Att11_100209_Drawings.pdf
PDF 23 MB Posted
- Solicitation number
- FA813727R0003
About this file
This is a set of construction design drawings for a roadway repair project at Tinker Air Force Base in Oklahoma. The project, identified as WWYK100209, involves the repair of Perimeter Drive and Industrial Boulevard at 35% design completion as of August 6, 2026. The project is managed by the Air Force Materiel Command's 72nd Air Base Wing Civil Engineer Directorate.
The scope of work encompasses full-depth asphalt pavement repairs on Industrial Boulevard across three sections, demolition of existing concrete and asphalt on Perimeter Drive, installation of new asphalt concrete pavement with gutters and curbing, replacement of storm drain systems between the airfield fence and perimeter fence, installation of new pavement markings including 4-inch centerlines and edge lines, and grading for drainage swales on both sides of Perimeter Drive. The design includes detailed cross-sections showing a pavement structure of 2-inch Type C asphalt concrete over 6-inch modified subgrade and 6-inch stabilized aggregate base. Work involves utility coordination including underground communications, gas, electric, fuel, wastewater, and storm drain lines. The contractor is responsible for erosion and sediment control, construction fencing, material staging, and restoration of any damage to existing facilities at no additional cost to the government. Standard details are provided for gutters, curbing, RCP bedding, PCC drainage flumes, and silt fence installation per Oklahoma Department of Transportation specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .