This document is a technical specification for an access control system for the National Interagency Fire Center (NIFC) 440-Boise Air Center. The key details are:

The access control system must be compatible with the existing AMAG Symmetry Access Control Professional Homeland Security v9.4 or higher software at the NIFC. It must meet federal FICAM compliance requirements at the Single Factor or Dual Factor Assurance Levels. Required components include access control units, software and licensing, card readers, door position switches, request-to-exit devices, and power supplies. The system must interface with other building systems and provide FICAM-compliant infrastructure. The contractor is responsible for installation, testing, training, and warranty. The access control system is required for the overall NIFC 440-Boise Air Center construction project, solicitation number 140L0624R0059.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUGUST 2024 ACCESS CONTROL

NIFC 440-Boise Air Center 281000 - 1

SECTION 281000 - ACCESS CONTROL

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Access control system requirements.

B. Access control units and software.

C. Access control point peripherals, including readers and keypads.

D. Accessories.

1.2 ADMINISTRATIVE REQUIREMENTS

A. Coordination:

1. Coordinate the work with other installers to provide suitable door hardware as required for both access control functionality and code compliance.

2. Coordinate the placement of readers with millwork, furniture, equipment, etc. installed under other sections or by others.

3. Coordinate the work with other installers to provide power for equipment at required locations.

4. Notify Govern of any conflicts with or deviations from Contract Documents. Obtain direction before proceeding with work.

B. Preinstallation Meetings:

1. Conduct meeting with facility representative to review reader and equipment locations.

2. Conduct meeting with facility representative and other related equipment manufacturers to discuss access control system interface requirements.

C. Federal Identity, Credential, and Access Management (FICAM) Compliance

1. All infrastructure provided shall provide FICAM compliance in this building at the appropriate Assurance Level. Provide all components, readers, software, licensing, etc. as required for FICAM compliance.

1.3 SUBMITTALS

A. See Section 013300 Submittal Procedures.

B. Shop Drawings: Include plan views indicating locations of system components and proposed size, type, and routing of conduits and/or cables. Include elevations and details of proposed

AUGUST 2024 ACCESS CONTROL

NIFC 440-Boise Air Center 281000 - 2 equipment arrangements. Include system interconnection schematic diagrams. Include requirements for interface with other systems.

C. Product Data: Provide manufacturer's standard catalog pages and data sheets for each system component. Include ratings, configurations, standard wiring diagrams, dimensions, finishes, service condition requirements, and installed features.

D. Certify that proposed system design and components meet or exceed specified requirements.

E. Certificates of on-site factory trained/certified technician for software and hardware.

F. Certificate of on-site Certified Systems Engineer (CSEIP) for Identity, Credential, and Access Management (ICAM) Physical Access Control System (PACS).

G. Manufacturer's detailed field-testing procedures.

H. Field quality control test reports.

I. Project Record Documents: Record actual locations of system components and installed wiring arrangements and routing.

J. Operation and Maintenance Data: Include detailed information on system operation, equipment programming and setup, replacement parts, and recommended maintenance procedures and intervals.

1.4 QUALITY ASSURANCE

A. Comply with the following:

1. NFPA 70.

2. The requirements of the local authorities having jurisdiction.

3. Applicable TIA/EIA standards.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Receive, inspect, handle, and store products in accordance with manufacturer's instructions.

B. Store products in manufacturer's unopened packaging, keep dry and protect from damage until ready for installation.

1.6 FIELD CONDITIONS

A. Maintain field conditions within manufacturer's required service conditions during and after installation.

1.7 WARRANTY

A. See Section 017700 Closeout Procedures for additional warranty requirements.

AUGUST 2024 ACCESS CONTROL

NIFC 440-Boise Air Center 281000 - 3

B. Provide minimum one year manufacturer warranty covering repair or replacement due to defective materials or workmanship.

PART 2 PRODUCTS

2.1 ACCESS CONTROL SYSTEM REQUIREMENTS

A. Provide new access control system consisting of required equipment, conduit, boxes, wiring, connectors, hardware, supports, accessories, software, system programming, etc. as necessary for a complete operating system that provides the functional intent indicated.

B. Access Control System shall be compatible with AMAG Symmetry Access Control Professional Homeland Security v9.4 or higher centralized software located on NIFC server.

C. Surge Protection:

1. Provide surge protection for readers and door strikes/locks.

2. Provide equipment power surge protection where electrical distribution system surge protection is not provided.

D. Interface with Other Systems:

1. Provide products compatible with existing access control system and other systems requiring interface with access control system.

E. Assurance Level: Meet the General Services Administration (GSA) Federal Information Processing Standard (FIPS) Publication 201, Evaluation Program Functional Requirements and Test Cases (FRTC) 1.3, for the levels indicated. Provide products listed under FIPS Approved Product List (APL) compatible with existing campus.

1. Single Factor PACS: Non-FICAM one factor authentication without PAM: Contactless PIV proximity car read, with the option to enter a numeric code to perform door unlock/lock commands.

2. Dual Factor PACS: FICAM Assurance Level 2: Two factor authentication with PAM:

Contact PIV card insertion and input PIN.

F. Provide products listed, classified, and labeled as suitable for the purpose intended.

1. Access Control Units and Readers: Listed and labeled as complying with UL 294.

2.2 ACCESS CONTROL UNITS AND SOFTWARE

A. Provide access control units and software compatible with campus system, and new readers to be connected.

B. Access Control Unit Hardware:

1. Control Unit: AMAG Technology Model M4000-DEC4

AUGUST 2024 ACCESS CONTROL

NIFC 440-Boise Air Center 281000 - 4

2. Network Board: AMAG Technology Model M4000-DBB

3. Lockable Enclosure: AMAG Technology Model M4000-CAB2A, M4000-CAB2, or equivalent, sized to optimize placement of all access control unit hardware. Include power supply.

4. Board Fixing Kit

5. Adapter Mount Plate

6. pivCLASS Authentication Module (PAM): AMAG Technology Model PVC-PAM-B

7. Input/Output board as required.

C. Access Control Software and Licensing:

1. Software: AMAG Technology PRO-PLAT-V9.4-HSE

2. Licensing: AMAG Technology PRO-LIC-008-V9

3. Data Connect Module: AMAG Technology DATA-CONNECT-V9

D. Hardware Credential Enrollment

1. AMAG Technology No. 799-105100

2. AMAG Technology No. R31210349-1

2.3 ACCESS CONTROL POINT PERIPHERALS

A. Provide devices compatible with control units and software.

B. Provide devices suitable for operation under the service conditions at the installed location.

C. Card Readers:

1. Input: Lighted numeric keypad.

2. Output: LED light and integrated buzzer providing an indication of card read and lock/unlock status.

3. Models: Provided and programmed to meet Assurance Level indicated, and listed on

FIPS Approved Products List.

D. Door Position Switches:

1. Magnetic Contacts: Encapsulated reed switch(es) and separate magnet; designed to monitor opened/closed position of doors.

2. Contact Color: To be selected by Government from manufacturer's available standard colors.

E. Request to Exit Devices:

1. Door Hardware with Integral Request to Exit Switches: Comply with Section 087111.

F. Door Locking Devices (Electric Strikes and Magnetic Locks): Comply with Section 087111.

G. Battery Backup:

1. Input: 120V AC, 3.5 Amps, overcurrent protection with automatic reset.

AUGUST 2024 ACCESS CONTROL

NIFC 440-Boise Air Center 281000 - 5

2. Output: 12V or 24V, 8 channels, 6 Amps total, overcurrent protection with automatic reset.

3. Power Supply

4. Batteries: 12V AGM sized to provide a minimum of one hour of static operation of the access control system, 5 year design life, UL94 HB listed case.

2.4 ACCESSORIES

A. Provide components as indicated or as required for connection of access control system to devices and other systems indicated.

B. Unless otherwise indicated, credentials to be provided by Contractor.

1. Provide credentials compatible with readers and control units/software to be used.

C. Unless otherwise indicated, network switches required for network connections to system components to be provided by Contractor.

D. Provide cables as indicated or as required for connections between system components.

1. Data Cables for IP Network Connections: Cat 6 unshielded twisted pair (UTP).

2. RS-485 Cables: FICAM compliant for access system, 6-conductor twisted-pair, wire gauge as determined by manufacturer for cable length and card reader, Over-All-Shield, grounded drain wire.

E. Provide end-of-line resistors (EOLR) as required for supervision of hardwired connections.

F. Provide accessory racks/cabinets as indicated or as required for equipment mounting.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that field measurements are as indicated.

B. Verify that ratings and configurations of system components are consistent with the indicated requirements.

C. Verify that mounting surfaces are ready to receive system components.

D. Verify that branch circuit wiring installation is completed, tested, and ready for connection to system.

E. Verify that conditions are satisfactory for installation prior to starting work.

3.2 INSTALLATION

A. Install access control system in accordance with NECA 1 (general workmanship).

AUGUST 2024 ACCESS CONTROL

NIFC 440-Boise Air Center 281000 - 6

B. Install products in accordance with manufacturer's instructions.

C. Wiring Method: Unless otherwise indicated, use cables (not in conduit).

1. Use suitable listed cables in wet locations, including underground raceways.

2. Use suitable listed cables for vertical riser applications.

3. Use listed plenum rated cables in spaces used for environmental air.

4. Install wiring in conduit for the following:

a. Where required for rough-in.

b. Where required by authorities having jurisdiction.

c. Where exposed to damage.

d. Where installed outside the building.

e. For exposed connections from outlet boxes to devices.

5. Conduit: Comply with Section 260533.13.

6. Conceal cables unless specifically indicated to be exposed.

7. Use power transfer hinges complying concealed connections to door hardware.

8. Route exposed cables parallel or perpendicular to building structural members and surfaces.

9. Do not exceed manufacturer's recommended maximum cable length between components.

D. Provide grounding and bonding in accordance with Section 260526 and with manufacturer requirements.

E. Install firestopping to preserve fire resistance rating of partitions and other elements.

F. Identify system wiring and components in accordance with Section 260553.

3.3 FIELD QUALITY CONTROL

A. See Section 014000 - Quality Requirements, for additional requirements.

B. Provide services of a manufacturer's authorized representative to observe installation and assist in inspection and testing. Include manufacturer's detailed testing procedures and field reports with submittals.

C. Prepare and start system in accordance with manufacturer's instructions.

D. Program system parameters according to requirements of Government.

E. Test for proper interface with other systems.

F. Correct defective work, adjust for proper operation, and retest until entire system complies with Contract Documents.

G. Submit detailed reports indicating inspection and testing results and corrective actions taken.

AUGUST 2024 ACCESS CONTROL

NIFC 440-Boise Air Center 281000 - 7

3.4 CLEANING

A. Clean exposed surfaces to remove dirt, paint, or other foreign material and restore to match original factory finish.

3.5 CLOSEOUT ACTIVITIES

A. See Section 017700 Closeout Procedures for closeout submittals.

B. Demonstration: Demonstrate proper operation of system to Government, and correct deficiencies or make adjustments as directed.

C. Training: Train Government's personnel on operation, adjustment, and maintenance of system.

1. Use operation and maintenance manual as training reference, supplemented with additional training materials as required.

2. Instructor: Manufacturer's authorized representative.

3. Location: At project site.

3.6 PROTECTION

A. Protect installed system components from subsequent construction operations.

END OF SECTION

AUGUST 2024 ACCESS CONTROL

NIFC 440-Boise Air Center 281000 - 8

THIS PAGE INTENTIONALLY LEFT BLANK

PART 1 GENERAL
1.1 SECTION INCLUDES
A. Access control system requirements.
B. Access control units and software.
C. Access control point peripherals, including readers and keypads.
D. Accessories.
1.2 ADMINISTRATIVE REQUIREMENTS
A. Coordination:
1. Coordinate the work with other installers to provide suitable door hardware as required for both access control functionality and code compliance.
2. Coordinate the placement of readers with millwork, furniture, equipment, etc. installed under other sections or by others.
3. Coordinate the work with other installers to provide power for equipment at required locations.
4. Notify Govern of any conflicts with or deviations from Contract Documents. Obtain direction before proceeding with work.
B. Preinstallation Meetings:
1. Conduct meeting with facility representative to review reader and equipment locations.
2. Conduct meeting with facility representative and other related equipment manufacturers to discuss access control system interface requirements.
C. Federal Identity, Credential, and Access Management (FICAM) Compliance
1. All infrastructure provided shall provide FICAM compliance in this building at the appropriate Assurance Level. Provide all components, readers, software, licensing, etc. as required for FICAM compliance.
1.3 SUBMITTALS
A. See Section 013300 Submittal Procedures.
B. Shop Drawings: Include plan views indicating locations of system components and proposed size, type, and routing of conduits and/or cables. Include elevations and details of proposed equipment arrangements. Include system interconnection schematic...
C. Product Data: Provide manufacturer's standard catalog pages and data sheets for each system component. Include ratings, configurations, standard wiring diagrams, dimensions, finishes, service condition requirements, and installed features.
D. Certify that proposed system design and components meet or exceed specified requirements.
E. Certificates of on-site factory trained/certified technician for software and hardware.
F. Certificate of on-site Certified Systems Engineer (CSEIP) for Identity, Credential, and Access Management (ICAM) Physical Access Control System (PACS).
G. Manufacturer's detailed field-testing procedures.
H. Field quality control test reports.
I. Project Record Documents: Record actual locations of system components and installed wiring arrangements and routing.
J. Operation and Maintenance Data: Include detailed information on system operation, equipment programming and setup, replacement parts, and recommended maintenance procedures and intervals.
1.4 QUALITY ASSURANCE
A. Comply with the following:
1. NFPA 70.
2. The requirements of the local authorities having jurisdiction.
3. Applicable TIA/EIA standards.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Receive, inspect, handle, and store products in accordance with manufacturer's instructions.
B. Store products in manufacturer's unopened packaging, keep dry and protect from damage until ready for installation.
1.6 FIELD CONDITIONS
A. Maintain field conditions within manufacturer's required service conditions during and after installation.
1.7 WARRANTY
A. See Section 017700 Closeout Procedures for additional warranty requirements.
B. Provide minimum one year manufacturer warranty covering repair or replacement due to defective materials or workmanship.
PART 2 PRODUCTS
2.1 ACCESS CONTROL SYSTEM REQUIREMENTS
A. Provide new access control system consisting of required equipment, conduit, boxes, wiring, connectors, hardware, supports, accessories, software, system programming, etc. as necessary for a complete operating system that provides the functional in...
B. Access Control System shall be compatible with AMAG Symmetry Access Control Professional Homeland Security v9.4 or higher centralized software located on NIFC server.
C. Surge Protection:
1. Provide surge protection for readers and door strikes/locks.
2. Provide equipment power surge protection where electrical distribution system surge protection is not provided.
D. Interface with Other Systems:
1. Provide products compatible with existing access control system and other systems requiring interface with access control system.
E. Assurance Level: Meet the General Services Administration (GSA) Federal Information Processing Standard (FIPS) Publication 201, Evaluation Program Functional Requirements and Test Cases (FRTC) 1.3, for the levels indicated. Provide products listed ...
1. Single Factor PACS: Non-FICAM one factor authentication without PAM: Contactless PIV proximity car read, with the option to enter a numeric code to perform door unlock/lock commands.
2. Dual Factor PACS: FICAM Assurance Level 2: Two factor authentication with PAM: Contact PIV card insertion and input PIN.
F. Provide products listed, classified, and labeled as suitable for the purpose intended.
1. Access Control Units and Readers: Listed and labeled as complying with UL 294.
2.2 ACCESS CONTROL UNITS AND SOFTWARE
A. Provide access control units and software compatible with campus system, and new readers to be connected.
B. Access Control Unit Hardware:
1. Control Unit: AMAG Technology Model M4000-DEC4
2. Network Board: AMAG Technology Model M4000-DBB
3. Lockable Enclosure: AMAG Technology Model M4000-CAB2A, M4000-CAB2, or equivalent, sized to optimize placement of all access control unit hardware. Include power supply.
4. Board Fixing Kit
5. Adapter Mount Plate
6. pivCLASS Authentication Module (PAM): AMAG Technology Model PVC-PAM-B
7. Input/Output board as required.
C. Access Control Software and Licensing:
1. Software: AMAG Technology PRO-PLAT-V9.4-HSE
2. Licensing: AMAG Technology PRO-LIC-008-V9
3. Data Connect Module: AMAG Technology DATA-CONNECT-V9
D. Hardware Credential Enrollment
1. AMAG Technology No. 799-105100
2. AMAG Technology No. R31210349-1
2.3 ACCESS CONTROL POINT PERIPHERALS
A. Provide devices compatible with control units and software.
B. Provide devices suitable for operation under the service conditions at the installed location.
C. Card Readers:
1. Input: Lighted numeric keypad.
2. Output: LED light and integrated buzzer providing an indication of card read and lock/unlock status.
3. Models: Provided and programmed to meet Assurance Level indicated, and listed on FIPS Approved Products List.
D. Door Position Switches:
1. Magnetic Contacts: Encapsulated reed switch(es) and separate magnet; designed to monitor opened/closed position of doors.
2. Contact Color: To be selected by Government from manufacturer's available standard colors.
E. Request to Exit Devices:
1. Door Hardware with Integral Request to Exit Switches: Comply with Section 087111.
F. Door Locking Devices (Electric Strikes and Magnetic Locks): Comply with Section 087111.
G. Battery Backup:
1. Input: 120V AC, 3.5 Amps, overcurrent protection with automatic reset.
2. Output: 12V or 24V, 8 channels, 6 Amps total, overcurrent protection with automatic reset.
3. Power Supply
4. Batteries: 12V AGM sized to provide a minimum of one hour of static operation of the access control system, 5 year design life, UL94 HB listed case.
2.4 ACCESSORIES
A. Provide components as indicated or as required for connection of access control system to devices and other systems indicated.
B. Unless otherwise indicated, credentials to be provided by Contractor.
1. Provide credentials compatible with readers and control units/software to be used.
C. Unless otherwise indicated, network switches required for network connections to system components to be provided by Contractor.
D. Provide cables as indicated or as required for connections between system components.
1. Data Cables for IP Network Connections: Cat 6 unshielded twisted pair (UTP).
2. RS-485 Cables: FICAM compliant for access system, 6-conductor twisted-pair, wire gauge as determined by manufacturer for cable length and card reader, Over-All-Shield, grounded drain wire.
E. Provide end-of-line resistors (EOLR) as required for supervision of hardwired connections.
F. Provide accessory racks/cabinets as indicated or as required for equipment mounting.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify that field measurements are as indicated.
B. Verify that ratings and configurations of system components are consistent with the indicated requirements.
C. Verify that mounting surfaces are ready to receive system components.
D. Verify that branch circuit wiring installation is completed, tested, and ready for connection to system.
E. Verify that conditions are satisfactory for installation prior to starting work.
3.2 INSTALLATION
A. Install access control system in accordance with NECA 1 (general workmanship).
B. Install products in accordance with manufacturer's instructions.
C. Wiring Method: Unless otherwise indicated, use cables (not in conduit).
1. Use suitable listed cables in wet locations, including underground raceways.
2. Use suitable listed cables for vertical riser applications.
3. Use listed plenum rated cables in spaces used for environmental air.
4. Install wiring in conduit for the following:
a. Where required for rough-in.
b. Where required by authorities having jurisdiction.
c. Where exposed to damage.
d. Where installed outside the building.
e. For exposed connections from outlet boxes to devices.
5. Conduit: Comply with Section 260533.13.
6. Conceal cables unless specifically indicated to be exposed.
7. Use power transfer hinges complying concealed connections to door hardware.
8. Route exposed cables parallel or perpendicular to building structural members and surfaces.
9. Do not exceed manufacturer's recommended maximum cable length between components.
D. Provide grounding and bonding in accordance with Section 260526 and with manufacturer requirements.
E. Install firestopping to preserve fire resistance rating of partitions and other elements.
F. Identify system wiring and components in accordance with Section 260553.
3.3 FIELD QUALITY CONTROL
A. See Section 014000 - Quality Requirements, for additional requirements.
B. Provide services of a manufacturer's authorized representative to observe installation and assist in inspection and testing. Include manufacturer's detailed testing procedures and field reports with submittals.
C. Prepare and start system in accordance with manufacturer's instructions.
D. Program system parameters according to requirements of Government.
E. Test for proper interface with other systems.
F. Correct defective work, adjust for proper operation, and retest until entire system complies with Contract Documents.
G. Submit detailed reports indicating inspection and testing results and corrective actions taken.
3.4 CLEANING
A. Clean exposed surfaces to remove dirt, paint, or other foreign material and restore to match original factory finish.
3.5 CLOSEOUT ACTIVITIES
A. See Section 017700 Closeout Procedures for closeout submittals.
B. Demonstration: Demonstrate proper operation of system to Government, and correct deficiencies or make adjustments as directed.
C. Training: Train Government's personnel on operation, adjustment, and maintenance of system.
1. Use operation and maintenance manual as training reference, supplemented with additional training materials as required.
2. Instructor: Manufacturer's authorized representative.
3. Location: At project site.
3.6 PROTECTION
A. Protect installed system components from subsequent construction operations.

END OF SECTION