About this file

This is a Performance Work Statement for Integrated Solid Waste Management services at U.S. Commander Fleet Activities Yokosuka (CFAY), Japan. The contract covers general and medical waste collection, transportation, and disposal services across U.S. Naval installations in the Kanto Plain region of Japan.

The contract structure includes a base period plus seven one-year options and potential half-year extensions. The Naval Facilities Engineering Command will award a single Fixed Price contract through Sealed Bidding procedures. Key requirements include proper collection and disposal of refuse and recyclables, with bids to be priced exclusively in Japanese Yen. Award will be made to the responsible bidder offering the best value based on price, contingent upon holding required Japanese permits and licenses. A site visit is scheduled for January 7, 2025, at 10:00 AM, with interested parties requiring escort to email Mayumi.Ikeno.ln@us.navy.mil by December 23, 2024.

View the file

Other files

File Type Posted
Amend 0001.pdf PDF
Attach 1. C_1503030, Rev.pdf PDF
N4008425B0404A.pdf PDF
N4008425B0404.pdf PDF
Attach-3. Note - NIST SP 800-171 and SPRS.pdf PDF
Attach-5. PreBid Inquiry Form.xlsx XLSX spreadsheet
Attach-2. AcceptableID.pdf PDF
Attach-4 PriceProposal_ELINs.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI // FEDCON

CUI // FEDCON

Integrated Solid Waste Management (ISWM) for General and Medical Wastes Collection, Transportation & Disposal Services in the U.S. Commander Fleet Activities Yokosuka (CFAY), JAPAN by Combination Contract of Recurring

Work & Non-Recurring Work Items (U.S. Naval Installations in KANTO Plain)

Prepared By: NAVFAC FE PRY 231 Name: R. Matsumoto Date: 9 September 2024

Specification Approved By: NAVFAC FE PRY23 Facilities Support Contracts Branch Head

Name Date

Specification Approved By: NAVFAC FE PW2 Facility Support Contracts Division Director

Name Date

S/R#: 24124560 (CNIC, DECA, DLA, DoDEA, HSG, Navy Lodge, SRF, USNH)

Controlled by: NAVFAC Far East Controlled by: NAVFAC FE PWD Yokosuka CUI Category: Basic Limited Dissemination Control: FEDCON POC: tsukasa.t.santos.civ@us.navy.mil

23OCT24

23 Oct 2024

SANTOS.TSUKASA.TE

RUYA.1120774960

Digitally signed by

SANTOS.TSUKASA.TERUYA.1120774960

Date: 2024.10.23 12:05:46 +09'00'

Digitally signed by

CRUZ.KEVIN.A.1232226850

Date: 2024.10.23 13:19:14 +09'00'

B-1

PART I - THE SCHEDULE

SECTION B: SUPPLIES OR SERVICES AND PRICES/COSTS

TABLE OF CONTENTS

PARA PAGE

NO. TITLE NO.

B.1 CONTRACT LINE ITEMS AND EXHIBIT LINE ITEMS ... B-2

B.2 MAXIMUM QUANTITIES ............................ B-2

B.3 NON-RECURRING LINE ITEM QUANTITIES ..... B-2

SCHEDULE OF PRICE............................ B-3

B-2

PART I - THE SCHEDULE

SECTION B: SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 CONTRACT LINE ITEMS AND EXHIBIT LINE ITEMS

a. Bidders/Offerors shall enter unit prices and amounts for contract line items (CLINs) and exhibit line items (ELINs) as indicated in the schedules and the accompanying exhibits, Attachment J-0200000-08.

b. In the event that there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid/offer and the total of the CLINs or ELINs will be recomputed accordingly. The CLIN which includes recomputed contract ELINs will also be recomputed to take into account the change in the contract ELIN. If the bidder/offeror provides a total amount for a CLIN or ELIN but fails to enter the unit price, the total amount divided by the CLIN or ELIN will be held to be the intended unit price.

B.2 MAXIMUM QUANTITIES

The maximum NTE value of an ordering period is the total of all the CLINs in that ordering period. The maximum or NTE value of the contract is the total value of all CLINs in the Schedule. Orders shall not be made that exceed the maximum NTE value for any ordering period. The maximum NTE value of an ordering period and of the contract may be increased by written modification to the contract in conjunction with any modification that increases the value of an existing task order that is authorized by a contract clause. Orders in excess of the estimated quantity set forth for any particular CLIN shall not be exceeded without the Contractor’s agreement which shall be indicated by signing or beginning performance of the order.

Concurrently with the award of the basic contract, the Government intends to issue a task order to obligate the contract minimum guarantee for: CLIN 0001, Base Period recurring work.

Minimum guarantees do not apply to the option periods.

B.3 NON-RECURRING LINE ITEM QUANTITIES

The estimated line item quantities under each CLIN or ELIN for the non-recurring portion of the contract may be unilaterally increased by the Contracting Officer by one unit or 30%, whichever is greater, so long as the total estimated contract price is not exceeded. The Contractor is not obligated to furnish any additional quantity under each CLIN or ELIN line item beyond 130%. Any quantity greater than 130% of the original CLIN or ELIN may be ordered at the bid price if the Contractor agrees by signing the task order.

CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]

Date: #MM/DD/YYYY

NAME OF OFFEROR OR CONTRACTOR:

LINE ITEM Q'TY UNIT AMOUNT

NO.

Item 0001 Recurring, Base Period 1 LS Provide Integrated Solid Waste Management (ISWM) for

Service Start General Waste & Medical Waste Collection, Transportation Date of related and Disposal Services, a Period of 12 months.

Medical Waste From 1 April 2025 through 31 March 2026.

General Waste From 1 June 2025 through 31 March 2026.

Item 0002 Non-Recurring, Base Period 1 LS Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 April 2025 through 31 March 2026.

Item 0003 Recurring, First Option Period 1 LS Provide Integrated Solid Waste Management (ISWM) for General Waste & Medical Waste Collection, Transportation and Disposal Services, a Period of 12 months.

From 1 April 2026 through 31 March 2027.

Item 0004 Non-Recurring, First Option Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 April 2026 through 31 March 2027.

Item 0005 Recurring, Second Option Period 1 LS ¥ Provide Integrated Solid Waste Management (ISWM) for General Waste & Medical Waste Collection, Transportation and Disposal Services, a Period of 12 months.

From 1 April 2027 through 31 March 2028.

Item 0006 Non-Recurring, Second Option Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 April 2027 through 31 March 2028.

Item 0007 Recurring, Third Option Period 1 LS ¥ Provide Integrated Solid Waste Management (ISWM) for General Waste & Medical Waste Collection, Transportation and Disposal Services, a Period of 12 months.

From 1 April 2028 through 31 March 2029.

Item 0008 Non-Recurring, Third Option Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 April 2028 through 31 March 2029.

SCHEDULE OF PRICE

ITEM

Date: #MM/DD/YYYY

NAME OF OFFEROR OR CONTRACTOR:

LINE ITEM Q'TY UNIT AMOUNT

NO.

SCHEDULE OF PRICE

ITEM

Item 0009 Recurring, Fourth Option Period 1 LS ¥ Provide Integrated Solid Waste Management (ISWM) for General Waste & Medical Waste Collection, Transportation and Disposal Services, a Period of 12 months.

From 1 April 2029 through 31 March 2030.

Item 0010 Non-Recurring, Fourth Option Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 April 2029 through 31 March 2030.

Item 0011 Recurring, Fifth Option Period 1 LS ¥ Provide Integrated Solid Waste Management (ISWM) for General Waste & Medical Waste Collection, Transportation and Disposal Services, a Period of 12 months.

From 1 April 2030 through 31 March 2031.

Item 0012 Non-Recurring, Fifth Option Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 April 2030 through 31 March 2031.

Item 0013 Recurring, Sixth Option Period 1 LS ¥ Provide Integrated Solid Waste Management (ISWM) for General Waste & Medical Waste Collection, Transportation and Disposal Services, a Period of 12 months.

From 1 April 2031 through 31 March 2032.

Item 0014 Non-Recurring, Sixth Option Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 April 2031 through 31 March 2032.

Item 0015 Recurring, Seventh Option Period 1 LS ¥ Provide Integrated Solid Waste Management (ISWM) for General Waste & Medical Waste Collection, Transportation and Disposal Services, a Period of 12 months.

From 1 April 2032 through 31 March 2033.

Item 0016 Non-Recurring, Seventh Option Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 April 2032 through 31 March 2033.

Date: #MM/DD/YYYY

NAME OF OFFEROR OR CONTRACTOR:

LINE ITEM Q'TY UNIT AMOUNT

NO.

SCHEDULE OF PRICE

ITEM

Item 0017 Recurring, Six Months Extention Period 1 LS ¥ Provide Integrated Solid Waste Management (ISWM) for General Waste & Medical Waste Collection, Transportation and Disposal Services, a Period of 6 months.

From 1 April 2033 through 30 September 2033.

Item 0018 Non-Recurring, Six Months Extention Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 April 2033 through 30 September 2033.

TOTAL: (LINE ITEM 0001 through 0018) ¥

CLIN 9000 Exhibit A (Base Period) CLIN 9001 Exhibit B (First Option Period) CLIN 9002 Exhibit C (Second Option Period) CLIN 9003 Exhibit D (Third Option Period) CLIN 9004 Exhibit E (Fourth Option Period) CLIN 9005 Exhibit F (Fifth Option Period) CLIN 9006 Exhibit G (Sixth Option Period) CLIN 9007 Exhibit H (Seventh Option Period) CLIN 9008 Exhibit I (Six Months Extention Period)

NOTE: The number of Placeholders established depends on the maximum number of lines of accounting anticipated on an individual task order.

Detail line items for task order is located in Attachment J-0200000-08

CLIN = CONTRACT LINE ITEM

LS = LUMP SUM

NTE = NOT-TO-EXCEED

Q'TY = QUANTITY

Note:

SECTION C

Index

Annex Sub Annex Spec Item # Title Annex 1 0100000 1 General Information

Annex 2 0200000 2 Management and Administration

Integrated Solid Waste Management Services Annex 15 1503030 1 General Information

Annex 15 1503030 2 Management and Administration

Annex 15 1503030 3 Recurring Work

Annex 15 1503030 4 Non-recurring Work

0100000 – General Information Table of Contents

Spec Item Title 1 General Information

1.1 Outline of Services

1.2 Acquisition of Additional Work

1.3 Background Information

1.4 Navy PBSA Approach

1.5 Standard Template

1.6 Related Information

1.7 Verification of Workload and Conditions

1.8 Contractor's Knowledge

1.9 Technical Proposal Certification

Spec Item Title Description 1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Commander Navy Region Japan (CNRJ) to include the U.S. Commander Fleet Activities Yokosuka (CFAY), Naval Air Facility (NAF) Atsugi, Combined Arms Training Center (CATC) Camp Fuji and New SANNO Hotel Tokyo in Kanto Plain Area Japan outlying areas supported by this installation, under a performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items

The PWS is organized into annexes. Annex 1 is "General Information".

Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.

The annex numbers are identified as 1 through 18 in the description column, but the fully expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).

Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff Not Applicable (N/A) Annex 4 Public Safety N/A Annex 5 Air Operations N/A Annex 6 Port Operations N/A Annex 7 Ordnance N/A Annex 8 Range Operations N/A Annex 9 Health Care Support N/A Annex 10 Supply N/A Annex 11 Personnel Support N/A Annex 12 Morale, Welfare and Recreation Support N/A Annex 13 Galley N/A Annex 14 Housing N/A Annex 15 Facilities Support

Sub Annex 1503030 Integrated Solid Waste Management Annex 16 Utilities N/A Annex 17 Base Support Vehicles and Equipment N/A Annex 18 Environmental N/A

1.2 Acquisition of

Additional Work

The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.3 Background

Information

Commander, Navy Region Japan (CNRJ) Acts as Navy representative and coordinator in our area of responsibility, executes shore installation management, and promotes operability and conducts liaison with the Japan Maritime Self Defense Force.

Additional information for Commander Navy Region Japan is available at:

http://cnrj.cnic.navy.mil.

CFAY

CFAY’s mission is to maintain and operate base facilities for the logistic, recreational, administrative support and service of the U.S. Naval Forces Japan, U.S. SEVENTH Fleet and other operating forces forward-deployed in the Western Pacific.

CFAY comprises 568 acres and is located 43 miles south of Tokyo at the entrance of Tokyo Bay and approximately 18 miles south of Yokohama.

Yokosuka is on the Miura peninsula in the Kanto Plain region of the Pacific Coast in Central Honshu, Japan. CFAY is the largest overseas U.S.

Naval installation in the world and is considered to be one of the most strategically important bases in the U.S. military.

Additional information for CFAY is available at:

https://cnrj.cnic.navy.mil/Installations/CFA-Yokosuka/

THE NEW SANNO Hotel Tokyo THE NEW SANNO hotel, a U.S. Naval joint activity located in the heart of Tokyo, is an American-style oasis for a reasonable price for eligible patrons. THE NEW SANNO offers a variety of accommodations and restaurants in a helpful, English-speaking environment.

Additional information for THE NEW SANNO Hotel is available at:

http://www.thenewsanno.com

Information for NAF Atsugi available at:

https://cnrj.cnic.navy.mil/Installations/NAF-Atsugi/

Information for Combined Arms Training Center (CATC) Camp Fuji available at: https://www.japan.marines.mil/Camps/Fuji/ http://www.mccsfuji.com/index.html

1.4 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are:

1) performance outcomes

2) measurable standards

3) consideration of incentives

4) performance assessment plan

1.5 Standard Template Key to implementing the PBSA approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs.

The standard template contains 18 standard annexes. Annex 1 will always contain General Information that is relevant to the entire scope of the contract. Annex 2 contains Management and Administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 and their associated sub-annexes contain the General Information, Management and Administration requirements, Performance Objectives, Related Information, and Performance Standards that are relevant to that technical annex. Except where otherwise stated, Annexes 3 through 18 and their associated sub-annex requirements are not relevant to one another.

Within each technical annex and sub-annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the Management and Administrative requirements. Specification

Item 3 will always contain the Recurring Work requirements.

Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.

Specification Items 3.2 and 3.3 are not considered subordinate to 3.1 nor are they considered subordinate to one another. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 shall be priced, and their price shall be allocated pro rata share to the Exhibit Line Items.

1.6 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors’ to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 and their associated sub-annexes are subject to this disclaimer. Offerors’ may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractually binding requirement on either party.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.7 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, maps, floor plans, and tables to represent the type and location of services to be provided.

All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified.

As prescribed in FAR 52.237-1, offerors’ or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

1.8 Contractor's

Knowledge

The Navy expects to receive insightful management from its contractors.

This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.9 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference in Section A – Solicitation/Contract Form including, but not limited to, proposed approaches, staffing, methodology, or work plans, will meet the performance objectives and standards set forth in this contract during execution thereof. The Contractor is not excused from meeting such performance objectives and standards in the event such proposal proves inadequate as conceived or executed to meet such performance objectives and standards. The Contractor understands that it bears all of the cost and performance risk associated with adopting acceptable additional (and/or alternative) means or methods of meeting the performance objectives and standards.

Section C – 0200000 Management and Administration

0200000 – Management and Administration Table of Contents

Spec Item Title 2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment

2.3.3 Partnering

2.3.3.1 Informal Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Directives, Instructions, and References

2.3.8 Invoicing Procedures

2.3.9 Forms

2.3.10 Performance Evaluation

2.4 Government-Furnished Items

2.4.1 Government-Furnished Property (GFP)

2.4.2 Government-Furnished Facilities

2.4.3 Government-Furnished Vehicles and Equipment

2.4.4 Government-Furnished Utilities

2.4.5 Government-Furnished Services (GFS)

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Safeguarding Information

2.6.2 Dissemination of Information

2.6.3 Work Reception

2.6.4 Work Control

2.6.5 Work Schedule

2.6.6 Deliverables

2.6.7 Service Interruptions

2.6.8 NAVFAC MAXIMO

2.6.9 Quality Management System (QMS)

2.6.9.1 Quality Management (QM) Plan

2.6.9.2 Quality Inspection and Surveillance

2.6.9.3 Quality Inspection and Surveillance Report

2.6.10 Property Management Plan

2.6.11 System and Equipment Replacement

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Manager

0200000 – Management and Administration Table of Contents

Spec Item Title

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.1.4 Environmental/Energy Manager

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

2.7.2.5 Removal of Employees

2.7.2.6 Proof of Legal Residency

2.7.3 Service Contract Reporting (SCR)

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 DBIDS Program

2.8.4.2 DBIDS Credentials

2.8.5 Access to Buildings

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.8 Access to Controlled Unclassified Information

2.8.8.1 Information Security

2.8.8.2 Information Safeguarding Requirements

2.8.8.3 Disclosure of Information Requirements

2.8.8.4 Operations Security (OPSEC) Requirements

2.8.8.5 Violation of the Information Security Requirement

2.8.9 Employee Status

2.9 Contractor Safety Program

2.9.1 Contractor Safety Requirements

2.9.1.1 Experience Modification Rate (EMR)

2.9.1.2 OSHA Days Away From Work, Restricted Duty, or Job Transfer (DART) Rate

2.9.2 Accident Prevention Plan (APP)

2.9.3 Activity Hazard Analysis (AHA)

2.9.4 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.9.4.1 Alcohol and Drug Abuse Prevention Plan

2.9.4.2 Chemical Hazard Communication Program

2.9.4.3 Confined Space Program

2.9.4.4 Critical Lift Plan

2.9.4.5 Fall Prevention and Protection Plan

2.9.4.6 Pathogen Exposure

2.9.4.7 Control of Hazardous Energy (lockout/tagout)

2.9.5 Crane Operations

2.9.5.1 Crane Inspections

2.9.5.2 Rigging Gear

2.9.5.3 Crane Operators

2.9.6 Accident and Damage Reporting

2.9.6.1 Accident Reporting and Notification Criteria

2.9.6.2 CFAY Accident Reporting Notification

2.9.7 Fire Protection

0200000 – Management and Administration Table of Contents

Spec Item Title

2.9.8 Monthly On-Site Labor Report

2.9.9 OSHA and/or Japanese Labor Standards Inspection Office (LSIO) Citations and Violations

2.9.10 Safety Inspections and Monitoring

2.9.11 Safety Certification

2.9.12 Safety Apparel on Jobsites

2.9.13 Emergency Medical Treatment

2.9.14 Excavations

2.10 Environmental Management and Sustainability

2.10.1 Energy Management Program

2.10.1.1 Water Conservation Plan

2.10.1.2 Energy Efficient Products

2.10.2 Environmental Protection

2.10.2.1 Solid Waste Management and Recycling

2.10.2.2 Non-Regulated Waste Disposal

2.10.2.3 Regulated Waste Disposal

2.10.2.4 Universal Waste

2.10.2.5 Spill Prevention, Containment, and Clean-up

2.10.2.6 Hazardous Material Management

2.10.2.7 Noise Control

2.10.2.8 Asbestos Containing Material (ACM)

2.10.2.9 Air Quality

2.10.3 Sustainable Procurement and Practices

2.10.3.1 Environmentally Preferable Products

2.10.3.2 Use of Recovered Materials

2.10.3.3 Use of Biobased Products

2.11 Disaster Preparedness

2.12 Technical Library

2.13 Warranty Management

2.14 Recurring Work Procedures

2.14.1 Recurring Work Preparation of Proposals

2.14.2 Notification to the Government for Work Above the Recurring Work Limitations

2.14.3 Recurring Work Exhibit Line Item Numbers (ELINs)

2.15 Non-recurring Work

2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.15.1.1 Acceptance and Performance

2.15.1.2 Invoicing and Receiving Payment

2.15.2 Unit Priced Labor (UPL)Work (Negotiated)

2.15.3 Non-Recurring Work ELINs

0200000 - Management and Administration Spec Item Title Description 2 Management and

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-0200000-01.

2.2 General

Information

2.2.1 Government

Regular Working Hours

The Government's regular working hours are from 0800-1645, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this performance work statement (PWS). Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours must be authorized by the Contracting Officer (KO) prior to commencement of work.

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays:

New Year’s Day Martin Luther King Jr.’s Birthday President’s Day Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans’ Day Thanksgiving Day Christmas Day

2.2.1.2 Restriction to

Contractor Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.

Unless otherwise specified, the Contractor’s normal working days for performing contract requirements in every day during the Government Regular Working Hours above.

2.2.2 Wage

Determinations

N/A

2.2.3 Requirements

Hierarchy

Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

2.3 General

Administrative Requirements

2.3.1 Required

Conferences and Meetings

The Contractor shall attend administrative and coordination meetings. The Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit per Section F for review and comments. Comments received within two working days shall be incorporated into the minutes and a copy of the final revision shall be submitted per Section F for concurrence.

Historically, there have been approximately four meetings annually, and the Contractor shall attend meetings for the pre-performance conference.

Required meetings may be held remotely as directed by KO.

2.3.2 Training for

Maintenance and

When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, 0200000 - Management and Administration Spec Item Title Description

Operation of New and Replacement Systems and Equipment as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.3 Partnering The Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who may receive services, principal individuals from Naval Facilities Engineering Systems Command (NAVFAC), the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

- The goal of Partnering is to develop a cohesive team with common purpose, commitment and established communication processes.

2.3.3.1 Informal Partnering The KO shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel.

The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.

The Initial Informal Partnering Session will be conducted and facilitated by the KO. The senior Government stakeholder present will lead the meeting, however, the Contractor’s Project Manager (PM) or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.3.2 Contract Partnering

Administration

Upon award, the Administrative Contracting Office (ACO) will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3 Contract Partnering

Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President

* Project Manager (PM)

* Quality Manager (QM) Site Safety and Health Officer (SSHO)

2.3.4 Permits and

Licenses

The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable

0200000 - Management and Administration Spec Item Title Description

Federal, host nation (Japanese), prefecture, and local laws and regulations.

The Contractor shall submit copies of Permits and Licenses per Section F.

2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause

52.228-5, INSURANCE – WORK ON A GOVERNMENT

INSTALLATION. This insurance must be maintained during the performance period.

2.3.5.1 Certificate of

Insurance

The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause. The Contractor shall submit change in policy coverage per Section F.

2.3.5.2 Minimum

Insurance Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: ¥50,000,000 per occurrence

Automobile Liability: ¥20,000,000 per person, ¥50,000,000 per occurrence for bodily injury, ¥3,000,000 per occurrence for property damage

Workmen's Compensation: As required by Japanese worker's compensation and occupational disease statutes

Employer's Liability coverage: ¥10,000,000

Other as required by Japanese Law

2.3.6 Protection of

Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of Contractor negligence under this contract to their original condition at no cost to the Government.

2.3.7 Directives, Instructions, and References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03 and throughout the various Performance Work Statements and their respective J Attachments. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.8 Invoicing

Procedures

Refer to Section G for invoicing instructions. Refer to Invoice Form in J- 0200000-04 for sample, and following accessible address of WAWF's website: https://piee.eb.mil/ Login address of above: https://piee.eb.mil/xhtml/unauth/home/login.xhtml

Invoices shall be submitted per section F, in a format compatible with the most recent Government installed Microsoft Office Version (currently 2016).

Invoice data shall be capable of being sorted by CLIN, annex/sub-annex, spec item, spec item title, and Exhibit Line Item Numbers (ELIN)/Sub-ELIN.

-recurring services as issued of task order, or One time contract invoices required performance record, unless otherwise direction by the KO.

2.3.9 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-04.

0200000 - Management and Administration Spec Item Title Description

2.3.10 Performance

Evaluation The Contractor’s performance will be evaluated using the Contractor Performance Assessment Reporting System (CPARS) located on the website https://www.cpars.gov. On-line training for Contractor personnel is available on the website.

Prior to commencement of work the Contractor is required to provide the Government with the name, phone number and e-mail address of the “Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the Government. It is the Contractor’s responsibility to keep this contact information current and provided changes to the KO.

2.4 Government-

Furnished Items

Except for items identified below as Government-Furnished, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services described in this PWS.

Government-Furnished Items will be provided in "AS-IS" condition and their use is at the option of the Contractor. The total or partial breakdown or failure of Government-Furnished Items shall not relieve the Contractor of the responsibility to perform the requirements of this contract.

The Contractor shall provide periodic servicing, maintenance, and repair of the Government-Furnished Items accepted for use at no additional cost to the Government. Servicing, maintenance, and repair shall be provided in accordance with the manufacturer’s recommendations. The Contractor shall generate work orders in NAVFAC Maximo per Spec Item 2.6.8 for all servicing, maintenance, and repair activities performed on Government- Furnished Items.

At the completion of the contract, all Government-Furnished Items shall be returned to the Government in the same condition as received, except for reasonable wear and tear. Government-Furnished Items, which becomes worn out due to normal wear and tear, shall be returned to the Government and its replacement shall be the responsibility of the Contractor at no additional cost to the Government. The Contractor shall be responsible for the cost of any repairs or replacement caused by Contractor negligence or abuse.

The Government may inspect Government-Furnished Items at any time and without notice.

2.4.1 Government-

Furnished Property

(GFP)

None.

2.4.2 Government-

Furnished Facilities

The Government will make available to the Contractor certain facilities for use in connection with this contract. The use of these facilities for any other purposes is prohibited.

The Contractor shall be responsible and accountable for the facilities accepted for use and shall take adequate precautions to prevent fire hazards, odors, and vermin. Janitorial and refuse collection services for the facilities shall be provided by the Contractor. The Contractor shall obtain written acceptance from the KO prior to making any modifications or alterations to the facilities.

0200000 - Management and Administration Spec Item Title Description

The Government reserves the right to require facilities deemed as unsafe or unclean by the COR to be removed or repaired within eight hours of notification.

A list of the facilities that will be made available to the Contractor is provided in below.

Bldg. 1829 (Pre-Fab Spaces): Use for Office/Lockers.

Bldg. 1829 (Shower Room): Use for Shower/Washroom.

Bldg. 1829 (Washing Facility): Use for Vehicle/Equipment Washing Area.

Behind Bldg. 1829 (Container Temporary Storage Area): Use for Collection.

Bldg. 5004, Material Recovery Facility (MRF): Use for Segregation.

All drains of Bldg. 5004 west side/south side of Bldg. 1829 shall be cleaned (no garbage, no sludge) at the end of every working day.

The GFF floor plans and photos are provide in J-0200000-09.

2.4.3 Government-

Furnished Vehicles and Equipment

The Government will provide the Contractor the use of existing and available Government –owned equipment as listed below.

Existing Available Equipment:

The Contractor can use the existing available equipment listed below during the contract period. If the Contractor performs the contract requirements by using the equipment, it shall be at no additional cost to the Government, even if the equipment becomes out of order or non-serviceable condition, unless specified below.

Solid Waste storage container of the 32/50 Gallon Container, Waste Segregation Type Bin and 10 CM Dumpster, and Solid Waste Sorting Conveyer Line, for one each.

The Contractor shall apply lubricant for solid waste sorting conveyer equipment, as necessary. (Lubricant will be furnished by the Government)

1) The Contractor shall provide daily servicing, maintenance, specific operators and recording for the above equipment of waste containers.

The operator shall not leave the equipment while it is in operation or moving. The Contractor shall perform specific inspection of the above sorting conveyer only as specified in J-0200000-09. The repair services for 32/50/55 Gallon Container, Waste Segregation Type Bin, and Dumpster shall be performed in accordance with Spec Item 3.3.

2) The total or partial breakdown or failure of the GFE shall not relieve the Contractor of responsibility to fully perform the work of the contract.

Upon completion or termination of the contract, all Government-owned equipment shall be returned to the Government in the same condition as received, except for normal wear and tear. Equipment which becomes worn out due to normal wear and tear shall be returned to the Government. The Contractor shall be responsible for the cost of any repairs or replacement caused by negligence or abuse.

3) The Contractor and KO shall conduct a joint inventory prior commencing work under this contract to determine the exact number and serviceability of GFE. The Contractor shall then certify the findings of this inventory, assume accounting responsibility, and subsequently report inventory discrepancies to the KO. GFE shall not be removed from the U.S. Naval Base/facility unless approved by the KO in writing.

The Government-Furnished Equipment (GFE) of Solid Waste Storage Container photos and sketches are provide in J-0200000-10.

0200000 - Management and Administration Spec Item Title Description

2.4.4 Government-

Furnished Utilities The Government will make available water and electricity at existing outlets required for the work to be performed under the contract. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.

2.4.5 Government-

Furnished Services

(GFS)

Waterborne Transportation for Azuma Island Work The Government will provide necessary daily transportation for personnel, for Azuma Island work providing notification is given to the Government not less than seven calendar days in advance. The Government will provide this daily waterborne transportation at no cost to the Contractor between Arai Dock and the U.S. Navy Azuma Petroleum Area. Contractor's personnel shall possess a valid security pass to the Petroleum area prior to boarding at Arai Dock.

Transportation will be by small boat with a capacity of about 20 people. 24 hours shuttle service is available. In addition to above, the U.S. Government will also provide waterborne transportation for the Contractor's truck and it's operator between the ramp adjacent to Berth 5 at the U.S. Fleet Activities, Yokosuka, and the U.S. Navy Azuma Petroleum Area, at no cost to the Contractor, providing that written notification specifying the size of the truck for this movement is submitted not less than seven calendar days in advance.

2.5 Contractor-

Furnished Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.

Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.6.1 Safeguarding

Information

The Contractor shall safeguard controlled unclassified information and information associated with Government property in accordance with the latest revision of CNSSI 1253, DoDI 8582.01, NIST SP 800-53, NIST SP 800-171, SECNAV Defense Industrial Base (DIB) Memo, DoDI 5200.48, and applicable contract clauses. At a minimum, this information shall be protected at the moderate confidentiality level as defined in NIST SP 800-

171. Refer to Spec Item 2.8.8.3 Disclosure of Information Requirements, and DI-MGMT-82247 Contractor’s System Security Plan and Associated Plans of Action to Implement NIST SP 800-171 on a Contractor’s Internal Unclassified Information System, for more detailed information.

0200000 - Management and Administration Spec Item Title Description

Contractor information and data systems that contain information associated with Government property shall comply with DoD Risk Management Framework (RMF).

The Contractor shall develop Plans of Action and Milestones (POA&Ms) per NIST SP 800-171, track accomplishment, and submit to the Government per Section F.

If a cybersecurity incident is encountered or suspected related to any (Contractor or Government) Information Technology (IT) or Operating Technology (OT) systems, including Monitoring and Control Systems, the Contractor shall notify the Government per Section F.

2.6.2 Dissemination of

Information

DoD policy limits the dissemination of certain information. Instructions, Directives, and References not releasable to the public, e.g., Floor Plans, Maps, Post Orders, and Standard Operating Procedures, will be made available after contract award to the successful offeror with appropriate credentials and a need to know.

2.6.3 Work Reception Unless otherwise specified hereinafter, the Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls/order and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.

2.6.4 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the Government. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

The Contractor shall provide work schedules for both Recurring and Non- Recurring Work per Section F. At a minimum, work schedules shall include:

Description of service(s) to be accomplished.

Location.

Date service(s) are scheduled to be accomplished.

2.6.5 Work Schedule The Contractor's work shall not interfere with normal Government business.

In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall provide written notification of any difficulty in scheduling work due to Government controls per Section F. At a minimum, the notification shall include the following:

The date and time the work was initially coordinated.

The name and phone number of the Government person with whom the work was initially coordinated.

The name and phone number of the Government person who prevented the work from being performed as previously coordinated.

The alternative date and time, the Government person requested the work be accomplished.

0200000 - Management and Administration Spec Item Title Description

2.6.6 Deliverables Except where otherwise stated, deliverable requirements are specified in

Sections C, F, H, I, J, and within the Directives, Instructions, and References.

The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify deliverables, as directed by the KO, at no additional cost to the Government. All Contractor submittals shall be in English or may be submitted in Japanese with English translations.

Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office 2016 or Current Version compatible format. Deliverables shall include the company name, contract number, contract title, date, and shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub-ELIN or clause. All formulas shall be traceable. Refer to DoDI 5200.48 for marking requirements (as applicable).

Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website. The Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website. Each deliverable posting on the website and each email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.

2.6.7 Service

Interruptions

If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, COR, affected tenants, and customers in accordance with local procedures. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, COR, affected tenants, and customers as soon as practicable and provide the status of repairs, as directed by the KO, until normal operation is restored.

2.6.8 NAVFAC

MAXIMO

N/A

2.6.9 Quality

Management System (QMS)

The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

Accurate documentation of work processes, procedures, and output measures.

A systematic procedure for assessing compliance with performance objectives and standards.

Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

0200000 - Management and Administration Spec Item Title…