Attach 2- Pricing Worksheet.pdf

PDF 116 KB Posted

Attached to
SANITARY HOLDING TANK PUMPING AND DISPOSAL SERVICES
Solicitation number
N0060426Q4027
Issued by

About this file

This is a Pricing Worksheet for wastewater pumping and evacuation services solicited by the NAVSUP Fleet Logistics Center, Pearl Harbor (FLCPH) Regional Contracting Office. The solicitation requests pricing for the complete evacuation of two 1,000-gallon holding tanks (2,000 gallons total) on a weekly basis. The contract structure includes a 12-month base period (CLIN 0001) running from April 23, 2026 to April 22, 2027, with four subsequent 12-month option periods (CLINs 1001, 2001, 3001, and 4001) extending through April 22, 2031. Each period is priced on a monthly unit basis for 12 months of service.

Respondents are required to provide pricing for each contract line item, with totals calculated for the base period and each option period. The pricing worksheet includes a line for the total evaluated price, which combines the base period total with all four option period totals, allowing the government to assess the complete five-year contract value for evaluation purposes. The worksheet does not specify response dates, award dates, or set-aside information, serving primarily as the pricing template for qualified sources to submit their cost proposals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Worksheet

The NAVSUP Fleet Logistics Center, Pearl Harbor (FLCPH) Regional Contracting Office requests responses from qualified sources capable of providing the services mentioned in Table 1 below:

TABLE 1

CLIN DESCRIPTION QTY UNIT TOTAL

Pump and completely evacuate all wastewater from both 1,000-gallon holding tanks (2,000 gallons total) once per week.

23 April 2026 to 22 April 2027.

Month

Base Period Total

Option 1 CLIN DESCRIPTION QTY UNIT TOTAL

1001 Pump and completely evacuate all wastewater from both 1,000-gallon holding

23 April 2027 to 22 April 2028.

Option 1 Period Total

Option 2 CLIN DESCRIPTION QTY UNIT TOTAL 2001 Pump and completely evacuate all wastewater from both 1,000-gallon holding

23 April 2028 to 22 April 2029.

Option 2 Period Total

Option 3 CLIN DESCRIPTION QTY UNIT TOTAL 3001 Pump and completely evacuate all wastewater from both 1,000-gallon holding

23 April 2029 to 22 April 2030.

Option 3 Period Total

Option 4 CLIN DESCRIPTION QTY UNIT TOTAL 4001 Pump and completely evacuate all wastewater from both 1,000-gallon holding

23 April 2030 to 22 April 2031.

Option 4 Period Total

Total Evaluated Price (Base Total + Option Totals)

File details come from the government source that posted it. Updated .