ATTACH_3_J-0200000-05 ELINS_22T2204.xlsx

XLSX spreadsheet 81 KB Posted

Attached to
Fire Protection System Maintenance, Repair Services and Hood & Duct Services for MCB Butler Okinawa, Japan
Solicitation number
N40084-22-T-2204
Issued by

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Attachment J-0200000-05 ELIN Schedule

SUMMARY

DATE PREPARED:
CONTRACT NUMBER: N40084-22-T-2204
PROJECT TITLE:
KITCHEN FIRE PROTECTION SYSTEM MAINTENANCE, REPAIR SERVICES AND HOOD & DUCT SERVICES AT MARINE CORPS BASE CAMP BUTLER, OKINAWA, JAPAN

CLIN ITEM DESCRIPTION ORIGINAL AMOUNT

Base Year 1 Aug 2022 ~

31 Jul 20230001BASE PERIOD - RECURRING WORK¥ -
0002BASE YEAR - NON-RECURRING WORK¥ 7,500,000

Option 1 1 Aug 2023 ~

31 Jan 20240003OPTION PERIOD 1 - RECURRING WORK¥ -
0004OPTION PERIOD 1 - NON-RECURRING WORK¥ 2,500,000

Option 2 1 Feb 2024 ~

31 Jul 20240005OPTION PERIOD 2 - RECURRING WORK¥ -
0006OPTION PERIOD 2 - NON-RECURRING WORK¥ 2,500,000
SUBTOTAL RECURRING (FFP) COST ALL OPTIONS:¥ -
FY22 EXCHANGE RATE: $1.00/¥106.4531$ - 0
SUBTOTAL NON-RECURRING (IDIQ) COST ALL OPTIONS:¥ 12,500,000
FY22 EXCHANGE RATE: $1.00/¥106.4531$ 117,422.60
TOTAL CONTRACT AMOUNT (¥):¥ 12,500,000
TOTAL CONTRACT AMOUNT ($):
FY22 EXCHANGE RATE: $1.00/¥106.4531$ 117,422.60

&"Times New Roman,Regular"&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

ELIN-Base FFP

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS (ELINS)
SOLICITATION/CONTRACT # N40084-22-T-2204
EXHIBIT A - CLIN 0001
Line Item 0001 Recurring Work - Base Period
PROVIDE PRICES FOR SCHEDULED PREVENTATIVE MAINTENANCE - FIRM FIXED PRICE
- IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A004
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit
PriceTotal
A001MCB (FS = Fire Suppression Services)
A00101Urgent Service Orders (FS)5EA¥ -¥ -
A00102Routine Service Orders (FS)10EA¥ -¥ -
Subtotal A00101and A00102:¥ -
MCBCamp Courtney
A00103Building 901 (FS)12MO¥ -¥ -
A00104Building 4218 (FS)12MO¥ -¥ -
A00105Building 4417 (FS)12MO¥ -¥ -
A00106Building 4419 (FS)12MO¥ -¥ -
A00107Building 4456 (FS)12MO¥ -¥ -
Subtotal A00103 through A00107:¥ -
MCBCamp Hansen
A00108Building 2214 (FS)12MO¥ -¥ -
A00109Building 2365 (FS)12MO¥ -¥ -
A00110Building 2635 (FS)12MO¥ -¥ -
A00111Building 2654 (FS)12MO¥ -¥ -
Subtotal A00108 through A00111:¥ -
MCBCamp Schwab
A00112Building 3434 (FS)12MO¥ -¥ -
A00113Building 3667 (FS)12MO¥ -¥ -
Subtotal A00112 and A00113:¥ -
MCBCamp Gonzalves
A00114Building 500 (FS)12MO¥ -¥ -
Subtotal A00114:¥ -
MCBCamp Kinser
A00115Building 864 (FS)12MO¥ -¥ -
A00116Building 1202 (FS)12MO¥ -¥ -
A00117Building 1223 (FS)12MO¥ -¥ -
A00118Building 1316 (FS)12MO¥ -¥ -
Subtotal A00115 through A00118:¥ -
MCBFutenma
A00119Building 201 (FS)12MO¥ -¥ -
A00120Building 401 (FS)12MO¥ -¥ -
A00121Building 402 (FS)12MO¥ -¥ -
A00122Building 423 (FS)12MO¥ -¥ -
Subtotal A00119 through A00122:¥ -
MCBCamp Foster
A00123Building 9 (FS)12MO¥ -¥ -
A00124Building 488 (FS)12MO¥ -¥ -
A00125Building 499 (FS)12MO¥ -¥ -
A00126Building 1620 (FS)12MO¥ -¥ -
A00127Building 1680 (FS)12MO¥ -¥ -
A00128Building 5670 (FS)12MO¥ -¥ -
A00129Building 5906 (FS)12MO¥ -¥ -
Subtotal A00123 through A00129:¥ -
MCBPlaza
A00130Building 4100 (FS)12MO¥ -¥ -
Subtotal A00130:¥ -
MCBCamp McTureous
A00131Building 5206 (FS)12MO¥ -¥ -
Subtotal A00131:¥ -
Subtotal MCB (FS) A00103 through A00131:¥ -
MCB Service Call A00101 and A00102:¥ -
A001 Fire Suppression Total¥ -
A002MCB (FM=Hood and Duct Cleaning)
A00201Urgent Service Orders (FM)5EA¥ -¥ -
A00202Routine Service Orders (FM)10EA¥ -¥ -
Subtotal A00201 and A00202:¥ -
MCBCamp Courtney
A00203Building 901 (FM)12MO¥ -¥ -
A00204Building 905 (FM)12MO¥ -¥ -
A00205Building 4218 (FM)12MO¥ -¥ -
A00206Building 4300 (FM)12MO¥ -¥ -
A00207Building 4417 (FM)12MO¥ -¥ -
A00208Building 4419 (FM)12MO¥ -¥ -
A00209Building 4446 (FM)12MO¥ -¥ -
A00210Building 4450 (FM)12MO¥ -¥ -
A00211Building 4456 (FM)12MO¥ -¥ -
Subtotal A00203 through A00211:¥ -
MCBCamp Hansen
A00212Building 2214 (FM)12MO¥ -¥ -
A00213Building 2365 (FM)12MO¥ -¥ -
A00214Building 2635 (FM)12MO¥ -¥ -
A00215Building 2654 (FM)12MO¥ -¥ -
Subtotal A00212 through A00215:¥ -
MCBCamp Schwab
A00216Building 3223 (FM)12MO¥ -¥ -
A00217Building 3224 – 2nd Floor (FM)12MO¥ -¥ -
A00218Building 3224 – 4th Floor (FM)12MO¥ -¥ -
A00219Building 3407 (FM)12MO¥ -¥ -
A00220Building 3434 (FM)12MO¥ -¥ -
A00221Building 3667 (FM)12MO¥ -¥ -
Subtotal A00216 through A00221:¥ -
MCBCamp Gonzalves
A00222Building 500 (FM)12MO¥ -¥ -
Subtotal A00222:¥ -
MCBCamp Kinser
A00223Building 864 (FM)12MO¥ -¥ -
A00224Building 1091 (FM)12MO¥ -¥ -
A00225Building 1202 (FM)12MO¥ -¥ -
A00226Building 1217 (FM)12MO¥ -¥ -
A00227Building 1223 (FM)12MO¥ -¥ -
A00228Building 1316 (FM)12MO¥ -¥ -
Subtotal A00223 through A00228:¥ -
MCBFutenma
A00229Building 201 (FM)12MO¥ -¥ -
A00230Building 401 (FM)12MO¥ -¥ -
A00231Building 402 (FM)12MO¥ -¥ -
A00232Building 417 (FM)12MO¥ -¥ -
A00233Building 423 (FM)12MO¥ -¥ -
A00234Building 429 (FM)12MO¥ -¥ -
Subtotal A00229 through A00234:¥ -
MCBCamp Foster
A00235Building 9 (FM)12MO¥ -¥ -
A00236Building 473 (FM)12MO¥ -¥ -
A00237Building 488 (FM)12MO¥ -¥ -
A00238Building 499 (FM)12MO¥ -¥ -
A00239Building 1620 (FM)12MO¥ -¥ -
A00240Building 1680 (FM)12MO¥ -¥ -
A00241Building 5670 (FM)12MO¥ -¥ -
A00242Building 5906 (FM)12MO¥ -¥ -
Subtotal A00235 through A00242:¥ -
MCBPlaza
A00243Building 4100 (FM)12MO¥ -¥ -
Subtotal A00243:¥ -
MCBCamp McTureous
A00244Building 5206 (FM)12MO¥ -¥ -
Subtotal A00244:¥ -
MCBCamp Lester
A00245Building 6038 (FM)12MO¥ -¥ -
A00246Building 6040 (FM)12MO¥ -¥ -
A00247Building 6041 (FM)12MO¥ -¥ -
Subtotal A00245 through A00247:¥ -
Subtotal MCB (FS) A00203 through A00247:¥ -
MCB Service Call A00201 and A00202:¥ -
A002 Hood and Duct Cleaning Total¥ -
Total MCB ACRN AA (FS & FM):¥ -
A003USNH - Camp Foster
A00301Building 960 (FM)12MO¥ -¥ -
Total USNH Subtotal ACRN AB (FM):¥ -
A004DoDEA
A00401Building 380 (FS), Killin Elementary School12MO¥ -¥ -
A00402Building 1041 (FS), Kinser Elementary School12MO¥ -¥ -
A00403Building 1400 (FS), Kubasaki High School12MO¥ -¥ -
A00404Building 5000 (FS), Bechetel Elementary School12MO¥ -¥ -
A00405Building 5300 (FS), New Zukeran Elementary12MO¥ -¥ -
A00406Building 6388 (FS), Lester Middle School12MO¥ -¥ -
Subtotal DoDEA (FS) A00401 through A00406:¥ -
A00407Building 380 (FM), Killin Elementary School12MO¥ -¥ -
A00408Building 1041 (FM), Kinser Elementary School12MO¥ -¥ -
A00409Building 1400 (FM), Kubasaki High School12MO¥ -¥ -
A00410Building 5000 (FM), Betchel Elementary School12MO¥ -¥ -
A00411Building 5300 (FM), New Zukeran Elementary12MO¥ -¥ -
A00412Building 6388 (FM), Lester Middle School12MO¥ -¥ -
Subtotal DoDEA (FM) A00407 through A00412:¥ -
Total DoDEA -ACRN AC (FS & FM):¥ -

TOTAL FFP LINE ITEMS TOTAL ¥ -

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

Attachment 3 &"Times New Roman,Regular"&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELIN-Base IDIQ

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40084-22-T-2204
EXHIBIT A - CLIN 0002
Line Item 0002 Non-Recurring Work - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK (IDIQ)
- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELIN A700
ELINDescription ExtendedUnit of IssueTotal
A700WILL BE NEGOTIATED BY KO AT A T.O. LEVELProvide labor and material to perform all necessary work per the scope and delivery schedule specified in the order.NTE¥ 7,500,000

TOTAL NON-RECURRING WORK LINE ITEMS ¥ 7,500,000

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

Attachment 3 &"Times New Roman,Regular"&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELIN-1st OPT FFP

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS (ELINS)
SOLICITATION/CONTRACT # N40084-22-T-2204
EXHIBIT A - CLIN 0003
Line Item 0003 Recurring Work - 1st Option Period
PROVIDE PRICES FOR SCHEDULED PREVENTATIVE MAINTENANCE - FIRM FIXED PRICE
- IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 through B004
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit
PriceTotal
B001MCB (FS = Fire Suppression Services)
B00101Urgent Service Orders (FS)3EA¥ -¥ -
B00102Routine Service Orders (FS)5EA¥ -¥ -
Subtotal B00101 and B00102:¥ -
MCBCamp Courtney
B00103Building 901 (FS)6MO¥ -¥ -
B00104Building 4218 (FS)6MO¥ -¥ -
B00105Building 4417 (FS)6MO¥ -¥ -
B00106Building 4419 (FS)6MO¥ -¥ -
B00107Building 4456 (FS)6MO¥ -¥ -
Subtotal B00103 through B00107:¥ -
MCBCamp Hansen
B00108Building 2214 (FS)6MO¥ -¥ -
B00109Building 2365 (FS)6MO¥ -¥ -
B00110Building 2635 (FS)6MO¥ -¥ -
B00111Building 2654 (FS)6MO¥ -¥ -
Subtotal B00108 through B00111:¥ -
MCBCamp Schwab
B00112Building 3434 (FS)6MO¥ -¥ -
B00113Building 3667 (FS)6MO¥ -¥ -
Subtotal B00112 and B00113:¥ -
MCBCamp Gonzalves
B00114Building 500 (FS)6MO¥ -¥ -
Subtotal B00114:¥ -
MCBCamp Kinser
B00115Building 864 (FS)6MO¥ -¥ -
B00116Building 1202 (FS)6MO¥ -¥ -
B00117Building 1223 (FS)6MO¥ -¥ -
B00118Building 1316 (FS)6MO¥ -¥ -
Subtotal B00115 through B00118:¥ -
MCBFutenma
B00119Building 201 (FS)6MO¥ -¥ -
B00120Building 401 (FS)6MO¥ -¥ -
B00121Building 402 (FS)6MO¥ -¥ -
B00122Building 423 (FS)6MO¥ -¥ -
Subtotal B00119 through B00122:¥ -
MCBFoster
B00123Building 9 (FS)6MO¥ -¥ -
B00124Building 488 (FS)6MO¥ -¥ -
B00125Building 499 (FS)6MO¥ -¥ -
B00126Building 1620 (FS)6MO¥ -¥ -
B00127Building 1680 (FS)6MO¥ -¥ -
B00128Building 5670 (FS)6MO¥ -¥ -
B00129Building 5906 (FS)6MO¥ -¥ -
Subtotal B00123 through B00129:¥ -
MCBPlaza
B00130Building 4100 (FS)6MO¥ -¥ -
Subtotal B00130:¥ -
MCBCamp McTureous
B00131Building 5206 (FS)6MO¥ -¥ -
Subtotal B00131:¥ -
Subtotal MCB (FS) B00103 through B00131:¥ -
MCB Service Call B00101 and B00102:¥ -
B001 Fire Suppression Total¥ -
B002MCB (FM=Hood and Duct Cleaning)
B00201Urgent Service Orders (FM)3EA¥ -¥ -
B00202Routine Service Orders (FM)5EA¥ -¥ -
Subtotal B00201 and B00202:¥ -
MCBCamp Courtney
B00203Building 901 (FM)6MO¥ -¥ -
B00204Building 905 (FM)6MO¥ -¥ -
B00205Building 4218 (FM)6MO¥ -¥ -
B00206Building 4300 (FM)6MO¥ -¥ -
B00207Building 4417 (FM)6MO¥ -¥ -
B00208Building 4419 (FM)6MO¥ -¥ -
B00209Building 4446 (FM)6MO¥ -¥ -
B00210Building 4450 (FM)6MO¥ -¥ -
B00211Building 4456 (FM)6MO¥ -¥ -
Subtotal B00203 through B00211:¥ -
MCBCamp Hansen
B00212Building 2214 (FM)6MO¥ -¥ -
B00213Building 2365 (FM)6MO¥ -¥ -
B00214Building 2635 (FM)6MO¥ -¥ -
B00215Building 2654 (FM)6MO¥ -¥ -
Subtotal B00212 through B00215:¥ -
MCBCamp Schwab
B00216Building 3223 (FM)6MO¥ -¥ -
B00217Building 3224 – 2nd Floor (FM)6MO¥ -¥ -
B00218Building 3224 – 4th Floor (FM)6MO¥ -¥ -
B00219Building 3407 (FM)6MO¥ -¥ -
B00220Building 3434 (FM)6MO¥ -¥ -
B00221Building 3667 (FM)6MO¥ -¥ -
Subtotal B00216 and B00221:¥ -
MCBCamp Gonzalves
B00222Building 500 (FM)6MO¥ -¥ -
Subtotal B00222:¥ -
MCBCamp Kinser
B00223Building 864 (FM)6MO¥ -¥ -
B00224Building 1091 (FM)6MO¥ -¥ -
B00225Building 1202 (FM)6MO¥ -¥ -
B00226Building 1217 (FM)6MO¥ -¥ -
B00227Building 1223 (FM)6MO¥ -¥ -
B00228Building 1316 (FM)6MO¥ -¥ -
Subtotal B00223 through B00228:¥ -
MCBFutenma
B00229Building 201 (FM)6MO¥ -¥ -
B00230Building 401 (FM)6MO¥ -¥ -
B00231Building 402 (FM)6MO¥ -¥ -
B00232Building 417 (FM)6MO¥ -¥ -
B00233Building 423 (FM)6MO¥ -¥ -
B00234Building 429 (FM)6MO¥ -¥ -
Subtotal B00229 through B00234:¥ -
MCBFoster
B00235Building 9 (FM)6MO¥ -¥ -
B00236Building 473 (FM)6MO¥ -¥ -
B00237Building 488 (FM)6MO¥ -¥ -
B00238Building 499 (FM)6MO¥ -¥ -
B00239Building 1620 (FM)6MO¥ -¥ -
B00240Building 1680 (FM)6MO¥ -¥ -
B00241Building 5670 (FM)6MO¥ -¥ -
B00242Building 5906 (FM)6MO¥ -¥ -
Subtotal B00235 through B00242:¥ -
MCBPlaza
B00243Building 4100 (FM)6MO¥ -¥ -
Subtotal B00243:¥ -
MCBCamp McTureous
B00244Building 5206 (FM)6MO¥ -¥ -
Subtotal B00244:¥ -
MCBCamp Lester
B00245Building 6038 (FM)6MO¥ -¥ -
B00246Building 6040 (FM)6MO¥ -¥ -
B00247Building 6041 (FM)6MO¥ -¥ -
Subtotal B00245 through B00247:¥ -
Subtotal MCB (FS) B00203 through B00247:¥ -
MCB Service Call B00201 and B00202:¥ -
B002 Hood and Duct Cleaning Total¥ -
Total MCB ACRN AA (FS & FM):¥ -
B003USNH - Camp Foster
B00301Building 960 (FM)6MO¥ -¥ -
Total USNH Subtotal ACRN AB (FM):¥ -
B004DoDEA
B00401Building 380 (FS), Killin Elementary School6MO¥ -¥ -
B00402Building 1041 (FS), Kinser Elementary School6MO¥ -¥ -
B00403Building 1400 (FS), Kubasaki High School6MO¥ -¥ -
B00404Building 5000 (FS), Bechetel Elementary School6MO¥ -¥ -
B00405Building 5300 (FS), New Zukeran Elementary6MO¥ -¥ -
B00406Building 6388 (FS), Lester Middle School6MO¥ -¥ -
Subtotal DoDEA (FS) B00401 through B00406:¥ -
B00407Building 380 (FM), Killin Elementary School6MO¥ -¥ -
B00408Building 1041 (FM), Kinser Elementary School6MO¥ -¥ -
B00409Building 1400 (FM), Kubasaki High School6MO¥ -¥ -
B00410Building 5000 (FM), Betchel Elementary School6MO¥ -¥ -
B00411Building 5300 (FM), New Zukeran Elementary6MO¥ -¥ -
B00412Building 6388 (FM), Lester Middle School6MO¥ -¥ -
Subtotal DoDEA (FM) B00407 through B00412:¥ -
Total DoDEA -ACRN AC (FS & FM):¥ -

TOTAL FFP LINE ITEMS TOTAL ¥ -

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

Attachment 3 &"Times New Roman,Regular"&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELIN-1ST OPT IDIQ

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40084-22-T-2204
EXHIBIT A - CLIN 0004
Line Item 0004 Non-Recurring Work - 1st Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK (IDIQ)
- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELIN B700
ELINDescription ExtendedUnit of IssueTotal
B700WILL BE NEGOTIATED BY KO AT A T.O. LEVELProvide labor and material to perform all necessary work per the scope and delivery schedule specified in the order.NTE¥ 2,500,000

TOTAL NON-RECURRING WORK LINE ITEMS ¥ 2,500,000

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

Attachment 3 &"Times New Roman,Regular"&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELIN-2nd OPT FFP

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS (ELINS)
SOLICITATION/CONTRACT # N40084-22-T-2204
EXHIBIT A - CLIN 0005
Line Item 0005 Recurring Work - 2nd Option Period
PROVIDE PRICES FOR SCHEDULED PREVENTATIVE MAINTENANCE - FIRM FIXED PRICE
- IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs C001 through C004
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit
PriceTotal
C001MCB (FS = Fire Suppression Services)
C00101Urgent Service Orders (FS)3EA¥ -¥ -
C00102Routine Service Orders (FS)5EA¥ -¥ -
Subtotal C00101 and C00102:¥ -
MCBCamp Courtney
C00103Building 901 (FS)6MO¥ -¥ -
C00104Building 4218 (FS)6MO¥ -¥ -
C00105Building 4417 (FS)6MO¥ -¥ -
C00106Building 4419 (FS)6MO¥ -¥ -
C00107Building 4456 (FS)6MO¥ -¥ -
Subtotal C00103 through C00107:¥ -
MCBCamp Hansen
C00108Building 2214 (FS)6MO¥ -¥ -
C00109Building 2365 (FS)6MO¥ -¥ -
C00110Building 2635 (FS)6MO¥ -¥ -
C00111Building 2654 (FS)6MO¥ -¥ -
Subtotal C00108 through C00111:¥ -
MCBCamp Schwab
C00112Building 3434 (FS)6MO¥ -¥ -
C00113Building 3667 (FS)6MO¥ -¥ -
Subtotal C00112 and C00113:¥ -
MCBCamp Gonzalves
C00114Building 500 (FS)6MO¥ -¥ -
Subtotal C00114:¥ -
MCBCamp Kinser
C00115Building 864 (FS)6MO¥ -¥ -
C00116Building 1202 (FS)6MO¥ -¥ -
C00117Building 1223 (FS)6MO¥ -¥ -
C00118Building 1316 (FS)6MO¥ -¥ -
Subtotal B00115 through C00118:¥ -
MCBFutenma
C00119Building 201 (FS)6MO¥ -¥ -
C00120Building 401 (FS)6MO¥ -¥ -
C00121Building 402 (FS)6MO¥ -¥ -
C00122Building 423 (FS)6MO¥ -¥ -
Subtotal C00119 through C00122:¥ -
MCBFoster
C00123Building 9 (FS)6MO¥ -¥ -
C00124Building 488 (FS)6MO¥ -¥ -
C00125Building 499 (FS)6MO¥ -¥ -
C00126Building 1620 (FS)6MO¥ -¥ -
C00127Building 1680 (FS)6MO¥ -¥ -
C00128Building 5670 (FS)6MO¥ -¥ -
C00129Building 5906 (FS)6MO¥ -¥ -
Subtotal C00123 through C00129:¥ -
MCBPlaza
C00130Building 4100 (FS)6MO¥ -¥ -
Subtotal C00130:¥ -
MCBCamp McTureous
C00131Building 5206 (FS)6MO¥ -¥ -
Subtotal C00131:¥ -
Subtotal MCB (FS) C00103 through C00131:¥ -
MCB Service Call C00101 and C00102:¥ -
C001 Fire Suppression Total¥ -
C002MCB (FM=Hood and Duct Cleaning)
C00201Urgent Service Orders (FS)3EA¥ -¥ -
C00202Routine Service Orders (FS)5EA¥ -¥ -
Subtotal C00201 and C00202:¥ -
MCBCamp Courtney
C00203Building 901 (FM)6MO¥ -¥ -
C00204Building 905 (FM)6MO¥ -¥ -
C00205Building 4218 (FM)6MO¥ -¥ -
C00206Building 4300 (FM)6MO¥ -¥ -
C00207Building 4417 (FM)6MO¥ -¥ -
C00208Building 4419 (FM)6MO¥ -¥ -
C00209Building 4446 (FM)6MO¥ -¥ -
C00210Building 4450 (FM)6MO¥ -¥ -
C00211Building 4456 (FM)6MO¥ -¥ -
Subtotal C00203 through C00211:¥ -
MCBCamp Hansen
C00212Building 2214 (FM)6MO¥ -¥ -
C00213Building 2365 (FM)6MO¥ -¥ -
C00214Building 2635 (FM)6MO¥ -¥ -
C00215Building 2654 (FM)6MO¥ -¥ -
Subtotal C00212 through C00215:¥ -
MCBCamp Schwab
C00216Building 3223 (FM)6MO¥ -¥ -
C00217Building 3224 – 2nd Floor (FM)6MO¥ -¥ -
C00218Building 3224 – 4th Floor (FM)6MO¥ -¥ -
C00219Building 3407 (FM)6MO¥ -¥ -
C00220Building 3434 (FM)6MO¥ -¥ -
C00221Building 3667 (FM)6MO¥ -¥ -
Subtotal C00216 and C00221:¥ -
MCBCamp Gonzalves
C00222Building 500 (FM)6MO¥ -¥ -
Subtotal C00222:¥ -
MCBCamp Kinser
C00223Building 864 (FM)6MO¥ -¥ -
C00224Building 1091 (FM)6MO¥ -¥ -
C00225Building 1202 (FM)6MO¥ -¥ -
C00226Building 1217 (FM)6MO¥ -¥ -
C00227Building 1223 (FM)6MO¥ -¥ -
C00228Building 1316 (FM)6MO¥ -¥ -
Subtotal C00223 through C00228:¥ -
MCBFutenma
C00229Building 201 (FM)6MO¥ -¥ -
C00230Building 401 (FM)6MO¥ -¥ -
C00231Building 402 (FM)6MO¥ -¥ -
C00232Building 417 (FM)6MO¥ -¥ -
C00233Building 423 (FM)6MO¥ -¥ -
C00234Building 429 (FM)6MO¥ -¥ -
Subtotal C00229 through C00234:¥ -
MCBFoster
C00235Building 9 (FM)6MO¥ -¥ -
C00236Building 473 (FM)6MO¥ -¥ -
C00237Building 488 (FM)6MO¥ -¥ -
C00238Building 499 (FM)6MO¥ -¥ -
C00239Building 1620 (FM)6MO¥ -¥ -
C00240Building 1680 (FM)6MO¥ -¥ -
C00241Building 5670 (FM)6MO¥ -¥ -
C00242Building 5906 (FM)6MO¥ -¥ -
Subtotal C00235 through C00242:¥ -
MCBPlaza
C00243Building 4100 (FM)6MO¥ -¥ -
Subtotal C00243:¥ -
MCBCamp McTureous
C00244Building 5206 (FM)6MO¥ -¥ -
Subtotal C00244:¥ -
MCBCamp Lester
C00245Building 6038 (FM)6MO¥ -¥ -
C00246Building 6040 (FM)6MO¥ -¥ -
C00247Building 6041 (FM)6MO¥ -¥ -
Subtotal C00245through C00247:¥ -
Subtotal MCB (FS) C00203 through C00247:¥ -
MCB Service Call C00201 and C00202:¥ -
C002 Hood and Duct Cleaning Total¥ -
Total MCB ACRN AA (FS & FM):¥ -
C003USNH - Camp Foster
C00301Building 960 (FM)6MO¥ -¥ -
Total USNH Subtotal ACRN AB (FM):¥ -
C004DoDEA
C00401Building 380 (FS), Killin Elementary School6MO¥ -¥ -
C00402Building 1041 (FS), Kinser Elementary School6MO¥ -¥ -
C00403Building 1400 (FS), Kubasaki High School6MO¥ -¥ -
C00404Building 5000 (FS), Bechetel Elementary School6MO¥ -¥ -
C00405Building 5300 (FS), New Zukeran Elementary6MO¥ -¥ -
C00406Building 6388 (FS), Lester Middle School6MO¥ -¥ -
Subtotal DoDEA (FS) C00401 through C00406:¥ -
C00407Building 380 (FM), Killin Elementary School6MO¥ -¥ -
C00408Building 1041 (FM), Kinser Elementary School6MO¥ -¥ -
C00409Building 1400 (FM), Kubasaki High School6MO¥ -¥ -
C00410Building 5000 (FM), Betchel Elementary School6MO¥ -¥ -
C00411Building 5300 (FM), New Zukeran Elementary6MO¥ -¥ -
C00412Building 6388 (FM), Lester Middle School6MO¥ -¥ -
Subtotal DoDEA (FM) C00407 through C00412:¥ -
Total DoDEA -ACRN AC (FS & FM):¥ -

TOTAL FFP LINE ITEMS TOTAL ¥ -

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

Attachment 3 &"Times New Roman,Regular"&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELIN-2ND OPT IDIQ

ATTACHMENT J-0200000-05
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N40084-22-T-2204
EXHIBIT A - CLIN 0006
Line Item 0006 Non-Recurring Work - 2nd Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK (IDIQ)
- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELIN C700
ELINDescription ExtendedUnit of IssueTotal
C700WILL BE NEGOTIATED BY KO AT A T.O. LEVELProvide labor and material to perform all necessary work per the scope and delivery schedule specified in the order.NTE¥ 2,500,000

TOTAL NON-RECURRING WORK LINE ITEMS ¥ 2,500,000

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

Attachment 3 &"Times New Roman,Regular"&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

File details come from the government source that posted it. Updated .