Att9_Lim_on_SubK_Breakout.xlsx

XLSX spreadsheet 94 KB Posted

Attached to
NIFC 440 BOISE AIR CENTER CONSTRUCTION
Solicitation number
140L0624R0059
Issued by

About this file

This document appears to be an attachment titled "Att9_Lim_on_SubK_Breakout.xlsx" that provides a template for calculating compliance with the Limitations on Subcontracting requirements under FAR 52.219-14 for small business set-aside contracts.

The template includes fields to capture the total amount proposed, total material cost, self-performed labor, small business subcontractor labor, and large business subcontractor labor. It then calculates the Limitations on Subcontracting percentage to ensure compliance with the required 15% self-performance.

The related federal contract opportunity is for the "NIFC 440 BOISE AIR CENTER CONSTRUCTION" solicitation, a construction project issued by the Department of the Interior's Bureau of Land Management National Office. The solicitation number is 140L0624R0059, and it is a small business set-aside with a pre-proposal site visit scheduled for July 31, 2024.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)

Solicitation Number
Type of Set-AsideSmall Business
Performance Period
Required Self-Performance15%

(A) Total Amount Proposed¹

(B) Total Material Cost

(C) Self Performed Labor

(D) Small Business Subcontractor (SSS) Labor²
Total Amount Paid to [Insert First SSS Name]
Total Amount Paid to [Insert Second SSS Name]
Total Amount Paid to [Insert Third SSS Name]
Total Amount Paid to [Insert Fourth SSS Name]
Total Amount Paid to [Insert Fifth SSS Name]
Total Amount Paid to [Insert Sixth SSS Name]
Total Amount Paid to SSS Companies$0.00
(E) Large Business Subcontractor (LBS) Labor
Total Amount Paid to [Insert First LBS Name]
Total Amount Paid to [Insert Second LBS Name]
Total Amount Paid to [Insert Third LBS Name]
Total Amount Paid to [Insert Fourth LBS Name]
Total Amount Paid to [Insert Fifth LBS Name]
Total Amount Paid to [Insert Sixth LBS Name]
Total Amount Paid to LBS Companies$0.00

(F) Total Labor Cost³ $0.00

(G) Limitation on Subcontracting Percentage⁴
(Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor CostERROR:#DIV/0!
*Note 1: (A) = (B) + (F)
*Note 2: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor.
*Note 3: Total labor costs consist of all contractual costs other than material.
*Note 4: To be compliant, limitation percentage must be greater than the required self-performance percentage.

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .