----- ::.~ ·....,-- "" ,,~ .... ---j""""'""'' ---------------h ......... .,,,.,,, -~--- '""'"" "'"' iii> -----,;o·-- • ~0- """'" , 0,., W"l won(< """"' '"' 0011 OkllLIR CO(O.. NO I

MOOftiNG 001(0 NO 0 0 0 0 UNGTH PUW' ""' -·- WOOil SIOOOI I 0 OAII

Ool on Ill Ill "''Al NO '"SO/~-- OIP!H IICI HOUR' ACC '""' W[<OHI 001•"' •101 OUMP PUMP< MOO DUll COO! .~~::~.;.. OAIE NO Sllf IOIGO ''PI Of Ill 1 >I 1 001 OUN HOUOS 1000105 RPM Of> POl$$ Oo '"'" '"" wo '" 1 I G WI< FlOOD, II&

I !Zit STC SDS AN0831 II 1l II 2083 1978 55 55 35.9 2500 160 ) 0 1500 I bl, 55 IO 35 ~ 4 I __ _

2 121,; STC sos AL8773 I l(l 1.7 I?~ ~ ao. ?~ ~{]( 140 3° 1500" b~ 55 " 35 3 3 I Pulled for logs.

3 8"'STC DSJ HJ334 101010 2940 21012 92.517.5 2000 1002lj0 JJOO"~I, 55 .6366[51

CHI 81, Chri C201 IW 236 - - - I 2982 42 I 8.5 101 4.9 2000 0/6 - 1500" ~Is 55 .9 47 G cs~e~ ~~se ~1\~~~~ e

4 8~ STC SDGH 8H7447 10 10 11 3322 _ ]~ lL_ p~ 10.0 20/2 ?ftr , JJ,0 1650" b!.; rss . 9 45 5 6 Shale & siltstone

5 8~ Sec 44N 993199 10 10 11 3505 183 8.5 63.5 6.4 2500 0 2° 1650" Is: 1 .9 40 7 3 I Shale & siltstone

6 8' Reed lJG ;;;~ 10 12 12 16 4 139 tls 2W 'i.O 2'iOOC.7'i - 11>00" lj 1 O. 8 4 I Kingak formation

7 81,: HTC -22 JS-215 11 11 ll 3783 139 4. 75 ~~i!i. _1,_!_~~L1.. 0 1° 1625" b"' 4 lUi 41 l 3 0

CHI 81,: Chri C201 IW-4236 - - - 3816 33 __ :!_·_?_5 19.5 8.8 ~~~Qf"''--+---Jf'l60000+"+''-J•'"-jc•29f4clTT+'t--------f-- RR7 81, HTC J-22 JS-215 II II 11 4005 189 36.6 56 5.2 22/25 0 3/4 12002 b!s: 90 .846 2 711''-t-------j-~- CHI Bl~ Chrtfl-~~9! ~~-~?J_~_- ~-=-+-=-- 4015 _lQ_ 4 60 2.5 18/2 5/6 - UQQ

1 );-f"%"'!C·Q8p4~6f'-J'-'P\--------+-

~ - ~ -1-- ~

- - ~- - ~--t--+-+t-1--+-t--t--t--t +-----+- -+-+--t--t--+-++-1-----t-t--t---- -- - ~~~ - -+-+-+--11----t-++- - - ~ ~

~ ~ ~ -f--- -- ~~--- ~ - ~~ ~

--l---1-+---+--++-f-+-~+-+--1--- ~ -f-+-t-++-+-++-t-+

SMITHAfPHESONTATIVE PHON~--

=~-·· -- CofnP!iments o/ :=Ill

PO BOXCHI511•TFIVTNE.CAUF 92113

SmiTH TOOL 01VISIONOFSMITH INTERNATION.O.l, 1"-'C

After the 1976 drilling season, casing requirements were reviewed and design of casing strings standardized. Every effort was made to minimize weight and grade changes for simplicity, cost effectiveness, and to reduce chances of error during handling and running operations. Casing sizes were selected to accommodate designs for wells from 2,000' to 20,000'.

Steel grade selection was the controlling factor on design with low hardness (Rockwell C24-28) steel being selected for Arctic application and possible H

S environment. Below is listed casing sizes and design criteria required by Husky:

MINIMUM PRESSURE

Yl ELD STRENGTH REQUIREMENT

(PSI) (PSI)

SIZE( 1) WEIGHT MIN. MAX. COLLAPSE BURST CONNECTION

20" 133#/ft. 55,000 80,000 1 ,500 3,050 STC

13-3/8"(2) 72#/ft. 95,000 110,000 3,450 5,350 BTC

9-5/8"(3 ) 53.5#/ft. 95,000 110,000 8,850 7,900 BTC

9-3/4"(3 ) 59.2#/ft. 95,000 110,000 9,750 8,540 BTC 7" 38#/ft. 95,000 110,000 12,600 9,200 BTC

(1) OD tolerance to be within API requirements unless adjustment absolutely necessary to meet ID requirements.

(2)

(3) Special drift to 12.25".

Special drift to 8.50".

The following are additional requirements primarily to assure that the steel exhibits the metallurgical properties for Arctic applications and resistance to hydrogen embrittlement.

1. All pipe that is 13-3/8" OD and smaller to be quenched and tempered.

2. Run Charpy "V" notch tests on two random samples per 50 tons per heat. Minimum acceptance of 15 ft.-lb.@-50°F. Furnish test repor·ts with order.

3. Perform all testing normally required for API approved prpe.

4. Furnish test reports for ladle analysis, quantitative analysis, and all…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .