Attach 1 - Statement of Work - DCC Surveillance Audio-Visual System -17 June 2026.pdf

PDF 889 KB Posted

Attached to
Surveillance System - Removal, Installation and Upgrade
Solicitation number
FA442726Q1141
Issued by

About this file

This is a Statement of Work (SOW) for the complete removal and upgrade of the Travis Air Force Base Deployment and Reception Surveillance and Audio-Visual System, dated June 17, 2026. The 60th Logistics Readiness Squadron requires replacement of eighteen (18) existing cameras with eighteen (18) new IP-based, Pan-Tilt-Zoom (PTZ), multi-sensor surveillance cameras with a minimum of 8 megapixels, plus installation of two (2) additional new IP-based PTZ cameras in the 900 Cargo Deployment Function area. The contractor must remove the outdated Crestron-based audio-visual system and install an Air Force-approved replacement capable of managing and displaying twenty (20) camera feeds to five monitors across multiple locations (three 75-inch Samsung monitors, one 42-inch Sony monitor, and one 55-inch Samsung monitor in the Deployment Control Center and Passenger Deployment Function). The system must support secure remote viewing for authorized users at six remote locations and display Secret Internet Protocol Router (SIPR) data on three Samsung monitors.

The contract requires use of CAT 6A cabling, EMT conduit protection for outdoor cables, and coordination with the 60th Communications Squadron regarding Power over Ethernet (PoE) switch specifications. The Network Video Recorder (NVR) must store thirty (30) days of video at 30 frames per second with compressed files, and the uninterruptible power supply (UPS) must provide minimum one-hour backup power. All equipment must comply with Section 889 of the John S. McCain National Defense Authorization Act (NDAA) regarding covered telecommunications equipment. The project must start within 60 days of contract award and be completed within 60 days thereafter. The contractor must provide training for Deployment Control Center personnel, 60th Logistics Readiness Squadron IT personnel, and 60th Communications Squadron staff; deliver a continuity book within 30 days of installation; and provide a one-year warranty with service and repair capabilities. All personnel must obtain security clearances for work on SIPR equipment, and all work must comply with Air Force Instruction 91-202 Mishap Prevention Program and safety regulations (NFPA 70). The existing PoE switches and UPS will be utilized where compatible; the contractor must supply all cameras, software licenses, servers, NVRs, patch panels, cables, and other necessary equipment. Approved camera and system equipment options are listed in Attachment 3 (Non-Nuclear Configuration Management Database Equipment Approval List).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Deployment and Reception Surveillance & Audio-Visual System

17 Jun 2026

1.0 DESCRIPTION: The 60th Logistics Readiness Squadron requires complete removal and upgrade of the Travis AFB Deployment and Reception Surveillance/Presentation System. This includes providing all necessary personnel, equipment, materials, and services, as detailed in this Statement of Work, except where government-furnished items are explicitly specified. All work will be performed according to the standards outlined in this Statement of Work

(SOW).

1.1 BACKGROUND: The existing cameras are operational; however, they are turned off because they do not comply with Section 889 of the John S. McCain National Defense Authorization Act of 2019 (NDAA), Prohibition on “Covered Telecommunications Equipment or Services” as defined at 48 C.F.R. par. 52.204-25(a). The current cable for the existing cameras is category cable and coaxial cable. There is a current network PoE switch for the existing 18 cameras. The current audio and visual control equipment in the Deployment Control System (DCC) consists of Crestron System, Crown CD 2000, Diamond Security, and Pelco. The audio and visual system are partially operational. All buildings, cameras, and audio-visual equipment are on the same network.

1.2 INCUMBENT: There is no incumbent. This is a new requirement.

1.3 OBJECTIVES: The objective is to upgrade the current surveillance and presentation system with the following:

1.3.1 Replace Cameras: Remove eighteen (18) existing cameras and install eighteen (18) new IP-based, PTZ, multi sensors surveillance cameras. The minimum Mega Pixel shall be 8MP. The existing cables shall be used if compatible with new cameras.

1.3.2 Add Cameras: Install two (2) new IP-based, PTZ, multi sensors IP-based surveillance cameras in the 900 Cargo Deployment Function (CDF) area. The minimum Mega Pixel shall be 8MP. New cables will be required. The estimated cable length to the PoE network switch is 125+ feet.

1.3.3 Upgrade Audio-Visual system: Remove and replace outdated Crestron-based system with an Air Force-approved A/V solution. The Audio-Visual equipment and software shall be used to manage and display camera feeds and information from computers to the following monitors:

Three (3) Samsung, UN75MU6300 75” monitors in the Deployment Control Center (DCC) One (1) Sony, FWD-42PX2 42” monitor in the Deployment Control Center (DCC) One (1) Samsung UN55MU6071 monitor in the Passenger Deployment Function (PDF) in Building P1.

1.3.3.1 The Audio-Visual system will manage and display twenty (20) camera feeds.

1.3.3.2 The Audio-Visual will manage and display data from eleven (11) unclassified Windows 11 Enterprise, Version 23H2, computers, located inside the DCC.

1.3.3.3 The Audio-Visual will display data from one (1) Secret Internet Protocol Router (SIPR) computer on any three (3) Samsung 75” monitors located inside the DCC.

1.4 Remote Access: Enable secure remote viewing of camera feeds for authorized users from workstations in different locations:

1.4.1 Crisis Action Team (CAT)

1.4.2 Alternate CAT

1.4.3 60 AMW/XP office

1.4.4 Passenger Deployment Function (PDF)

1.4.5 Pole Barn

1.4.6Air Passenger Terminal (APT)

NOTE: Currently, remote access users type in an IP address provided by 60 CS into their workstation browsers (e.g. Microsoft Edge or Goggle Chrome). The IP address directs the remote user to the NVR in the DCC. The remote user has an account on the NVR which provides access to all cameras. However, the DCC staff has the ability to select which cameras the remote user can view.

1.5 SCOPE OF WORK:

1.5.1 Remove 18 cameras and at buildings: 31, P1, P3, 977, Pole Barn, and associate 900 area on Travis AFB. Lift or scaffolding is required. The existing cables will be used for replacement cameras.

1.5.2 Create a plan to design and build a new surveillance system with 20 cameras in these buildings: 31, P1, P3, 977, and the Pole Barn plus associated 900 Area. (SEE EXHIBIT 1 for proposed 20 cameras installment locations)

1.5.3 Ensure the proposed system is installed by the manufacturers certified technician of the system.

1.5.4 Engineer, furnish, install and test the newly installed system to meet industry standards and the original equipment manufacturers (OEM) specifications

1.5.5 Ensure all cameras have both day/night and low-light (but not thermal/heat-sensing) capabilities

1.5.6 Set up all cameras to automatically start recording when they detect motion. The recording system must be digital

1.5.7 Ensure authorized personnel (DCC and Security Forces) can access, view, and download recordings

1.5.8 Install new cables and any other support infrastructures (including power outlets) as needed for the 2 new cameras in the 900 area. The cabling must be CAT 6A.

1.5.9 Provide all new: cameras, software licenses, a server, and any other necessary parts. The contractor shall utilize the customer's existing cables and licenses, if feasible/compatible with the new system. The cameras must be able to withstand the weather in the area

1.5.10 The contractor will configure the field of view for each camera.

1.5.11 Utilize existing Power over Ethernet (POE) switches and UPS (uninterruptible power supply). The Contractor shall supply any additional equipment needed such as new POE switches, UPS, Network Video Recorders (NVRs), patch panels, cables, and other items as needed. The contractor needs to coordinate with the 60th Communications Squadron (60 CS) to determine the POE switch specifications

1.5.12 The new NVR must be able to store 30 days of video at 30 frames per second using compressed video files.

The UPS must be able to power the system for at least one hour during a power outage

1.5.13 The contractor will use CAT 6A cable to connect the cameras to the switches to ensure the best signal quality.

For outdoor cables, the contractor will install EMT conduit (metal tubing) to protect the cables, and paint the conduit to match the buildings

1.5.14 The contractor's design plan should include a PDF drawing showing the layout of the buildings, conduit runs, rack elevations/locations, control monitor locations, switches, NVRs, UPS and individual camera locations, along with the manufacturer and model number of each piece of equipment.

1.5.15 The contractor shall install the necessary equipment to display SIPR data on all 3 monitors in the DCC. The contractor must be certified to handle SECRET level equipment and ensure the installed equipment is also certified for SECRET security classifications. The 60th Logistics Readiness Squadron (60 LRS) will check personnel security clearances, and the 60 CS will verify that the equipment meets Air Force compliance before being approved for purchase.

1.5.16 When the project is complete, the contractor will provide training for DCC personnel, the 60 LRS ITEC personnel, and the 60 CS. After training, these personnel should be able to operate the system without the contractor's assistance.

1.5.17 The camera system must come with a one-year warranty. The contractor must be able to provide or arrange for service and repairs of the equipment during the warranty period.

1.5.18 The camera system shall be a standalone system that allows viewing all cameras via one NVR. No specific brand name is dictated for cameras, equipment, monitors, or software; however, review the Attachment 3/Non-Nuclear Configuration Management Database (CMD) Equipment Approval List.

1.6 PERIOD OF PERFORMANCE: The project must start within 60 days of the contract being awarded and must be completed within 60 days after that, unless the Contracting Officer approves an extension. The contractor must follow safety regulations (NFPA 70) during the project.

1.7 GENERAL INFORMATION

1.7.1 Recognized Holidays: The contractor will not perform any services on the following Holidays, or the accompanying Air Mobility Command Goal/Family Days:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day

1.7.2 Hours of Operation: The contractor is responsible for conducting business between the hours of [0800-1600] Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Military exercises, inclement conditions caused by Mother Earth, civil unrest resulting in base closure, etc. are considered inherent government delays. The Contractor will be notified as soon as possible if any delays are anticipated. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.7.3 Place of Performance: The work under this contract will be performed at the following locations: Buildings P1 (DCC, PDF), P3 (APT), 31 (CAT), the 900 area (CDF), and Building 243 (60th Communications Squadron - 60

CS)

1.7.4 Security Requirements: Contractor personnel performing work under this contract shall not employ any personnel presenting potential threats to the health, safety, security, general well-being, or operational mission of the installation and its population during the execution of the project. Compliance with AFI 91-202, The U.S. Air force Mishap Prevention Program, is mandatory for the Contractor.

The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.7.5 Special Qualifications: The Contractor shall be certified to work at the Secret level. This means the personnel working on the SIPR portion must hold individual Secret Clearance. The Contractor shall be regularly and professionally engaged in the business of the applications, installation, and testing of the specified camera systems and presentation equipment. The Contractor shall demonstrate experience in providing successful camera/presentation systems within the past 3 years of similar scope and size and submit documentation for a minimum of three successful camera system installations. All key personnel shall be employed by the Contractor at the date of issuance of this solicitation, or if not, have a commitment to the Contractor to work on this project by the closing of the associated solicitation.

1.7.6 Standard Product Requirements: Provide new materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design, and workmanship.

Products shall have been in satisfactory commercial or industrial use for 2 years prior to solicitation opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar sizes.

The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.

1.7.7 Alternative Product Qualifications: Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusively of the manufacturers' factory or laboratory tests, is furnished.

1.7.8 Material and Equipment Manufacturing Date: Products manufactured more than 1 year prior to date of delivery to site shall not be used, unless specified otherwise. All cables used for telecommunications outlets shall be four pairs, solid copper conductor, green CAT 6A standard, UL tested and certified. Each cable shall be dedicated to one device or outlet only.

1.7.9 Delivery and Storage: Provide protection from weather, moisture, extreme heat and cold, dirt, dust, and other contaminants for telecommunications cabling and equipment placed in storage.

1.7.10 Environmental Requirements: Connecting hardware shall be rated for operation under ambient conditions of 32 to 140 Degrees Fahrenheit and in the range of 0 to 95 percent relative humidity, noncondensing.

1.7.12 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer (CO), Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will appraise the contractor of how the government views the contractor's performance and the contractor will appraise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.7.13 Government POCs after award: Primary, Nathaniel O. Middleton, 707-424-3557; Secondary, (S)MSgt Diego Veliz, 707-816-4137.

1.7.14 Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract.

The contract manager or alternate shall be available between 0800 - 1600, Monday through Friday, except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:

1.7.15 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Travis Air Force Base is designated as a closed base. In order to promote security and safety, all employees desiring access must adhere to installation entry requirements, to include identity proofing and vetting. This includes a National Crime Information Center (NCIC) and California Law Enforcement Telecommunication System (CLETS) check. Identity proofing and vetting is not required for employees if they have a current favorable government security clearance, which can be verified through the Joint Personnel Adjudication System (JPAS).

1.7.15.1 Credentials: The contractor will ensure all employees possess proper credentials allowing them to work in the United States and ensure illegal aliens are not employed and/or transported onto the installation. Identification required for identity proofing follows:

United States Passport Permanent Registration Card/Alien Registration Receipt Card (Form I-1551) Foreign Passport with a temporary (I-1551) stamp or temporary (I-1551) printed notation on a machine-readable immigrant visa.

Employment authorization document that contains a photograph (Form I-766) Current/valid Driver’s License Identification card issued by Federal, State or local Government U.S. Coast Guard Merchant Mariner Legacy Card U.S. Coast Guard New Merchant Mariner Credential

Additional supplemental sources of identity proofing which may be requested during increased Force Protection Conditions (FPCONS) or Random Antiterrorism Measures (RAMs) include, but are not limited to:

School identification card with photograph U.S. Military or draft record Native American Tribal Document U.S. Social Security Card issued by the Social Security Administration (SSA) Certification of Birth Abroad issued by the Department of State (Form FS-545 or Form DS-1350) Original or certified copy of a birth certificate issued by a state, county, municipal authority or outlying possession of the United States bearing an official seal U.S. Citizen ID Card (Form I-197) ID Card for use of Resident Citizen in the United States (Form I-179) Unexpired employment authorization document issued by the Department of Homeland Security (DHS) which includes, a) Form I-94 identifying the holder as an asylee, or b) other documentation issued by DHS or the former Immigration and Naturalization Service that identifies the holder as an asylee, lawful permanent resident, refugee or other status authorized to work in the United States incident to status Foreign Military or Government Identification Credentials Foreign passport with a current arrival-departure record (Form I-94) bearing the same name as the passport and containing an endorsement of the alien’s nonimmigrant status, if that status authorizes the alien to work for the employer. In the case of a non-immigrant alien authorized to work for a specific employer incident to status, a foreign passport with Form I-94 or Form I-94A bearing the same name as the passport and containing an endorsement of the alien’s nonimmigrant status, as long as the endorsement has not yet expired and the proposed employment is not in conflict with any restrictions or limitations identified on the form.

1.7.16 Data Rights: The Government has unlimited rights to all documents/material produced under this contract.

All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.7.17 PHASE IN /PHASE OUT PERIOD: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the 30-day phase in/ phase out periods. During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.

2.0 GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

2.1 Services: N/A

2.1.1 Facilities: The Government will furnish facilities and utilities to the Contractor such as light, heat, ventilation, electric current, and outlets for use by installation personnel. Facilities and utilities will be provided as specified in the Site Survey Report. Facilities will be readied prior to arrival of Contractor personnel and be provided at no cost to the Contractor. The Contractor shall provide required temporary utilities, which are not readily available in the work area. The Contractor shall coordinate, through the on-site point of contact any requirement before temporary disconnection of a utility. The Contractor shall submit a request in writing to the on-site point of contact 14 days in advance of the necessity of utility disconnection.

2.1.2 Utilities: The Government will provide utilities in the facility for the contractor’s use in the performance of tasks outlined in this SOW. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

2.1.3 Equipment: The Contractor shall utilize existing PoE switches and UPS; however, the contractor shall supply all or any other equipment and peripherals needed to make this project functional”

2.1.4 Materials: The Government will provide Operating Rating Procedures and Policies as required.

2.1.5 Storage: The Government will provide storage space for parts ordered and the contractor equipment.

3.0 APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

3.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures

ATTACHMENT LISTING

4.0 Attachment List:

4.1. Attachment 1/Technical Exhibit 1 – Overview of Work to Preform.

4.2. Attachment 2/Technical Exhibit 2 – Deliverables Schedule

4.3. Attachment 3/Non-Nuclear Configuration Management Database (CMD) Equipment Approval List

ATTACHMENT 1

TECHNICAL EXHIBIT 1

Existing System

Manufactures such as Pelco and Motorola representatives evaluated the Deployment and Reception Surveillance/Presentation System, Thursday, Nov 11, 2021. Their overall analysis of the system is a refresh is overdue. The critical components of the system are past the manufacture lifecycle requirements. As of March 2022, some components are no longer supported by the manufacturer.

The Deployment and Reception Surveillance/Presentation System consist of cameras, NIPR and SIPR workstations, display monitors, and Audio-Visual equipment:

a. 1 monitor (75”) and Audio-Visual presentation equipment in the DCC Conference Room, bldg. P1 (will not be replaced)

b. 2 projectors and 1 monitor in the Personnel Deployment Function (PDF) in-brief section, bldg. P1

c. (will not be replaced)

d. 1 projector, 2 monitors, and Audio-Visual presentation equipment in the PDF Classify Briefing Room, bldg. P1(will not be replaced)

e. 18 Hangzhou Hikvision Digital Technology Co cameras (will be replaced)

Number of Cameras

Building Locations

Interior/Exterior, Placement

Photo

2 P1

Exterior, Pole

7 P1 Interior pole, wall

5 P3 (Pax Terminal)

Interior, ceiling

2 900 (CDF) Exterior, Pole

2 900 (CDF) Exterior, Pole

f. DCC Current Audio-Visual System (Will be upgraded/replaced)

1. DCC Equipment Rack

Equipment Brand

Switch Cisco C3850-NM-210G Monitor Tote Vision Audio Amp Crown CD 2000 NVR/Server Diamond Security, DSS-T479017 NVR Pelco Digital Sentry DS5rv2 Control Processor Crestron Pro 2 Volume/EQ Control Module Crestron Volume C2n-VEQ4 H.264 Streaming Receiver Crestron DM-RMC-100-STR

UPS VERTIV LIBERT PSIS

DCC Workstations:

9 Encoder/decoder (under workstations)

Crestron DM-TXRX-100-STR

Control Panel:

Controller Crestron TSW-10-60-TTK-B-5

The initial installation was in May 2003. A refresh was accomplished Sep 2012

Overview of Work to Perform

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

1.1 Overview of camera placement and connections:

1.1.1 Building P1 (DCC and PDF Interior): Replace 7 Cameras

1.1.2 Building P1 (Exterior): Replace 2 Cameras

1.1.3 Building P3 (APT): Replace 5 Cameras

1 Camera Main Hall, 1 Camera Gate 4, 1 Camera Gate 5, 2 Cameras Baggage Pick Up

Exit to Baggage Pick Up &

Transportation

Bu s

D ro p O ff at

In bo un d Lo un ge

R eception Station

3 2

R eception Station

R eception Station

R eception Station

Reception Station

R eception Station

Reception Station

Reception Station

SE

AT

IN

G

A R

EA

Baggage Pick Up Area

1.1.4 900 Area (CDF): Replace 4 and Add 2 Cameras

Existing Camera (1 for 1 Swap) Added Camera (900 Ramp/Rolling)

900 RAMP

NEW MMHS

BLDG 977

RS Lift /

Chalk

ATTACHMENT 2

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To Continuity Book Within 30 days after installation

Hard and soft copy

60 LRS/LGRD

User Training Within 30 days after installation

10 personnel In person or virtual training

60 LRS/LGRD and

60 AMW/XP

ATTACHMENT 3/CMD (NON-NUCLEAR) EQUIPMENT LIST, 23 MAR 2026

APPROVED FOR NEW PROCUREMENTS, INSTALLS AND UPGRADES

COMMAND, CONTROL AND DISPLAY EQUIPMENT (CCDE)

(Integrated Intrusion Detection (IDS) and Access Control (ACS))

Prometheus Security Group (PSG) Global

• LINX Predator Elite (LPE) Annunciator Version 8.1 (Windows 10)

– LINX SNMP version p90100.2.58

– LINX Predator Enrollment System Version 4.1.220

– LINX Predator Badging Enrollment Application Version 8.1.2100P

– LINX Versatile Interface Panel (VIP) Version 8.116

– LINX Versatile Interface Panel (VIP-16i) Version 1.09

– WSD-E Card Reader version 3.1110

– LINX Touch Zone Controller (PSG ordering code: 15-20000-001 for controller itself, 15-20000-007 for install kit)

– iDentyTech IDT Jade Biometric Physical Access Control: o IDT Jade Palm Scanner Model 100120135-PRO, v15.06.000-112 (PSG ordering code: 15-18010-000) o IDT Jade Palm Enrollment Scanner (USB) Model 100230910-PRO, v15.06.000-112 (PSG ordering code: 15- 18010-001) o IDT Jade Palm Scanner Reader Installation Kit (PSG ordering code: 15-18010-002) o HID SE RPK40 o HID Proximity ProxPro card reader

LenelS2

• OnGuard Version 8.1 module on (must be used with Milestone XProtect 22.2av to provide the required graphic/mapping display)

– Tested with Seneca/Dell R540 Server and Seneca/Dell R330 Server

– Windows 10 Enterprise 20H2 (OnGuard and Milestone Client)

– Windows Server 2019 Standard (OnGuard and Milestone Servers)

– SQL Server 2019 Standard

– Zebra ZXP Series 7 Card Printer

– Videology 24C708AF Photo ID Camera

– Morpho MSO-300 Fingerprint Enrollment Reader

– HID Omnikey 5422 Personal Identity Verifier (PIV) / Common Access Card (CAC) Enrollment Reader

– HID Omnikey 3121 PIV/CAC Enrollment Reader

– RFIDeas HID iCLASS Enrollment Reader

– Intelligent System Controllers: o LenelS2 LNL-X4420 v1.303 o LenelS2 LNL-X2220 v1.303 o LenelS2 LNL-X2210 v1.303

– Reader and Input Modules:

o LenelS2 LNL-1320-S3 Reader Module (tested with LNL-X4420 & using RS-485) v3.21.12 o LenelS2 LNL-1200-S3 Alarm Module (tested with LNL-X2220 using RS-485) v3.21.12 o LenelS2 LNL-1100-S3 Alarm Modules (tested with its respective LNL-X2210 using RS-485) v3.21.12

– Card and Biometric Readers:

o HID pivCLASS RK40 Card Reader o HID pivCLASS RKCL40 Card Reader o Morpho Sigma LitePlus Biometric and Card Reader o Veridt Stealth 900W2026 proximity (Prox) (RFID) Card Reader o Veridt Stealth 900W2036 tested with the LNL-X2220 Prox (RFID) and chip card reader o LNL-CK arm/disarm reader, tested with the LNL-X2220 o Morpho Access Sigma SMA-293645512 Biometric (fingerprint) and Card Reader

Honeywell Vindicator

• Vindicator Command and Control Platform Version 10 (tested with VICADS 4.3.5 and V100)

– Vindicator 10 Annunciator Workstation (Win 10 LTSC):

o Windows 10 LTSC version 21H2 (OS Build 19044)

– Vindicator Security Server (VSS) o Windows Server 2019 version 1809 (OS Build 17763.4377)

– Windows Structured Query Language (SQL) Database Management VSS o SQL Server 2019 version 1809 (OS Build 17763.4377)

– Vindicator System Terminal o Windows 10 LTSC version 21H2 (OS Build 19044)

– Vindicator Command and Control 2 (VCC2) 1.3.0.2 SP4

– V3 Network Security (IDS & ACS) Firmware 4.3.2 SP VR22

– V5 Network Security (IDS & ACS) Firmware 4.5.2 SP VR22

– AES-1500 Network Field Device Firmware 4.3.2 SP VR22

– Security Archive Workstation 2 (SAW2) 1.4.3.0 SP6

– Vindicator Badge Manager 3 2.0.27.0 SP4

– Vindicator Site Commander with or without SAW2 1.3.0.7 SP2

– Vindicator Area Commander 1.1.0.7

– Vindicator Premise Controller 4.3.2 VR22

– Vindicator PC Smart Pak (PCSP) 6.0.0.1

Note: No new orders of the V5 panel (V5 IDS & ACS hardware) are being taken by the OEM as production is discontinued.

VIDEO MANAGEMENT SYSTEMS (VMS)

Milestone

• Milestone XProtect 22.2av tested with LenelS2 OnGuard v8.1

– XProtect Server 2022 R2 (22.2av), XProtect Smart Client 2022 R2 (22.2av)

– Windows 10 Enterprise 20H2 (OnGuard and Milestone Client)

– Windows Server 2019 Standard (OnGuard and Milestone Servers)

PSG Video Image Control and Display System (VICADS)

• VICADS Version 4.3 tested with LPE v8.1 (on Windows 10)

• VICADS Version 4.3.5 tested with Vindicator Command and Control Platform Version 10 (on Windows 10)

– Server O/S: Microsoft Windows Server 2022 version: 10.0.20348, (OS Build 20348)

– Client O/S: Microsoft Windows 10 Internet of Things Enterprise LTSC version: 10.0.19044, (OS Build 19044)

• VICADS Version V100.2.1 tested with LINX Predator Elite Version 8.1.2100p, subpatch p8121.01.17, Cyber Security Solution 2.0.0 (Windows 10 LTSC 2021; Windows Server 2022, build 21H2; Ubuntu 20.04 LTS in FIPS Mode)

• VICADS Version V100.2.1 tested with Vindicator Command and Control Platform Version 10: Intrusion Detection System (IDS) & Access Control System (ACS) V5 Devices (4.5.2), VR22; IDS & ACS V3 Devices (4.3.2) VR22; Security Archive Workstation (SAW) 1.4.3.0, SP6; and Vindicator Badge Manager (VBM) 2.0.26.7, SP3.

CAMERAS / IMAGERS

Assessment Cameras Note: The following imagers may be used to perform alarm assessments from interior and exterior sensor points.

• Axis Q6075 Indoor PTZ

• Axis Q6075-E Outdoor PTZ

• Axis Q1656

• Bosch NBN-63023-B

• Bosch NBN-73023-BA

• Hanwha PNB-A6001

• Hanwha XNB-6003

• Hanwha XNZ-L6320A

• Pelco Sarix IXE Series Box Cameras w/ SureVision 3.0

• Vicon V2002D-W313MIR

• Vicon V2008-W-NL

• Vivotek IP9165-HT-v2 (Note: for indoor use only and was only integrated with the Video Image Control and Display System (VICADS) V-100 (Version 100.2.1.1) VMS)

Pan-Tilt-Zoom Cameras Note: These cameras may be used to assess alarms received from the approach zone as well as to perform surveillance and situational awareness functions. They will not be used as the primary means to perform alarm assessments of interior or exterior sensor points.

• Avigilon H5A IR PTZ (Model: H5A-IRPTZ-DP40-WP)

• Bosch Auto Dome IP Starlight 7000i Camera (Model: NDP-7512-Z30)

• Bosch MIC IP Fusion 9000i (Model: MIC-9502-Z30WVF)

• Pelco Espirit Enhanced ES6230-15P-R2

• Pelco S7230L-PW

• Vicon V2002-D-PTZ

Camera Environmental Enclosures

• Bosch UHO-HBGS-61 Outdoor Camera Housing

INTRUSION DETECTION SENSORS

Interior Sensors

Note: Balanced Magnetic Switch (BMS) will not be used as a line of detection.

• ASSA ABLOY (Securitron Group) MSS-1 High Security Balanced Magnetic Switch

• Banner Engineering Series Active Infrared (AIR), intrinsically safe, Model SMI30 (Note: Must be installed as an array of individually reporting sensor points, for use across openings in areas where explosive fumes may be present).

• BEA LZR-i30

• BEA LZR-s600

• Bosch ISC-BPQ2-W12 PIR (Curtain Configuration Only)

• Bosch ISC-PDL1-WA18G PIR (Curtain and Volumetric Configuration)

• Dortronics 1110 xD xCT, Magnetic Lock/BMS

• Dortronics 1120 x2D xCT, Series Electromagnetic Lock and BMS

• East Coast Security Products Inc. ESM-6T Tandem BMS

• Edwards 2807T-M BMS

• Eltec 862 Passive Infrared (PIR) Sensor (Wall)

• Eltec 864 PIR

• Fiber Sensys LD204S

• Fiber Sensys LD308SH

• Magnasphere HS-L1.5-101 BMS

• Magnasphere HS-L1.5-111 BMS

• Magnasphere HSS-L2C-101 BMS (Concealed Contact)

• Magnasphere HSS-L2C-101-A BMS (Concealed Contact)

• Magnasphere HSS-L2C-111 BMS (Concealed Contact)

• Magnasphere HSS-L2C-111-A BMS (Concealed Contact)

• Magnasphere HSS-L2D-000 BMS (Dual Alarm Contact)

• Magnasphere HSS-L2D-800 BMS (Dual Alarm Contact)

• Magnasphere HSS-L2S-000 BMS (Single Alarm Contact)

• Magnasphere HSS-L2S-800 BMS (Single Alarm Contact)

• Magnasphere Interior Barrier Sensor Model MSK-101-MM

• Magnasphere Interior Motion Sensor Model MSK-101-MM

• Optex Redscan RLS-3060V

• Optex Redscan RLS-50100V

• Optex SX360Z PIR

• Protech Maxiris 3000/3100 Active IR Interior Sensor

• Protech Passive IR and Microwave Intruder Detectors (PIRAMID) SDI-76-G (Volumetric)

• Protech PIRAMID SDI-77-D (Volumetric)

• Protech SDI-76M-HS1-H Volumetric (Coverage 60’x 40’, Two Sensors in Combination)

• Protech SDI-76MW Volumetric (Coverage 60’x 40’, Two Sensors in Combination)

• Protech SDI-77XL2-EX, Explosion Proof Volumetric

Exterior Sensors

• BEA LZR-i30 (ECP Configuration)

• BEA LZR-s600 (ECP Configuration)

• DeTekion Defensor 100 Fence Sensor

• DeTekion Defensor 100 Fence Sensor (with Culvert Configuration)

• DeTekion Defensor 100 sensor system with the GD-5000 Eliminator signal analyzer

• DeTekion Vertical Taut Wire Sensor 400 (VTW-400), full fence or out-rigger configuration

• EAG of Americas Infrared Intrusion Detection System 4/2/2 (IIDS4/2/2) Active Infrared Sensor

• EAG of Americas Infrared Intrusion Detection System 4/4/2/2/2 w/ PSTC

• EAG of Americas Intrusion Detection System 4/2 (IDS 4/2) Active Infrared Sensor

• ECSI Infrared Pulsed Intrusion Detection System (IPIDS), up to 80m with spring loaded mount bases and 100m with solid concrete bases.

• Fiber SenSys Fiber Defender The following models have been tested: 331, 332, 341, and 342. (Note: The 331 and 332 series is with “Sensitive” Lead-in cables whereas the 341 and 342 series is with the “Insensitive” Lead-in cables. Also, the last digit (1 or 2) indicates a single channel processor or dual channel processor. Additional note:

The 33x series is normally utilized for TASS applications with the 34x series being utilized for all hardwired configurations.)

• Fiber SenSys Fiber Defender 525 (Note: Not approved for use in Northern tier, or areas where snow and ice accumulations are normal, pending further testing)

• Fiber SenSys Fiber Defender FD-342, v4.47

• Fiber SenSys Fiber Defender FD-342, v4.47 (Culvert Configuration)

• IR Global Infrared Intrusion Detection System 4/4/2

• IR Global IRG-509-15M

• Protech G-Fence with 2400 Processor, v2.5

• Protech G-Fence Gate Connector

• Protech PIRAMID / SDI-76-XL-MIL LT (Ladder and Tower) Only

• Protech PIRAMID / SDI-76-XL-MIL, PIR and Monostatic Microwave Sensor

• Protech Maxiris 3000/3100 Active Infrared Barrier (100 meter) w/ New Cell Insensitive to the Sun (NCIS) cells

• Protech Maxiris 3100 Active Infrared Barrier (100 meter)

• Protech Sorhea Technology G-Fence 600 Zoning (600Z) System

• Protech Sorhea Technology G-Fence 600 Zoning (600Z) System (Culvert Configuration)

• RBtec Ironclad Fence Sensor Double Run Configuration

• Senstar FlexZone Fence Sensor (Note: Not approved for use in Northern tier, or areas where snow and ice accumulations are normal, pending further testing)

• Senstar Omnitrax buried line sensor w/Firmware Version MSP v2.90 w/FPGA v13.93

• Senstar UltraWave Detection Sensor TE (w/ Whiteman AFB tamper protection modification)

• Senstar UltraWave Microwave Detection Sensor (Firmware 3.04)

• Southwest Microwave 330 Digital Microwave System

• Southwest Microwave 385 Monostatic Sensor, up to 100m

• Southwest Microwave 460B Active Infrared Exterior Sensor

• Southwest Microwave Intrepid 334-33465 (Model 334), Double Stacked configuration with Model 336 installed on bottom of stack and Model 334 installed on top (Note: Not approved for use in close proximity with airfield due to X-Band frequency for Model 334)

• Southwest Microwave Intrepid 336-33464 (Model 336), Double Stacked configuration

• Southwest Microwave Intrepid Micropoint II

Wide Area Detection/Approach Zone Sensors

• FLIR Ranger 1 Perimeter Surveillance Radar (700 meters)

• FLIR Ranger 2 Perimeter Surveillance Radar (1400 meters)

• FLIR Ranger 3 Perimeter Surveillance Radar (2800 meters)

• Magos SR-500 Perimeter Surveillance System

– Integrated with the Lenel OnGuard Version 8.1

– Integrated with the Advantor Systems ASN, Version 6.2. MASS Version 2.24.10053, SR-500 Radar Version 3.64 and Radar Manager Version 1.5

• SpotterRF C40D Integrated with Advantor Version 6.2 (Note: Not approved for use in Northern tier, or areas where snow and ice accumulations are normal, pending further testing)

ADDITIONAL PL-3 AND PL-4 ITEMS

In addition to the above components, the following equipment is approved for use in the protection of PL-3 and below assets.

Command, Control and Display Equipment (CCDE): None Video Management Systems (VMS): None

Cameras/Imagers

• Clear Align VZ-250 LRTI 23164-600

• Clear Align VZ-250 LRTI 23164Z1-600 (Improved Cooling)

• Clear Align LRTI-w/CCTV

– C907891 Complete Kit

– TICC/PTH only C907892

• FLIR DEFENDIR MS-UC 640 30/90MM CZ

Interior Sensors: None Exterior Sensors: None

File details come from the government source that posted it. Updated .